Anda di halaman 1dari 23

CONTRACT NO.

QAQC DOCUMENT

DOCUMENT NO.
8 Pages
KLD-I-PRC-0010

KLD FIELD DEVELOPMENT PROJECT


BID PACKAGE NO. S34H18002A

ITP FOR OFFSHORE PIPELINE INSTALLATION

A 17/07/2018 Issued For Tender DA YF FS

Originator Checked Approved Approved


Rev Date Document Status PT ELNUSA Tbk. – PT. HAFAR
PT. PHE ONWJ
DAYA KONSTRUKSI
KLD FIELD DEVELOPMENT PROJECT
BID PACKAGE NO. S34H18002A

Date : 17/07/2018
DOCUMENT NO
Rev. A ITP for Offshore Pipeline Installation
KLD-I-PRC-0010 Page 2 of 8

REVISION TABLE

REVISION REVISION REVISION


PAGES PAGE ATTACHEMENT
A B C 0 1 A B C 0 1 A B C 0 1
KLD FIELD DEVELOPMENT PROJECT
BID PACKAGE NO. S34H18002A

Date : 17/07/2018
DOCUMENT NO
Rev. A ITP for Offshore Pipeline Installation
KLD-I-PRC-0010 Page 3 of 8

REVISION NOTE

Implementasion
Rev Section Pages Comment Description
(Y/N)
KLD FIELD DEVELOPMENT PROJECT
BID PACKAGE NO. S34H18002A

Date : 17/07/2018
DOCUMENT NO
Rev. A ITP for Offshore Pipeline Installation
KLD-I-PRC-0010 Page 4 of 8

DAFTAR ISI

1. INTRODUCTION ................................................................................................................ 5
1.1 General ............................................................................................................................ 5
2. DEFNITIONS ....................................................................................................................... 6
3. OBJECTIVES...................................................................................................................... 7
4. ABBREVITIONS ................................................................................................................. 7
5. LEGEND OF INSPECTION LEVEL ................................................................................ 7
6. NOTES ................................................................................................................................. 8
7. ITP TABLE .......................................................................................................................... 8
KLD FIELD DEVELOPMENT PROJECT
BID PACKAGE NO. S34H18002A

Date : 17/07/2018
DOCUMENT NO
Rev. A ITP for Offshore Pipeline Installation
KLD-I-PRC-0010 Page 5 of 8

1. INTRODUCTION

1.1 General

Company has undertaken Front End Engineering Design (FEED) for new KLD Field
Development Project in the COMPANY’s operated Offshore North Wes Java (“ONWJ”) Block.
KLD Field Development facilities are required to sustain oil and gas production of
COMPANY.
KLD Field Development Project will be consisted of new KLD NUI Platform, subsea pipline,
and brownfield modification at KLB and KLA Plaform.
KLD NUI platform will be located at approximately 3,5 km east of existing KLB Platform, 2,9
km northwest of existing KLA Platform, please refer to below figure:

1.1.1 KLD NUI Platform


KLD Field Development is a 3phase reserve and will require facilities and pipeline for
gathering. The objective of KLD Field Development Project is to drain the hydrocarbon from
reservoir with production rate at wellhead af 15.5 MMSCFD and 225 BOPD.
KLD NUI Platfrom will be one (1) braced monopod Platform.
KLD NUI Platform will be designed fro accommodating 4 (four) wells that consis of 2 (two)
doube-stringed wells and 1 (one) single-stringed wells that will be installed at this stage and
1 (one) double-string wells fro future installed.
KLD FIELD DEVELOPMENT PROJECT
BID PACKAGE NO. S34H18002A

Date : 17/07/2018
DOCUMENT NO
Rev. A ITP for Offshore Pipeline Installation
KLD-I-PRC-0010 Page 6 of 8

Doble-stringed well are wells consist of “S” string and “L” string where “S” string for well gas
sources and “L” string for well oil sources.
From 3 (three) wells that will be installed at this stage, only KLD_WH-003 will be utilized as
gas lift well.
1.2
The KLD NUI Platform will be connected to existing KLB Platform through 10” dia subsea
pipeline that will be installed with approximate 3.5 km length.
The Brownfield Modification shall cover

1.1.2 Subsea Pipeline


The KLD NUI Platform will be connected to existing KLB Platform through 10” dia subsea
pipeline that will be installed with approximate 3.5 km length. The well fluid will be further
processed in KLB Platform.

