RA Number(‫)رقم تتقت ييم المخاطر‬:


‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫موقع‬

RA TEAM(Names) (‫)أسماء تترف يق التقييم‬:


1. BLOCK & PLASTERING WORKS FOR CONSTRUCTION OF N
2.

HAZARD IDENTIFICATION/‫تتح ديد الخطر‬


‫ت‬

Workplace/ Risks Issue


(Possible incident)
Item Activity/Process/Equipment Hazards/‫الخطار‬
/Material‫مهمة‬/‫موق ع العمل‬ [What can go wrong]
#
‫ت المواد‬
/‫ الم عدا‬/‫العمل‬ (Accident/ill
health to persons, fire or property loss)

Inadequate planning and preparation of the Fire or property damage or Major


job
unauthorised working personnel performed injury due to contact with live
party without planning
the activity.

1 Work Preparation
. RA Number(‫)رقم تتقت ييم المخاطر‬:
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫موقع‬

RA TEAM(Names) (‫)أسماء تترف يق التقييم‬:


1. BLOCK & PLASTERING WORKS FOR CONSTRUCTION OF N
2.

HAZARD IDENTIFICATION/‫تتح ديد الخطر‬


‫ت‬

Workplace/ Risks Issue


(Possible incident)
Item Activity/Process/Equipment Hazards/‫الخطار‬
/Material‫مهمة‬/‫موق ع العمل‬ [What can go wrong]
#
‫ت المواد‬
/‫ الم عدا‬/‫العمل‬ (Accident/ill
health to persons, fire or property loss)
1 Work Preparation

Major or minor injury due to not


lack of / inappropriate PPE wearing PPE / inappropriate PPE

Slips, trips and falls


Untidy work area Fire due to poor maintenance of
housekeeping
. RA Number(‫)رقم تتقت ييم المخاطر‬:
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫موقع‬

RA TEAM(Names) (‫)أسماء تترف يق التقييم‬:


1. BLOCK & PLASTERING WORKS FOR CONSTRUCTION OF N
2.

HAZARD IDENTIFICATION/‫تتح ديد الخطر‬


‫ت‬

Workplace/ Risks Issue


(Possible incident)
Item Activity/Process/Equipment Hazards/‫الخطار‬
/Material‫مهمة‬/‫موق ع العمل‬ [What can go wrong]
#
‫ت المواد‬
/‫ الم عدا‬/‫العمل‬ (Accident/ill
health to persons, fire or property loss)

Standing under direct sunlight during Tool


Box Meeting (can cause Heat Illnesses). Heat Illnesses due to standing in
Negligence of the workers during discussion direct sunlight
2 Carry out the induction Topic not related to the task Property damange due to lack of /
and Daily tool box talks TBT not conducted daily and workers not wrong communcating the
interested to absorb. employees leads to do a mistake
Language barriers
. RA Number(‫)رقم تتقت ييم المخاطر‬:
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫موقع‬

RA TEAM(Names) (‫)أسماء تترف يق التقييم‬:


1. BLOCK & PLASTERING WORKS FOR CONSTRUCTION OF N
2.

HAZARD IDENTIFICATION/‫تتح ديد الخطر‬


‫ت‬

Workplace/ Risks Issue


(Possible incident)
Item Activity/Process/Equipment Hazards/‫الخطار‬
/Material‫مهمة‬/‫موق ع العمل‬ [What can go wrong]
#
‫ت المواد‬
/‫ الم عدا‬/‫العمل‬ (Accident/ill
health to persons, fire or property loss)

Overheating , electrocution,
Usage of defective power and hand tools electrical shocks, electrical burns,
Using single insulated cable & without fire due to defective tools/ not
earthing cable and plug. voltage rate tools / uninspected.
Using power hand tools Failure to notice the damaged cable Cut injury due to not using safety
3 and hand tools for the Missing of safe guards guard.
job Using un-insulated or not voltage rated Falling from trip due to poor cable
tools . management can cause minor to
Lack of inspection of tools & equipment major injuries for the workmen.
Lack of supervision
. RA Number(‫)رقم تتقت ييم المخاطر‬:
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫موقع‬

RA TEAM(Names) (‫)أسماء تترف يق التقييم‬:


1. BLOCK & PLASTERING WORKS FOR CONSTRUCTION OF N
2.

HAZARD IDENTIFICATION/‫تتح ديد الخطر‬


‫ت‬

Workplace/ Risks Issue


(Possible incident)
Item Activity/Process/Equipment Hazards/‫الخطار‬
/Material‫مهمة‬/‫موق ع العمل‬ [What can go wrong]
#
‫ت المواد‬
/‫ الم عدا‬/‫العمل‬ (Accident/ill
health to persons, fire or property loss)

Fall of person from truck/ van while Major Injury due to fall from
climbing /descending due to height of the truck/van
truck/van more than 30 cm / not using steps

Loading ,Unloading & Slip/trip due to no access to remove the


Transportation (Shifting equipments from the vehicle Minor Injury - cut/bruise
4 of materials from site
store to work place -
Platform materials )
Fall of materials due to improper handling or Minor injury property damage
too heavy load for a person
. RA Number(‫)رقم تتقت ييم المخاطر‬:
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫موقع‬

RA TEAM(Names) (‫)أسماء تترف يق التقييم‬:


1. BLOCK & PLASTERING WORKS FOR CONSTRUCTION OF N
2.

HAZARD IDENTIFICATION/‫تتح ديد الخطر‬


‫ت‬
Loading ,Unloading &
Transportation (Shifting
4 of materials from site
storeWorkplace/
to work place - Risks Issue
(Possible incident)
Platform materials )
Item Activity/Process/Equipment Hazards/‫الخطار‬ [What can go wrong]
# /Material‫مهمة‬/‫موق ع العمل‬
‫ت المواد‬
/‫ الم عدا‬/‫العمل‬ (Accident/ill
health to persons, fire or property loss)

Manual Handling over load Back pain/ Sprain


. RA Number(‫)رقم تتقت ييم المخاطر‬:
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫موقع‬

RA TEAM(Names) (‫)أسماء تترف يق التقييم‬:


1. BLOCK & PLASTERING WORKS FOR CONSTRUCTION OF N
2.

HAZARD IDENTIFICATION/‫تتح ديد الخطر‬


‫ت‬

Workplace/ Risks Issue


(Possible incident)
Item Activity/Process/Equipment Hazards/‫الخطار‬
/Material‫مهمة‬/‫موق ع العمل‬ [What can go wrong]
#
‫ت المواد‬
/‫ الم عدا‬/‫العمل‬ (Accident/ill
health to persons, fire or property loss)

Defective tools/equipment (cutter, hammer


etc) leads to cut injury.
Manual handling (lifting block - more than
20kg) - back pain, sprain
. RA Number(‫)رقم تتقت ييم المخاطر‬:
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫موقع‬

RA TEAM(Names) (‫)أسماء تترف يق التقييم‬:


1. BLOCK & PLASTERING WORKS FOR CONSTRUCTION OF N
2. Defective tools/equipment (cutter, hammer
etc) leads to cut injury.
Manual handling (lifting block - more than
20kg) - back pain, sprain
HAZARD
Slip, trip and fall IDENTIFICATION/ ‫ديد الخطر‬
- poor housekeeping or‫تتح‬
‫ت‬
materials scattered on the access.
Penetration due to protruding rods and nails. Cut/ major injury due to without
Workplace/ lack of concentration while hammering leads safe guard ofRisks Issue
cutting
(Possible equipments)
incident)
Item Activity/Process/Equipment to fall and hit against - injury
Hazards/‫الخطار‬ or incompetent person involving.
/Material‫مهمة‬/‫ موق ع العمل‬Inappropriate PPE (cotton gloves) [What can go wrong]
#
Back Injury (Accident/ill
‫ت المواد‬
/‫ الم عدا‬/‫العمل‬ Using of defective power tools health toshock
persons, firetoordamaged
property loss)
5 Block work Electric due
Inhaling dust during drilling cable/ power tools.
Closed room (confined space) lack of Sever Injury/ Fatality due to Fall
ventilation
Fall from height while working on scaffold/ from height
ladder / edge of the wall due to uninspected, Heat/ cold stress
work without safety harness or not hooking/
inadequate anchorage point
incompetent person involving in the activity
Heat stress, Heat cramps due to working
under direct sunlight
. RA Number(‫)رقم تتقت ييم المخاطر‬:
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫موقع‬

RA TEAM(Names) (‫)أسماء تترف يق التقييم‬:


1. BLOCK & PLASTERING WORKS FOR CONSTRUCTION OF N
2.

HAZARD IDENTIFICATION/‫تتح ديد الخطر‬


‫ت‬

Workplace/ Risks Issue


(Possible incident)
Item Activity/Process/Equipment Hazards/‫الخطار‬
/Material‫مهمة‬/‫موق ع العمل‬ [What can go wrong]
#
‫ت المواد‬
/‫ الم عدا‬/‫العمل‬ (Accident/ill
health to persons, fire or property loss)

Slip, trip and fall - poor housekeeping or


materials scattered on the access.
Handling of cement leads to Eye injury, skin
irritation, respiratory diseases due to
inhalation of dust, fume.
Penetration due to protruding rods and nails.
. RA Number(‫)رقم تتقت ييم المخاطر‬:
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫موقع‬

Slip, trip and fall RA TEAM(Names)


- poor (‫ يق التقييم‬or
housekeeping ‫)أسماء تترف‬:
1. materials scattered on the access. BLOCK & PLASTERING WORKS FOR CONSTRUCTION OF N
2.
Handling of cement leads to Eye injury, skin
irritation, respiratory diseases due to
inhalation of dust, fume.
Penetration due to
HAZARD protruding rods
IDENTIFICATION/ ‫الخطر‬and nails.
‫تتح ديد‬
‫ت‬
Electric shock due to damaged cable/ power Eye injury, skin irritation,
tools. respiratory diseases due to
Manual handling (lifting block - more than inhalation of dust, fume.
Risks Issue
Workplace/ 20kg) - back pain, sprain. incompetent person
(Possible involving.
incident)
Item Activity/Process/Equipment Inappropriate PPE (cotton gloves)
Hazards/‫الخطار‬ Back Injury
6# Plastering Works
/Material‫مهمة‬ /‫ موق ع العمل‬Using of defective power tools. [What can go wrong]
Electric shock due to damaged
(Accident/ill
‫ت المواد‬
/‫ الم عدا‬/‫العمل‬
Closed room (confined space) lack of cable/ power
health to tools.
persons, fire or property loss)
ventilation. Sever Injury/ Fatality due to Fall
Fall from height while working on scaffold/ from height
ladder / edge of the wall due to uninspected, Heat/ cold stress
work without safety harness or not hooking/
inadequate anchorage point
incompetent person involving in the activity
Heat stress, Heat cramps due to working
under direct sunlight
. RA Number(‫)رقم تتقت ييم المخاطر‬:
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫موقع‬

RA TEAM(Names) (‫)أسماء تترف يق التقييم‬:


1. BLOCK & PLASTERING WORKS FOR CONSTRUCTION OF N
2.

HAZARD IDENTIFICATION/‫تتح ديد الخطر‬


‫ت‬

Workplace/ Risks Issue


(Possible incident)
Item Activity/Process/Equipment Hazards/‫الخطار‬
/Material‫مهمة‬/‫موق ع العمل‬ [What can go wrong]
#
‫ت المواد‬
/‫ الم عدا‬/‫العمل‬ (Accident/ill
health to persons, fire or property loss)

Slip, trip & Fall

Poor Illumination Heat stress, cramps


Work Environment
( lighting, ventilation, Working under direct sunlight and poor Eye Strain
7 welfare facilities, heat,) ventilation
Hygienic Disorder
Inadequate welfare facilities (drinking water,
toilet and lunch room)
. RA Number(‫)رقم تتقت ييم المخاطر‬:
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫موقع‬

RA TEAM(Names) (‫)أسماء تترف يق التقييم‬:


1. BLOCK & PLASTERING WORKS FOR CONSTRUCTION OF N
2.

HAZARD IDENTIFICATION/‫تتح ديد الخطر‬


‫ت‬

Workplace/ Risks Issue


(Possible incident)
Item Activity/Process/Equipment Hazards/‫الخطار‬
/Material‫مهمة‬/‫موق ع العمل‬ [What can go wrong]
#
‫ت المواد‬
/‫ الم عدا‬/‫العمل‬ (Accident/ill
health to persons, fire or property loss)

Unaware about emergency response

No availability of Emergency Response


8 Emergency Response Procedure Severe injury or fatality
and first facility
No availability of Emergency Equipment and
insufficient first aid facilities
. RA Number(‫)رقم تتقت ييم المخاطر‬:
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫موقع‬

RA TEAM(Names) (‫)أسماء تترف يق التقييم‬:


1. BLOCK & PLASTERING WORKS FOR CONSTRUCTION OF N
2.

HAZARD IDENTIFICATION/‫تتح ديد الخطر‬


‫ت‬

Workplace/ Risks Issue


(Possible incident)
Item Activity/Process/Equipment Hazards/‫الخطار‬
/Material‫مهمة‬/‫موق ع العمل‬ [What can go wrong]
#
‫ت المواد‬
/‫ الم عدا‬/‫العمل‬ (Accident/ill
health to persons, fire or property loss)

Housekeeping &
9 removal of undesired Slip, trip and falls & fire due to poor stacking Scratches, bruises or fracture
materials generarted by & housekeeping Fire
the activity.
/RISK ASSESSMENT AND ANALYSIS/‫تتق ييم المخاطر‬
‫ت‬
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫الموقع‬WORKPLACE/TASK/ACTIVITY/PROCESS NAME:

K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY

CONTROL‫وسائل التحكم‬ RISK ASSESSMENT‫تتق ييم المخاطر‬


‫ت‬

Consequen Likelihoo ‫الخطر‬Risk


‫تصنيف‬
Existing Controls /‫وسائل التحكم المتوفرة‬ d/
‫ا‬
‫ل‬ ‫لحتم‬ ‫ا‬
ce /‫الشدة‬ ‫تتة‬
‫ي‬ Ranking

1. Ensure all concern personnel doing these tasks are qualified


and certified.
2. Ensure Emergency Response Plan is established and discussed 4 2 8
to the workforce before commencing the work activity.
/RISK ASSESSMENT AND ANALYSIS/‫تتق ييم المخاطر‬
‫ت‬
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫الموقع‬WORKPLACE/TASK/ACTIVITY/PROCESS NAME:

K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY

CONTROL‫وسائل التحكم‬ RISK ASSESSMENT‫تتق ييم المخاطر‬


‫ت‬

Consequen Likelihoo ‫الخطر‬Risk


‫تصنيف‬
Existing Controls /‫وسائل التحكم المتوفرة‬ d/
‫ا‬
‫ل‬ ‫لحتم‬ ‫ا‬
ce /‫الشدة‬ ‫تتة‬
‫ي‬ Ranking

1. Ensure sufficient adequate PPEs have been provided (Hard hat, 3 2 6


gloves, safety shoe, hi-visible vest, safety glases)

1. Ensure good housekeeping is promptly implemented at 4 2 8


workplace.
/RISK ASSESSMENT AND ANALYSIS/‫تتق ييم المخاطر‬
‫ت‬
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫الموقع‬WORKPLACE/TASK/ACTIVITY/PROCESS NAME:

K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY

CONTROL‫وسائل التحكم‬ RISK ASSESSMENT‫تتق ييم المخاطر‬


‫ت‬

Consequen Likelihoo ‫الخطر‬Risk


‫تصنيف‬
Existing Controls /‫وسائل التحكم المتوفرة‬ d/
‫ا‬
‫ل‬ ‫لحتم‬ ‫ا‬
ce /‫الشدة‬ ‫تتة‬
‫ي‬ Ranking

1. Appropriate (Job Specific) induction/ Tool Box talk


2.Provide safety induction and tool box in well ventilated room
and prevent from noise and direct sunlight. 3 2 6
3. Competent person only should give safety induction and tool
box talk (supervisor who received safety tool box training)
/RISK ASSESSMENT AND ANALYSIS/‫تتق ييم المخاطر‬
‫ت‬
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫الموقع‬WORKPLACE/TASK/ACTIVITY/PROCESS NAME:

K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY

CONTROL‫وسائل التحكم‬ RISK ASSESSMENT‫تتق ييم المخاطر‬


‫ت‬

Consequen Likelihoo ‫الخطر‬Risk


‫تصنيف‬
Existing Controls /‫وسائل التحكم المتوفرة‬ d/
‫ا‬
‫ل‬ ‫لحتم‬ ‫ا‬
ce /‫الشدة‬ ‫تتة‬
‫ي‬ Ranking

1. Use of appropriate and good condition tools.


2. Tool Box Talk
3. Ensure inspection of the activity area for hazards. 4 2 8
4.Use of double insulated electrical cable and plug with earthing
pin
/RISK ASSESSMENT AND ANALYSIS/‫تتق ييم المخاطر‬
‫ت‬
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫الموقع‬WORKPLACE/TASK/ACTIVITY/PROCESS NAME:

K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY

CONTROL‫وسائل التحكم‬ RISK ASSESSMENT‫تتق ييم المخاطر‬


‫ت‬

Consequen Likelihoo ‫الخطر‬Risk


‫تصنيف‬
Existing Controls /‫وسائل التحكم المتوفرة‬ d/
‫ا‬
‫ل‬ ‫لحتم‬ ‫ا‬
ce /‫الشدة‬ ‫تتة‬
‫ي‬ Ranking

