Drainase Perkotaan IQbal 01 146

I. 2. Data Topograf
Gambar 1. Denah Daerah Perencanaan
34 33 32 31 30 29 28
27
219 357 300 150

34.8 34.2 33.7 31.8 31 29.5 28.2


26
26.9
A0 A1 B0 B1 C0 C1 D0 D1

310 A B C D

A3 A2 B3 B2 C3 C2 D3 D2
33.7 32.8 31.7 28.9 28.8 26.7 26.5 25.5
33.6 32.6 31.6 28.7 28.6 26.6 26.4 25.4
E0 E1 F0 F1 G0 G1 H0 H1

G H 332
429 E F

G3 G2 H3 H2
27.9 26.5 26.2 25.3

28.4 26.5
I0 I1
Saluran pembuan g
E3 E2 F3 F2
33.5 32.2 31.5 28.5
220

26

I 390

I3 I2
28.3 27.4
27

34 32 31 30 29 28
33

a = 200 m f = 190 m
b = 115 m g = 160 m
c = 225 m h = 150 m
d = 110 m i = 100 m
e = 175 m

Lebar Jalan + Trotoar = 5.2 m

Tinggi Elevasi

X0 = 72 m X5 = 72 m
X1 = 72.4 m X6 = 71.9 m
X2 = 72.3 m X7 = 71.8 m
X3 = 72.2 m X8 = 71.7 m
X4 = 72.1 m X9 = 71.6 m

I. 3. Data Saluran
Koefisien Run Off ( C )
Drainase Perkotaan IQbal 01 146

C1 = 0.700 C4 = 0.600
C2 = 0.500 C5 = 0.400
C3 = 0.600 C jalur = 0.700
BAB IV
PERHITUNGAN DAN PERENCANAAN
III.1. Data Dasar
III. 1.1Data Curah Hujan

Tabel III. 1. DATA DASAR


Curah Hujan (mm)
No Tahun Tanggal
Stasiun A Stasiun B Stasiun C Stasiun D Stasiun E
1 2000 4-Jan 94 97 105 98 91
9-Mar 99 90 109 112 88
7-Apr 84 79 80 102 81
20-Jul 77 79 90 76 78
15-Nov 89 96 94 91 100
2 2001 2-Jan 88 109 97 103 95
5-Mar 108 124 115 111 113
7-May 91 85 127 87 88
8-Aug 79 81 83 121 78
23-Dec 116 114 112 109 123
3 2002 9-Feb 125 119 120 129 117
8-Apr 117 111 109 107 115
8-Jun 103 91 97 114 98
29-Nov 93 85 99 95 98
14-Dec 95 91 103 93 101
4 2003 4-Feb 137 129 118 119 129
30-Mar 129 145 118 113 115
10-Apr 106 96 121 99 98
7-Sep 77 79 82 123 77
17-Oct 79 81 82 83 77
5 2004 12-Jan 88 97 90 94 95
14-Feb 92 96 101 102 97
19-Jun 89 85 87 103 86
31-Aug 83 79 88 80 81
4-Sep 79 77 76 75 78
6 2005 13-Apr 93 101 107 98 105
5-May 94 104 97 99 98
7-Aug 78 79 99 82 76
25-Oct 84 86 89 115 93
24-Dec 93 92 95 97 111
7 2006 6-Mar 119 114 122 125 121
15-Jul 86 89 88 86 95
17-Sep 84 82 81 86 85
28-Oct 86 87 85 90 88
31-Dec 95 84 99 98 102
8 2007 21-Feb 108 114 117 111 113
24-Apr 103 107 102 101 100
15-Jul 85 89 103 86 84
17-Aug 83 79 81 85 81
11-Oct 85 90 88 87 83
9 2008 21-Feb 108 114 117 111 113
24-Apr 103 107 102 101 100
15-Jul 85 89 103 86 84
17-Aug 83 79 81 85 81
11-Oct 85 90 88 87 83
10 2009 4-Feb 137 129 118 119 129
30-Mar 129 145 118 113 115
10-Apr 106 96 121 99 98
7-Sep 77 79 82 123 77
17-Oct 79 81 82 83 77
11 2010 13-Apr 93 101 107 98 105
5-May 94 104 97 99 98
7-Aug 78 79 99 82 76
25-Oct 84 86 89 115 93
24-Dec 93 92 95 97 111
12 2011 12-Jan 108 119 114 114 111
14-Mar 119 125 119 126 119
19-Apr 115 111 109 87 112
30-Aug 86 89 111 93 91
16-Dec 95 88 98 98 103
13 2012 21-Feb 108 114 117 111 113
24-Apr 103 107 102 101 100
15-Jul 85 89 103 86 84
17-Aug 83 79 81 85 81
11-Oct 85 90 88 87 83
14 2013 21-Feb 108 114 117 111 113
24-Apr 103 107 102 101 100
15-Jul 85 89 103 86 84
17-Aug 83 79 81 85 81
11-Oct 85 90 88 87 83
15 2014 3-Jan 99 103 106 106 104
14-May 135 145 130 132 136
21-Jun 119 120 123 116 116
2-Nov 95 95 97 124 94
7-Dec 106 109 110 108 80
Data Curah Hujan Yang Digunakan
1 Stasiun A
2 Stasiun B
3 Stasiun C
4 Stasiun D
5 Stasiun E

Tabel I.1 Data Curah Hujan


Curah Hujan (mm)
No Tahun
Stasiun A Stasiun B Stasiun C Stasiun D Stasiun E
1 2000 443 441 478 479 438
2 2001 482 513 534 531 497
3 2002 533 497 528 538 529
4 2003 528 530 521 537 496
5 2004 431 434 442 454 437
6 2005 442 462 487 491 483
7 2006 470 456 475 485 491
8 2007 464 479 491 470 461
9 2008 464 479 491 470 461
10 2009 528 530 521 537 496
11 2010 442 462 487 491 483
12 2011 523 532 551 518 536
13 2012 464 479 491 470 461
14 2013 464 479 491 470 461
15 2014 554 572 566 586 530
BAB IV
ANALISA PERHITUNGAN

DATA DASAR
Data Topograf

Dengan mengacu pada denah, dapat dibuat tabel sebagai berikut :

Luas Areal Elevasi (m) Panjang Lahan Kemiringan


No. Petak
(Ha) Awal Akhir (m) (%)
1 A 2.59 34.8 32.8 252.69 0.79
2 B 1.27 33.7 28.9 159.14 3.02
3 C 2.01 31.0 26.7 209.40 2.05
4 D 1.14 28.2 25.5 222.09 1.22
5 E 4.50 33.6 32.2 301.04 0.47
6 F 2.20 31.6 28.5 228.25 1.36
7 G 1.75 28.6 26.5 201.56 1.04
8 H 2.32 26.4 25.3 188.68 0.58
9 I 2.63 28.6 26.5 230.49 0.91

Diketahui :
✏ Q1 = 0.84 m³/dtk
Q2 = 0.54 m³/dtk

✏ Panjang lahan :
a = 200 m f = 190 m
b = 115 m g = 160 m
c = 225 m h = 150 m
d = 110 m i = 100 m
e = 175 m

✏ Lebar jalan + trotoar


Jalan A = 5.2 m Jalan E = 5.2 m
Jalan B = 5.2 m Jalan F = 5.2 m
Jalan C = 5.2 m Jalan H = 5.2 m
Jalan D = 5.2 m Jalan I = 5.2 m

✏ Elevasi x = 72

elevasi tertinggi - elevasi terendah


Kemiringan lahan = x 100%
panjang lahan

a(P-Q) Syarat : P > Q


Mencari elevasi titk = + Q
b
p
x = elevasi titik yang ditinjau
P = kontur tertinggi
Q
X Q = kontur terendah
a
a = jarak dari kontur Q ke titik x
b
b = jarak P dan Q
Data Saluran

Dengan mengacu pada denah, dapat dibuat tabel sebagai berikut :


Nama Elevasi (m) Panjang Kemiringan
No.
Saluran Awal Akhir Saluran (m) (%)
1 A0 - A1 34.8 34.2 225 0.27
2 A1 - A2 34.2 32.8 115 1.22
3 A0 - A3 34.8 33.7 115 0.96
4 A3 - A2 33.7 32.8 225 0.40
5 B0 - B1 33.7 31.8 110 1.73
6 B1 - B2 31.8 28.9 115 2.52
7 B0 - B3 33.7 31.7 115 1.74
8 B3 - B2 31.7 28.9 110 2.55
9 C0 - C 1 31.0 29.5 175 0.86
10 C1 - C 2 29.5 26.7 115 2.43
11 C0 - C 3 31.0 28.8 115 1.91
12 C3 - C 2 28.8 26.7 175 1.20
13 D0 - D 1 28.2 26.9 190 0.68
14 D1 - D 2 26.9 25.5 311 0.45
15 D0 - D 3 28.2 26.5 115 1.48
16 D3 - D 2 26.5 25.5 188 0.53
17 E0 - E 1 33.6 32.6 225 0.44
18 E1 - E 2 32.6 32.2 200 0.20
19 E0 - E 3 33.6 33.5 200 0.05
20 E3 - E 2 33.5 32.2 225 0.58
21 F0 - F1 31.6 28.7 110 2.64
22 F1 - F2 28.7 28.5 200 0.10
23 F0 - F3 31.6 31.5 200 0.05
24 F3 - F2 31.5 28.5 110 2.73
25 G0 - G1 28.6 26.6 175 1.14
26 G1 - G2 26.6 26.5 100 0.10
27 G0 - G3 28.6 27.9 100 0.70
28 G3 - G2 27.9 26.5 175 0.80
29 H0 - H 1 26.4 25.4 189 0.53
30 H1 - H 2 25.4 25.3 334 0.03
31 H0 - H 3 26.4 26.2 100 0.20
32 H3 - H 2 26.2 25.3 160 0.56
33 I0 - I1 28.4 26.5 175 1.09
34 I2 - I1 27.4 26.5 150 0.60
35 I3 - I2 28.6 27.4 175 0.69
36 I3 - I0 28.6 28.4 150 0.13
miringan
(%)
0.79
3.02
2.05
1.22
0.47
1.36
1.04
0.58
0.91
III. 2.2. Perhitungan Data Curah Hujan Max Tiap Stasiun
Tabel III. 1. DATA DASAR

Curah Hujan (mm) Ch Max Ch Max Ch Max


No Tahun Tanggal Jumlah
Sta. A Sta. B Sta. C Sta. D Sta. E Sta. A Sta. B Sta. C

4-Jan 94 97 105 98 91 485

9-Mar 99 90 109 112 88 498

1 2000 7-Apr 84 79 80 102 81 426 99 97 109

20-Jul 77 79 90 76 78 400

15-Nov 89 96 94 91 100 470

2-Jan 88 109 97 103 95 492

5-Mar 108 124 115 111 113 571

2 2001 7-May 91 85 127 87 88 478 116 124 127

8-Aug 79 81 83 121 78 442

23-Dec 116 114 112 109 123 574

9-Feb 125 119 120 129 117 610

8-Apr 117 111 109 107 115 559

3 2002 8-Jun 103 91 97 114 98 503 125 119 120

29-Nov 93 85 99 95 98 470

14-Dec 95 91 103 93 101 483

4-Feb 137 129 118 119 129 632

30-Mar 129 145 118 113 115 620

4 2003 10-Apr 106 96 121 99 98 520 137 145 121

7-Sep 77 79 82 123 77 438

17-Oct 79 81 82 83 77 402

12-Jan 88 97 90 94 95 464

14-Feb 92 96 101 102 97 488

5 2004 19-Jun 89 85 87 103 86 450 92 97 101

31-Aug 83 79 88 80 81 411

4-Sep 79 77 76 75 78 385

13-Apr 93 101 107 98 105 504

5-May 94 104 97 99 98 492

6 2005 7-Aug 78 79 99 82 76 414 94 104 107

25-Oct 84 86 89 115 93 467

24-Dec 93 92 95 97 111 488

6-Mar 119 114 122 125 121 601


15-Jul 86 89 88 86 95 444

7 2006 17-Sep 84 82 81 86 85 418 119 114 122

28-Oct 86 87 85 90 88 436

31-Dec 95 84 99 98 102 478

21-Feb 108 114 117 111 113 563

24-Apr 103 107 102 101 100 513

8 2007 15-Jul 85 89 103 86 84 447 108 114 117

17-Aug 83 79 81 85 81 409

11-Oct 85 90 88 87 83 433

21-Feb 108 114 117 111 113 563

24-Apr 103 107 102 101 100 513

9 2008 15-Jul 85 89 103 86 84 447 108 114 117

17-Aug 83 79 81 85 81 409

11-Oct 85 90 88 87 83 433
4-Feb 137 129 118 119 129 632

30-Mar 129 145 118 113 115 620

10 2009 10-Apr 106 96 121 99 98 520 137 145 121

7-Sep 77 79 82 123 77 438

17-Oct 79 81 82 83 77 402

13-Apr 93 101 107 98 105 504

5-May 94 104 97 99 98 492

11 2010 7-Aug 78 79 99 82 76 414 94 104 107

25-Oct 84 86 89 115 93 467

24-Dec 93 92 95 97 111 488

12-Jan 108 119 114 114 111 566

14-Mar 119 125 119 126 119 608

12 2011 19-Apr 115 111 109 87 112 534 119 125 119

30-Aug 86 89 111 93 91 470

16-Dec 95 88 98 98 103 482

21-Feb 108 114 117 111 113 563

24-Apr 103 107 102 101 100 513

13 2012 15-Jul 85 89 103 86 84 447 108 114 117

17-Aug 83 79 81 85 81 409

11-Oct 85 90 88 87 83 433

21-Feb 108 114 117 111 113 563

24-Apr 103 107 102 101 100 513

14 2013 15-Jul 85 89 103 86 84 447 108 114 117

17-Aug 83 79 81 85 81 409

11-Oct 85 90 88 87 83 433

3-Jan 99 103 106 106 104 518

14-May 135 145 130 132 136 678

15 2014 21-Jun 119 120 123 116 116 594 135 145 130

2-Nov 95 95 97 124 94 505

7-Dec 106 109 110 108 80 513

Curah Hujan Maksimum yang diurutkan


Stasiun A Stasiun B Stasiun C Stasiun D Stasiun E

CH CH CH CH CH
Tahun Tahun Tahun Tahun Tahun
(mm) (mm) (mm) (mm) (mm
2000 137 2000 145 2000 130 2000 132 2000 136
2001 137 2001 145 2001 127 2001 129 2001 129

2002 135 2002 145 2002 122 2002 126 2002 129

2003 125 2003 125 2003 121 2003 125 2003 123

2004 119 2004 124 2004 121 2004 123 2004 121

2005 119 2005 119 2005 120 2005 123 2005 119

2006 116 2006 114 2006 119 2006 121 2006 117

2007 108 2007 114 2007 117 2007 115 2007 113

2008 108 2008 114 2008 117 2008 115 2008 113

2009 108 2009 114 2009 117 2009 112 2009 113

2010 108 2010 114 2010 117 2010 111 2010 113

2011 99 2011 104 2011 109 2011 111 2011 111

2012 94 2012 104 2012 107 2012 111 2012 111

2013 92 2013 97 2013 107 2013 111 2013 100

2014 92 2014 97 2014 101 2014 103 2014 97


Ch Max Ch Max

Sta. D Sta. E

112 100

121 123

129 117

123 129

103 97

115 111
125 121

111 113

111 113
123 129

115 111

126 119

111 113

111 113

132 136

Stasiun E

CH
(mm)
136
129

129

123

121

119

117

113

113

113

113

111

111

100

97
3.2.3 Metode Log Pearson Type III

☛ Stasiun A

No Tahun Curah Hujan (Xi) Log Xi (Log Xi - Log Xi)² (Log X

1 2000 137 2.137 0.0076 0


2 2001 137 2.137 0.0076 0
3 2002 135 2.130 0.0065 0
4 2003 125 2.097 0.0022 0
5 2004 119 2.076 0.0007 0
6 2005 119 2.076 0.0007 0
7 2006 116 2.064 0.0002 0
8 2007 108 2.033 0.0003 0
9 2008 108 2.033 0.0003 0
10 2009 108 2.033 0.0003 0
11 2010 108 2.033 0.0003 0
12 2011 99 1.996 0.0029 -0
13 2012 94 1.973 0.0059 -0
14 2013 92 1.964 0.0074 -0
15 2014 92 1.964 0.0074 -0
Jumlah 1697 30.746 0.0425 0

Σ (Log Xi) Σ(Log Xi - Log Xi)²


• Log Xi =
n
• Sx = ( n - 1
30.746 0.0425 0.5
=
15
= ( 15 - 1
)
= 2.050 = 0.055

n x Σ(Log Xi - Log Xi)³


• Cs =
( n - 1 ) x ( n - 2 ) x ( Sx ) ³
15 x 0.0001
=
14 x 13 x 0.0002
= 0.04

• K2 = 0 (Lampiran tabel 3)
• K5 = 0.842 (Lampiran tabel 3)
• K10 = 1.282 (Lampiran tabel 3)
• K15 = 1.438 (Lampiran tabel 3)
• Persamaan garis lurus untuk distribusi normal :