1.1.3 Brownfiled Modification at KLB and KLA Platform


Brownfield modification Work that will be executed in the Project as following:
KLB Platform
• The topside modification will be comprised of but not limited to pig receiver installation,
riser guard, piping modification, structure, electrical, instrumentation and demolish work
etc
KLA Platform
• The existing monitoring system modification will be compared of but not limited to
modification existing Master Terminal Unit (MTU) etc.

2. DEFNITIONS

COMPANY PT Pertamina Hulu Energi ONWJ


CONTRACTOR PT ELNUSA Tbk - PT HAFAR DAYA KONTRUKSI Consortium
PROJECT KLD Field Development Project
MIGAS
Indonesian Government Body responsible for issuing approvals and
licenses for oil and gas facilities.
Shall/ Must/ Will
Indicate requirement strictly to be followed in order to conform to this
specification and from which no deviation is permitted.
KLD FIELD DEVELOPMENT PROJECT
BID PACKAGE NO. S34H18002A

Date : 17/07/2018
DOCUMENT NO
Rev. A ITP for Offshore Pipeline Installation
KLD-I-PRC-0010 Page 7 of 8

Should Indicates that among several possibilities, one is recommended as


particularly suitable, without mentioning or excluded others, or that
certain course of action is preferred but not necessarily required.
Other possibilities may be applied subject to agreement.

May/ Can Verbal form used to indicate a course of action permissible within the
limit of the specification.

PMT Project Management Team

3. OBJECTIVES

This document showing the sample the Inspection and Test Offshore Pipeline Installation
activities to be perfomed throught out the project execution in accordance with PHEONWJ
project specification, standard & code.

4. ABBREVITIONS

Following abbreviations have been used where applicable throughout this document.
All other abbreviations will in the first occurrence include a full description.

Table 1.1 Abbreviations

Abb. Description
PHE ONWJ PERTAMINA Hulu Energy – Offshore North West Java
ITP Inspection and Test Plan
MPS Manufacturing Procedure Specification
PQT Pre-Production Quality Testing
QA Quality Assurance
QC Quality Control
TBA To be Advised

5. LEGEND OF INSPECTION LEVEL

Within the ITP Table, the following definitions shall be used:


(a) “P” means the Primary Responsibility as defined in the attached ITP.
(b) “A” means the Approval.
(c) “R” means the Review being undertaken by the responsible parties as indicated in the
attached ITP.
KLD FIELD DEVELOPMENT PROJECT
BID PACKAGE NO. S34H18002A

Date : 17/07/2018
DOCUMENT NO
Rev. A ITP for Offshore Pipeline Installation
KLD-I-PRC-0010 Page 8 of 8

(d) “V” means the Verification being performed by the responsible parties as indicated in
the attached ITP.
(e) “SW” means the Spot Witness being undertaken by the responsible parties as
indicated in the attached ITP.
(f) “W” means a Witness Point.
“Witness Point” is defined as critical steps in the installation and testing process, in
respect of which the Contractor is obligated to agree a time with the Company in
advance of the operation so that it may be witnessed by Company’s authorized
representatives and, where indicated in the Procedure, by representatives from PJIT
and/or MIGAS. If the Company advises the Contractor that the indicated witnesses
cannot attend, then the Contractor may proceed the witness point.
(g) “H” means a Hold Point.
Hold Points” is defined as critical steps in the installation and testing process, in
respect of which the Contractor is obligated to advise the Company by an agreed time
period in advance of the operation so that it may be witnessed by the Company’s
authorized representatives, and, where applicable, by PJIT and/or MIGAS
representatives. The Contractor may not proceed the such operation with the hold
point without it being witnessed by the requisite representative(s), except by prior
written agreement from the Company

6. NOTES

1. Test/Inspection shall be carried out if specified or required in the applicable requisition


or specification.
2. Inspection and Testing of the items and materials not listed in this ITP but required by
other specification or applicable code/standard shall be carried out by Vendor.
3. “Random” means as little as possible of the test number will be performed at shop in
respect of which the employee is obligated to agree with other parties who witness the
shop test.
Random does not confine to set a frequency or level of inspection.

7. ITP TABLE

• Attachment : ITP For Offshore Pipeline Installation activities

Anda mungkin juga menyukai