1. Do not take shortcut, use only the steps 4 2 8

1.Remove the materials/ equipments from first to last. 3 2 6

1. Provide & use mechanical gloves 3 2 6


/RISK ASSESSMENT AND ANALYSIS/‫تتق ييم المخاطر‬
‫ت‬
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫الموقع‬WORKPLACE/TASK/ACTIVITY/PROCESS NAME:

K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY

CONTROL‫وسائل التحكم‬ RISK ASSESSMENT‫تتق ييم المخاطر‬


‫ت‬

Consequen Likelihoo ‫الخطر‬Risk


‫تصنيف‬
Existing Controls /‫وسائل التحكم المتوفرة‬ d/
‫ا‬
‫ل‬ ‫لحتم‬ ‫ا‬
ce /‫الشدة‬ ‫تتة‬
‫ي‬ Ranking

1. Follow the manual lifting technique 3 2 6


2. Obtain assistance if required.
/RISK ASSESSMENT AND ANALYSIS/‫تتق ييم المخاطر‬
‫ت‬
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫الموقع‬WORKPLACE/TASK/ACTIVITY/PROCESS NAME:

K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY

CONTROL‫وسائل التحكم‬ RISK ASSESSMENT‫تتق ييم المخاطر‬


‫ت‬

Consequen Likelihoo ‫الخطر‬Risk


‫تصنيف‬
Existing Controls /‫وسائل التحكم المتوفرة‬ d/
‫ا‬
‫ل‬ ‫لحتم‬ ‫ا‬
ce /‫الشدة‬ ‫تتة‬
‫ي‬ Ranking

1. Obtain work permit from authorized issuer.


2. Use filter mask, goggles, helmet, safety shoe, cover all, ear plug
and cut resistant gloves while involving with drilling and fixing
conduit.
3. Visual inspection should be done before each task perform. If
damage/crack immediately report to supervisor. Verification/
/RISK ASSESSMENT AND ANALYSIS/‫تتق ييم المخاطر‬
‫ت‬
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫الموقع‬WORKPLACE/TASK/ACTIVITY/PROCESS NAME:

1. Obtain work permit from authorized issuer.


K & PLASTERING WORKS FOR CONSTRUCTION OF NEW
2. Use filter mask, 380/132KV
goggles, DAWMAT
helmet, safetyALshoe,
– JANDAL BSP
cover all,- ear
AL BABTAIN
plug CONTRACTING COMPANY
and cut resistant gloves while involving with drilling and fixing
conduit.
3. Visual inspection should be done before each task perform. If
damage/crack immediately report
CONTROL to‫ ا‬supervisor.
‫لتحكم‬ ‫وسائل‬ Verification/ RISK ASSESSMENT‫تتق ييم المخاطر‬
‫ت‬
Inspection of tools as per the tools list. Check for "color code for
use in case of power tools.
4. Protect hands by leather gloves to avoid bruise, sprain,
hematoma during hammering.
Consequen Likelihoo ‫الخطر‬Risk
‫تصنيف‬
5. Maintain goodExisting
housekeeping
Controls /and stack
‫لمتوفرة‬ materials
‫لتحكم ا‬
‫وسائل ا‬ properly and d/
‫ا‬
‫ل‬ ‫لحتم‬ ‫ا‬
ce /‫الشدة‬
remove the materials from access. ‫تتة‬
‫ي‬ Ranking
6. Ladder must be secured or buddy system in place. Ladder must 4 2 8
be inspected and color coded for inspection. defective ladder
must be tagged with "do not use" and removed from the place.
7. Scaffolding must be erected and inspected by competent
person only. Each employee should ensure before climbing the
scaffold the scaffolding inspected and tag in place. if the tag is red
colored (do not use) do not climb and report to your supervisor.
8. Tool Box Talk must be conducted before commencment of the
task.
9. Heat/cold Stress index shall be used to assess the humidity and
temperature and it will be communicated with employees.
10. During extreme temperature work rotation shall be
implemented.
/RISK ASSESSMENT AND ANALYSIS/‫تتق ييم المخاطر‬
‫ت‬
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫الموقع‬WORKPLACE/TASK/ACTIVITY/PROCESS NAME:

K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY

CONTROL‫وسائل التحكم‬ RISK ASSESSMENT‫تتق ييم المخاطر‬


‫ت‬

Consequen Likelihoo ‫الخطر‬Risk


‫تصنيف‬
Existing Controls /‫وسائل التحكم المتوفرة‬ d/
‫ا‬
‫ل‬ ‫لحتم‬ ‫ا‬
ce /‫الشدة‬ ‫تتة‬
‫ي‬ Ranking

1. Obtain work permit from authorized issuer.


Adequate illumination should be ensured before comment of the
task. The electrical connection should be done only by competent
electrician.
2. Chemical awareness must be given to all employees involved in
the activity.
3. The cement should be stored only a proper chemical storage
area (mortar materials) according to the requirement of MSDS &
label.
4. The cements shall store hazards substance storage area.
Appropriate warning signs (flammable material, no smoking) shall
1. Obtain work permit from authorized issuer.
Adequate illumination /RISK
shouldASSESSMENT
be ensured before AND comment ANALYSIS/
of the ‫تتق ييم المخاطر‬ ‫ت‬
‫المعدة‬/task. The
‫العملية‬ electrical
/ ‫المهمة‬ connection should be done only by competent
/ ‫الموقع‬WORKPLACE/TASK/ACTIVITY/PROCESS NAME:
electrician.
2. Chemical awareness must be given to all employees involved in
the activity.
K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY
3. The cement should be stored only a proper chemical storage
area (mortar materials) according to the requirement of MSDS &
label.
4. The cements shall store hazards substance storage area.
Appropriate warning signs CONTROL
(flammable material, no smoking) shall RISK ASSESSMENT‫تتق ييم المخاطر‬
‫وسائل التحكم‬ ‫ت‬
be posted in storage area.
5. Use filter mask, goggles, helmet, safety gumboot, cover all, ear
plug and nylon gloves while involving mortar application.
6. Visual inspection should be done before each task perform. If Consequen Likelihoo ‫تصنيف‬
Existing Controls
damage/crack immediately report/‫لمتوفرة‬‫ وسائل التحكم ا‬Verification/
to supervisor. 4ce /‫ الشدة‬2d/‫ الحتم ال‬8 ‫الخطر‬Risk
Inspection of tools as per the tools list. Check for "color code for ‫تتة‬
‫ي‬ Ranking
use in case of power tools.
6. Maintain good housekeeping and stack materials properly and
remove the materials from access.
7. Ladder must be secured or buddy system in place. Ladder must
be inspected and color coded for inspection. defective ladder
must be tagged with "do not use" and removed from the place.
8. Scaffolding must be erected and inspected by competent
person only. Each employee should ensure before climbing the
scaffold the scaffolding inspected and tag in place. if the tag is red
colored (do not use) do not climb and report to your supervisor.
9. Tool Box Talk must be conducted before commencment of the
task.
10. Heat/cold Stress index shall be used to assess the humidity
and temperature and it will be communicated with employees.
/RISK ASSESSMENT AND ANALYSIS/‫تتق ييم المخاطر‬
‫ت‬
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫الموقع‬WORKPLACE/TASK/ACTIVITY/PROCESS NAME:

