Jumlah 295,683,261.55
Pembulatan 295,680,000.00 254,806,600.00 40,873,400.00
Total Nilai Pekerjaan Desmon s/d Tanggal 24 Oktober 2018 : 295,680,000.00 (A)
Total Nilai Pengambilan Desmon s/d Tanggal 24 Oktober 2018 : 254,806,600.00 (B)
Nilai Penerimaan Desmon s/d Tanggal 24 Oktober 2018 : 40,873,400.00 (A-B)
Terbilang :
EMPAT PULUH JUTA DELAPAN RATUS TUJUH PULUH TIGA RIBU SERATUS RUPIAH.
Dibuat Oleh :
Kontraktor Pelaksana
PT. PRANINA GLOBALINDO SEJAHTERA
KONTRAK
NILAI
HARGA SATUAN
CHANGE CONTRAC ORDER
NO. URAIAN PEKERJAAN SAT.
PEKERJAAN
Jumlah Harga Jumlah Harga
Volume Volume
KET.
( Rp. )
16%
( Rp. ) ( Rp. ) 16%
1 2 3 4 5 6 8 9 13
1 Pengukuran dan Pemasangan Bouwplank M' 60,568.53 297.18 17,999,755.75 297.18 17,999,755.75 2,879,960.92
2 Gudang Kerja M2 959,962.85 24.00 23,039,108.40 - - -
3 Papan Nama Proyek ls 1,000,000.00 1.00 1,000,000.00 - - -
4 Pagar Seng Keliling Proyek M' 248,768.85 104.00 25,871,960.40 104.00 25,871,960.40 4,139,513.66
5 Pekerjaan Bor Dalam set 25,000,000.00 1.00 25,000,000.00 - - -
6 IZIN MENDIRIKAN BANGUNAN Ls Tanpa Biaya 1.00 - - - -
7 Pembersihan Lokasi M2 23,589.00 - - -
Nama Proyek : PEMBANGUNAN RUMAH SUSUN PONPES NUR SUFI'IYAH
Pemilik Proyek : SNVT PENYEDIAAN PERUMAHAN PROV. KALIMANTAN SELATAN
No. Kontrak / Tgl.Kontrak : 76/012/Kontrak/Rusun/Rr/2018, Tanggal. 28 Maret 2018
Nilai Kontrak : Rp. 8.915.148.000,-
Kontraktor : PT. PRANINA GLOBALINDO SEJAHTERA
Konsultan MK : PT. BUMI MADANI
Waktu Pelaksanaan : 240 HARI KALENDER
Masa Pemeliharaan : 180 HARI KALENDER
2.1. Pekerjaan Struktur Lantai Dasar elv. -0.05 m 342,765,181.49 204,369,114.50 33,618,719.34
a Komponen Kolom
Tipe K.1 40x50 cm (12buah)
Beton K-275 m3 1,543,527.41 10.13 15,632,845.65 9.29 14,336,282.62 2,358,318.49
Besi beton U-39 kg 12,320.84 2,362.65 29,109,838.95 2,823.42 34,786,953.92 5,722,453.92
Bekisting m2 160,667.54 91.15 14,645,167.61 96.33 15,477,296.93 2,546,015.34
Tipe K.1A 40x50 cm (24buah)
Beton K-275 m3 1,543,527.41 20.26 31,265,691.30 18.58 28,672,565.24 4,716,636.98
Besi beton U-39 kg 12,320.84 2,996.43 36,918,467.50 3,307.94 40,756,635.52 6,704,466.54
Bekisting m2 160,667.54 182.30 29,290,335.21 192.66 30,954,593.86 5,092,030.69
Tipe K.1B 40x50 cm (4 buah)
Beton K-275 m3 1,543,527.41 3.38 5,210,948.55 3.42 5,272,689.65 867,357.45
Besi beton U-39 kg 12,320.84 614.47 7,570,835.68 711.09 8,761,267.63 1,441,228.52
Bekisting m2 160,667.54 30.38 4,881,722.54 32.11 5,159,098.98 848,671.78
Tipe K.2 25 x 40 cm (1 buah Yang Desmon Kerja)
Beton K-275 m3 1,543,527.41 0.84 1,302,737.14 0.39 597,345.11 98,263.27
Besi beton U-39 kg 12,320.84 192.31 2,369,429.20 224.44 2,765,231.76 454,880.62
Bekisting m2 160,667.54 10.97 1,762,844.25 5.89 946,749.55 155,740.30
Tipe K.3 25 x 25 cm (2 buah)
KONTRAK CHANGE CONTRAC ORDER
HARGA SATUAN UPAH KERJA
NO. URAIAN PEKERJAAN SAT VOLUME JUMLAH HARGA Jumlah Harga KET.
