1 Work Preparation
. RA Number()رقم تتقت ييم المخاطر:
المعدة/ العملية/ المهمة/ موقع
Overheating , electrocution,
Usage of defective power and hand tools electrical shocks, electrical burns,
Using single insulated cable & without fire due to defective tools/ not
earthing cable and plug. voltage rate tools / uninspected.
Using power hand tools Failure to notice the damaged cable Cut injury due to not using safety
3 and hand tools for the Missing of safe guards guard.
job Using un-insulated or not voltage rated Falling from trip due to poor cable
tools . management can cause minor to
Lack of inspection of tools & equipment major injuries for the workmen.
Lack of supervision
. RA Number()رقم تتقت ييم المخاطر:
المعدة/ العملية/ المهمة/ موقع
Fall of person from truck/ van while Major Injury due to fall from
climbing /descending due to height of the truck/van
truck/van more than 30 cm / not using steps
Housekeeping &
9 removal of undesired Slip, trip and falls & fire due to poor stacking Scratches, bruises or fracture
materials generarted by & housekeeping Fire
the activity.
/RISK ASSESSMENT AND ANALYSIS/تتق ييم المخاطر
ت
المعدة/ العملية/ المهمة/ الموقعWORKPLACE/TASK/ACTIVITY/PROCESS NAME:
K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY
K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY
K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY
K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY
K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY
K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY
K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY
K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY
K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY
K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY
K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY
Controls
Follow up by Whom Implement
Consequ Likelihoo تصنيف
(Improve existing controls / implement new controls)/وسائل التحكم و السيطرة (name) & By When ed ence d/الخطر الحتم الRisk
الضافية (date)/ الجهة المعنيةYes/No/هل
/لشدة
ا تتة
ي Ranking
التاريخ/ لتنفيذ بe
تتاتت تتم التفيذ؟
ت
/نعم ل
1. TBT and other pertinent documents are secured before any work
commence.
2. Explain all employees about this JSP, Risk assessment,
Emergency Reponse Plan through Tool Box talk before Civil Engineer
commencement of the task by Civil Engineer, Safety Engineer/ 4 1 4
Safety Officer
officer and supervisor.
3. Ensure performing employees have SEC/S7 before entering in to
the substation.
تتقت ي
DEPARTMENT/AREA( المنطقة/ ) الدارة: COA
DATE
NEXT REVIEW DATE()تتات ريخ المراج عة القادم:
APPROVED BY MANAGER/SUPERVISOR()اعتمد من قبل: Eng.
Signature ( ) التوقي ع
Controls
Follow up by Whom Implement
Consequ Likelihoo تصنيف
(Improve existing controls / implement new controls)/وسائل التحكم و السيطرة (name) & By When ed ence d/الخطر الحتم الRisk
الضافية (date)/ الجهة المعنيةYes/No/هل
/لشدة
ا تتة
ي Ranking
التاريخ/ لتنفيذ بe
تتاتت تتم التفيذ؟
ت
/نعم ل
1. Enough supervision to be given for the work force to ensure Civil Engineer 3 1 3
employees are using PPE while working. Safety Officer
1. Enough supervision to be given for the work force to ensure Civil Engineer 4 1 4
housekeeping has been followed. Safety Officer
تتقت ي
DEPARTMENT/AREA( المنطقة/ ) الدارة: COA
DATE
NEXT REVIEW DATE()تتات ريخ المراج عة القادم:
APPROVED BY MANAGER/SUPERVISOR()اعتمد من قبل: Eng.
Signature ( ) التوقي ع
Controls
Follow up by Whom Implement
Consequ Likelihoo تصنيف
(Improve existing controls / implement new controls)/وسائل التحكم و السيطرة (name) & By When ed ence d/الخطر الحتم الRisk
الضافية (date)/ الجهة المعنيةYes/No/هل
/لشدة
ا تتة
ي Ranking
التاريخ/ لتنفيذ بe
تتاتت تتم التفيذ؟
ت
/نعم ل
Controls
Follow up by Whom Implement
Consequ Likelihoo تصنيف
(Improve existing controls / implement new controls)/وسائل التحكم و السيطرة (name) & By When ed ence d/الخطر الحتم الRisk
الضافية (date)/ الجهة المعنيةYes/No/هل
/لشدة
ا تتة
ي Ranking
التاريخ/ لتنفيذ بe
تتاتت تتم التفيذ؟
ت
/نعم ل
Controls
Follow up by Whom Implement
Consequ Likelihoo تصنيف
(Improve existing controls / implement new controls)/وسائل التحكم و السيطرة (name) & By When ed ence d/الخطر الحتم الRisk
الضافية (date)/ الجهة المعنيةYes/No/هل
/لشدة
ا تتة
ي Ranking
التاريخ/ لتنفيذ بe
تتاتت تتم التفيذ؟
ت
/نعم ل
Supervisor
1. If steps not available use ladder for climbing /descending place. safety Officer 4 1 4
Supervisor
1. Clean up any hazards such as protruding rods, sharp edges etc., 3 1 3
safety Officer
Controls
Follow up by Whom Implement
Consequ Likelihoo تصنيف
(Improve existing controls / implement new controls)/وسائل التحكم و السيطرة (name) & By When ed ence d/الخطر الحتم الRisk
الضافية (date)/ الجهة المعنيةYes/No/هل
/لشدة
ا تتة
ي Ranking
التاريخ/ لتنفيذ بe
تتاتت تتم التفيذ؟
ت
/نعم ل
Controls
Follow up by Whom Implement
Consequ Likelihoo تصنيف
(Improve existing controls / implement new controls)/وسائل التحكم و السيطرة (name) & By When ed ence d/الخطر الحتم الRisk
الضافية (date)/ الجهة المعنيةYes/No/هل
/لشدة
ا تتة
ي Ranking
التاريخ/ لتنفيذ بe
تتاتت تتم التفيذ؟
ت
/نعم ل
Controls
Follow up by Whom Implement
Consequ Likelihoo تصنيف
(Improve existing controls / implement new controls)/وسائل التحكم و السيطرة (name) & By When ed ence d/الخطر الحتم الRisk
الضافية (date)/ الجهة المعنيةYes/No/هل
/لشدة
ا تتة
ي Ranking
التاريخ/ لتنفيذ بe
تتاتت تتم التفيذ؟
ت
/نعم ل
Controls
Follow up by Whom Implement
Consequ Likelihoo تصنيف
(Improve existing controls / implement new controls)/وسائل التحكم و السيطرة (name) & By When ed ence d/الخطر الحتم الRisk
الضافية (date)/ الجهة المعنيةYes/No/هل
/لشدة
ا تتة
ي Ranking
التاريخ/ لتنفيذ بe
تتاتت تتم التفيذ؟
ت
/نعم ل
Controls
Follow up by Whom Implement
Consequ Likelihoo تصنيف
(Improve existing controls / implement new controls)/وسائل التحكم و السيطرة (name) & By When ed ence d/الخطر الحتم الRisk
الضافية (date)/ الجهة المعنيةYes/No/هل
/لشدة
ا تتة
ي Ranking
التاريخ/ لتنفيذ بe
تتاتت تتم التفيذ؟
ت
/نعم ل
Controls
Follow up by Whom Implement
Consequ Likelihoo تصنيف
(Improve existing controls / implement new controls)/وسائل التحكم و السيطرة (name) & By When ed ence d/الخطر الحتم الRisk
الضافية (date)/ الجهة المعنيةYes/No/هل
/لشدة
ا تتة
ي Ranking
التاريخ/ لتنفيذ بe
تتاتت تتم التفيذ؟
ت
/نعم ل