Log Xi = Log Xi + Sx . K

• Log X2 = 2.050 + ( 0.055 x 0 ) • Log X10 = 2.050 +


= 2.050 = 2.120
X2 = 112.138 mm X10 = 131.936

• Log X5 = 2.050 + ( 0.055 x 0.842 ) • Log X15 = 2.050 +


= 2.096 = 2.129
X5 = 124.78 mm X15 = 134.578
☛ Stasiun B

No Tahun Curah Hujan (Xi) Log Xi (Log Xi - Log Xi)² (Log X

1 2000 145 2.161 0.0084 0


2 2001 145 2.161 0.0084 0
3 2002 145 2.161 0.0084 0
4 2003 125 2.097 0.0008 0
5 2004 124 2.093 0.0006 0
6 2005 119 2.076 0.0000 0
7 2006 114 2.057 0.0002 0
8 2007 114 2.057 0.0002 0
9 2008 114 2.057 0.0002 0
10 2009 114 2.057 0.0002 0
11 2010 114 2.057 0.0002 0
12 2011 104 2.017 0.0028 -0
13 2012 104 2.017 0.0028 -0
14 2013 97 1.987 0.0068 -0
15 2014 97 1.987 0.0068 -0
Jumlah 1775 31.042 0.0467 0

Σ (Log Xi) Σ(Log Xi - Log Xi)²


• Log Xi =
n
• Sx = ( n - 1
31.042 0.0467 0.5
=
15
= ( 15 - 1
)
= 2.069 = 0.058

n x Σ(Log Xi - Log Xi)³


• Cs =
( n - 1 ) x ( n - 2 ) x ( Sx ) ³
15 x 0.0009
=
14 x 13 x 0.000
= 0.4

• K2 = -0.066 (Lampiran tabel 3)


• K5 = 0.816 (Lampiran tabel 3)
• K10 = 1.317 (Lampiran tabel 3)
• K15 = 1.505 (Lampiran tabel 3)
• Persamaan garis lurus untuk distribusi normal :

Log Xi = Log Xi + Sx . K

• Log X2 = 2.069 + ( 0.058 x -0.066 ) • Log X10 = 2.069 +


= 2.066 = 2.146
X2 = 116.323 mm X10 = 139.801

• Log X5 = 2.069 + ( 0.058 x 0.816 ) • Log X15 = 2.069 +


= 2.117 = 2.156
X5 = 130.793 mm X15 = 143.333
☛ Stasiun C

No Tahun Curah Hujan (Xi) Log Xi (Log Xi - Log Xi)² (Log X

1 2000 130 2.114 0.0022 0


2 2001 127 2.104 0.0014 0
3 2002 122 2.086 0.0004 0
4 2003 121 2.083 0.0003 0
5 2004 121 2.083 0.0003 0
6 2005 120 2.079 0.0002 0
7 2006 119 2.076 0.0001 0
8 2007 117 2.068 0.0000 0
9 2008 117 2.068 0.0000 0
10 2009 117 2.068 0.0000 0
11 2010 117 2.068 0.0000 0
12 2011 109 2.037 0.0008 0
13 2012 107 2.029 0.0014 -0
14 2013 107 2.029 0.0014 -0
15 2014 101 2.004 0.0039 -0
Jumlah 1752 30.998 0.0123 -0

Σ (Log Xi) Σ(Log Xi - Log Xi)²


• Log X =
n
• Sx = ( n - 1
30.998 0.0123 0.5
=
15
= ( 15 - 1
)
= 2.067 = 0.030

n x Σ(Log Xi - Log Xi)³


• Cs =
( n - 1 ) x ( n - 2 ) x ( Sx ) ³
15 x -0.0002
=
14 x 13 x 0.000
= -0.6

• K2 = 0.099 (Lampiran tabel 3)


• K5 = 0.857 (Lampiran tabel 3)
• K10 = 1.200 (Lampiran tabel 3)
• K15 = 1.309 (Lampiran tabel 3)

• Persamaan garis lurus untuk distribusi normal :

Log Xi = Log X + Sx . K

• Log X2 = 2.067 + ( 0.030 x 0.099 ) • Log X10 = 2.067 +


= 2.069 = 2.102
X2 = 117.339 mm X10 = 126.492

• Log X5 = 2.067 + ( 0.030 x 0.857 ) • Log X15 = 2.067 +


= 2.092 = 2.105
X5 = 123.566 mm X15 = 127.439
☛ Stasiun D

No Tahun Curah Hujan (Xi) Log Xi (Log Xi - Log Xi)² (Log X

1 2000 132 2.121 0.0050 0


2 2001 129 2.111 0.0037 0
3 2002 126 2.100 0.0026 0
4 2003 125 2.097 0.0022 0
5 2004 123 2.090 0.0016 0
6 2005 123 2.090 0.0016 0
7 2006 121 2.083 0.0011 0
8 2007 115 2.061 0.0001 0
9 2008 115 2.061 0.0001 0
10 2009 112 2.049 0.0000 0
11 2010 111 2.045 0.0000 0
12 2011 111 2.045 0.0000 0
13 2012 111 2.045 0.0000 0
14 2013 111 2.045 0.0000 0
15 2014 103 2.013 0.0014 -0
Jumlah 1768 31.056 0.0145 0

Σ (Log Xi) Σ(Log Xi - Log Xi)²


• Log Xi =
n
• Sx = ( n - 1
31.056 0.0145 0.5
=
15
= ( 15 - 1
)
= 2.070 = 0.032

n x Σ(Log Xi - Log Xi)³


• Cs =
( n - 1 ) x ( n - 2 ) x ( Sx ) ³
15 x 0.0009
=
14 x 13 x 0.000
= 2.3

• K2 = -0.345 (Lampiran tabel 3)


• K5 = 0.546 (Lampiran tabel 3)
• K10 = 1.267 (Lampiran tabel 3)
• K15 = 1.595 (Lampiran tabel 3)
• Persamaan garis lurus untuk distribusi normal :

Log Xi = Log Xi + Sx . K

• Log X2 = 2.050 + ( 0.032 x -0.345 ) • Log X10 = 2.050 +


= 2.039 = 2.120
X2 = 109.309 mm X10 = 131.686

• Log X5 = 2.050 + ( 0.055 x 0.546 ) • Log X15 = 2.050 +


= 2.080 = 2.138
X5 = 120.18 mm X15 = 137.279
☛ Stasiun E

No Tahun Curah Hujan (Xi) Log Xi (Log Xi - Log Xi)² (Log X

1 2000 136 2.134 0.0041 0


2 2001 129 2.111 0.0017 0
3 2002 129 2.111 0.0017 0
4 2003 123 2.090 0.0004 0
5 2004 121 2.083 0.0002 0
6 2005 119 2.076 0.0000 0
7 2006 117 2.068 0.0000 0
8 2007 113 2.053 0.0003 0
9 2008 113 2.053 0.0003 0
10 2009 113 2.053 0.0003 0
11 2010 113 2.053 0.0003 0
12 2011 111 2.045 0.0006 0
13 2012 111 2.045 0.0006 0
14 2013 100 2.000 0.0048 -0
15 2014 97 1.987 0.0068 -0
Jumlah 1745 30.961 0.0220 -0

Σ (Log Xi) Σ(Log Xi - Log Xi)²


• Log Xi =
n
• Sx = ( n - 1
30.961 0.0220 0.5
=
15
= ( 15 - 1
)
= 2.064 = 0.040

n x Σ(Log Xi - Log Xi)³


• Cs =
( n - 1 ) x ( n - 2 ) x ( Sx ) ³
15 x -0.0005
=
14 x 13 x 0.000
= -0.7

• K2 = 0.116 (Lampiran tabel 3)


• K5 = 0.857 (Lampiran tabel 3)
• K10 = 1.183 (Lampiran tabel 3)
• K15 = 1.285 (Lampiran tabel 3)
• Persamaan garis lurus untuk distribusi normal :

Log Xi = Log Xi + Sx . K

• Log X2 = 2.064 + ( 0.040 x 0.116 ) • Log X10 = 2.064 +


= 2.069 = 2.111
X2 = 117.128 mm X10 = 129.117

• Log X5 = 2.064 + ( 0.040 x 0.857 ) • Log X15 = 2.064 +


= 2.098 = 2.115
X5 = 125.329 mm X15 = 130.321
☛ Tabel Rekap Curah Hujan Rata - Rata Ketiga Stasiun Dengan Metode Log Pearson Typ

Periode Ulang Stasiun A Stasiun B Stasiun C Stasiun D Stasiun E


No Rata
(Tahun) (mm) (mm) (mm) (mm) (mm)

1 2 112.138 116.323 117.339 109.309 117.128


2 5 124.775 130.793 123.566 120.178 125.329
3 10 131.936 139.801 126.492 131.686 129.117
4 15 134.578 143.333 127.439 137.279 130.321
(Log Xi - Log Xi)³

0.0007
0.0007
0.0005
0.0001
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
-0.0002
-0.0004
-0.0006
-0.0006
0.0001

0.5
)
( 0.055 x 1.282 )

mm

( 0.055 x 1.438 )

mm
(Log Xi - Log Xi)³

0.0008
0.0008
0.0008
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
-0.0001
-0.0001
-0.0006
-0.0006
0.0009

0.5
)
( 0.058 x 1.317 )

mm

( 0.058 x 1.505 )

mm
(Log Xi - Log Xi)³

0.0001
0.0001
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
-0.0001
-0.0001
-0.0002
-0.0002

0.5
)
( 0.030 x 1.200 )

mm

( 0.030 x 1.309 )

mm
(Log Xi - Log Xi)³

0.0004
0.0002
0.0001
0.0001
0.0001
0.0001
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
-0.0001
0.0009

0.5
)
( 0.055 x 1.267 )

mm

( 0.055 x 1.595 )

mm
(Log Xi - Log Xi)³

0.0003
0.0001
0.0001
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
-0.0003
-0.0006
-0.0005

0.5
)
( 0.040 x 1.183 )

mm

( 0.040 x 1.285 )

mm
arson Type III (mm)

Rata - Rata (mm)

114.447
124.928
131.806
134.590
Lampiran 3
NILAI K DISTRIBUSI LOG PEARSON TIPE III
Perode Ulang (Tahun)
Kemencengan
2 5 10 25 50 100 200 1000
(Cs)
3.0 -0.360 0.420 1.180 2.278 3.152 4.051 4.970 7.250
2.5 -0.360 0.518 1.250 2.262 3.048 3.845 4.652 6.600
2.2 -0.330 0.574 1.284 2.240 2.970 3.705 4.444 6.200
2.0 -0.307 0.609 1.302 2.219 2.912 3.605 4.298 5.910
1.8 -0.282 0.643 1.318 2.193 2.848 3.499 4.147 5.660
1.6 -0.254 0.675 1.329 2.163 2.780 3.388 3.990 5.390
1.4 -0.225 0.705 1.337 2.128 2.706 3.271 3.828 5.110
1.2 -0.195 0.732 1.340 2.087 2.626 3.149 3.661 4.820
1.0 -0.164 0.758 1.340 2.043 2.542 3.022 3.489 4.540
0.9 -0.148 0.769 1.339 2.018 2.498 2.957 3.401 4.395
0.8 -0.132 0.780 1.336 1.998 2.453 2.891 3.312 4.250
0.7 -0.116 0.790 1.333 1.967 2.407 2.824 3.223 4.105
0.6 -0.099 0.800 1.328 1.939 2.359 2.755 3.132 3.960
0.5 -0.083 0.808 1.323 1.910 2.311 2.686 3.041 3.815
0.4 -0.066 0.816 1.317 1.880 2.261 2.615 2.949 3.670
0.3 -0.050 0.824 1.309 1.849 2.211 2.544 2.856 3.525
0.2 -0.033 0.842 1.282 1.751 2.054 2.326 2.576 3.090
0.1 -0.017 0.836 1.270 1.761 2.000 2.252 2.482 3.950
0.0 0.000 0.842 1.282 1.751 2.054 2.326 2.576 3.090
-0.1 0.017 0.850 1.258 1.680 1.945 2.178 2.388 3.950
-0.2 0.033 0.850 1.258 1.680 1.945 2.178 2.388 2.810
-0.3 0.050 0.853 1.245 1.643 1.890 2.104 2.294 2.675
-0.4 0.066 0.855 1.231 1.606 1.834 2.029 2.210 2.540
-0.5 0.083 1.856 1.260 1.567 1.777 1.955 2.108 2.400
-0.6 0.099 0.857 1.200 1.528 1.720 1.880 2.016 2.275
-0.7 0.116 0.857 1.183 1.488 1.663 1.806 1.926 2.150
-0.8 0.132 0.856 1.166 1.448 1.606 1.733 1.873 2.035
-0.9 0.148 0.854 1.147 1.407 1.549 1.660 1.749 1.910
-1.0 0.164 0.852 1.128 1.366 1.492 1.588 1.664 1.800
-1.2 0.195 0.844 1.086 1.282 1.379 1.449 1.501 1.625
-1.4 0.225 0.832 1.041 1.198 1.270 1.318 1.351 1.465
-1.6 0.254 0.817 0.994 1.116 1.166 1.197 1.216 1.280
-1.8 0.282 0.799 0.945 1.035 1.0.69 1.087 1.097 1.130
-2.0 0.307 0.777 0.895 0.959 0.980 0.990 1.995 1.000
-2.2 0.330 0.752 0.844 0.888 0.900 0.905 0.907 0.910
-2.5 0.360 0.711 0.771 0.793 0.798 0.799 0.800 0.802
-3.0 0.396 0.636 0.660 0.666 0.666 0.667 0.667 0.668
PERHITUNGAN CURAH HUJAN RENCANA

Perhitungan Curah Hujan Maksimum Rerata

Luas DAS / Luas pengaruh = 20.40 Ha Koefisien Thissen


Stasiun A = 17.12 W1 = 0.84
Stasiun B = 16.47 W2 = 0.81
Stasiun C = 15.19 W3 = 0.74
Stasiun D = 15.40 W4 = 0.75
Stasiun E = 16.37 W5 = 0.80
+ +
80.55 3.95

Curah Hujan (mm) Rata - Rata


No Tahun Tanggal Max
Sta. A Sta. B Sta. C Sta. D Sta. E Aljabar Thiessen
1 2000 4-Jan 94 97 105 98 91 97.00 382.32
9-Mar 99 90 109 112 88 99.60 392.00
7-Apr 84 79 80 102 81 85.20 335.78 392.00
20-Jul 77 79 90 76 78 80.00 315.32
15-Nov 89 96 94 91 100 94.00 371.06
2 2001 2-Jan 88 109 97 103 95 98.40 388.00
5-Mar 108 124 115 111 113 114.20 450.77
7-May 91 85 127 87 88 95.60 375.78 453.69
8-Aug 79 81 83 121 78 88.40 347.37
23-Dec 116 114 112 109 123 114.80 453.69
3 2002 9-Feb 125 119 120 129 117 122.00 481.51
8-Apr 117 111 109 107 115 111.80 441.94
8-Jun 103 91 97 114 98 100.60 396.76 481.51
29-Nov 93 85 99 95 98 94.00 370.68
14-Dec 95 91 103 93 101 96.60 381.07
4 2003 4-Feb 137 129 118 119 129 126.40 500.24
30-Mar 129 145 118 113 115 124.00 490.68
10-Apr 106 96 121 99 98 104.00 409.86 500.24
7-Sep 77 79 82 123 77 87.60 344.04
17-Oct 79 81 82 83 77 80.40 317.14
5 2004 12-Jan 88 97 90 94 95 92.80 366.31
14-Feb 92 96 101 102 97 97.60 384.69
19-Jun 89 85 87 103 86 90.00 354.80 384.69
31-Aug 83 79 88 80 81 82.20 324.29
4-Sep 79 77 76 75 78 77.00 304.21
6 2005 13-Apr 93 101 107 98 105 100.80 397.43
5-May 94 104 97 99 98 98.40 388.38
7-Aug 78 79 99 82 76 82.80 325.78 397.43
25-Oct 84 86 89 115 93 93.40 367.57
24-Dec 93 92 95 97 111 97.60 385.29
7 2006 6-Mar 119 114 122 125 121 120.20 474.12
15-Jul 86 89 88 86 95 88.80 350.64
17-Sep 84 82 81 86 85 83.60 330.08 474.12
28-Oct 86 87 85 90 88 87.20 344.20
31-Dec 95 84 99 98 102 95.60 377.02
8 2007 21-Feb 108 114 117 111 113 112.60 444.18
24-Apr 103 107 102 101 100 102.60 405.19
15-Jul 85 89 103 86 84 89.40 352.15 444.18
17-Aug 83 79 81 85 81 81.80 322.85
11-Oct 85 90 88 87 83 86.60 341.74
9 2008 21-Feb 108 114 117 111 113 112.60 444.18
24-Apr 103 107 102 101 100 102.60 405.19
15-Jul 85 89 103 86 84 89.40 352.15 444.18
17-Aug 83 79 81 85 81 81.80 322.85
11-Oct 85 90 88 87 83 86.60 341.74
10 2009 4-Feb 137 129 118 119 129 126.40 500.24
30-Mar 129 145 118 113 115 124.00 490.68
10-Apr 106 96 121 99 98 104.00 409.86 500.24
7-Sep 77 79 82 123 77 87.60 344.04
17-Oct 79 81 82 83 77 80.40 317.14
11 2010 13-Apr 93 101 107 98 105 100.80 397.43
5-May 94 104 97 99 98 98.40 388.38
7-Aug 78 79 99 82 76 82.80 325.78 397.43
25-Oct 84 86 89 115 93 93.40 367.57
24-Dec 93 92 95 97 111 97.60 385.29
12 2011 12-Jan 108 119 114 114 111 113.20 446.64
14-Mar 119 125 119 126 119 121.60 479.92
19-Apr 115 111 109 87 112 106.80 422.76 479.92
30-Aug 86 89 111 93 91 94.00 369.84
16-Dec 95 88 98 98 103 96.40 380.31
13 2012 21-Feb 108 114 117 111 113 112.60 444.18
24-Apr 103 107 102 101 100 102.60 405.19
15-Jul 85 89 103 86 84 89.40 352.15 444.18
17-Aug 83 79 81 85 81 81.80 322.85
11-Oct 85 90 88 87 83 86.60 341.74
14 2013 21-Feb 108 114 117 111 113 112.60 444.18
24-Apr 103 107 102 101 100 102.60 405.19
15-Jul 85 89 103 86 84 89.40 352.15 444.18
17-Aug 83 79 81 85 81 81.80 322.85
11-Oct 85 90 88 87 83 86.60 341.74
15 2014 3-Jan 99 103 106 106 104 103.60 408.57
14-May 135 145 130 132 136 135.60 535.84
21-Jun 119 120 123 116 116 118.80 468.90 535.84
2-Nov 95 95 97 124 94 101.00 397.62
7-Dec 106 109 110 108 80 102.60 404.52
Metode Thiessen & Rata - Rata Aljabar