K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY

CONTROL‫وسائل التحكم‬ RISK ASSESSMENT‫تتق ييم المخاطر‬


‫ت‬

Consequen Likelihoo ‫الخطر‬Risk


‫تصنيف‬
Existing Controls /‫وسائل التحكم المتوفرة‬ d/
‫ا‬
‫ل‬ ‫لحتم‬ ‫ا‬
ce /‫الشدة‬ ‫تتة‬
‫ي‬ Ranking

1. Conduct tool box talk before commencement of the task.


2. Adequate Drinking water must be provided.
3. Rest area must be provided.
4. Use appropriate goggles (if work at outside the building use
shaded goggles, inside the building use white goggles)
5. Work should not be carried out during bad light and under poor
visibility. 4 2 8
6. Ensure the adequacy of illumination.
Provide adequate drinking water (either by thermo cooler or
water bottles)
7. Toilet facility must be provided if not permanent not available
provide mobile toilets.
/RISK ASSESSMENT AND ANALYSIS/‫تتق ييم المخاطر‬
‫ت‬
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫الموقع‬WORKPLACE/TASK/ACTIVITY/PROCESS NAME:

K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY

CONTROL‫وسائل التحكم‬ RISK ASSESSMENT‫تتق ييم المخاطر‬


‫ت‬

Consequen Likelihoo ‫الخطر‬Risk


‫تصنيف‬
Existing Controls /‫وسائل التحكم المتوفرة‬ d/
‫ا‬
‫ل‬ ‫لحتم‬ ‫ا‬
ce /‫الشدة‬ ‫تتة‬
‫ي‬ Ranking

1. The injured person should be given First aid immediately.


2. First aid box shall be made available with required medicines in
adequate quantity.
3. Conduct Tool Box Talk Meeting
4. Adequate (as per 5 star) Certified First Aider must be available 4 2 8
at site.
5. All employees shall be explained about the emergency
response (emergency action, fire actions )provisions of first aid,
assembly point and contact numbers etc.
/RISK ASSESSMENT AND ANALYSIS/‫تتق ييم المخاطر‬
‫ت‬
‫المعدة‬/ ‫العملية‬/ ‫المهمة‬/ ‫الموقع‬WORKPLACE/TASK/ACTIVITY/PROCESS NAME:

K & PLASTERING WORKS FOR CONSTRUCTION OF NEW 380/132KV DAWMAT AL – JANDAL BSP - AL BABTAIN CONTRACTING COMPANY

CONTROL‫وسائل التحكم‬ RISK ASSESSMENT‫تتق ييم المخاطر‬


‫ت‬

Consequen Likelihoo ‫الخطر‬Risk


‫تصنيف‬
Existing Controls /‫وسائل التحكم المتوفرة‬ d/
‫ا‬
‫ل‬ ‫لحتم‬ ‫ا‬
ce /‫الشدة‬ ‫تتة‬
‫ي‬ Ranking

1. Good housekeeping & Stacking should be maintained &


Followed. 3 2 6
2. Daily TBT regarding housekeeping is a must.
‫تتقت ي‬
DEPARTMENT/AREA( ‫ المنطقة‬/ ‫) الدارة‬: COA
DATE
NEXT REVIEW DATE(‫)تتات ريخ المراج عة القادم‬:
APPROVED BY MANAGER/SUPERVISOR(‫)اعتمد من قبل‬: Eng.
Signature ( ‫) التوقي ع‬

ACTION PLAN/‫تتت قليل الخطر‬


‫العمل ل‬ ‫خطة‬

Controls
Follow up by Whom Implement
Consequ Likelihoo ‫تصنيف‬
(Improve existing controls / implement new controls)/‫وسائل التحكم و السيطرة‬ (name) & By When ed ence d/‫الخطر الحتم ال‬Risk
‫الضافية‬ (date)/‫ الجهة المعنية‬Yes/No/‫هل‬
/‫لشدة‬
‫ا‬ ‫تتة‬
‫ي‬ Ranking
‫ التاريخ‬/ ‫لتنفيذ‬ ‫ ب‬e
‫تتاتت‬ ‫تتم التفيذ؟‬
‫ت‬
/‫نعم ل‬

1. TBT and other pertinent documents are secured before any work
commence.
2. Explain all employees about this JSP, Risk assessment,
Emergency Reponse Plan through Tool Box talk before Civil Engineer
commencement of the task by Civil Engineer, Safety Engineer/ 4 1 4
Safety Officer
officer and supervisor.
3. Ensure performing employees have SEC/S7 before entering in to
the substation.
‫تتقت ي‬
DEPARTMENT/AREA( ‫ المنطقة‬/ ‫) الدارة‬: COA
DATE
NEXT REVIEW DATE(‫)تتات ريخ المراج عة القادم‬:
APPROVED BY MANAGER/SUPERVISOR(‫)اعتمد من قبل‬: Eng.
Signature ( ‫) التوقي ع‬