Volume
(Rp) (Rp) ( Rp. ) 16%
b. Komponen Balok
Tipe B-1 250x400 mm
L = 1.70 m
Beton K-275 m3 1,543,527.41 0.34 524,799.32 - - -
Besi beton U-39 kg 12,320.84 71.31 878,593.60 66.48 819,074.39 134,737.74
Bekisting m2 118,524.34 2.75 326,416.03 2.82 334,475.69 55,021.25
L = 2.05 m
Beton K-275 m3 1,543,527.41 1.23 1,898,538.72 - -
Besi beton U-39 kg 12,320.84 257.97 3,178,441.56 305.11 3,759,234.91 618,394.14
Bekisting m2 118,524.34 9.96 1,180,858.00 13.61 1,613,353.32 265,396.62
L = 4,50 m
Beton K-275 m3 1,543,527.41 0.45 694,587.34 - -
Besi beton U-39 kg 12,320.84 94.38 1,162,844.47 77.97 960,667.90 158,029.87
Bekisting m2 118,524.34 3.65 432,021.22 3.74 442,688.41 72,822.24
L = 5.60 m
Beton K-275 m3 1,543,527.41 6.72 10,372,504.22 - -
Besi beton U-39 kg 12,320.84 1,409.41 17,365,144.11 1,655.86 20,401,628.78 3,356,067.93
Bekisting m2 118,524.34 54.43 6,451,516.87 55.78 6,610,813.59 1,087,478.84
Tipe B-1' 250x400 mm
L = 2.05 m
Beton K-275 m3 1,543,527.41 0.41 632,846.24 - -
Besi beton U-39 kg 12,320.84 92.98 1,145,570.67 90.18 1,111,117.63 182,778.85
Bekisting m2 118,524.34 3.32 393,619.33 3.40 403,338.33 66,349.16
L = 5.60 m
Beton K-275 m3 1,543,527.41 2.24 3,457,501.41 - -
Besi beton U-39 kg 12,320.84 507.98 6,258,727.55 519.27 6,397,865.15 1,052,448.82
Bekisting m2 118,524.34 18.14 2,150,505.62 18.59 2,203,604.53 362,492.95
Tipe B-2 250x400 mm
L = 2.05 m
Beton K-275 m3 1,543,527.41 0.41 632,846.24 - -
Besi beton U-39 kg 12,320.84 65.03 801,210.07 52.26 643,911.53 105,923.45
Bekisting m2 118,524.34 3.32 393,619.33 3.40 403,338.33 66,349.16
L = 3.00 m
Beton K-275 m3 1,543,527.41 2.40 3,704,465.79 - -
Besi beton U-39 kg 12,320.84 380.66 4,690,010.18 319.32 3,934,289.35 647,190.60
Bekisting m2 118,524.34 19.44 2,304,113.17 19.92 2,361,004.85 388,385.30
L = 4,50 m
Beton K-275 m3 1,543,527.41 12.60 19,448,445.42 - -
Besi beton U-39 kg 12,320.84 1,998.45 24,622,553.46 2,149.64 26,485,312.62 4,356,833.93
Bekisting m2 118,524.34 102.06 12,096,594.14 104.58 12,395,275.48 2,039,022.82
L = 4,795 m
KONTRAK CHANGE CONTRAC ORDER
HARGA SATUAN UPAH KERJA
NO. URAIAN PEKERJAAN SAT VOLUME JUMLAH HARGA Jumlah Harga KET.
