I DATA UMUM
NAMA BANGUNAN PEMBANGUNAN RUMAH TAMU
TAHUN DIUSULKAN 2019
JUMLAH TINGKAT
LUAS TOTAL LANTAI 394 M2
LUAS YANG DIAJUKAN 394
KOOFISIEN TINGKAT BGN 1
FUNGSI BANGUNAN
KELAS BANGUNAN sederhana
Biaya keseluruhan baru 100.00% x 1.100 Rp 9,000,000 = 9,900,000.00 mak harga /m2 bangunan baru
TERBILANG : Dua milyar dua ratus sebelas juta lima ratus lima ribu seratus delapan puluh enam rupiah.
BOBOT (%) TINGKAT PEMBANGUNAN SUB
NO KOMPONEN BGNN SUB KOMPONEN BANGUNAN TERHADAP SELURUH BOBOT BOBOT NILAI KOMPONEN BANGUNAN
BANGUNAN MAKSIMUM % %
MENGETAHUI
RUPR
…………………………..
NIP. ……………..
TABEL E1
DAFTAR BIAYA KOMPONEN KEGIATAN PEMBANGUNAN BANGUNAN GEDUNG NEGARA
Klasifikasi :
SEDERHANA
(dalam ribuan rupiah)
BIAYA
BIAYA MANAJEMEN BIAYA PENGAWASAN BIAYA PENGELOLAAN
PERENCANAAN
BIAYA KONSTRUKSI KONSTRUKSI KONSTRUKSI KEGIATAN TOTAL BIAYA
KONSTRUKSI
FISIK PEMBANGUNAN
1 2 3 4 5 6
BIAYA
BIAYA MANAJEMEN BIAYA PENGAWASAN BIAYA PENGELOLAAN
PERENCANAAN
BIAYA KONSTRUKSI KONSTRUKSI KONSTRUKSI KEGIATAN TOTAL BIAYA
KONSTRUKSI
FISIK PEMBANGUNAN
1 2 3 4 5 6
98,040,000
100,000,000
INTERPOLASI
RENCANA ANGGARAN BELANJA MODAL TA 2019
SATKER : RUPR
BIAYA PERENCANAAN
2,214,511,000.00 95,494,000.00
DIP 2,214,511,000.00 x
2,268,666,660.00 99,266,660.00
( 2,214,511,000.00 - 2,214,511,000.00 )
95,494,000.00 + ----------------------------------------------------------------------- +
( 2,268,666,660.00 - 2,214,511,000.00 )
( 99,266,660.00 - 95,494,000.00 )
95,494,000.00
BIAYA PENGAWASAN
2,214,511,000.00 66,690,000.00
DIP 2,214,511,000.00 x PENGAWASAN
2,268,666,660.00 69,400,000.00
( 2,214,511,000.00 - 2,214,511,000.00 )
66,690,000.00 + ----------------------------------------------------------------------- +
( 2,268,666,660.00 - 2,214,511,000.00 )
( 69,400,000.00 - 66,690,000.00 )
66,690,000.00
2,160,224,000.00 1,900,000,000.00
DIP 2,214,511,000.00 x KONSTRUKSI
2,268,666,660.00 2,000,000,000.00
( 2,214,511,000.00 - 2,160,224,000.00 )
1,900,000,000.00 + ----------------------------------------------------------------------- +
( 2,268,666,660.00 - 2,160,224,000.00 )
( 2,000,000,000.00 - 1,900,000,000.00 )
1,950,060,557.35
2,160,224,000.00 98,040,000.00
DIP 2,214,511,000.00 x PENGELOLA PROYEK
2,268,666,660.00 100,000,000.00
( 2,214,511,000.00 - 2,160,224,000.00 )
98,040,000.00 + ----------------------------------------------------------------------- +
( 2,268,666,660.00 - 2,160,224,000.00 )
( 100,000,000.00 - 98,040,000.00 )
99,021,186.92
RESUME
1. SOVA LT 1 R Keluarga
R tamu
LT 2
R tamu
JUMLAH NILAI
MEBELAIR
SUB
jml HARGA TOTAL
356,000,000.00
Rp 350,000,000
Pejabat Pembuat Komitmen