ACTION PLAN/‫تتت قليل الخطر‬


‫العمل ل‬ ‫خطة‬

Controls
Follow up by Whom Implement
Consequ Likelihoo ‫تصنيف‬
(Improve existing controls / implement new controls)/‫وسائل التحكم و السيطرة‬ (name) & By When ed ence d/‫الخطر الحتم ال‬Risk
‫الضافية‬ (date)/‫ الجهة المعنية‬Yes/No/‫هل‬
/‫لشدة‬
‫ا‬ ‫تتة‬
‫ي‬ Ranking
‫ التاريخ‬/ ‫لتنفيذ‬ ‫ ب‬e
‫تتاتت‬ ‫تتم التفيذ؟‬
‫ت‬
/‫نعم ل‬

1. Enough supervision to be given for the work force to ensure Civil Engineer 3 1 3
employees are using PPE while working. Safety Officer

1. Enough supervision to be given for the work force to ensure Civil Engineer 4 1 4
housekeeping has been followed. Safety Officer
‫تتقت ي‬
DEPARTMENT/AREA( ‫ المنطقة‬/ ‫) الدارة‬: COA
DATE
NEXT REVIEW DATE(‫)تتات ريخ المراج عة القادم‬:
APPROVED BY MANAGER/SUPERVISOR(‫)اعتمد من قبل‬: Eng.
Signature ( ‫) التوقي ع‬

ACTION PLAN/‫تتت قليل الخطر‬


‫العمل ل‬ ‫خطة‬

Controls
Follow up by Whom Implement
Consequ Likelihoo ‫تصنيف‬
(Improve existing controls / implement new controls)/‫وسائل التحكم و السيطرة‬ (name) & By When ed ence d/‫الخطر الحتم ال‬Risk
‫الضافية‬ (date)/‫ الجهة المعنية‬Yes/No/‫هل‬
/‫لشدة‬
‫ا‬ ‫تتة‬
‫ي‬ Ranking
‫ التاريخ‬/ ‫لتنفيذ‬ ‫ ب‬e
‫تتاتت‬ ‫تتم التفيذ؟‬
‫ت‬
/‫نعم ل‬

1. Explain all employees related this acvities JSP, Risk assessment,


Emergency Response Plan through Tool Box talk before Safety Officer
commencement of the task by Civil Engineer, Safety Engineer/
officer and supervisor. Supervisor
2. If the instructor known only English, ask the participants who 3 1 3
knows their language and ask them to translate (Multilingual Safety Electrical
Induction and Tool Box Talk should be given to employees) Engineer
‫تتقت ي‬
DEPARTMENT/AREA( ‫ المنطقة‬/ ‫) الدارة‬: COA
DATE
NEXT REVIEW DATE(‫)تتات ريخ المراج عة القادم‬:
APPROVED BY MANAGER/SUPERVISOR(‫)اعتمد من قبل‬: Eng.
Signature ( ‫) التوقي ع‬

ACTION PLAN/‫تتت قليل الخطر‬


‫العمل ل‬ ‫خطة‬

Controls
Follow up by Whom Implement
Consequ Likelihoo ‫تصنيف‬
(Improve existing controls / implement new controls)/‫وسائل التحكم و السيطرة‬ (name) & By When ed ence d/‫الخطر الحتم ال‬Risk
‫الضافية‬ (date)/‫ الجهة المعنية‬Yes/No/‫هل‬
/‫لشدة‬
‫ا‬ ‫تتة‬
‫ي‬ Ranking
‫ التاريخ‬/ ‫لتنفيذ‬ ‫ ب‬e
‫تتاتت‬ ‫تتم التفيذ؟‬
‫ت‬
/‫نعم ل‬

1. Visual inspection of activity area and tools should be done before


commencement of work.
2. If damage/crack immediately report to supervisor.
3. Verification/ Inspection of tools as per the tools list.
4. Check for monthly inspection "color code'' for the current month safety Officer 4 1 4
before use in case of power tools. Supervisor
5. Competent person only should use powered hand tools.
6. Use insulated/ voltage rated tools only while involving with live
equipment.
‫تتقت ي‬
DEPARTMENT/AREA( ‫ المنطقة‬/ ‫) الدارة‬: COA
DATE
NEXT REVIEW DATE(‫)تتات ريخ المراج عة القادم‬:
APPROVED BY MANAGER/SUPERVISOR(‫)اعتمد من قبل‬: Eng.
Signature ( ‫) التوقي ع‬

ACTION PLAN/‫تتت قليل الخطر‬


‫العمل ل‬ ‫خطة‬

Controls
Follow up by Whom Implement
Consequ Likelihoo ‫تصنيف‬
(Improve existing controls / implement new controls)/‫وسائل التحكم و السيطرة‬ (name) & By When ed ence d/‫الخطر الحتم ال‬Risk
‫الضافية‬ (date)/‫ الجهة المعنية‬Yes/No/‫هل‬
/‫لشدة‬
‫ا‬ ‫تتة‬
‫ي‬ Ranking
‫ التاريخ‬/ ‫لتنفيذ‬ ‫ ب‬e
‫تتاتت‬ ‫تتم التفيذ؟‬
‫ت‬
/‫نعم ل‬

Supervisor
1. If steps not available use ladder for climbing /descending place. safety Officer 4 1 4

Supervisor
1. Clean up any hazards such as protruding rods, sharp edges etc., 3 1 3
safety Officer

1. Supervisor should explain the capacity of the equipments, hazard Supervisor 3 1 3


involved in manual lifting through tool box talk. safety Officer
‫تتقت ي‬
DEPARTMENT/AREA( ‫ المنطقة‬/ ‫) الدارة‬: COA
DATE
NEXT REVIEW DATE(‫)تتات ريخ المراج عة القادم‬:
APPROVED BY MANAGER/SUPERVISOR(‫)اعتمد من قبل‬: Eng.
Signature ( ‫) التوقي ع‬