Volume
(Rp) (Rp) ( Rp. ) 16%
L = 2.05 m
Beton K-275 m3 1,543,527.41 1.23 1,898,538.72 0.41 626,517.78 103,062.17
Besi beton U-39 kg 12,320.84 257.97 3,178,441.56 228.83 2,819,426.19 463,795.61
Bekisting m2 118,524.34 9.96 1,180,858.00 10.21 1,210,014.99 199,047.47
L = 5.60 m
Beton K-275 m3 1,543,527.41 6.72 10,372,504.22 2.22 3,422,926.39 563,071.39
Besi beton U-39 kg 12,320.84 1,409.41 17,365,144.11 1,655.86 20,401,628.78 3,356,067.93
Bekisting m2 118,524.34 54.43 6,451,516.87 55.78 6,610,813.59 1,087,478.84
Tipe B-1' 250x400 mm
L = 2.05 m
Beton K-275 m3 1,543,527.41 0.41 632,846.24 0.14 208,839.26 34,354.06
Besi beton U-39 kg 12,320.84 92.98 1,145,570.67 76.28 939,808.73 154,598.54
Bekisting m2 118,524.34 3.32 393,619.33 3.40 403,338.33 66,349.16
L = 5.60 m
Beton K-275 m3 1,543,527.41 2.24 3,457,501.41 0.74 1,140,975.46 187,690.46
Besi beton U-39 kg 12,320.84 507.98 6,258,727.55 385.29 4,747,070.26 780,893.06
Bekisting m2 118,524.34 18.14 2,150,505.62 18.59 2,203,604.53 362,492.95
Tipe B-2 250x400 mm
L = 2.05 m
Beton K-275 m3 1,543,527.41 0.41 632,846.24 0.14 208,839.26 34,354.06
Besi beton U-39 kg 12,320.84 65.03 801,210.07 106.38 1,310,641.25 215,600.49
Bekisting m2 118,524.34 3.32 393,619.33 3.40 403,338.33 66,349.16
L = 3.00 m
Beton K-275 m3 1,543,527.41 2.40 3,704,465.79 0.79 1,222,473.71 201,096.93
Besi beton U-39 kg 12,320.84 380.66 4,690,010.18 306.68 3,778,553.98 621,572.13
Bekisting m2 118,524.34 19.44 2,304,113.17 19.92 2,361,004.85 388,385.30
L = 4,50 m
Beton K-275 m3 1,543,527.41 12.60 19,448,445.42 4.16 6,417,986.99 1,055,758.86
Besi beton U-39 kg 12,320.84 1,998.45 24,622,553.46 2,149.64 26,485,312.62 4,356,833.93
Bekisting m2 118,524.34 102.06 12,096,594.14 104.58 12,395,275.48 2,039,022.82
L = 4,795 m
Beton K-275 m3 1,543,527.41 1.92 2,960,485.58 0.63 976,960.24 160,709.96
Besi beton U-39 kg 12,320.84 304.21 3,748,099.80 242.12 2,983,091.24 490,718.51
Bekisting m2 118,524.34 15.54 1,841,370.44 15.92 1,886,836.38 310,384.58
Tipe B-A 200x300 mm
L = 4.50 m
Beton K-275 m3 1,543,527.41 3.51 5,417,781.22 0.66 1,013,125.09 166,659.08
Besi beton U-39 kg 12,320.84 595.30 7,334,569.38 673.57 8,298,933.18 1,365,174.51
Bekisting m2 118,524.34 32.76 3,882,857.38 33.93 4,021,530.86 661,541.83
c Komponen Pelat Lantai
Pelat Bangunan t = 130 mm
KONTRAK CHANGE CONTRAC ORDER
HARGA SATUAN UPAH KERJA
NO. URAIAN PEKERJAAN SAT VOLUME JUMLAH HARGA Jumlah Harga KET.
