• TUJUAN
• PRINSIP KERJA
• INSTALASI
• RANGKAIAN PERCOBAAN
• RALAT INSTRUMEN
• LANGKAH
• TABEL DATA
• BAHAYA
TUJUAN
☼ MEMPARALEL
TRANSFORMATOR
KERJA SENDIRI & BERSAMA
SENDIRI BERDUA
BERAPA
PERSEN
BEBAN YG
DIPIKUL
OLEH TIAP
ORANG ?
BERTIGA
TRAFO PARALEL
DIAGRAM SATU GARIS
UJI POLARITAS
POLARITAS
BENAR
POLARITAS
SALAH
CARILAH BEDANYA
KUTUB SAMA
.
Trafo 1
Trafo 2
TT TR
KUTUB BEDA
.
TT TR
Trafo 1
Trafo 2
TT TR
BERBEBAN
TT TR
Trafo 1 R1
SB
S A
Trafo 2
R2
A
A
TABEL DATA
.
TABEL DATA
• PERCOBAAN :
PARALEL TRAFO 3 FASA
BAHA(G)YA
• GROUNDING
• PARALEL DG KUTUB BEDA TIDAK BOLEH LAMA
BISA PANAS DAN TERBAKAR
• ARUS PADA BEBAN TIDAK BOLEH MELEBIHI NILAI
NOMINAL BISA TERBAKAR
BEBAN SEGITIGA
• TUJUAN
• PRINSIP KERJA
• INSTALASI
• RANGKAIAN PERCOBAAN
• ALAT DAN INSTRUMEN
• LANGKAH
• TABEL DATA
• BAHAYA
TUJUAN
SUMBER
SUMBER METERING
METER BEBAN
BEBAN
1 = RESISTIF
= WATTMETER ( LAMPU )
3 x 220 Volt
WATTMETER
• .
COSQ METER
• .
RALAT INSTRUMEN
RANGKAIAN & ALAT
Beban R / Lampu Pijar Beban Balast
L1
A W L1
V R1 R2 L1 L2
N
L2 L2
R3 L3
L3
L3
3 x 220 Volt Beban Balast // Condensator
L1 L2
C1
C2
L3
C3
.
DATA
METODE PENGUKURAN :
• 1 buah Cos Ø meter, Voltmeter, Ameter.
• 1 buah Watt meter, Voltmeter, Ameter.
• 2 buah Watt meter, Voltmeter, Ameter.
TIPS CERDAS
• WIRING WATTMETER DAN
COSQMETER MENGIKUTI
GAMBAR PADA METER TSB
• BEBAN PERTAMA LAMPU PIJAR
• PENGGANTIAN BEBAN KE
BALAST DG MELEPAS BOLAM
• BEBAN KAPASITOR PARALEL
• DENGAN BALAST
BAHA(G)YA
• GROUNDING
• TEGANGAN KERJA HANYA 3X220 V
• CUKUP SEBUAH AMPER METER TANG DAN
SEBUAH VOLTMETER YANG DIPINDAH - PINDAH
• WIRING SUMBER KE BEBAN LALU WIRING METER
KELP. TANGGUNG JWB. DATA & ALAT
“ ROTASI KELOMPOK
UTK. VALIDASI DATA “
TIAP KLP KUMPULKAN
SEMUA TABEL DATA