ACTION PLAN/‫تتت قليل الخطر‬


‫العمل ل‬ ‫خطة‬

Controls
Follow up by Whom Implement
Consequ Likelihoo ‫تصنيف‬
(Improve existing controls / implement new controls)/‫وسائل التحكم و السيطرة‬ (name) & By When ed ence d/‫الخطر الحتم ال‬Risk
‫الضافية‬ (date)/‫ الجهة المعنية‬Yes/No/‫هل‬
/‫لشدة‬
‫ا‬ ‫تتة‬
‫ي‬ Ranking
‫ التاريخ‬/ ‫لتنفيذ‬ ‫ ب‬e
‫تتاتت‬ ‫تتم التفيذ؟‬
‫ت‬
/‫نعم ل‬

1. Lift using the legs – use safe lifting techniques Supervisor 3 1 3


2. Train the Manual handling technique through Tool Box Talk safety Officer
‫تتقت ي‬
DEPARTMENT/AREA( ‫ المنطقة‬/ ‫) الدارة‬: COA
DATE
NEXT REVIEW DATE(‫)تتات ريخ المراج عة القادم‬:
APPROVED BY MANAGER/SUPERVISOR(‫)اعتمد من قبل‬: Eng.
Signature ( ‫) التوقي ع‬

ACTION PLAN/‫تتت قليل الخطر‬


‫العمل ل‬ ‫خطة‬

Controls
Follow up by Whom Implement
Consequ Likelihoo ‫تصنيف‬
(Improve existing controls / implement new controls)/‫وسائل التحكم و السيطرة‬ (name) & By When ed ence d/‫الخطر الحتم ال‬Risk
‫الضافية‬ (date)/‫ الجهة المعنية‬Yes/No/‫هل‬
/‫لشدة‬
‫ا‬ ‫تتة‬
‫ي‬ Ranking
‫ التاريخ‬/ ‫لتنفيذ‬ ‫ ب‬e
‫تتاتت‬ ‫تتم التفيذ؟‬
‫ت‬
/‫نعم ل‬

1. Reduce accumulation of dust by vacuum provision of Local


‫تتقت ي‬
DEPARTMENT/AREA( ‫ المنطقة‬/ ‫) الدارة‬: COA
DATE
NEXT REVIEW DATE(‫)تتات ريخ المراج عة القادم‬:
APPROVED BY MANAGER/SUPERVISOR(‫)اعتمد من قبل‬: Eng.
Signature ( ‫) التوقي ع‬

1. Reduce accumulation of dust by vacuum provision of Local


ACTION PLAN/
Exhaust Ventilation (LEV) must be in place for removing the ‫لخطر‬
dust ‫تتت قليل ا‬
‫خطة العمل ل‬
and maintain proper ventilation.
2. Construct blocks in stage by stage Controls
3. Give sufficient time to start with new layers to gain adequate Follow up by Whom Implement Consequ
strength. (name) & By When Likelihoo ‫تصنيف‬
(Improve existing controls / implement new controls)/‫وسائل التحكم و السيطرة‬ ed ence d/‫الخطر الحتم ال‬Risk
4. Manual handling procedure must ‫الضافية‬be followed. Adequate interval (date)/‫الجهة المعنية‬ Yes/No/‫هل‬
Site Engineer /‫الشدة‬ ‫تتة‬
‫ي‬ Ranking
and rest by changing the worker should be given for those who ‫لتاريخ‬
‫ ا‬/ ‫لتنفيذ‬ ‫ ب‬e
‫تتاتت‬ ‫تتم التفيذ؟‬
‫ت‬
Safety Officer /‫ نعم ل‬4 1 4
involving Supervisor
5. Heat/ cold stress training will be conducted at site during
execution of work to notify all employees working at site with
precautionary measures
6. Use double hook harness while climbing and working at height.
7. Hook on appropriate anchorage point always and ask the
supervisor for provision of anchorage point if work near edge by
means of horizontal life line.
‫تتقت ي‬
DEPARTMENT/AREA( ‫ المنطقة‬/ ‫) الدارة‬: COA
DATE
NEXT REVIEW DATE(‫)تتات ريخ المراج عة القادم‬:
APPROVED BY MANAGER/SUPERVISOR(‫)اعتمد من قبل‬: Eng.
Signature ( ‫) التوقي ع‬

ACTION PLAN/‫تتت قليل الخطر‬


‫العمل ل‬ ‫خطة‬

Controls
Follow up by Whom Implement
Consequ Likelihoo ‫تصنيف‬
(Improve existing controls / implement new controls)/‫وسائل التحكم و السيطرة‬ (name) & By When ed ence d/‫الخطر الحتم ال‬Risk
‫الضافية‬ (date)/‫ الجهة المعنية‬Yes/No/‫هل‬
/‫لشدة‬
‫ا‬ ‫تتة‬
‫ي‬ Ranking
‫ التاريخ‬/ ‫لتنفيذ‬ ‫ ب‬e
‫تتاتت‬ ‫تتم التفيذ؟‬
‫ت‬
/‫نعم ل‬