Volume
(Rp) (Rp) ( Rp. ) 16%
Beton K-275 m3 1,543,527.41 58.84 90,818,065.98 17.69 27,304,714.40 4,491,625.52 1/3 cor
Besi beton U-39 kg 12,320.84 8,983.30 110,681,822.20 9,814.84 120,926,979.79 19,892,488.18
Bekisting m2 231,887.37 452.60 104,952,223.66 412.35 95,618,757.02 15,729,285.53
Pelat Konsol t = 100 mm
Beton K-275 m3 1,543,527.41 2.50 3,858,818.54 - - -
Besi beton U-39 kg 12,320.84 496.21 6,113,666.71 397.64 4,899,220.26 805,921.73 Stek
Bekisting m2 231,887.37 25.00 5,797,184.25 - - -
d Komponen Tangga
Tangga Darurat (2 buah)
Pek. Anak Tangga
Beton K-275 m3 1,543,527.41 1.48 2,287,507.63 - -
Besi beton U-39 kg 12,320.84 183.84 2,265,113.52 - -
Pek. Hamparan Tangga
Beton K-275 m3 1,543,527.41 2.77 4,274,027.41 - -
Besi beton U-39 kg 12,320.84 593.94 7,317,801.46 327.24 4,031,821.09 663,234.57 Stek
Besi beton U-24 kg 9,433.34 - - - -
Bekisting m2 263,574.74 18.46 4,865,589.70 - -
2.4. Pekerjaan Struktur Lantai Dak/Jemur elv. +9.98 m 358,590,823.35 274,285,956.39 45,120,039.83
a Komponen Kolom
Tipe K.2A 25x40 cm (36 buah)
Beton K-275 m3 1,543,527.41 4.96 7,655,895.97 5.68 8,767,235.71 1,442,210.27
Besi beton U-39 kg 12,320.84 2,297.74 28,310,061.44 1,567.89 19,317,715.56 3,177,764.21
Bekisting m2 160,667.54 64.48 10,359,842.98 14.72 2,365,026.19 389,046.81
b. Komponen Balok
Tipe B-1 250x400 mm
L = 2.05 m
Beton K-275 m3 1,543,527.41 0.82 1,265,692.48 - - -
Besi beton U-39 kg 12,320.84 171.98 2,118,961.04 228.83 2,819,426.19 463,795.61
Bekisting m2 118,524.34 6.64 787,238.67 10.21 1,210,014.99 199,047.47
L = 5.60 m
Beton K-275 m3 1,543,527.41 4.48 6,915,002.81 - - -
Besi beton U-39 kg 12,320.84 939.61 11,576,762.74 1,655.86 20,401,628.78 3,356,067.93
Bekisting m2 118,524.34 36.29 4,301,011.25 55.78 6,610,813.59 1,087,478.84
Tipe B-1' 250x400 mm
L = 2.05 m
Beton K-275 m3 1,543,527.41 0.41 632,846.24 - - -
Besi beton U-39 kg 12,320.84 92.98 1,145,570.67 76.28 939,808.73 154,598.54
Bekisting m2 118,524.34 3.32 393,619.33 3.40 403,338.33 66,349.16
L = 5.60 m
Beton K-275 m3 1,543,527.41 2.24 3,457,501.41 - - -
KONTRAK CHANGE CONTRAC ORDER
HARGA SATUAN UPAH KERJA
NO. URAIAN PEKERJAAN SAT VOLUME JUMLAH HARGA Jumlah Harga KET.
Volume
(Rp) (Rp) ( Rp. ) 16%
2.5. Pekerjaan Struktur Lantai RingBalk elv. +11.53 m 74,810,789.04 47,657,947.91 7,839,732.43
a Komponen Kolom
Tipe K.2A 25x40 cm (12 buah)
Beton K-275 m3 1,543,527.41 1.14 1,759,621.25 1.14 1,759,621.25 289,457.70
Besi beton U-39 kg 12,320.84 528.11 6,506,747.99 627.11 7,726,510.76 1,271,011.02
KONTRAK CHANGE CONTRAC ORDER
HARGA SATUAN UPAH KERJA
NO. URAIAN PEKERJAAN SAT VOLUME JUMLAH HARGA Jumlah Harga KET.
Volume
(Rp) (Rp) ( Rp. ) 16%
2.6. Pekerjaan Struktur Lantai Atap elv. +12.48 m 42,272,913.63 21,136,456.82 3,381,833.09
a Komponen Balok
KONTRAK CHANGE CONTRAC ORDER
HARGA SATUAN UPAH KERJA
NO. URAIAN PEKERJAAN SAT VOLUME JUMLAH HARGA Jumlah Harga KET.
Volume
(Rp) (Rp) ( Rp. ) 16%