Luas Poligon Ai x Pi
No. POS CH ( mm )
Thiessen ( ha )
Stasiun A 554 17.12 9484.48
Stasiun B 572 16.47 9420.84
Stasiun C 566 15.19 8597.54
Stasiun D 586 15.40 9024.4
Stasiun E 536 16.37 8774.32
Jumlah 2814 80.55 45301.58

Penyelesaian :

a) Dengan Metode rata-rata Aljabar


554 + 572 + 566 + 586 + 536 2814
P = = = 563 mm
5 5

b) Dengan Metode Thiessen


n

S Pi Ai
i=l
###
P = = = 562 mm
n 80.55
S Ai
i=l
3.1.3 Data Curah Hujan
Data curah hujan yang digunakan :
1. Stasiun A 3. Stasiun C 5. Stasiun E
2. Stasiun B 4. Stasiun D 6. Stasiun F
Curah Hujan (mm)
No Tahun
Sta. A Sta. B Sta. C Sta. D Sta. E
1 2000 443 441 478 479 438
2 2001 482 513 534 531 497
3 2002 533 497 528 538 529
4 2003 528 530 521 537 496
5 2004 431 434 442 454 437
6 2005 442 462 487 491 483
7 2006 470 456 475 485 491
8 2007 464 479 491 470 461
9 2008 464 479 491 470 461
10 2009 528 530 521 537 496
11 2010 442 462 487 491 483
12 2011 523 532 551 518 536
13 2012 464 479 491 470 461
14 2013 464 479 491 470 461
15 2014 554 572 566 586 530

3.2 ANALISA CURAH HUJAN RENCANA


3.2.1 Metode Haspers

☛ Stasiun A
Maks m T Ut
No Urutan X
554 1 16 1.69
1 1 554 533 2 8 1.06
2 2 533
3 3 528 Tinggi curah hujan rata-rata :
4 4 528 ΣX 7232 Rumus :
R = = = 482.133 mm
5 5 523 n 15 T=(n+1)/m
6 6 482
7 7 470 U2 = -0.22 (Lampiran tabel 1) U10 = 1.26 (Lampiran t
8 8 464 U5 = 0.64 (Lampiran tabel 1) U15 = 1.63 (Lampiran t
9 9 464
10 10 464 1 R1 - R R2 - R
Sn = ( + )
11 11 464 2 U1 U2
12 12 443 1 554 - 482.133 533 - 482.133
= ( + )
13 13 442 2 1.69 1.06
14 14 442 1
= ( 42.525 + 47.987 )
15 15 431 2
Jumlah 7232 Sn = 45.256
• R2 = R + Sn + U2 • R10 = R + Sn + U2
= 482.133 + 45.256 + -0.22 = 482.133 + 45.256 + 1.26
= 527.169 mm = 528.649 mm
• R5 = R + Sn + U5 • R15 = R + Sn + U2
= 482.133 + 45.256 + 0.64 = 482.133 + 45.256 + 1.63
= 528.029 mm = 529.019 mm
☛ Stasiun B
Maks m T Ut
No Urutan X
572 1 16 1.69
1 1 572 532 2 8 1.06
2 2 532
3 3 530 Tinggi curah hujan rata-rata :
4 4 530 ΣX 7345 Rumus :
R = = = 489.667 mm
5 5 513 n 15 T=(n+1)/m
6 6 497
7 7 479 U2 = -0.22 (Lampiran tabel 1) U10 = 1.26 (Lampiran t
8 8 479 U5 = 0.64 (Lampiran tabel 1) U15 = 1.63 (Lampiran t
9 9 479
10 10 479 1 R1 - R R2 - R
Sn = ( + )
11 11 462 2 U1 U2
12 12 462 1 572 - 489.667 532 - 489.667
= ( + )
13 13 456 2 1.69 1.06
14 14 441 1
= ( 48.718 + 39.937 )
15 15 434 2
Jumlah 7345 Sn = 44.328

• R2 = R + Sn + U2 • R10 = R + Sn + U2
= 489.667 + 44.328 + -0.22 = 489.667 + 44.328 + 1.26
= 533.774 mm = 535.254 mm
• R5 = R + Sn + U5 • R15 = R + Sn + U2
= 489.667 + 44.328 + 0.64 = 489.667 + 44.328 + 1.63
= 534.634 mm = 535.624 mm
☛ Stasiun C
Maks m T Ut
No Urutan X
566 1 16 1.69
1 1 566 551 2 8 1.06
2 2 551
3 3 534 Tinggi curah hujan rata-rata :
4 4 528 ΣX 7554 Rumus :
R = = = 503.600 mm
5 5 521 n 15 T=(n+1)/m
6 6 521
7 7 491 U2 = -0.22 (Lampiran tabel 1) U10 = 1.26 (Lampiran t
8 8 491 U5 = 0.64 (Lampiran tabel 1) U15 = 1.63 (Lampiran t
9 9 491
10 10 491 1 R1 - R R2 - R
Sn = ( + )
11 11 487 2 U1 U2
12 12 487 1 566 - 503.600 551 - 503.600
= ( + )
13 13 478 2 1.69 1.06
14 14 475 1
= ( 36.923 + 44.717 )
15 15 442 2
Jumlah 7554 Sn = 40.820

• R2 = R + Sn + U2 • R10 = R + Sn + U2
= 503.600 + 40.820 + -0.22 = 503.600 + 40.820 + 1.26
= 544.200 mm = 545.680 mm
• R5 = R + Sn + U5 R
• 15 = R + Sn + U2
= 503.600 + 40.820 + 0.64 = 503.600 + 40.820 + 1.63
= 545.060 mm = 546.050 mm
☛ Stasiun D
Maks m T Ut
No Urutan X
586 1 16 1.69
1 1 586 538 2 8 1.06
2 2 538
3 3 537 Tinggi curah hujan rata-rata :
4 4 537 ΣX 7527 Rumus :
R = = = 501.800 mm
5 5 531 n 15 T=(n+1)/m
6 6 518
7 7 491 U2 = -0.22 (Lampiran tabel 1) U10 = 1.26 (Lampiran t
8 8 491 U5 = 0.64 (Lampiran tabel 1) U15 = 1.63 (Lampiran t
9 9 485
10 10 479 1 R1 - R R2 - R
Sn = ( + )
11 11 470 2 U1 U2
12 12 470 1 586 - 501.800 538 - 501.800
= ( + )
13 13 470 2 1.69 1.06
14 14 470 1
= ( 49.822 + 34.151 )
15 15 454 2
Jumlah 7527 Sn = 41.987

• R2 = R + Sn + U2 • R10 = R + Sn + U2
= 501.800 + 41.987 + -0.22 = 501.800 + 41.987 + 1.26
= 543.567 mm = 545.047 mm
• R5 = R + Sn + U5 • R15 = R + Sn + U2
= 501.800 + 41.987 + 0.64 = 501.800 + 41.987 + 1.63
= 544.427 mm = 545.417 mm
☛ Stasiun E
Maks m T Ut
No Urutan X
536 1 16 1.69
1 1 536 530 2 8 1.06
2 2 530
3 3 529 Tinggi curah hujan rata-rata :
4 4 497 ΣX 7260 Rumus :
R = = = 484.000 mm
5 5 496 n 15 T=(n+1)/m
6 6 496
7 7 491 U2 = -0.22 (Lampiran tabel 1) U10 = 1.26 (Lampiran t
8 8 483 U5 = 0.64 (Lampiran tabel 1) U15 = 1.63 (Lampiran t
9 9 483
10 10 461 1 R1 - R R2 - R
Sn = ( + )
11 11 461 2 U1 U2
12 12 461 1 536 - 484.000 530 - 484.000
= ( + )
13 13 461 2 1.69 1.06
14 14 438 1
= ( 30.769 + 43.396 )
15 15 437 2
Jumlah 7260 Sn = 37.083

• R2 = R + Sn + U2 • R10 = R + Sn + U2
= 484.000 + 37.083 + -0.22 = 484.000 + 37.083 + 1.26
= 520.863 mm = 522.343 mm
• R5 = R + Sn + U5 R
• 15 = R + Sn + U2
= 484.000 + 37.083 + 0.64 = 484.000 + 37.083 + 1.63
= 521.723 mm = 522.713 mm
☛ Tabel Rekap Curah Hujan Rata - Rata Ketiga Stasiun Dengan Metode Haspers (mm)
Periode Sta. A Sta. B Sta. C Sta. D Sta. E Rata - Rata
No
Ulang (Tahun) (mm) (mm) (mm) (mm) (mm) (mm)
1 2 527.169 282.593 274.449 543.567 520.863 429.728
2 5 528.029 283.453 275.309 544.427 521.723 430.588
3 10 528.649 284.073 275.929 545.047 522.343 431.208
4 15 529.019 284.443 276.299 545.417 522.713 431.578
ampiran tabel 1)
ampiran tabel 1)
ampiran tabel 1)
ampiran tabel 1)

ampiran tabel 1)
ampiran tabel 1)
ampiran tabel 1)
ampiran tabel 1)

ampiran tabel 1)
ampiran tabel 1)
Lampiran Tabel 1
HUBUNGAN ANTARA T dan U

T U T U T U
1.00 - 1,86 15.00 1.63 70.00 3.08
1.01 - 1,35 16.00 1.69 72.00 3.11
1.02 - 1,28 17.00 1.74 74.00 3.13
1.03 - 1,23 18.00 1.80 76.00 3.16
1.04 - 1,19 19.00 1.85 78.00 3.16
1.05 - 1,15 20.00 1.89 80.00 3.21
1.06 - 1,12 21.00 1.94 82.00 3.23
1.08 - 1,07 22.00 1.98 84.00 3.26
1.10 - 1,02 23.00 2.02 86.00 3.28
1.15 - 0,93 24.00 2.06 88.00 3.30
1.20 - 0,85 25.00 2.10 90.00 3.33
1.25 - 0,79 26.00 2.13 92.00 3.35
1.30 - 0,73 27.00 2.17 94.00 3.37
1.35 - 0,68 28.00 2.19 96.00 3.39
1.40 - 0,63 29.00 2.24 98.00 3.41
1.50 - 0,54 30.00 2.27 100.00 3.43
1.60 - 0,46 31.00 2.30 110.00 3.53
1.70 - 0,40 32.00 2.33 120.00 3.62
1.80 - 0,33 33.00 2.36 130.00 3.70
1.90 - 0,28 34.00 2.39 140.00 3.77
2.00 -0.22 35.00 2.41 150.00 3.84
2.20 - 0,13 36.00 2.44 160.00 3.91
2.40 - 0,04 37.00 2.47 170.00 3.97
2.60 0.04 38.00 2.49 180.00 4.03
2.80 0.11 39.00 2.51 190.00 4.09
3.00 0.17 40.00 2.54 200.00 4.14
3.20 0.24 41.00 2.56 220.00 4.24
3.40 0.29 42.00 2.59 240.00 4.33
3.60 0.34 43.00 2.61 260.00 4.42
3.80 0.39 44.00 2.63 280.00 4.50
4.00 0.44 45.00 2.65 300.00 4.57
4.50 0.55 46.00 2.67 350.00 4.77
5.00 0.64 47.00 2.69 400.00 4.88
5.50 0.73 48.00 2.71 450.00 5.01
6.00 0.81 49.00 2.73 500.00 5.13
6.50 0.88 50.00 2.75 600.00 5.33
7.00 0.95 52.00 2.79 700.00 5.51
7.50 1.01 54.00 2.83 800.00 5.56
8.00 1.06 56.00 2.86 900.00 5.80
9.00 1.17 58.00 2.90 1000.0 5.92
10.00 1.26 60.00 2.93 5000.0 7.90
11.00 1.35 62.00 2.96 10000 8.83
12.00 1.43 64.00 2.99 50000 11.08
13.00 1.50 66.00 3.00 80000 12.32
14.00 1.57 68.00 3.05 500000 13.74
CURAH HUJAN RATA-RATA DENGAN METODE HASPER
Periode Curah Hujan Stasiun (mm) Curah Hujan Rata-
No
Ulang A B C D E Rata

1 2 527.169 282.593 274.449 543.567 520.863 429.728

2 5 528.029 283.453 275.309 544.427 521.723 430.588

3 10 528.649 284.073 275.929 545.047 522.343 431.208

4 15 529.019 284.443 276.299 545.417 522.713 431.578

CURAH HUJAN RATA-RATA DENGAN METODE LOG PERSON III


Periode Curah Huajn Stasiun (mm)
] Curah Hujan Rata-Rata
Ulang A B C D E

1 2 112.138 116.323 117.34 109.309 117.128 114.447

2 5 124.775 130.793 123.57 120.178 125.329 124.928

3 10 131.936 139.801 126.49 131.686 129.117 131.806

4 15 134.578 143.333 127.439 137.279 130.321 134.590

CURAH HUJAN MAKSIMUM DARI KEDUA METODE


Periode Curah Hujan (mm) Curah Hujan
No
Ulang Hasper LOG PERSON III Maximum

1 2 429.728 114.447 114.447


2 5 430.588 124.928 124.928

3 10 431.208 131.806 131.806

4 15 431.578 134.590 134.590


4.1.4. Uji Kesesuaian Distribusi (Smirnov-Kolmogorof).
Tabel 1.5 Uji Smirnov-Kolmogorof
No x Log x Sn (x) g Pr (%) Px (x) Sn(x) - Px (x)
1 137 2.1367 2.0435 3.9651 1.0753 0.9892 1.0543
2 137 2.1367 2.0435 3.9651 2.1505 0.9785 1.0650
3 135 2.1303 2.0440 3.9184 3.2258 0.9677 1.0763
4 125 2.0969 2.0464 3.6740 4.3011 0.9570 1.0894
5 119 2.0755 2.0479 3.5179 5.3763 0.9462 1.1017
6 119 2.0755 2.0479 3.5179 6.4516 0.9355 1.1124
7 116 2.0645 2.0487 3.4368 7.5269 0.9247 1.1240
8 108 2.0334 2.0509 3.2100 8.6022 0.9140 1.1369
9 108 2.0334 2.0509 3.2100 9.6774 0.9032 1.1477
10 108 2.0334 2.0509 3.2100 10.7527 0.8925 1.1584
11 108 2.0334 2.0509 3.2100 11.8280 0.8817 1.1692
12 99 1.9956 2.0536 2.9337 12.9032 0.8710 1.1826
13 94 1.9731 2.0552 2.7692 13.9785 0.8602 1.1950
14 92 1.9638 2.0559 2.7009 15.0538 0.8495 1.2064
15 92 1.9638 2.0559 2.7009 16.1290 0.8387 1.2172
1697 30.7463 2.0498 D= 1.2172

Langkah Kerja :

Log X = Log Xi/n = 2.0498

Sn = (((Log Xi - Log X)2)0.5)/(n - 1) = 2.0435

Cs = ((Log Xi - Log X)3)/((n-1)(n-2)Sn3) = 15.07692

Dari tabel Smirnov-Kolmogorof :

a = 5% Dcr = 0.28995 ( D > Dcr )


a = 1% Dcr = 0.34752 ( D > Dcr )
distribusi terpenuhi
4.1.5. PERHITUNGAN INTENSITAS CURAH HUJAN ( Metode Mononobe )
Untuk menghitung Intensitas Curah Hujan, Digunakan data Curah Hujan
maksimum dari beberapa metode yang digunakan

R 24 2/3
I =
24 t/60

Contoh : Untuk t = 5 menit

I2 114.447 24 2/3
= = 207.964
24 5/60

I5 124.928 24 2/3
= = 227.010
24 5/60

I10 131.806 24 2/3


= = 239.508
24 5/60

I15 134.590 24 2/3


= = 244.566
24 5/60

Tabel 1.6. Intensitas Curah Hujan

t INTENSITAS CURAH HUJAN (mm/jam)


(menit) I2 I5 I 10 I 15
5 207.964 227.010 239.508 244.566
10 131.009 143.007 150.881 154.067
15 99.979 109.135 115.143 117.575
20 82.531 90.089 95.049 97.056
25 71.123 77.636 81.911 83.641
30 62.983 68.751 72.536 74.068
35 56.832 62.036 65.452 66.834
40 51.991 56.753 59.877 61.142
45 48.065 52.467 55.355 56.524
50 44.805 48.908 51.600 52.690
55 42.046 45.897 48.424 49.446
60 39.677 43.310 45.695 46.660
65 37.615 41.060 43.320 44.235
70 35.802 39.080 41.232 42.103
75 34.192 37.324 39.378 40.210
80 32.752 35.752 37.720 38.517
85 31.455 34.336 36.226 36.991
90 30.279 33.052 34.872 35.608
Sumber : Hasil Perhitungan
mm/jam

mm/jam

mm/jam

mm/jam
III.4. PERHITUNGAN DEBIT RENCANA

Rumus yang digunakan


~ Debit Rencana

Qs  0 , 00278  C  Cs  I  A
~ Faktor Koefisien Konsentrasi
2 tc
Cs  tc  to  td (waktu pengumpulan air)
2 tc  td