1. Reduce accumulation of dust by vacuum provision of Local


Exhaust Ventilation (LEV) must be in place for removing the dust
and maintain proper ventilation.
‫تتقت ي‬
DEPARTMENT/AREA( ‫ المنطقة‬/ ‫) الدارة‬: COA
DATE
NEXT REVIEW DATE(‫)تتات ريخ المراج عة القادم‬:
APPROVED BY MANAGER/SUPERVISOR(‫)اعتمد من قبل‬: Eng.
Signature ( ‫) التوقي ع‬
1. Reduce accumulation of dust by vacuum provision of Local
Exhaust Ventilation (LEV) must be in place for removing the dust
and maintain proper ventilation. ACTION PLAN/‫تتت قليل الخطر‬ ‫خطة العمل ل‬
ficient time to start with new layers to gain adequate strength.
2. Manual handling procedure must be followed. Adequate interval
and rest by changing the worker should be given for those who Controls
involving Follow up by Whom Implement Consequ
Site Engineer
(name) & By When Likelihoo ‫تصنيف‬
3. (Improve existing
Heat/ cold controls
stress / implement
training new controls)/
will be conducted ‫لسيطرة‬
at site ‫وسائل التحكم و ا‬
during ed ence d/‫ الحتم ال‬4‫الخطر‬Risk
‫لضافية‬‫ا‬ Safety
(date)/ Officer
‫لمعنية‬‫الجهة ا‬ Yes/No/‫ هل‬4 /‫ الشدة‬1
execution of work to notify all employees working at site with ‫تتة‬
‫ي‬ Ranking
Supervisor
‫ التاريخ‬/ ‫لتنفيذ‬ ‫ ب‬e
‫تتاتت‬ ‫تتم التفيذ؟‬
‫ت‬
precautionary measures /‫نعم ل‬
4. Use double hook harness while climbing and working at height.
5. Hook on appropriate anchorage point always and ask the
supervisor for provision of anchorage point if work near edge by
means of horizontal life line.
6. During extreme temperature work rotation shall be
implemented.
‫تتقت ي‬
DEPARTMENT/AREA( ‫ المنطقة‬/ ‫) الدارة‬: COA
DATE
NEXT REVIEW DATE(‫)تتات ريخ المراج عة القادم‬:
APPROVED BY MANAGER/SUPERVISOR(‫)اعتمد من قبل‬: Eng.
Signature ( ‫) التوقي ع‬

ACTION PLAN/‫تتت قليل الخطر‬


‫العمل ل‬ ‫خطة‬

Controls
Follow up by Whom Implement
Consequ Likelihoo ‫تصنيف‬
(Improve existing controls / implement new controls)/‫وسائل التحكم و السيطرة‬ (name) & By When ed ence d/‫الخطر الحتم ال‬Risk
‫الضافية‬ (date)/‫ الجهة المعنية‬Yes/No/‫هل‬
/‫لشدة‬
‫ا‬ ‫تتة‬
‫ي‬ Ranking
‫ التاريخ‬/ ‫لتنفيذ‬ ‫ ب‬e
‫تتاتت‬ ‫تتم التفيذ؟‬
‫ت‬
/‫نعم ل‬

1. Drinking water should be available with disposable glass in work


area. Provision of rest area at job site to be provided.
2. Heat/cold Stress index shall be used to assess the humidity and
temperature and it will be communicated with employees. Site Engineer
During extreme temperature work rotation shall be implemented. Safety Officer 4 1 4
3. Heat/cold stress training will be conducted at site during Supervisor
execution of work to notify all employees working at site with
precautionary measures.
4. No outdoor activity should be performed (direct sunlight) during
12 pm to 3 pm from 15th June to 15th September.
‫تتقت ي‬
DEPARTMENT/AREA( ‫ المنطقة‬/ ‫) الدارة‬: COA
DATE
NEXT REVIEW DATE(‫)تتات ريخ المراج عة القادم‬:
APPROVED BY MANAGER/SUPERVISOR(‫)اعتمد من قبل‬: Eng.
Signature ( ‫) التوقي ع‬

ACTION PLAN/‫تتت قليل الخطر‬


‫العمل ل‬ ‫خطة‬

Controls
Follow up by Whom Implement
Consequ Likelihoo ‫تصنيف‬
(Improve existing controls / implement new controls)/‫وسائل التحكم و السيطرة‬ (name) & By When ed ence d/‫الخطر الحتم ال‬Risk
‫الضافية‬ (date)/‫ الجهة المعنية‬Yes/No/‫هل‬
/‫لشدة‬
‫ا‬ ‫تتة‬
‫ي‬ Ranking
‫ التاريخ‬/ ‫لتنفيذ‬ ‫ ب‬e
‫تتاتت‬ ‫تتم التفيذ؟‬
‫ت‬
/‫نعم ل‬

1. One separate vehicle shall be made available for meeting


emergency needs. Site Engineer
2. All required emergency response equipment shall be available at Safety Officer 4 1 4
site. Supervisor
3. Emergency Response Procedure shall be discussed with the
employees
‫تتقت ي‬
DEPARTMENT/AREA( ‫ المنطقة‬/ ‫) الدارة‬: COA
DATE
NEXT REVIEW DATE(‫)تتات ريخ المراج عة القادم‬:
APPROVED BY MANAGER/SUPERVISOR(‫)اعتمد من قبل‬: Eng.
Signature ( ‫) التوقي ع‬

ACTION PLAN/‫تتت قليل الخطر‬


‫العمل ل‬ ‫خطة‬

Controls
Follow up by Whom Implement
Consequ Likelihoo ‫تصنيف‬
(Improve existing controls / implement new controls)/‫وسائل التحكم و السيطرة‬ (name) & By When ed ence d/‫الخطر الحتم ال‬Risk
‫الضافية‬ (date)/‫ الجهة المعنية‬Yes/No/‫هل‬
/‫لشدة‬
‫ا‬ ‫تتة‬
‫ي‬ Ranking
‫ التاريخ‬/ ‫لتنفيذ‬ ‫ ب‬e
‫تتاتت‬ ‫تتم التفيذ؟‬
‫ت‬
/‫نعم ل‬

1. Supervisor should ensure the stacking and housekeeping and


everyday before completion of work ask the work to do
housekeeping and remaining materials should be stacked properly..
2. Ensure waste management plan is established. Civil Engineer
3. Assigning permanent cleaners in daily basis. Provision of Yes 3 1 3
Safety Officer
adequate bins.
4. Ensure removal of all undesired materials and garbage inside
substation.
RA Prepared by : RA Reveiwed by : RA Accepted by SEC - Safety Rep:
Name & Sign : Sathiyendran Name & Sign : Name & Sign
Desgination : HSE Engineer Desgination: Desgination
Date : Date : Date
y SEC - Safety Rep: RA Aprroved by SEC-EHVPD: