SATUAN KERJA : DINAS SUMBER DAYA AIR DAN BINA MARGA NAMA PAKET : PENINGKATAN JALAN BATU PUTIH POREHU TOLALA PROP/KAB/KODYA : KABUPATEN KOLAKA UTARA SUMBER DANA : APBD TAHUN ANGGARAN : 2019
NILAI GABUNGAN BARANG/JASA (Rp) TKDN
Total URAIAN PEKERJAAN KDN KLN % Barang/ Jasa Gabungan (RP) KDN 1 2 3 4 5 6 7 Barang I. Material Langsung (Bahan Baku) 3.376.794.077,98 - 3.376.794.077,98 94,45 3.376.794.077,98 3.376.794.077,98 II. Peralatan (Barang Jadi) - - - A. Sub Total Barang 3.376.794.077,98 - 3.376.794.077,98 94,45 3.376.794.077,98 3.376.794.077,98 Jasa III. Managemen Proyek dan Perekayasaan 65.700.000,00 - 65.700.000,00 1,84 65.700.000,00 65.700.000,00 IV. Alat Kerja / Fasilitas Kerja 106.358.857,14 - 106.358.857,14 2,97 106.358.857,14 106.358.857,14 V. Konstruksi dan Fabrikasi - - VI. Jasa Umum 26.419.614,73 26.419.614,73 0,74 26.419.614,73 26.419.614,73 B. Sub Total Jasa 198.478.471,87 - 198.478.471,87 5,55 198.478.471,87 198.478.471,87 C. TOTAL Biaya (A+B) 3.575.272.549,86 - 3.575.272.549,86 100,00 3.575.272.549,86 3.575.272.549,86