~ Waktu Pengaliran dalam Saluran

Ls
td 
V
~ Waktu yang diperlukan untuk mengalir dari permukaan ke saluran terdekat
0 , 77
 Lt 
to  0 , 0197   
 St 

~ Intensitas Curah Hujan


2

Rt  24  3

I   
24  td 
 60 

Keterangan :
A = Luas areal yang dilayani (Ha)
Ls = Panjang Saluran (m)
Lt = Panjang aliran terjauh diatas lahan (m)
St = Kemiringan Saluran (%)
t0 = Waktu yang diperlukan untuk mengalir dari permukaan lahan ke saluran
terdekat (menit)
td = Waktu pengaliran dalam saluran (menit)
tc = Waktu pengumpulan air (menit)
Cs = Faktor koefisien konsentrasi
I = Intensitas curah hujan (mm/jam)
C = Koefisien pengaliran
1 . Saluran A0-A1
diketahui data-data sbb :
A = 2.59 Ha
Ls = 225 m
Lt = 252.69 m
St = 0.27
C = 0.700 %
~ Luas Area yang dilayani (A) = 2.59 Ha
~ Waktu yang diperlukan untuk mengalir dari permukaan ke saluran terdekat

0 , 77
 Lt 
to  0 , 0197    St  0.516
 St 

252.69 0.77
to = 0.0197 x
0.516
to = 2.320 menit
~ Waktu Pengaliran dalam Saluran

Ls
td  direncanakan, V 0.4 m/det
V
225
td = = 562.5 det 9.375 menit
0.4
~ Waktu pengumpulan air

tc  td  to
tc = 9.375 + 2.320
tc = ### menit
~ Faktor Koefisien Konsentrasi

2 tc
Cs 
2 tc  td
23.390
Cs =
### + 9.375
Cs = 0.714
~ Intensitas Curah Hujan
2

Rt  24  3

I    Curah hujan maksimum rata-rata untuk 2 tahun,


24  td 
 60  Rt = 114.447 mm

114.447 24 2/3
I = x
24 11.695 /60

I = 118.025 mm/menit

~ Debit Rencana

Qs  0 , 00278  C  Cs  I  A
Q S = 0.00278 x 0.700 x 0.7139 x 118.025 x 2.588
= 0.424 m3/dt
diperoleh pengaliran total untuk saluran A0-A1 :
Q total = Q Lahan + Q Jalan + QS
Q total = 0 + 0 + 0.424
Q total = 0.424 m /dt 3
2. Saluran B0-B3
diketahui data-data sbb :
a. Limpasan Saluran A0-A1
direncanakan saluran menerima limpasan dari saluran sebelumnya
yaitu saluran A0-A1 0.424 m3/dt
b. Limpasan lahan
A = 1.27 Ha
Ls = 115 m
Lt = 159.14 m
St = 1.74 %
C1 = 0.700

Perhitungan Debit Akibat Curah Hujan


~ Luas Area yang dilayani (A) = 1.265 Ha
~ Waktu yang diperlukan untuk mengalir dari permukaan ke saluran terdekat

0 , 77
 Lt  St  1.319
to  0 ,0197   
 St 
159.14 0.77
to = 0.0197 x
1.319
to = 0.789 menit
~ Waktu Pengaliran dalam Saluran

Ls
td  direncanakan, V 0.4 m/det
V
115
td = = 287.5 det 4.8 menit
0.4
~ Waktu pengumpulan air

tc  td  to
tc = 4.8 + 0.789
tc = 5.58 menit
~ Faktor Koefisien Konsentrasi

2to
Cs 
2to  td
1.579
Cs =
1.579 + 5.581
Cs = 0.221
~ Intensitas Curah Hujan
2

Rt  24  3

I    Curah hujan maksimum rata-rata untuk 5 tahun,


24  td 
Rt = 124.928 mm
 60 

### 24 2/3
I = x
I = x
24 5.581 /60

I = 210.966 mm/menit

~ Debit Rencana

Qs  0 , 00278  C  Cs  I  A
Q Lahan = 0.00278 x 0.7 x 0.2205 x 211 x 1.265
Q Lahan = 0.115 m /dt
3
c. Limpasan Jalan
Ls = 115 m
A = 0.0058 Ha
Lt = 2.60 m
St = 1.74 %
Cjalur = 0.700

Perhitungan Debit Akibat Curah Hujan


~ Luas Area yang dilayani (A) = 0.0058 Ha
~ Waktu yang diperlukan untuk mengalir dari permukaan ke saluran terdekat

0 , 77
 Lt 
to  0 ,0197    St  1.319
 St 
2.60 0.77
to = 0.0197 x
1.319
to = 0.033 menit
~ Waktu Pengaliran dalam Saluran

Ls
td  direncanakan, V 0.4 m/det
V
115
td = = 287.5 det 4.8 menit
0.4
~ Waktu pengumpulan air

tc  td  to
td = 4.8 + 0.033
td = 4.825 menit
~ Faktor Koefisien Konsentrasi

2 tc
Cs 
2 tc  td
0.066
Cs =
0.066 + 4.825
Cs = 0.014
~ Intensitas Curah Hujan
2

Rt  24  3

I    Curah hujan maksimum rata-rata untuk 10 tahun,


24  td 
Rt = 131.806 mm
 60 

### 24 2/3
I = x
24 4.825 /60

I = 245.268 mm/menit

~ Debit Rencana

Qs  0 , 00278  C  Cs  I  A
Qs  0 , 00278  C  Cs  I  A
Q Jalan = 0.00278 x 0.7 x 0.0136 x 245.3 x 0.006
Q Jalan = 0.00004 m3/dt

diperoleh pengaliran total untuk saluran B1-B2 :


Q total = Q Lahan + Q Jalan + Q A1-A2
Q total = 0.115 + 0.00004 + 0.424
Q total = 0.539 m3/dt
3. Saluran B1-B2
diketahui data-data sbb :
a. Limpasan lahan,
direncanakan saluran tidak menerima limpasan dari lahan, = 0 m3/det
b. Limpasan 1/2 Q3,
direncanakan saluran menerima limpasan dari saluran sebelumnya
sebesar 1/2 Q3, 2.121 m3/det
c. Limpasan Jalan
A = 0.0058 Ha
Ls = 115 m
Lt = 2.60 m
St = 2.52 %
Cjalur = 0.700

Perhitungan Debit Akibat Curah Hujan


~ Luas Area yang dilayani (A) = 0.0058 Ha
~ Waktu yang diperlukan untuk mengalir dari permukaan ke saluran terdekat

0 , 77
 Lt 
to  0 ,0197    St  1.588
 St 
2.60 0.77
to = 0.0197 x
1.588
to = 0.029 menit
~ Waktu Pengaliran dalam Saluran
Ls
td 
V direncanakan, V 0.4 m/det
115
td = = 287.5 det 4.8 menit
0.4
~ Waktu pengumpulan air

tc  td  to
td = 4.8 + 0.029
td = 4.820 menit
~ Faktor Koefisien Konsentrasi

2to
Cs 
2to  td
0.058
Cs =
0.058 + 4.820
Cs = 0.012
~ Intensitas Curah Hujan
2

Rt  24  3

I    Curah hujan maksimum rata-rata untuk 15 tahun,


24  td 
 60  Rt = 134.590 mm
### 24 2/3
I = x
24 4.820 /60

I = 250.602 mm/menit

~ Debit Rencana

Qs  0 , 00278  C  Cs  I  A
Q Jalan = 0.00278 x 0.7 x 0.0118 x 250.6 x 0.006
Q =
Jalan 0.00003 m3/dt
diperoleh pengaliran total untuk saluran B0-B3 :
Q total = Q Lahan + Q Jalan + Q3
Q total = 0 + 0.00003 + 2.12
Q total = 2.121 m /dt 3
Kecepatan rata - rata pengaliran :
• Untuk kemiringan < 1 %, kecepatan rata - ratany : 0.40 m/dtk
• Untuk kemiringan 1 - 2 , kecepatan rata - ratany : 0.60 m/dtk
• Untuk kemiringan 2 - 4 , kecepatan rata - ratany : 0.90 m/dtk

Tabel Perhitungan Akibat Limpasan Dari Lahan Di Tiap - tiap Saluran


Aliran Permukaan Aliran Dalam Saluran
tc T I2
No Saluran Lt St to Ls V td Cs
(menit) (Tahun (mm/jam
(m) (%) (menit) (m) (m/dtk) (menit)
) )
1 2 3 4 5 6 7 8 9 10 11 12

1 A0 - A1 252.69 0.27 2.320 225 0.40 9.4 11.695 0.714 2 118.025


2 A1 - A2 252.69 1.22 1.293 115 0.40 4.8 6.085 0.717 2 118.025
3 A0 - A3 252.69 0.96 1.419 115 0.40 4.8 6.210 0.722 2 118.025
4 A3 - A2 252.69 0.40 1.985 225 0.40 9.4 11.360 0.708 2 118.025
5 B0 - B1 159.14 1.73 0.791 110 0.40 4.6 5.375 0.701 2 118.025
6 B1 - B2 159.14 2.52 0.684 115 0.40 4.8 5.476 0.696 2 118.025
7 B0 - B3 159.14 1.74 0.789 115 0.40 4.8 5.581 0.700 2 118.025
8 B3 - B2 159.14 2.55 0.682 110 0.40 4.6 5.265 0.697 2 118.025
9 C0 - C1 209.40 0.86 1.281 175 0.40 7.3 8.572 0.702 2 118.025
10 C1 - C2 209.40 2.43 0.857 115 0.40 4.8 5.648 0.702 2 118.025
11 C0 - C3 209.40 1.91 0.940 115 0.40 4.8 5.732 0.705 2 118.025
12 C3 - C2 209.40 1.20 1.125 175 0.40 7.3 8.417 0.698 2 118.025
13 D0 - D1 222.09 0.68 1.461 190 0.40 7.9 9.378 0.703 2 118.025
14 D1 - D2 222.09 0.45 1.717 311 0.40 13.0 14.675 0.694 2 118.025
15 D0 - D3 222.09 1.48 1.086 115 0.40 4.8 5.878 0.710 2 118.025
16 D3 - D2 222.09 0.53 1.610 188 0.40 7.8 9.443 0.707 2 118.025
17 E0 - E1 301.04 0.44 2.181 225 0.60 6.3 8.431 0.730 2 118.025
18 E1 - E2 301.04 0.20 2.966 200 0.40 8.3 11.299 0.731 2 118.025
19 E0 - E3 301.04 0.05 5.057 200 0.40 8.3 13.390 0.763 2 118.025
20 E3 - E2 301.04 0.58 1.971 225 0.40 9.4 11.346 0.708 2 118.025
21 F0 - F1 228.25 2.64 0.888 110 0.40 4.6 5.471 0.705 2 118.025
22 F1 - F2 228.25 0.10 3.129 200 0.40 8.3 11.463 0.733 2 118.025
23 F0 - F3 228.25 0.05 4.086 200 0.40 8.3 12.420 0.749 2 118.025
24 F3 - F2 228.25 2.73 0.876 110 0.40 4.6 5.460 0.704 2 118.025
25 G0 - G1 201.56 1.14 1.113 175 0.40 7.3 8.405 0.697 2 118.025
26 G1 - G2 201.56 0.10 2.843 100 0.40 4.2 7.010 0.771 2 118.025
27 G0 - G2 201.56 0.70 1.344 100 0.40 4.2 5.511 0.726 2 118.025
28 G3 - G2 201.56 0.80 1.277 175 0.40 7.3 8.569 0.702 2 118.025
29 H0 - H1 188.68 0.53 1.423 189 0.40 7.9 9.298 0.703 2 118.025
30 H1 - H2 188.68 0.03 4.299 334 0.40 13.9 18.216 0.724 2 118.025
31 H0 - H3 188.68 0.20 2.070 100 0.40 4.2 6.236 0.750 2 118.025
32 H3 - H2 188.68 0.56 1.390 160 0.40 6.7 8.057 0.707 2 118.025
33 I0 - I1 230.49 1.09 1.259 175 0.40 7.3 8.550 0.701 2 118.025
34 I2 - I1 230.49 0.60 1.582 150 0.40 6.3 7.832 0.715 2 118.025
35 I3 - I2 230.49 0.69 1.502 175 0.40 7.3 8.794 0.707 2 118.025
36 I3 - I0 230.49 0.13 2.822 150 0.40 6.3 9.072 0.744 2 118.025
Tabel Perhitungan Akibat Limpasan Dari Jalan Di Tiap - tiap Saluran

Aliran Permukaan Aliran Dalam Saluran


tc T I2
No Saluran Lt St to Ls V td Cs
(menit) (Tahun (mm/jam
(m) (%) (menit) (m) (m/dtk) (menit)
) )
1 2 3 4 5 6 7 8 9 10 11 12

1 A0 - A1 2.60 0.27 0.068 225 0.40 9.4 9.443 0.668 2 118.025


2 A1 - A2 2.60 1.22 0.038 115 0.40 4.8 4.830 0.668 2 118.025
3 A0 - A3 2.60 0.96 0.042 115 0.40 4.8 4.833 0.669 2 118.025
4 A3 - A2 2.60 0.40 0.059 225 0.40 9.4 9.434 0.668 2 118.025
5 B0 - B1 2.60 1.73 0.033 110 0.40 4.6 4.617 0.668 2 118.025
6 B1 - B2 2.60 2.52 0.029 115 0.40 4.8 4.820 0.668 2 118.025
7 B0 - B3 2.60 1.74 0.033 115 0.40 4.8 4.825 0.668 2 118.025
8 B3 - B2 2.60 2.55 0.029 110 0.40 4.6 4.612 0.668 2 118.025
9 C0 - C1 2.60 0.86 0.044 175 0.40 7.3 7.335 0.668 2 118.025
10 C1 - C2 2.60 2.43 0.029 115 0.40 4.8 4.821 0.668 2 118.025
11 C0 - C3 2.60 1.91 0.032 115 0.40 4.8 4.824 0.668 2 118.025
12 C3 - C2 2.60 1.20 0.038 175 0.40 7.3 7.330 0.668 2 118.025
13 D0 - D1 2.60 0.68 0.048 190 0.40 7.9 7.964 0.668 2 118.025
14 D1 - D2 2.60 0.45 0.056 311.0 0.40 13.0 13.014 0.668 2 118.025
15 D0 - D3 2.60 1.48 0.035 115 0.40 4.8 4.827 0.668 2 118.025
16 D3 - D2 2.60 0.53 0.052 188 0.40 7.8 7.886 0.668 2 118.025
17 E0 - E1 2.60 0.44 0.056 225 0.60 6.3 6.306 0.669 2 118.025
18 E1 - E2 2.60 0.20 0.076 200 0.40 8.3 8.410 0.669 2 118.025
19 E0 - E3 2.60 0.05 0.130 200 0.40 8.3 8.464 0.670 2 118.025
20 E3 - E2 2.60 0.58 0.051 225 0.40 9.4 9.426 0.668 2 118.025
21 F0 - F1 2.60 2.64 0.028 110 0.40 4.6 4.612 0.668 2 118.025
22 F1 - F2 2.60 0.10 0.100 200 0.40 8.3 8.433 0.669 2 118.025
23 F0 - F3 2.60 0.05 0.130 200 0.40 8.3 8.464 0.670 2 118.025
24 F3 - F2 2.60 2.73 0.028 110 0.40 4.6 4.611 0.668 2 118.025
25 G0 - G1 2.60 1.14 0.039 175 0.40 7.3 7.331 0.668 2 118.025
26 G1 - G2 2.60 0.10 0.100 100 0.40 4.2 4.266 0.672 2 118.025
27 G0 - G2 2.60 0.70 0.047 100 0.40 4.2 4.214 0.669 2 118.025
28 G3 - G2 2.60 0.80 0.045 175 0.40 7.3 7.336 0.668 2 118.025
29 H0 - H1 2.60 0.53 0.053 189 0.40 7.9 7.928 0.668 2 118.025
30 H1 - H2 2.60 0.03 0.159 334 0.40 13.9 14.075 0.669 2 118.025
31 H0 - H3 2.60 0.20 0.076 100 0.40 4.2 4.243 0.671 2 118.025
32 H3 - H2 2.60 0.56 0.051 160 0.40 6.7 6.718 0.668 2 118.025
33 I0 - I1 2.60 1.09 0.040 175 0.40 7.3 7.331 0.668 2 118.025
34 I2 - I1 2.60 0.60 0.050 150 0.40 6.3 6.300 0.668 2 118.025
35 I3 - I2 2.60 0.69 0.048 175 0.40 7.3 7.339 0.668 2 118.025
36 I3 - I0 2.60 0.13 0.089 150 0.40 6.3 6.339 0.670 2 118.025
Tabel Debit Rencana Untuk Kala Ulang 2 Tahun Tabel Debit Rencana Untuk Kala U

Debit Debit Debit


No Saluran Lahan Jalan Qsebelumnya Total No Saluran Lahan Jalan Qs
(m³/dtk) (m³/dtk) (m³/dtk) (m³/dtk) (m³/dtk) (m³/dtk) (m
1 2 3 4 5 6 1 2 3 4

1 A0 - A1 0.424 0.004 0.000 0.429 1 A0 - A1 0.758 0.008 0


2 A1 - A2 0.426 0.002 0.429 0.857 2 A1 - A2 0.762 0.004 0
3 A0 - A3 0.429 0.002 0.000 0.431 3 A0 - A3 0.767 0.004 0
4 A3 - A2 0.421 0.004 0.431 0.856 4 A3 - A2 0.752 0.008 0
5 B0 - B1 0.204 0.002 0.000 0.206 5 B0 - B1 0.364 0.004 0
6 B1 - B2 0.202 0.002 0.206 0.410 6 B1 - B2 0.361 0.004 0
7 B0 - B3 0.203 0.002 0.000 0.206 7 B0 - B3 0.363 0.004 0
8 B3 - B2 0.202 0.002 0.206 0.410 8 B3 - B2 0.362 0.004 0
9 C0 - C1 0.324 0.003 0.000 0.328 9 C0 - C1 0.580 0.006 0
10 C1 - C2 0.325 0.002 0.328 0.655 10 C1 - C2 0.580 0.004 0
11 C0 - C3 0.326 0.002 0.000 0.328 11 C0 - C3 0.583 0.004 0
12 C3 - C2 0.323 0.003 0.328 0.654 12 C3 - C2 0.576 0.006 0
13 D0 - D1 0.185 0.004 0.000 0.189 13 D0 - D1 0.330 0.007 0
14 D1 - D2 0.182 0.006 0.189 0.377 14 D1 - D2 0.326 0.011 0
15 D0 - D3 0.187 0.002 0.000 0.189 15 D0 - D3 0.334 0.004 0
16 D3 - D2 0.186 0.004 0.189 0.378 16 D3 - D2 0.332 0.007 0
17 E0 - E1 0.754 0.004 0.000 0.759 17 E0 - E1 1.348 0.008 0
18 E1 - E2 0.755 0.004 0.759 1.518 18 E1 - E2 1.350 0.007 1
19 E0 - E3 0.788 0.004 0.000 0.792 19 E0 - E3 1.409 0.007 0
20 E3 - E2 0.731 0.004 0.792 1.528 20 E3 - E2 1.307 0.008 1
21 F0 - F1 0.356 0.002 0.000 0.358 21 F0 - F1 0.637 0.004 0
22 F1 - F2 0.371 0.004 0.358 0.733 22 F1 - F2 0.662 0.007 0
23 F0 - F3 0.378 0.004 0.000 0.382 23 F0 - F3 0.676 0.007 0
24 F3 - F2 0.356 0.002 0.382 0.740 24 F3 - F2 0.636 0.004 0
25 G0 - G1 0.280 0.003 0.000 0.284 25 G0 - G1 0.501 0.006 0
26 G1 - G2 0.310 0.002 0.284 0.596 26 G1 - G2 0.554 0.004 0
27 G0 - G3 0.292 0.002 0.000 0.294 27 G0 - G3 0.521 0.004 0
28 G3 - G2 0.282 0.003 0.294 0.579 28 G3 - G2 0.504 0.006 0
29 H0 - H1 0.374 0.004 0.000 0.378 29 H0 - H1 0.669 0.007 0
30 H1 - H2 0.386 0.007 0.378 0.770 30 H1 - H2 0.689 0.012 0
31 H0 - H3 0.399 0.002 0.000 0.401 31 H0 - H3 0.714 0.004 0
32 H3 - H2 0.377 0.003 0.401 0.782 32 H3 - H2 0.674 0.006 0
33 I0 - I1 0.423 0.003 0.451 0.878 33 I0 - I1 0.756 0.006 0
34 I2 - I1 0.431 0.003 0.430 0.864 34 I2 - I1 0.770 0.005 0
35 I3 - I2 0.426 0.003 0.000 0.430 35 I3 - I2 0.762 0.006 0
36 I3 - I0 0.448 0.003 0.000 0.451 36 I3 - I0 0.802 0.005 0
Tabel Debit Rencana Untuk Kala Ulang 10 Tahun Tabel Debit Rencana Untuk Kala U

Debit Debit Debit


No Saluran Lahan Jalan Qsebelumnya Total No Saluran Lahan Jalan Qs
(m³/dtk) (m³/dtk) (m³/dtk) (m³/dtk) (m³/dtk) (m³/dtk) (m
1 2 3 4 5 6 1 2 3 4

1 A0 - A1 0.882 0.009 0.000 0.891 1 A0 - A1 0.901 0.010 0


2 A1 - A2 0.886 0.005 0.891 1.782 2 A1 - A2 0.905 0.005 0
3 A0 - A3 0.891 0.005 0.000 0.896 3 A0 - A3 0.911 0.005 0
4 A3 - A2 0.874 0.009 0.896 1.780 4 A3 - A2 0.893 0.010 0
5 B0 - B1 0.423 0.005 0.000 0.428 5 B0 - B1 0.432 0.005 0
6 B1 - B2 0.420 0.005 0.428 0.853 6 B1 - B2 0.429 0.005 0
7 B0 - B3 0.422 0.005 0.000 0.427 7 B0 - B3 0.432 0.005 0
8 B3 - B2 0.421 0.005 0.427 0.852 8 B3 - B2 0.430 0.005 0
9 C0 - C1 0.674 0.007 0.000 0.681 9 C0 - C1 0.689 0.007 0
10 C1 - C2 0.674 0.005 0.681 1.360 10 C1 - C2 0.689 0.005 0
11 C0 - C3 0.677 0.005 0.000 0.682 11 C0 - C3 0.692 0.005 0
12 C3 - C2 0.670 0.007 0.682 1.360 12 C3 - C2 0.685 0.007 0
13 D0 - D1 0.384 0.008 0.000 0.392 13 D0 - D1 0.392 0.008 0
14 D1 - D2 0.379 0.013 0.392 0.783 14 D1 - D2 0.387 0.013 0
15 D0 - D3 0.388 0.005 0.000 0.393 15 D0 - D3 0.396 0.005 0
16 D3 - D2 0.386 0.008 0.393 0.786 16 D3 - D2 0.394 0.008 0
17 E0 - E1 1.567 0.009 0.000 1.576 17 E0 - E1 1.601 0.010 0
18 E1 - E2 1.569 0.008 1.576 3.154 18 E1 - E2 1.603 0.008 1
19 E0 - E3 1.638 0.008 0.000 1.646 19 E0 - E3 1.674 0.008 0
20 E3 - E2 1.520 0.009 1.646 3.176 20 E3 - E2 1.553 0.010 1
21 F0 - F1 0.740 0.005 0.000 0.745 21 F0 - F1 0.756 0.005 0
22 F1 - F2 0.770 0.008 0.745 1.523 22 F1 - F2 0.787 0.008 0
23 F0 - F3 0.786 0.008 0.000 0.795 23 F0 - F3 0.803 0.008 0
24 F3 - F2 0.740 0.005 0.795 1.539 24 F3 - F2 0.756 0.005 0
25 G0 - G1 0.583 0.007 0.000 0.590 25 G0 - G1 0.595 0.007 0
26 G1 - G2 0.644 0.004 0.590 1.238 26 G1 - G2 0.658 0.004 0
27 G0 - G3 0.606 0.004 0.000 0.610 27 G0 - G3 0.619 0.004 0
28 G3 - G2 0.586 0.007 0.610 1.203 28 G3 - G2 0.599 0.007 0
29 H0 - H1 0.778 0.008 0.000 0.786 29 H0 - H1 0.795 0.008 0
30 H1 - H2 0.801 0.014 0.786 1.601 30 H1 - H2 0.819 0.014 0
31 H0 - H3 0.830 0.004 0.000 0.834 31 H0 - H3 0.848 0.004 0
32 H3 - H2 0.783 0.007 0.834 1.624 32 H3 - H2 0.800 0.007 0
33 I0 - I1 0.878 0.007 0.932 1.818 33 I0 - I1 0.897 0.007 0
34 I2 - I1 0.896 0.006 0.893 1.795 34 I2 - I1 0.915 0.006 0
35 I3 - I2 0.886 0.007 0.000 0.893 35 I3 - I2 0.905 0.007 0
36 I3 - I0 0.932 0.001 0.000 0.932 36 I3 - I0 0.952 0.006 0
Saluran Tersier Saluran Sekunder Saluran Prim
No Saluran No Saluran No Saluran
(m³/dtk) (m³/dtk) (m³/dtk)
1 2 3 1 2 3 1 2 3

1 A0 - A1 0.429 1 A3 - A2 1.717 1 H2 - SP 7.152


2 A1 - A2 0.857 2 B3 - B2 0.822 2 I1 - SP 2.608
3 A0 - A3 0.431 3 C3 - C2 1.311 3 H2I1 - SP 9.761
4 B0 - B1 0.206 4 D3 - D2 0.754
5 B1 - B2 0.410 5 E3 - E2 3.068
6 B0 - B3 0.206 6 F3 - F2 1.474
7 C0 - C1 0.328 7 G3 - G2 1.173
8 C1 - C2 0.655 8 H1 - H2 4.982
9 C0 - C3 0.328 9 H3 - H2 2.170
10 D0 - D1 0.189 10 I0 - I1 1.745
11 D1 - D2 0.377
12 D0 - D3 0.189
13 E0 - E1 0.759
14 E1 - E2 1.518
15 E0 - E3 0.792
16 F0 - F1 0.358
17 F1 - F2 0.733
18 F0 - F3 0.382
19 G0 - G1 0.284
20 G1 - G2 0.596
21 G0 - G3 0.294
22 H0 - H1 0.378
23 H0 - H3 0.401
24 I2 - I1 0.864
25 I3 - I2 0.430
26 I3 - I0 0.451
Parameter Curah Hujan
I2
(mm/jam (Tahun
)
12 13

118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
Parameter Curah Hujan
I2
(mm/jam (Tahun
)
12 13

118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
118.025 5
Tabel Debit Rencana Untuk Kala Ulang 5 Tahun

Debit
Qsebelumnya
(m³/dtk)
5

0.000
0.766
0.000
0.771
0.000
0.368
0.000
0.367
0.000
0.586
0.000
0.587
0.000
0.337
0.000
0.338
0.000
1.356
0.000
1.416
0.000
0.640
0.000
0.683
0.000
0.507
0.000
0.525
0.000
0.676
0.000
0.718
0.807
0.768
0.000
0.000
Tabel Debit Rencana Untuk Kala Ulang 15 Tahun

Debit
Qsebelumnya
(m³/dtk)
5

0.000
0.910
0.000
0.915
0.000
0.437
0.000
0.436
0.000
0.696
0.000
0.697
0.000
0.400
0.000
0.401
0.000
1.611
0.000
1.682
0.000
0.761
0.000
0.812
0.000
0.603
0.000
0.624
0.000
0.803
0.000
0.852
0.959
0.912
0.000
0.000
Saluran Primer

(m³/dtk)
3

7.152
2.608
9.761
Parameter Curah Hujan Luas
T I5 T I10 T I15 Q rencana
(A) C
(Tahun (mm/jam (Tahun (mm/jam (Tahun (mm/jam m3/dtk
(Ha)
) ) ) ) ) )
13 14 15 16 17 18 19 20 21

5 210.966 10 245.268 15 250.602 2.59 0.7 0.424


5 210.966 10 245.268 15 250.602 2.59 0.7 0.426
5 210.966 10 245.268 15 250.602 2.59 0.7 0.429
5 210.966 10 245.268 15 250.602 2.59 0.7 0.421
5 210.966 10 245.268 15 250.602 1.27 0.7 0.204
5 210.966 10 245.268 15 250.602 1.27 0.7 0.202
5 210.966 10 245.268 15 250.602 1.27 0.7 0.203
5 210.966 10 245.268 15 250.602 1.27 0.7 0.202
5 210.966 10 245.268 15 250.602 2.01 0.7 0.324
5 210.966 10 245.268 15 250.602 2.01 0.7 0.325
5 210.966 10 245.268 15 250.602 2.01 0.7 0.326
5 210.966 10 245.268 15 250.602 2.01 0.7 0.323
5 210.966 10 245.268 15 250.602 1.14 0.7 0.185
5 210.966 10 245.268 15 250.602 1.14 0.7 0.182
5 210.966 10 245.268 15 250.602 1.14 0.7 0.187
5 210.966 10 245.268 15 250.602 1.14 0.7 0.186
5 210.966 10 245.268 15 250.602 4.50 0.7 0.754
5 210.966 10 245.268 15 250.602 4.50 0.7 0.755
5 210.966 10 245.268 15 250.602 4.50 0.7 0.788
5 210.966 10 245.268 15 250.602 4.50 0.7 0.731
5 210.966 10 245.268 15 250.602 2.20 0.7 0.356
5 210.966 10 245.268 15 250.602 2.20 0.7 0.371
5 210.966 10 245.268 15 250.602 2.20 0.7 0.378
5 210.966 10 245.268 15 250.602 2.20 0.7 0.356
5 210.966 10 245.268 15 250.602 1.75 0.7 0.280
5 210.966 10 245.268 15 250.602 1.75 0.7 0.310
5 210.966 10 245.268 15 250.602 1.75 0.7 0.292
5 210.966 10 245.268 15 250.602 1.75 0.7 0.282
5 210.966 10 245.268 15 250.602 2.32 0.7 0.374
5 210.966 10 245.268 15 250.602 2.32 0.7 0.386
5 210.966 10 245.268 15 250.602 2.32 0.7 0.399
5 210.966 10 245.268 15 250.602 2.32 0.7 0.377
5 210.966 10 245.268 15 250.602 2.63 0.7 0.423
5 210.966 10 245.268 15 250.602 2.63 0.7 0.431
5 210.966 10 245.268 15 250.602 2.63 0.7 0.426
5 210.966 10 245.268 15 250.602 2.63 0.7 0.448
Parameter Curah Hujan Luas
T I5 T I10 T I15 Q rencana
(A) C
(Tahun (mm/jam (Tahun (mm/jam (Tahun (mm/jam m3/dtk
(Ha)
) ) ) ) ) )
13 14 15 16 17 18 19 20 21

5 210.966 10 245.268 15 250.602 0.03 0.7 0.004


5 210.966 10 245.268 15 250.602 0.01 0.7 0.002
5 210.966 10 245.268 15 250.602 0.01 0.7 0.002
5 210.966 10 245.268 15 250.602 0.03 0.7 0.004
5 210.966 10 245.268 15 250.602 0.01 0.7 0.002
5 210.966 10 245.268 15 250.602 0.01 0.7 0.002
5 210.966 10 245.268 15 250.602 0.01 0.7 0.002
5 210.966 10 245.268 15 250.602 0.01 0.7 0.002
5 210.966 10 245.268 15 250.602 0.02 0.7 0.003
5 210.966 10 245.268 15 250.602 0.01 0.7 0.002
5 210.966 10 245.268 15 250.602 0.01 0.7 0.002
5 210.966 10 245.268 15 250.602 0.02 0.7 0.003
5 210.966 10 245.268 15 250.602 0.02 0.7 0.004
5 210.966 10 245.268 15 250.602 0.04 0.7 0.006
5 210.966 10 245.268 15 250.602 0.01 0.7 0.002
5 210.966 10 245.268 15 250.602 0.02 0.7 0.004
5 210.966 10 245.268 15 250.602 0.03 0.7 0.004
5 210.966 10 245.268 15 250.602 0.03 0.7 0.004
5 210.966 10 245.268 15 250.602 0.03 0.7 0.004
5 210.966 10 245.268 15 250.602 0.03 0.7 0.004
5 210.966 10 245.268 15 250.602 0.01 0.7 0.002
5 210.966 10 245.268 15 250.602 0.03 0.7 0.004
5 210.966 10 245.268 15 250.602 0.03 0.7 0.004
5 210.966 10 245.268 15 250.602 0.01 0.7 0.002
5 210.966 10 245.268 15 250.602 0.02 0.7 0.003
5 210.966 10 245.268 15 250.602 0.01 0.7 0.002
5 210.966 10 245.268 15 250.602 0.01 0.7 0.002
5 210.966 10 245.268 15 250.602 0.02 0.7 0.003
5 210.966 10 245.268 15 250.602 0.02 0.7 0.004
5 210.966 10 245.268 15 250.602 0.04 0.7 0.007
5 210.966 10 245.268 15 250.602 0.01 0.7 0.002
5 210.966 10 245.268 15 250.602 0.02 0.7 0.003
5 210.966 10 245.268 15 250.602 0.02 0.7 0.003
5 210.966 10 245.268 15 250.602 0.02 0.7 0.003
5 210.966 10 245.268 15 250.602 0.02 0.7 0.003
5 210.966 10 20.951 15 250.602 0.02 0.7 0.003
a Untuk Kala Ulang 5 Tahun

Debit Debit
Qsebelumnya Total
(m³/dtk) (m³/dtk)
5 6

0.000 0.766
0.766 1.533
0.000 0.771
0.771 1.531
0.000 0.368
0.368 0.733
0.000 0.367
0.367 0.733
0.000 0.586
0.586 1.170
0.000 0.587
0.587 1.169
0.000 0.337
0.337 0.674
0.000 0.338
0.338 0.676
0.000 1.356
1.356 2.713
0.000 1.416
1.416 2.731
0.000 0.640
0.640 1.310
0.000 0.683
0.683 1.324
0.000 0.507
0.507 1.065
0.000 0.525
0.525 1.035
0.000 0.676
0.676 1.377
0.000 0.718
0.718 1.397
0.807 1.569
0.768 1.544
0.000 0.768
0.000 0.807
a Untuk Kala Ulang 15 Tahun

Debit Debit
Qsebelumnya Total
(m³/dtk) (m³/dtk)
5 6

0.000 0.910
0.910 1.821
0.000 0.915
0.915 1.818
0.000 0.437
0.437 0.871
0.000 0.436
0.436 0.871
0.000 0.696
0.696 1.390
0.000 0.697
0.697 1.389
0.000 0.400
0.400 0.800
0.000 0.401
0.401 0.803
0.000 1.611
1.611 3.222
0.000 1.682
1.682 3.245
0.000 0.761
0.761 1.556
0.000 0.812
0.812 1.572
0.000 0.603
0.603 1.265
0.000 0.624
0.624 1.230
0.000 0.803
0.803 1.636
0.000 0.852
0.852 1.659
0.959 1.863
0.912 1.834
0.000 0.912
0.000 0.959
3.5 PERENCANAAN DIMENSI SALURAN

Perhitungan debit rencana saluran untuk jalur A0 - A1, A1 - A2


3.5.1 Saluran A0 - A1
Data - data yang diketahui :
Bentuk saluran trapesium
Dari KP 03 hal. 98
• Qrencana = 0.429 m³/dtk
• Vrencana = 0.397 m/dtk
• m = 1.5
• n (manning) = 1.30
• k = 35
☛ Luas penampang akibat debit (A)
Qrencana 0.429
A = = = 1.079 m²
Vrencana 0.397
☛ Tinggi permukaan air (h)
A .0.5 1.079 .0.5
h = ( ) = ( ) = 0.6209
m + n 1.5 + 1.30
☛ Lebar dasar saluran (b)
b = n x h
= 1.30 x 0.6209
= 0.8072 m
☛ Tinggi jagaan (w)
w = 0.3 + 0.25 h
= 0.3 + 0.25 x 0.6209
= 0.4552 m
☛ Keliling basah (P)
P = b + 2h Ö 1 + m²
= 0.8072 + ( 2 x 0.6209 ) Ö 1 + 1.5 ²
= 3.046 m
☛ Jari - jari hidrolis ( R )
A 1.079
R = = = 0.3544 m
P 3.045908
☛ Kemiringan saluran (I)
V ²
I (
=
k x R ⅔)
0.397 ²
(
=
35 x 0.3544 ⅔ )
= 0.0005
☛ Lebar muka air (B)
B = b + 2 ( m x h )
= 0.8072 + 2 ( 1.5 x 0.6209 )
= 2.6699 m
Kesimpulan :
☛ Kecepatan rencana (V) = 0.397 m/dtk ☛ Keliling basah (P)
☛ Luas penampang (A) = 1.079 m² ☛ Jari - jari hidrolis (R)
☛ Tinggi muka air (h) = 0.621 m ☛ Kemiringan saluran (I)
☛ Lebar dasar saluran (b) = 0.807 m ☛ Lebar muka air (B)
☛ Tinggi jagaan (w) = 0.455 m

B = 2.670 m

w = 0.455 m

h = 0.621 m
b = 0.807 m
3.5.2 Saluran A1 - A2
Data - data yang diketahui :
Bentuk saluran trapesium
Dari KP 03 hal. 98
• Qrencana = 0.857 m³/dtk
• Vrencana = 0.519 m/dtk
• m = 1.5
• n (manning) = 1.80
• k = 40
☛ Luas penampang akibat debit (A)
Qrencana 0.857
A = = = 1.653 m²
Vrencana 0.519
☛ Tinggi permukaan air (h)
A .0.5 1.653 .0.5
h = ( ) = ( ) = 0.7078
m + n 1.5 + 1.80
☛ Lebar dasar saluran (b)
b = n x h
= 1.80 x 0.7078
= 1.2741 m
☛ Tinggi jagaan (w)
w = 0.3 + 0.25 h
= 0.3 + 0.25 x 0.7078
= 0.477 m
☛ Keliling basah (P)
P = b + 2h Ö 1 + m²
= 1.2741 + ( 2 x 0.7078 ) Ö 1 + 1.5 ²
= 3.8262 m
☛ Jari - jari hidrolis ( R )
A 1.653
R = = = 0.4321 m
P 3.826235
☛ Kemiringan saluran (I)
V ²
I (
=
k x R ⅔)
0.519 ²
(
=
40 x 0.4321 ⅔ )
= 0.0005
☛ Lebar muka air (B)
B = b + 2 ( m x h )
= 1.2741 + 2 ( 1.5 x 0.7078 )
= 3.3976 m
Kesimpulan :
☛ Kecepatan rencana (V) = 0.52 m/dtk ☛ Keliling basah (P)
☛ Luas penampang (A) = 1.653 m² ☛ Jari - jari hidrolis (R)
☛ Tinggi muka air (h) = 0.708 m ☛ Kemiringan saluran (I)
☛ Lebar dasar saluran (b) = 1.274 m ☛ Lebar muka air (B)
☛ Tinggi jagaan (w) = 0.477 m
B = 3.398 m

w = 0.477 m

h = 0.708 m

b = 1.274 m
3.6 PERENCANAAN DIMENSI GORONG-GORONG DAN KEHILANGAN ENERGI

Perhitungan dimensi gorong-gorong untuk jalur A2 - B3


3.6.1 Perhitungan gorong-gorong untuk jalur A2 - B3
Data - data yang diketahui sbb :
Bangunan pelintas gorong-gorong bentuk bulat
• Debit saluran (Qsaluran) = 1.717 m³/dtk
• Kecepatan di hulu saluran (V1) = 0.573 m/dtk
• Kecepatan di dalam gorong-gorong (V2) = 1.5 m/dtk
• Kecepatan di hilir saluran (V3) = 0.625 m/dtk
• Percepatan gravitasi (g) = 9.81 m²/dtk
• Kekasaran Saluran (k) = 70

☛ Luas Penampang Gorong - Gorong (A)


Q 1.717
A = = = 1.145 m²
V2 1.5
☛ Diameter Gorong - Gorong (D)
A = 1/4 p D²
1.145 = 1/4 x 3.14 x D²
1.145
D2 = (
0.785 )
D = 1.208 m
☛ Ketebalan Gorong - Gorong (t)
t = 0.1 x D
= 0.1 x 1.2077
= 0.1208 m
☛ Keliling Basah (P)
P = 3.14 x D
= 3.14 x 1.2077
= 3.792 m
☛ Jari - Jari Hidrolis ( R )
A 1.1449
R = = = 0.3019 m
P 3.792
☛ Kemiringan Saluran ( I )
V
I = (k x R ⅔ )
1.5 ²
= (
70 x 0.3019 ⅔ )
= 0.0023

☛ Kehilangan Energi
Ü Kehilangan energi akibat pemasukan (ΔH masuk)

( V2 - V1 ) ²
ΔHmasuk = ξmasuk x
2.g
( 1.5 - 0.5729 ) ²
= 0.25 x
2 x 9.81
= 0.011 m
Ü Kehilangan energi akibat gesekan (ΔH f)
V2² Dimana : 1 ⅙
ΔHf = Cf x Cf = x R
2g k
1.5 ² 1
= 0.01 x
2x 9.81
=
70
0.3019( )
= 0.001 m = 0.012 m
Ü Kehilangan energi akibat pengeluaran (ΔH keluar) Ü Total Kehilangan Energi (ΔHtotal)
( V3 - V2 ) ² ΔHtotal = ΔHmasuk + ΔHf
ΔHkeluar = ξkeluar x
2.g = 0.011 + 0.001
( 0.6255 - 1.5 ) ² = 0.032 m
= 0.5 x
2 x 9.81
= 0.019 m

w
Sketsa Penampang Gorong - Gorong
t

D
= 3.046 m
= 0.354 m
= 0.0005
= 2.670 m
= 3.826 m
= 0.432 m
= 0.0005
= 3.398 m

ΔHf + ΔHkeluar
0.0013 + 0.019
Tabel Perhitungan Dimensi Saluran Tersier
Dimensi Salura
Nama Q maks V
No m k n A h b w H
Saluran (m³/dtk) (m/dtk)
(m²) (m) (m) (m) (m)
1 2 3 4 5 6 7 8 10 11 12 13
1 A0 - A1 0.429 0.397 1.50 35 1.3 1.079 0.621 0.807 0.455 1.076
2 A1 - A2 0.857 0.519 1.50 40 1.8 1.653 0.708 1.274 0.477 1.185
3 A0 - A3 0.431 0.397 1.50 35 1.3 1.085 0.622 0.809 0.456 1.078
4 B0 - B1 0.206 0.497 1.50 40 1.8 0.414 0.354 0.638 0.389 0.743
5 B1 - B2 0.410 0.555 1.50 40 2.3 0.739 0.441 1.014 0.410 0.851
6 B0 - B3 0.206 0.497 1.50 40 1.8 0.414 0.354 0.637 0.389 0.743
7 C0 - C1 0.328 0.384 1.50 35 1.3 0.854 0.552 0.718 0.438 0.990
8 C1 - C2 0.655 0.512 1.50 40 1.8 1.279 0.623 1.121 0.456 1.078
9 C0 - C3 0.328 0.384 1.50 35 1.3 0.855 0.553 0.719 0.438 0.991
10 D0 - D1 0.189 0.390 1.00 35 1.0 0.483 0.492 0.492 0.423 0.915
11 D1 - D2 0.377 0.410 1.00 35 1.2 0.919 0.646 0.776 0.462 1.108
12 D0 - D3 0.189 0.373 1.00 35 1.0 0.506 0.503 0.503 0.426 0.929
13 E0 - E1 0.759 0.515 1.50 40 1.8 1.472 0.668 1.202 0.467 1.135
14 E1 - E2 1.518 0.570 1.50 40 2.3 2.661 0.837 1.925 0.509 1.346
15 E0 - E3 0.792 0.516 1.50 40 1.8 1.534 0.682 1.227 0.470 1.152
16 F0 - F1 0.358 0.502 1.50 40 1.8 0.714 0.465 0.837 0.416 0.881
17 F1 - F2 0.733 0.484 1.50 40 1.8 1.513 0.677 1.219 0.469 1.146
18 F0 - F3 0.382 0.503 1.50 40 1.8 0.761 0.480 0.864 0.420 0.900
19 G0 - G1 0.284 0.499 1.50 40 1.8 0.568 0.415 0.747 0.404 0.819
20 G1 - G2 0.596 0.558 1.50 40 2.3 1.068 0.530 1.219 0.433 0.963
21 G0 - G3 0.294 0.500 1.50 40 1.8 0.588 0.422 0.760 0.405 0.827
22 H0 - H1 0.378 0.390 1.50 35 1.3 0.968 0.588 0.765 0.447 1.035
23 H0 - H3 0.401 0.394 1.50 35 1.3 1.020 0.604 0.785 0.451 1.054
24 I2 - I1 0.864 0.562 1.50 40 2.3 1.538 0.636 1.463 0.459 1.095
25 I3 - I2 0.430 0.556 1.50 40 2.3 0.773 0.451 1.037 0.413 0.864
26 I0 - I3 0.451 0.505 1.50 40 1.8 0.894 0.520 0.937 0.430 0.951

Tabel Perhitungan Dimensi Saluran Sekunder


Dimensi Salura
Nama Q maks V
No m k n A h b w H
Saluran (m³/dtk) (m/dtk)
(m²) (m) (m) (m) (m)
1 2 3 4 5 6 7 8 10 11 12 13
1 A3 - A2 1.717 0.573 1.50 40 2.30 2.998 0.888 2.043 0.522 1.410
2 B3 - B2 0.822 0.625 1.50 43 3.10 1.314 0.534 1.657 0.434 0.968
3 C3 - C2 1.311 0.504 1.50 40 2.70 2.602 0.787 2.125 0.497 1.284
4 D3 - D2 0.754 0.441 1.50 35 1.30 1.712 0.782 1.017 0.495 1.277
5 E3 - E2 3.068 0.640 1.50 43 3.10 4.791 1.021 3.164 0.555 1.576
6 F3 - F2 1.474 0.557 1.50 43 3.70 2.65 0.713 2.639 0.478 1.192
7 G3 - G2 1.173 0.628 1.50 43 3.10 1.869 0.637 1.976 0.459 1.097
8 H1 - H2 4.982 0.700 2.00 45 4.90 7.117 1.016 4.977 0.554 1.570
9 H3 - H2 2.170 0.568 1.50 43 3.70 3.824 0.858 3.173 0.514 1.372
10 I0 - I1 1.745 0.670 1.50 43 3.50 2.604 0.722 2.526 0.480 1.202

Tabel Perhitungan Dimensi Saluran Primer


Dimensi Salura
Nama Q maks V
No m k n Ad h b w H
Saluran (m³/dtk) (m/dtk)
(m²) (m) (m) (m) (m)
1 2 3 4 5 6 7 8 10 11 12 13
1 H2 - SP 7.152 0.700 2.00 45.0 4.90 ### 1.217 5.963 0.604 1.821
2 I1 - SP 2.608 0.700 2.00 45.0 4.90 3.726 0.735 3.601 0.484 1.219
3 H2I1 - SP 9.761 0.700 2.00 45.0 4.90 ### 1.422 6.966 0.655 2.077
ersier
nsi Saluran
P R I B
(m) (m) (%)
14 15 16 17
3.046 0.354 0.0005 2.670
3.826 0.432 0.00051 3.398
3.053 0.355 0.00051 2.676
1.915 0.216 0.00119 1.701
2.604 0.284 0.00104 2.337
1.914 0.216 0.00119 1.700
2.710 0.315 0.00056 2.375
3.365 0.380 0.0006 2.988
2.711 0.315 0.00056 2.377
1.882 0.257 0.00076 1.475
2.604 0.353 0.00055 2.068
1.926 0.263 0.00068 1.509
3.610 0.408 0.00055 3.206
4.942 0.538 0.00046 4.435
3.686 0.416 0.00054 3.273
2.514 0.284 0.00084 2.232
3.660 0.413 0.00048 3.250
2.595 0.293 0.00081 2.304
2.243 0.253 0.00097 1.992
3.130 0.341 0.00082 2.809
2.281 0.258 0.00095 2.025
2.885 0.336 0.00053 2.529
2.961 0.345 0.00052 2.595
3.757 0.409 0.00065 3.372
2.664 0.290 0.00101 2.391
2.813 0.318 0.00074 2.498

kunder
nsi Saluran
P R I B
(m) (m) (%)
14 15 16 17
5.245 0.571 0.0004 4.707
3.584 0.367 0.0008 3.260
4.963 0.524 0.0004 4.487
3.836 0.446 0.0005 3.363
6.843 0.700 0.0004 6.225
5.210 0.508 0.0004 4.778
4.274 0.437 0.0007 3.888
9.519 0.748 0.0004 9.039
6.265 0.610 0.0003 5.745
5.128 0.508 0.0006 4.691

rimer
nsi Saluran
P R I B
(m) (m) (%)
14 15 16 17
### 0.896 0.0003 10.830
6.887 0.541 0.0005 6.540
### 1.047 0.0002 12.652
PERHITUNGAN GORONG-GORONG PERSEGI
Contoh perhitungan gorong-gorong
Diketahui data-data sebagai berikut :
Saluran : A3 - B2
Data-data :
Q rencana = 1.717 m³/det
Kecepatan aliran dalam saluran (V1) = 0.573 m/det
Kecepatan aliran dalam gorong-gorong (V2) = 1.50 m/det
Kecepatan aliran hilir saluran (V3) = 0.625 m/det
Koefesien kekasaran manning (n) = 0.02 m/det

Penampang Gorong-gorong

Q 1.717
A = = = 1.145 m²
V2 1.50

Tinggi permukaan air gorong-gorong (h) dapat dihitung :

A = 2 . h²

A 1.1448627
h = = = 0.757 m
2 2

b = 2 . h = 2 . 0.757 = 1.513 m
p = b + 2h = 1.51 + 1.513 = 3.026 m
w = 0.25 x h = 0.25 x 0.757 = 0.189 m
A 1.14486
R = = = 0.378 m
P 3.026
Kehilangan energi
1. Akibat pemasukan
(V2² - V1²) 2.25 - 0.33
hi = 0.25 = 0.25
2. g 19.62
= 0.024 m
2. Akibat gesekan
19,6 . n²
hf =
R . V3

19.60 . 0.0005
hf = = 0.040 m
0.378 . 0.63

3. Akibat pengeluaran
(V2² - V3²) 2.25 - 0.39
hb = 0.5 = 0.5
2.g 19.62
= 0.047 m
Kehilangan energi total= hi + hf + hb
= 0.112 m Plat Beton
Plat Beton
0.26
0.26

1.07
1.07

2.12
2.12
Sketsa Penampang Gorong-Gorong
Sketsa Penampang Gorong-Gorong
Tabel Perhitungan Dimensi Gorong - Gorong (Persegi)

Kecepatan Aliran Dimensi


Gorong - Qsaluran
No V1 V2 V3 A h b P
gorong (m³/dtk)
(m/dtk) (m/dtk) (m/dtk) (m²) (m) (m) (m)
1 2 3 4 5 6 7 8 9 10
1 A2 - B3 1.717 0.573 1.5 0.625 1.145 0.757 1.513 3.026
2 B2 - C3 0.822 0.625 1.5 0.504 0.548 0.523 1.047 2.093
3 C2 - D3 1.311 0.504 1.5 0.441 0.874 0.661 1.322 2.644
4 D2 - H1 0.754 0.441 1.5 0.640 0.503 0.501 1.003 2.006
5 E2 - F3 3.068 0.640 1.5 0.557 2.046 1.011 2.023 4.045
6 F2 - I0 1.474 0.557 1.5 0.628 0.982 0.701 1.402 2.803
7 G2 - H3 1.173 0.628 1.5 0.700 0.782 0.625 1.251 2.501
8 H2 - SP 2.170 0.700 1.5 0.670 1.447 0.851 1.701 3.402
9 I1 - SP 1.745 0.670 1.5 0.670 1.163 0.763 1.525 3.050

Tabel Kehilangan Energi

Kehilangan Energi
No Gorong - gorong hi hf hb h
masuk keluar total
(m) (m) (m) (m)
1 2 3 4 5 6
1 A2 - B3 0.024 0.040 0.047 0.112
2 B2 - C3 0.024 0.072 0.051 0.147
3 C2 - D3 0.025 0.065 0.052 0.143
4 D2 - H1 0.026 0.059 0.047 0.132
5 E5 - F3 0.023 0.034 0.049 0.107
6 F2 - I0 0.025 0.043 0.047 0.115
7 G2 - H3 0.024 0.043 0.045 0.112
8 H2 - SP 0.022 0.033 0.046 0.102
9 I1 - SP 0.023 0.037 0.046 0.106
)

Dimensi

P R w
(m) (m) (m)
10 11 13
3.026 0.378 0.189
2.093 0.262 0.131
2.644 0.330 0.165
2.006 0.251 0.125
4.045 0.506 0.253
2.803 0.350 0.175
2.501 0.313 0.156
3.402 0.425 0.213
3.050 0.381 0.191
PROYEKSI JUMLAH PENDUDUK

A. SECARA EKSPONENSIAL A. SECARA GEOMETRI

NO. TAHUN JUMLAH PENDUDUK NO. TAHUN JUMLAH PENDUDUK


1 2000 585.174 1 2000 585.174
2 2001 609.055 2 2001 585.408
3 2002 646.717 3 2002 621.608
4 2003 700.580 4 2003 673.380
5 2004 774.261 5 2004 744.200
6 2005 872.977 6 2005 839.083
7 2006 1,004.163 7 2006 965.175
8 2007 1,178.396 8 2007 1,132.643
9 2008 1,410.796 9 2008 1,356.020
10 2009 1,723.150 10 2009 1,656.246
11 2010 2,147.177 11 2010 2,063.810
12 2011 2,729.597 12 2011 2,623.617
13 2012 3,540.096 13 2012 3,402.648
14 2013 4,684.007 14 2013 4,502.145
15 2014 6,322.748 15 2014 6,077.260
16 2015 8,707.232 16 2015 8,369.163
17 2016 12,233.205 17 2016 11,758.235
18 2017 17,534.212 18 2017 16,853.425
19 2018 25,640.008 19 2018 24,644.503
20 2019 38,250.398 20 2019 36,765.278
21 2020 58,215.635 21 2020 55,955.340

Keterangan :
1. Tabel A Pn = Po x er n
2. Tabel BPn = Po x (1+r)n

dimana :
Pn = Jumlah penduduk pada tahun < n >
Po = Jumlah penduduk pada tahun aw< ### >
r = Angka pertumbuhan penduduk < 0.02 >
n = Jumlah waktu dalam tahun
e = 2.7183

Contoh Perhitungan Proyeksi Jumlah Penduduk

Jumlah penduduk= jumlah penduduk yang ditentukan setiap x e ^ angka PPx no. thn Pnddk

= 585.174 x 2.7183 ^ 0.02 x 2


= 609.0554
Perhitungan Debit Air Kotor Perumahan

Diketahui :
P (2007) Pada Daerah Perumah= 1,178.396 jiwa
Kebutuhan Air Bersih = 200 lt/org/hari
Air Yang Terbuang = 85% dari kebutuhan air bersih
Luas Area ( A Total ) = 2.59 Ha

Penyelesaian
R = P (2007) / A Total
= 1,178.396 / 2.59
= 455.419 Jiwa / Ha

Air buangan = 200 x 85%


= 170 lt/org/hari
Maka :
Q = R x air buangan
= 455.419 x 170
= 77421.169 lt/hari/Ha
= 0.0008961 m3/dtk/Ha

Saluran A0 - A1

A= 0.01125 Ha
A Total = 2.59 Ha
Q/Ha = 0.0008961 m3/dtk/Ha
Maka :
Q air kotor = Q/Ha x ( A / A Total )
= 0.0008961 x ( 0.01125 / 2.59 )
= 3.896E-06 m /dtk
3

Perhitungan Debit Air Kotor Industri

Diketahui :
P (2007) Pada Daerah Industr
= 1,178.396 Jiwa
Kebutuhan Air Bersih = 200 lt/org/hari
Air Yang Terbuang = 85% dari kebutuhan air bersih
Luas Area ( A Total ) = 2.20 Ha

Penyelesaian
R = P (2007) / A Total
= 1,178.396 / 2.20
= 535.634 Jiwa / Ha

Air buangan = 200 x 85%


= 170 lt/org/hari
Maka :
Q = R x air buangan
= ### x 170
= 91057.852 lt/hari/Ha
= 0.00105 m3/dtk/Ha
Saluran F0 - F1

A= 0.0055 Ha
A Total = 2.20 Ha
Q/Ha = 0.0010539 m3/dtk/Ha
Maka :
Q air kotor = Q/Km2 x ( A / A Total )
= 0.0010539 x ( 0.006 / 2.20 )
= 2.635E-06 m /dtk
3

Perhitungan Debit Rancangan

Saluran A0 - A1
Q Air Hujan = 0.4287322 m3/dtk
Q Air Kotor = 3.9E-06 m3/dtk
Maka :
Q Rancangan = Q Air Hujan + Q Air Kotor
= 0.4287322 + 0.000004
= 0.42874 m3/dtk
Tabel Air Kotor Perumahan

Luas Area Air Yang R


Luas Saluran Kebutuhan Proyeksi Penduduk Q
No Saluran Terbuang Air Yang Dibuang Q Air Kotor
(A) ( A Total ) Air Bersih ( 2007 ) ( Jiwa / Km2 )
(%) ( m3/dtk/Ha )
1 A0 - A1 0.1125 455.419 182.750 0.000963 0.000042
2 A1 - A2 0.0575 455.419 182.750 0.000963 0.000021
2.59 215 85% 1,178
3 A0 - A3 0.0575 455.419 182.750 0.000963 0.000021
4 A3 - A2 0.1125 455.419 182.750 0.000963 0.000042
5 C0 - C 1 0.0875 585.538 182.750 0.001239 0.000054
6 C1 - C 2 0.0575 585.538 182.750 0.001239 0.000035
2.01 215 85% 1,178
7 C0 - C 3 0.0575 585.538 182.750 0.001239 0.000035
8 C3 - C 2 0.0875 585.538 182.750 0.001239 0.000054
9 D0 - D1 0.095 1030.291 182.750 0.002179 0.000181
10 D1 - D2 0.1555 1030.291 182.750 0.002179 0.000296
1.14 215 85% 1,178
11 D0 - D3 0.0575 1030.291 182.750 0.002179 0.000110
12 D3 - D2 0.094 1030.291 182.750 0.002179 0.000179
13 E0 - E 1 0.1125 261.866 182.750 0.000554 0.000014
14 E1 - E 2 0.1 261.866 182.750 0.000554 0.000012
4.50 215 85% 1,178
15 E0 - E 3 0.1 261.866 182.750 0.000554 0.000012
16 E3 - E 2 0.1125 261.866 182.750 0.000554 0.000014

Tabel Air Kotor Industri

Luas Saluran Luas Area R Q


Air Yang
Kebutuhan Proyeksi Penduduk ( Jiwa / Air Yang Dibuang
No Saluran Terbuang Q Air Kotor
(A) ( A Total ) Air Bersih ( 2007 ) Km2 ) ( m3/dtk/Km2
(%)
)
1 F0 - F1 0.055 535.634 182.750 0.001133 0.000028
2 F1 - F2 0.1 535.634 182.750 0.001133 0.000051
2.20 215 85% 1,178
3 F0 - F3 0.1 535.634 182.750 0.001133 0.000051
4 F3 - F2 0.055 535.634 182.750 0.001133 0.000028
5 I0 - I1 0.0875 673.369 182.750 0.001424 0.000071
6 I2 - I1 0.05 673.369 182.750 0.001424 0.000041
1.75 215 85% 1,178
7 I3 - I2 0.05 673.369 182.750 0.001424 0.000041
1.75 215 85% 1,178

8 I3 - I0 0.0875 673.369 182.750 0.001424 0.000071


Q Air Kotor

0.000042
0.000021
0.000021
0.000042
0.000054
0.000035
0.000035
0.000054
0.000181
0.000296
0.000110
0.000179
0.000014
0.000012
0.000012
0.000014

Q Air Kotor

0.000028
0.000051
0.000051
0.000028
0.000071
0.000041
0.000041
0.000071
Tabel Debit Rancangan Perumahan Kala Ulang 2 T Tabel Debit Rancangan Perumahan Kala Ulang
Q Q
Q Air Q Air
No Saluran Q Air Kotor Rancanga No Saluran Q Air Kotor Rancang
Hujan Hujan
n n
1 A0 - A1 0.000042 0.429 0.429 1 A0 - A1 0.000042 0.891 0.891
2 A1 - A2 0.000021 0.857 0.857 2 A1 - A2 0.000021 1.782 1.782
3 A0 - A3 0.000021 0.431 0.431 3 A0 - A3 0.000021 0.896 0.896
4 A3 - A2 0.000042 0.856 0.856 4 A3 - A2 0.000042 1.780 1.780
5 C0 - C1 0.000054 0.328 0.328 5 C0 - C1 0.000054 0.681 0.681
6 C1 - C2 0.000035 0.655 0.655 6 C1 - C2 0.000035 1.360 1.360
7 C0 - C3 0.000035 0.328 0.328 7 C0 - C3 0.000035 0.682 0.682
8 C3 - C2 0.000054 0.654 0.654 8 C3 - C2 0.000054 1.360 1.360
9 D0 - D1 0.000181 0.189 0.189 9 D0 - D1 0.000181 0.392 0.392
10 D1 - D2 0.000296 0.377 0.377 10 D1 - D2 0.000296 0.783 0.784
11 D0 - D3 0.000110 0.189 0.189 11 D0 - D3 0.000110 0.393 0.393
12 D3 - D2 0.000179 0.378 0.379 12 D3 - D2 0.000179 0.786 0.786
13 E0 - E 1 0.000014 0.759 0.759 13 E0 - E 1 0.000014 1.576 1.576
14 E1 - E 2 0.000012 1.518 1.518 14 E1 - E 2 0.000012 3.154 3.154
15 E0 - E 3 0.000012 0.792 0.792 15 E0 - E 3 0.000012 1.646 1.646
16 E3 - E 2 0.000014 1.528 1.528 16 E3 - E 2 0.000014 3.176 3.176

Tabel Debit Rancangan Perumahan Kala Ulang 5 T Tabel Debit Rancangan Perumahan Kala Ulang
Q Q
Q Air Q Air
No Saluran Q Air Kotor Rancanga No Saluran Q Air Kotor Rancang
Hujan Hujan
n n
1 A0 - A1 0.000042 0.766 0.766 1 A0 - A1 0.000042 0.910 0.910
2 A1 - A2 0.000021 1.533 1.533 2 A1 - A2 0.000021 1.821 1.821
3 A0 - A3 0.000021 0.771 0.771 3 A0 - A3 0.000021 0.915 0.915
4 A3 - A2 0.000042 1.531 1.531 4 A3 - A2 0.000042 1.818 1.818
5 C0 - C1 0.000054 0.586 0.586 5 C0 - C1 0.000054 0.696 0.696
6 C1 - C2 0.000035 1.170 1.170 6 C1 - C2 0.000035 1.390 1.390
7 C0 - C3 0.000035 0.587 0.587 7 C0 - C3 0.000035 0.697 0.697
8 C3 - C2 0.000054 1.169 1.170 8 C3 - C2 0.000054 1.389 1.389
9 D0 - D1 0.000181 0.337 0.337 9 D0 - D1 0.000181 0.400 0.400
10 D1 - D2 0.000296 0.674 0.674 10 D1 - D2 0.000296 0.800 0.801
11 D0 - D3 0.000110 0.338 0.338 11 D0 - D3 0.000110 0.401 0.401
12 D3 - D2 0.000179 0.676 0.676 12 D3 - D2 0.000179 0.803 0.804
13 E0 - E 1 0.000014 1.356 1.356 13 E0 - E 1 0.000014 1.611 1.611
14 E1 - E 2 0.000012 2.713 2.713 14 E1 - E 2 0.000012 3.222 3.222
15 E0 - E 3 0.000012 1.416 1.416 15 E0 - E 3 0.000012 1.682 1.682
16 E3 - E 2 0.000014 2.731 2.732 16 E3 - E 2 0.000014 3.245 3.245
Tabel Debit Rancangan Industri Kala Ulang 2 Tahun

No Saluran Q Air Kotor Q Air Hujan Q Rancangan

1 F0 - F1 0.000028 0.358 0.358


2 F1 - F2 0.000051 0.733 0.733
3 F0 - F3 0.000051 0.382 0.382
4 F3 - F2 0.000028 0.740 0.740
5 I0 - I1 0.000071 0.878 0.878
6 I2 - I1 0.000041 0.864 0.864
7 I2 - I3 0.000041 0.430 0.430
8 I0 - I3 0.000071 0.451 0.452

Tabel Debit Rancangan Industri Kala Ulang 5 Tahun

No Saluran Q Air Kotor Q Air Hujan Q Rancangan

1 F0 - F1 0.000028 0.640 0.641


2 F1 - F2 0.000051 1.310 1.310
3 F0 - F3 0.000051 0.683 0.684
4 F3 - F2 0.000028 1.324 1.324
5 I0 - I1 0.000071 1.569 1.569
6 I2 - I1 0.000041 1.544 1.544
7 I2 - I3 0.000041 0.768 0.768
8 I0 - I3 0.000071 0.807 0.807

Tabel Debit Rancangan Industri Kala Ulang 10 Tahun

No Saluran Q Air Kotor Q Air Hujan Q Rancangan

1 F0 - F1 0.000028 0.745 0.745


2 F1 - F2 0.000051 1.523 1.523
3 F0 - F3 0.000051 0.795 0.795
4 F3 - F2 0.000028 1.539 1.539
5 I0 - I1 0.000071 1.818 1.818
6 I2 - I1 0.000041 1.795 1.795
7 I2 - I3 0.000041 0.893 0.893
8 I0 - I3 0.000071 0.932 0.932

Tabel Debit Rancangan Industri Kala Ulang 15 Tahun

No Saluran Q Air Kotor Q Air Hujan Q Rancangan

1 F0 - F1 0.000028 0.761 0.761


2 F1 - F2 0.000051 1.556 1.556
3 F0 - F3 0.000051 0.812 0.812
4 F3 - F2 0.000028 1.572 1.572
5 I0 - I1 0.000071 1.863 1.863
6 I2 - I1 0.000041 1.834 1.834
7 I2 - I3 0.000041 0.912 0.912
8 I0 - I3 0.000071 0.959 0.959
Kala Ulang 10 Tahun
Q
Rancanga
n
0.891
1.782
0.896
1.780
0.681
1.360
0.682
1.360
0.392
0.784
0.393
0.786
1.576
3.154
1.646
3.176

Kala Ulang 15 Tahun


Q
Rancanga
n
0.910
1.821
0.915
1.818
0.696
1.390
0.697
1.389
0.400
0.801
0.401
0.804
1.611
3.222
1.682
3.245
Perhitungan Galian

DATA : Saluran A0 - A1

Harga Galian : Rp 25,000 /m3


Panjang Saluran ( L ): 225 m
Luas Penampang ( A : 1.079 m

Jadi
Volume Galian : L x A
: 225 x 1.079
: 242.88 m3

Maka
Biaya : Volume Galian x Harga Galian
: 242.88 x Rp 25,000
: Rp 6,072,094
Perhitungan Lining

DATA : Saluran A0 - A1

Harga Beton ( tebal 10 cm: Rp150,000


Panjang Saluran ( L ) : 225
Luas Penampang ( A ) : 1.079
Kemiringan Saluran : 0.00051
Tinggi Permukaan Air ( h ): 0.621
Lebar Dasar Saluran ( b ) : 0.807

Jadi
Luas Penampang Basah : b + 2h
1 I 2
: 0.807 + 2 x 0.621 √ 1+ 0.0005 ###
: 2.05 m3

Luas Daerah Lining : Luas Penampang Basah x Panjang Saluran


: 2.05 x 225
: 461.03

Biaya Pembuatan Lining : Luas Daerah Lining x Harga Beton


: 461.03 x Rp150,000
: Rp 69,153,904
Perhitungan Biaya Galian

Nama Panjang Luas Volume


No. Biaya ( Rp )
Saluran Saluran (m) Penampang Galian
1 A0 - A1 225 1.079 242.88 Rp 7,286,512
2 A1 - A2 115 1.653 190.14 Rp 5,704,220
3 A0 - A3 115 1.085 124.74 Rp 3,742,123
4 A3 - A2 225 2.998 674.45 Rp 20,233,531
5 B0 - B1 110 0.414 45.58 Rp 1,367,433
6 B1 - B2 115 0.739 84.94 Rp 2,548,302
7 B0 - B3 115 0.414 47.58 Rp 1,427,433
8 B3 - B2 110 1.314 144.52 Rp 4,335,527
9 C0 - C 1 175 0.854 149.50 Rp 4,484,915
10 C1 - C 2 115 1.279 147.09 Rp 4,412,682
11 C0 - C 3 115 0.855 98.37 Rp 2,951,025
12 C3 - C 2 175 2.602 455.38 Rp 13,661,437
13 D0 - D1 190 0.483 91.84 Rp 2,755,182
14 D1 - D2 311 0.919 285.82 Rp 8,574,579
15 D0 - D3 115 0.506 58.19 Rp 1,745,795
16 D3 - D2 188 1.712 321.90 Rp 9,656,947
17 E0 - E 1 225 1.472 331.22 Rp 9,936,468
18 E1 - E 2 200 2.661 532.28 Rp 15,968,344
19 E0 - E 3 200 1.534 306.84 Rp 9,205,070
20 E3 - E 2 225 4.791 1077.97 Rp 32,339,149
22 F0 - F1 110 0.714 78.52 Rp 2,355,732
23 F1 - F2 200 1.513 302.58 Rp 9,077,412
24 F0 - F3 200 0.761 152.11 Rp 4,563,220
25 F3 - F2 110 2.645 290.96 Rp 8,728,672
26 G0 - G1 175 0.568 99.44 Rp 2,983,330
27 G1 - G2 100 1.068 106.76 Rp 3,202,890
28 G0 - G3 100 0.588 58.76 Rp 1,762,759
29 G3 - G2 175 1.869 327.01 Rp 9,810,308
30 H0 - H1 189 0.968 183.04 Rp 5,491,164
31 H1 - H2 334 7.117 2377.23 Rp 71,316,821
32 H0 - H3 100 1.020 102.01 Rp 3,060,195
33 H3 - H2 160 3.824 611.82 Rp 18,354,640
34 I0 - I1 175 2.604 455.72 Rp 13,671,656
35 I2 - I1 150 1.538 230.71 Rp 6,921,188
36 I3 - I2 175 0.773 135.31 Rp 4,059,355
37 I0 - I3 150 0.894 134.08 Rp 4,022,301

Total Anggaran Rp 331,718,319


Perhitungan Biaya Pembuatan Lining

Luas
Nama Panjang Kemiringan Luas Luas daera
No. Penampang
Saluran Saluran (m) (%) Penampang Lining
Basah

1 A0 - A1 225 0.27 1.079 2.05 461.03


2 A1 - A2 115 1.22 1.653 2.69 309.32
3 A0 - A3 115 0.96 1.085 2.05 236.20
4 A3 - A2 225 0.40 2.998 3.82 859.30
5 B0 - B1 110 1.73 0.414 1.35 148.12
6 B1 - B2 115 2.52 0.739 1.90 218.02
7 B0 - B3 115 1.74 0.414 1.35 154.74
8 B3 - B2 110 2.55 1.314 2.73 299.81
9 C0 - C 1 175 0.86 0.854 1.82 318.99
10 C1 - C 2 115 2.43 1.279 2.37 272.06
11 C0 - C 3 115 1.91 0.855 1.82 209.75
12 C3 - C 2 175 1.20 2.602 3.70 647.41
13 D0 - D1 190 0.68 0.483 1.47 280.22
14 D1 - D2 311 0.45 0.919 2.07 643.23
15 D0 - D3 115 1.48 0.506 1.51 173.54
16 D3 - D2 188 0.53 1.712 2.58 485.15
17 E0 - E 1 225 0.44 1.472 2.54 571.05
18 E1 - E 2 200 0.20 2.661 3.60 719.72
19 E0 - E 3 200 0.05 1.534 2.59 518.20
20 E3 - E 2 225 0.58 4.791 5.20 1171.08
21 F0 - F1 110 2.64 0.714 1.77 194.41
22 F1 - F2 200 0.10 1.513 2.57 514.59
23 F0 - F3 200 0.05 0.761 1.82 364.85
24 F3 - F2 110 2.73 2.645 4.07 447.18
25 G0 - G1 175 1.14 0.568 1.58 275.95
26 G1 - G2 100 0.10 1.068 2.28 227.92
27 G0 - G3 100 0.70 0.588 1.60 160.35
28 G3 - G2 175 0.80 1.869 3.25 568.84
29 H0 - H1 189 0.53 0.968 1.94 366.81
30 H1 - H2 334 0.03 7.117 7.01 2340.63
31 H0 - H3 100 0.20 1.020 1.99 199.18
32 H3 - H2 160 0.56 3.824 4.89 782.07
33 I0 - I1 175 1.09 2.604 3.97 694.62
34 I2 - I1 150 0.60 1.538 2.74 410.35
35 I3 - I2 175 0.69 0.773 1.94 339.44
36 I0 - I3 150 0.13 0.894 1.98 296.65

Total Anggaran
Luas daerah
Biaya ( Rp )
Lining

461.03 Rp 69,153,904
309.32 Rp 46,398,542
236.20 Rp 35,430,196
859.30 Rp 128,894,507
148.12 Rp 22,218,096
218.02 Rp 32,702,564
154.74 Rp 23,210,487
299.81 Rp 44,971,691
318.99 Rp 47,847,771
272.06 Rp 40,809,150
209.75 Rp 31,463,060
647.41 Rp 97,111,591
280.22 Rp 42,032,857
643.23 Rp 96,484,136
173.54 Rp 26,030,497
485.15 Rp 72,772,019
571.05 Rp 85,657,338
719.72 Rp 107,957,360
518.20 Rp 77,729,494
1171.08 Rp 175,661,850
194.41 Rp 29,161,955
514.59 Rp 77,188,627
364.85 Rp 54,727,808
447.18 Rp 67,077,097
275.95 Rp 41,393,015
227.92 Rp 34,188,369
160.35 Rp 24,052,144
568.84 Rp 85,326,173
366.81 Rp 55,021,028
2340.63 Rp 351,094,807
199.18 Rp 29,877,216
782.07 Rp 117,310,463
694.62 Rp 104,192,855
410.35 Rp 61,552,157
339.44 Rp 50,916,078
296.65 Rp 44,497,976

Rp 2,532,114,880
3.5 PERENCANAAN DIMENSI SALURAN

Perhitungan debit rencana saluran untuk jalur A0 - A1, A1 - A2


3.5.1 Saluran A0 - A1
Data - data yang diketahui :
Bentuk saluran trapesium
Dari KP 03 hal. 98
• Qrencana = 0.429 m³/dtk
• Vrencana = 0.397 m/dtk
• m = 1.5
•n (manning)= 0.03 k = 35
• n = 1.30

☛ Luas penampang akibat debit (A)


Qrencana 0.429
A = = = 1.079 m²
Vrencana 0.397
☛ Luas penampang sendiri (Ae)
A =h ( b+mxh )
1.079 = h ( 1.30 h + 1.5 h )
1.079 = 1.30 h² + 1.5 h²
1.079 = 2.80 h²
☛ Tinggi permukaan air (h)
1.079
h² =
2.80

Ö
1.079
h = = 0.621 m
2.80
☛ Lebar dasar saluran (b)
b = n x h
= 1.30 x 0.621
= 0.807 m
☛ Tinggi jagaan (w)
w = 0.3 + 0.25 h
= 0.3 + 0.25 x 0.621
= 0.455 m
☛ Keliling basah (P)
P = b + 2h Ö 1 + m²
= 0.807 + ( 2 x 0.621 ) Ö 1 + 1.5 ²
= 3.046 m

☛ Jari - jari hidrolis ( R )


A 1.079
R = = = 0.3544 m
P 3.04591
☛ Kemiringan saluran (I)
V ²
I =( k x R⅔ )
0.397 ²
=( 35 x 0.354 ⅔ )
= 0.00051377
☛ Lebar muka air (B)
B =b+2 ( mx h )
= 0.807 + 2 ( 1.5 x 0.6209 )
= 2.67 m

Kesimpulan :
☛ Kecepatan rencana (V) = 0.397 m/dtk ☛ Keliling basah (P) = 3.046 m
☛ Luas penampang (A) = 1.079 m² ☛ Jari - jari hidrolis (R) = 0.354 m
☛ Tinggi muka air (h) = 0.621 m ☛ Kemiringan saluran (I) = 0.0005
☛ Lebar dasar saluran (b) = 0.807 m ☛ Lebar muka air (B) = 2.670 m
☛ Tinggi jagaan (w) = 0.455 m

B = 2.670 m

w = 0.455 m

h = 0.621 m
b = 0.807 m
3.5.2 Saluran A1 - A2
Data - data yang diketahui :
Bentuk saluran trapesium
Dari KP 03 hal. 98
• Qrencana = 0.857 m³/dtk
• Vrencana = 0.519 m/dtk
• m = 1.5
• k = 40
• n = 1.80 •n (manning) = 0.03

☛ Luas penampang akibat debit (A)


Qrencana 0.857
A = = = 1.653 m²
Vrencana 0.519
☛ Luas penampang sendiri (Ae)
A =h ( b+mxh )
1.653 = h ( 1.80 h + 1.5 h )
1.653 = 1.80 h² + 1.5 h²
1.653 = 3.30 h²
☛ Tinggi permukaan air (h)
1.653
h² =
3.30

Ö
1.653
h = = 0.708 m
3.30
☛ Lebar dasar saluran (b)
b = n x h
= 1.80 x 0.708
= 1.274 m
☛ Tinggi jagaan (w)
w = 0.3 + 0.25 h
= 0.3 + 0.25 x 0.708
= 0.477 m
☛ Keliling basah (P)
P = b + 2h Ö 1 + m²
= 1.274 + ( 2 x 0.708 ) Ö 1 + 1.5 ²
= 3.826 m
☛ Jari - jari hidrolis ( R )
A 1.653
R = = = 0.4321 m
P 3.82623
☛ Kemiringan saluran (I)
V ²
I (
=
k x R⅔ )
0.519 ²
(
=
40 x 0.432 ⅔ )
= 0.00051
☛ Lebar muka air (B)
B =b+2 ( mx h )
= 1.274 + 2 ( 1.5 x 0.7078 )
= 3.398 m
Kesimpulan :
☛ Kecepatan rencana (V) = 0.52 m/dtk ☛ Keliling basah (P) = 3.826 m
☛ Luas penampang (A) = 1.653 m² ☛ Jari - jari hidrolis (R) = 0.432 m
☛ Tinggi muka air (h) = 0.708 m ☛ Kemiringan saluran (I) = 0.0005
☛ Lebar dasar saluran (b) = 1.274 m ☛ Lebar muka air (B) = 3.398 m
☛ Tinggi jagaan (w) = 0.477 m

B = 3.398 m

w = 0.477 m

h = 0.708 m

b = 1.274 m
3.6 PERENCANAAN DIMENSI GORONG-GORONG DAN KEHILANGAN ENERGI

Perhitungan dimensi gorong-gorong untuk jalur A2 - B3


3.6.1 Perhitungan gorong-gorong untuk jalur A 2 - B3
Data - data yang diketahui sbb :
Bangunan pelintas gorong-gorong bentuk bulat
• Debit saluran (Qsaluran) = 1.717 m³/dtk
• Kecepatan di hulu saluran (V1) = 0.573 m/dtk
• Kecepatan di dalam gorong-gorong (V2) = 1.500 m/dtk
• Kecepatan di hilir saluran (V3) = 0.625 m/dtk
• Percepatan gravitasi (g) = 9.81 m²/dtk
• Kekasaran Saluran (k) = 70

☛ Luas Penampang Gorong - Gorong (A)


Q 1.717
A = = = 1.145 m²
V2 1.5
☛ Diameter Gorong - Gorong (D)
A = 1/4 p D²
1.145 = 1/4 x 3.14 x D²
1.145
D² = ( 0.785 )
D = 1.208 m
☛ Ketebalan Gorong - Gorong (t)
t = 0.1 x D
= 0.1 x 1.208
= 0.121 m
☛ Keliling Basah (P)
P = p x D
= 3.14 x 1.208
= 3.792 m
☛ Jari - Jari Hidrolis ( R )
A 1.145
R = = = 0.302 m
P 3.792
☛ Kemiringan Saluran ( I )
V
I = ( k xR⅔ )
1.5 ²
= ( 70 x 0.302 ⅔ )
= 0.00227
☛ Kehilangan Energi
Ü Kehilangan energi akibat pemasukan (ΔH masuk)

( V2 - V1 ) ²
ΔHmasuk = ξmasuk x
2.g
( 1.5 - 0.573 ) ²
= 0.25 x
2 x 9.81
= 0.011 m
Ü Kehilangan energi akibat gesekan (ΔH f)
V2² Dimana : 1 ⅙
ΔHf = Cf x Cf = x R
ΔHf = Cf x Cf = x R
2g k
1.5 ² 1 ⅙
= 0.01 x
2 x 9.81
=
70 ( 0.3019 )
= 0.0013 m = 0.012 m
Ü Kehilangan energi akibat pengeluaran (ΔH keluar) Ü Total Kehilangan Energi (ΔHtotal)
( V3 - V2 ) ² ΔHtotal = ΔHmasuk + ΔHf + ΔHkeluar
ΔHkeluar = ξkeluar x
2.g = 0.011 + 0.0013 + 0.019
( 0.625 - 1.5 ) ² = 0.032 m
= 0.5 x
2 x 9.81
= 0.019 m
w

Sketsa Penampang Gorong - Gorong t

D
4.8. PERHITUNGAN INLET PADA TROTOAR

Defenisi
Street Inlet Lubang di sisi jalan yang berfungsi untuk menampung
menyalurkan limpasan air hujan yang berada di sepan
menuju ke dalam saluran.
• Jarak Antara Street Inlet (D)
280 Dimana : w= Lebar jalan
D = x S ≤ 50 m
w S = Kemiringan
D= Jarak antar

• Kapasitas Untuk Inlet Tegak


D 3/2 Dimana : Q= Kapasitas in
= 0.36 x g x a
L L = Lebar baha
g = Kecepatan
a = Kedalaman

☛Perencanaan Inlet Pada Jalur Trotoa(F0 - F3)


Diketahui :Panjang saluran (Ls) = 200 m
Lebar jalan (w) = 3.2 m
Lebar trotoar = 1.0 m
Jalan + trotoar = 5 m
Kemiringan saluran (S %) = 0.02 %= 2 %
Kecepatan gravitasi (g) = 9.81 m²/dtk
Untuk inlet yang sering digunakand = 10 cm = 0.1 m

• Jarak Antara Street Inlet (D)


280
D = x S ≤ 50 m
w
280
= x 2 ≤ 50 m
3.2
= 123.74 ≤ 50 m

Selanjutnya jumlah inlet tegak yang dibuat di sepanjang jalan


Ltot 200
N = = = 1.62
D 123.74

• Kapasitas Inti Tegak


Diketahui : A = D ( 0.5 w ) / 1000 = 0.198 Ha
Lt = 5 m
Ls = 200
st = 2
C = 0.70
Lt
(( )
0.77
to = 0.0175
st ) 0.5

5
0.0175 ( )
0.77
=
( 2 ) 0.5

= 0.05 menit

Ls
ts = Untuk kemiringan 2 % digunakan kecepat
V
200
=
0.75
= 267 dtk = 4.44 menit

tc = to + ts
= 0.05 + 4.44
= 4.49 menit

2 tc 2 x 4.49
Cp = = = 0.995
2 tc + to 2 x 4.49 + 0.05

Gunakan curah hujan maksimum antara periode ulang 2, 5, 10,


R 24 ⅔
I =
24
x (
tc / 60 )
114.4472 24 ⅔
=
24
x (
4.49 / 60 )
= 223.36 mm/jam

Q = 0.00278 x C x Cp x I x A
= 0.00278 x 0.70 x 0.995 x 223.36 x 0.19799
= 0.086 m³/dtk

• Ketinggian Air Di atas Jalan


Q 3/2
= 0.36 x g x d
L
Q = 0.36 x 9.81 x 0.032 x L
0.086 = 0.1117 x L
L = 0.767 m = 76.7 cm Inlet yang digu

Sketsa Inlet :

d
L
d = 0.1 m
0.767 m
enampung dan
da di sepanjang jalan

ebar jalan (m)


Kemiringan jalan (%= 2 %
arak antara street inlet (m)

Kapasitas inlet (m³/dtk)


ebar bahan inlet (m)
Kecepatan gravitasi (m²/dtk)
Kedalaman air (m)
an kecepatan aliran
: 0.75 m/dtk

g 2, 5, 10, dan 15
yang digunakan 0.767 m
4.9. PERHIRUNGAN OUTLET KE SUNGAI
outlet yang ke sungai digunakan adalah berbentuk persegi
1. Q rencana saluran I1-SP =2.608 m3/det
dik: V = kecepatan aliran dalam saluran = 0.700 m/det
n = koefisien kekasaran Manning = 0.0222
m = kemiringan talud = 2.00
diketahui dari perhitungan dimensi saluran, diperoleh;

Tinggi saluran = 1.219 m

Lebar saluran = 3.601 m


Tinggi permukaan air = 0.735 m
Tinggi jagaan = 0.484 m
Keliling basah = 6.887 m
Jari-jari hidrolis = 0.541 m

kehilangan energi
a. Akibat gesekan
nilai koefisian kekasaran Strikler (k) untuk beton= 70
Cf . V2 1 1/6
1 1/6
hf = Cf = R = 0.541 = 0.013 m
2. g k 70
0.013 x 0.700 2
= = 0.0003 m
2 x 9.81

b. akibat pemasukan (hc)


kehilangan energi pada peralihan tidak ada (tidak ada pengeluaran)

c. akibat pengeluaran (ho)


kehilangan energi pada pengeluaran tidak ada ( tidak ada pengeluaran )

Kehilangan energi total = hf + hc + ho

= 0.0003 + 0 + 0

= 0.0003

sketsa outlet ke sungai

w = 0.48 m

h = 0.735 m
b= 3.601 m