Table of contents
Page
1. Summary of Test .................................................................................................................4
1.1 Purpose of test...........................................................................................................................................4
1.2 Standards ...................................................................................................................................................4
1.3 List of applied test to the EUT .................................................................................................................5
1.4 Performance Criteria .................................................................................................................................6
1.5 Monitoring of EUT .....................................................................................................................................6
1.6 Test Plan .....................................................................................................................................................6
1.7 Modification to the EUT by laboratory....................................................................................................6
2. Equipment Under Test ........................................................................................................7
2.1 General Description of equipment ..........................................................................................................7
2.2 EUT information .........................................................................................................................................7
2.3 Variation of the family model(s) ...............................................................................................................7
2.4 Operating mode .........................................................................................................................................7
3. Configuration of equipment ...............................................................................................8
3.1 Equipment(s) used ....................................................................................................................................8
3.2 Cable(s) used .............................................................................................................................................8
3.3 System configuration................................................................................................................................9
4. Conducted emission at mains port test information ......................................................10
4.1 Measurement procedure ........................................................................................................................10
4.2 Calculation method .................................................................................................................................10
4.3 Test data.................................................................................................................................................... 11
5. Radiated emission test information .................................................................................14
5.1 Measurement procedure ........................................................................................................................14
5.2 Calculation method .................................................................................................................................14
5.3 Test data....................................................................................................................................................15
6. Harmonic current emissions ............................................................................................18
6.1 Applied test condition .............................................................................................................................18
6.2 Sample test setup ....................................................................................................................................18
6.3 Test data....................................................................................................................................................19
7. Voltage Change, voltage fluctuation and flicker .............................................................21
7.1 Applied test condition .............................................................................................................................21
7.2 Sample test setup ....................................................................................................................................21
7.3 Test data....................................................................................................................................................22
8. Electrostatic discharge immunity ....................................................................................24
8.1 Applied test condition .............................................................................................................................24
8.2 Sample test setup ....................................................................................................................................24
8.3 Test data....................................................................................................................................................25
8.4 Discharge locations ................................................................................................................................27
9. Radio-frequency electromagnetic field immunity...........................................................32
9.1 Applied test condition .............................................................................................................................32
9.2 Sample test setup ....................................................................................................................................32
9.3 Test data....................................................................................................................................................33
1. Summary of Test
1.1 Purpose of test
It is the original test in order to verify conformance to standards listed in section 1.2.
1.2 Standards
None
Classification
Test item Test Voltage Test Result Comment
of EUT
AC 100V 50Hz
Conducted emission
AC 120V 60Hz Applied PASS -
at mains port
AC 230V 50Hz
Group1 Class B
AC 100V 50Hz
Radiated emission AC 120V 60Hz Applied PASS -
AC 230V 50Hz
Classification
Test item Test Voltage Test Result Comment
of EUT
Harmonic current emissions Class A AC 230V 50Hz *1 Applied PASS *2
*1: Because tests at 100/120V are not prescribed in a standard, tests are not applied.
*2: Limit does not apply to the equipment with rated power of 75W or less.
Table-Top
In order to evaluate the performance of equipment during the test, it is confirmed visually whether
the EUT operates as intended.
All the tests in this test report are performed according to Test plan number: Z071Z-15087.
None
None
Not applicable
[Running mode]
i) Running mode is started.
ii) XYZ motor moves.
iii) The capture of the observation image is carried out and measurement arithmetic
processing is performed.
iv) Test data is printed out and LAN output after four second progress.
v) ii) to iv) is repeated
3. Configuration of equipment
3.1 Equipment(s) used
No. Equipment Company Model No. Serial No. Comment
COMPUTERIZED
1 TOPCON CT-800A DPM7 EUT
TONOMETER
OPTO
2 Barcode Scanner OPL-5850-USB 047185 -
ELECTRONICS
HP Z230 SFF
3 Personal Computer HP JPA4503HVV -
WorkStation
CN-0XT086-74261
4 Display DELL E248WFPb -
-856-4DKU
5 Keyboard HP KU-1156 BDMJA0CVB6A5JC -
6 Mouse HP MSU1158 N/A -
a AC Power source
AC in
(Note2)
b # 2. Barcode
USB
Scanner
1. COMPUTERIZED
TONOMETER e AC 100V 50Hz or
[EUT] AC 120V 60Hz
*c f *g h AC 100V 50Hz or
LAN 4. Display
AC 120V 60Hz
3. Personal
Computer
i #
5. Keyboard
*d
RS-232C
j #
6. Mouse
: Ferrite core
: Connecter
# : Un-detachable cable
* : Bundled excess cable
(CISPR 11 only)
Note1: Numbers assigned to equipment or cables on this diagram correspond to the list in “3.1 Equipment(s) used” and “3.2 Cable(s) used”.
Note2: Please refer to “1.3 List of applied test to the EUT” for test voltage.
Note3: Two ferrite cores of RGB cable (No.g) are accessories of Display (No.4).
EUT and peripherals are connected to 50Ω/50μH+5Ω and 50Ω/50μH Artificial Mains Network (AMN) which
are connected to reference ground plane, and are placed 80cm away from EUT. Excess of AC/DC power
cable is bundled in center. AMN for peripheral is terminated in 50Ω.
EUT operating mode is selected to emit the maximum noise. Overall frequency range is investigated with
spectrum analyzer using peak detector. Maximum emission configuration is determined by manipulating the
EUT, peripherals, interconnecting cables. Sufficient time for EUT, peripherals and test equipment is provided
in order for them to warm up to their normal operating condition. If the average limit is met when using a
quasi-peak detector receiver, the EUT shall be deemed to meet both limits.
- Test configuration
EUT operating mode is selected to emit the maximum noise. Overall frequency range is investigated with
spectrum analyzer using peak detector. Then, emission measurements are performed with test receiver in
above setting. In order to find the maximum emissions, antenna is adjusted between 1m to 4m in height and
varied its polarization (horizontal and vertical), and EUT azimuth is also varied by rotating turntable 0 to 360
degrees. Sufficient time for EUT, peripherals and test equipment is provided in order for them to warm up to
their normal operating condition.
- Test configuration
Emission level = Reading + (Ant. factor + Cable system loss – Amp. Gain)
Margin = Limit – Emission level
Items Description
Test method IEC 61000-3-2
POHC Limit 150 %
Classification of equipment A
Variability of results of Repeatability: ±5 % of the applicable limit
measurements Same EUT, same test system, same test conditions, repeated tests
Note: Limit does not apply to the equipment with rated power of 75W or less.
Note: As a result of test performed based on Test plan, EUT passed the test.
Items Description
Test method IEC 61000-3-3
120 min.
Observation period
1 min. × 24 times (Switched manually)
Note: As a result of test performed based on Test plan, EUT passed the test.
Items Description
Test method IEC 61000-4-2
The equipment and/or system continued to perform its intended
Performance criterion
function as specified by the manufacturer.
Contact discharge : ±2kV, ±4kV, ±6kV
Test level
Air discharge : ±2kV, ±4kV, ±8kV
Contact discharge : 10 discharges
Number of discharge
Air discharge : 10 single discharge
Time interval 1 sec.
Table size Wooden table / (W)2.0m × (D)1.0m × (H)0.8m
Horizontal coupling plane size 1.6m × 0.8m
Vertical coupling plane size 0.5m × 0.5m
1) Discharge to EUT
2) Discharge to Horizontal coupling plane
3) Discharge to Vertical coupling plane
Note: As a result of test performed based on Test plan, EUT passed the test.
[AC100V 50Hz]
[Contact discharge to conductive part]
Result of performance criterion
Discharge Point Test voltage Test voltage Test voltage
Test result
(Refer to discharge locations) 2kV 4kV 6kV
+ - + - + -
Contact discharge ( ) PASS PASS PASS PASS PASS PASS PASS
[AC120V 60Hz]
[Contact discharge to conductive part]
Result of performance criterion
Discharge Point Test voltage Test voltage Test voltage
Test result
(Refer to discharge locations) 2kV 4kV 6kV
+ - + - + -
Contact discharge ( ) PASS PASS PASS PASS PASS PASS PASS
[AC230V 50Hz]
[Contact discharge to conductive part]
Result of performance criterion
Discharge Point Test voltage Test voltage Test voltage
Test result
(Refer to discharge locations) 2kV 4kV 6kV
+ - + - + -
Contact discharge ( ) PASS PASS PASS PASS PASS PASS PASS
Figure1
Figure2
Figure3
Figure4
Figure5
Figure6
Figure7
Figure8
Figure9
Figure10
Figure11
Figure12
Figure13
Figure14
Items Description
Test method IEC 61000-4-3
The equipment and/or system continued to perform its intended
Performance criterion
function as specified by the manufacturer.
Test level 3V/m
Frequency range 80MHz to 2500MHz
Frequency step 1%
Dwell time 3.0 sec.
Modulation AM80% 1kHz
EUT direction Front, Right, Back, Left
Antenna polarity Horizontal and Vertical
2.3m (80MHz to 1000MHz)
Test distance
3.0m (1000MHz to 2500MHz)
1.2m (80MHz to 1000MHz)
Antenna height
1.5m (1000MHz to 2500MHz)
Log periodic antenna (80MHz to 1000MHz)
Antenna type
Broadband horn antenna (1000MHz to 2500MHz)
Antenna
EUT AE
0.8m *2
or
0.1m
1m *1 RS Test System
*1: Wiring is left exposed to the electromagnetic field for a distance of 1m from the EUT.
Wire is arranged parallel to the uniform area of the field.
*2: EUT Installation / Table-top: 0.8m
EUT Installation / Floor-Standing: 0.1m
Note: As a result of test performed based on Test plan, EUT passed the test.
[AC100V 50Hz]
[80MHz to 1000MHz]
EUT direction Test level (V/m) Antenna polarity Test result
Horizontal PASS
Front (0°) 3
Vertical PASS
Horizontal PASS
Right (90°) 3
Vertical PASS
Horizontal PASS
Back (180°) 3
Vertical PASS
Horizontal PASS
Left (270°) 3
Vertical PASS
[1000MHz to 2500MHz]
EUT direction Test level (V/m) Antenna polarity Test result
Horizontal PASS
Front (0°) 3
Vertical PASS
Horizontal PASS
Right (90°) 3
Vertical PASS
Horizontal PASS
Back (180°) 3
Vertical PASS
Horizontal PASS
Left (270°) 3
Vertical PASS
[AC120V 60Hz]
[80MHz to 1000MHz]
EUT direction Test level (V/m) Antenna polarity Test result
Horizontal PASS
Front (0°) 3
Vertical PASS
Horizontal PASS
Right (90°) 3
Vertical PASS
Horizontal PASS
Back (180°) 3
Vertical PASS
Horizontal PASS
Left (270°) 3
Vertical PASS
[1000MHz to 2500MHz]
EUT direction Test level (V/m) Antenna polarity Test result
Horizontal PASS
Front (0°) 3
Vertical PASS
Horizontal PASS
Right (90°) 3
Vertical PASS
Horizontal PASS
Back (180°) 3
Vertical PASS
Horizontal PASS
Left (270°) 3
Vertical PASS
[AC230V 50Hz]
[80MHz to 1000MHz]
EUT direction Test level (V/m) Antenna polarity Test result
Horizontal PASS
Front (0°) 3
Vertical PASS
Horizontal PASS
Right (90°) 3
Vertical PASS
Horizontal PASS
Back (180°) 3
Vertical PASS
Horizontal PASS
Left (270°) 3
Vertical PASS
[1000MHz to 2500MHz]
EUT direction Test level (V/m) Antenna polarity Test result
Horizontal PASS
Front (0°) 3
Vertical PASS
Horizontal PASS
Right (90°) 3
Vertical PASS
Horizontal PASS
Back (180°) 3
Vertical PASS
Horizontal PASS
Left (270°) 3
Vertical PASS
Items Description
Test method IEC 61000-4-4
The equipment and/or system continued to perform its intended
Performance criterion
function as specified by the manufacturer.
Power port : ±2.0 kV
Test level
Signal port : ±1.0 kV
Spec. of wave form
Rise time of one pulse 5 ns
Impulse duration 50ns
Repetition frequency 5 kHz
Burst duration 15 ms
Burst period 300 ms
Duration 60 sec.
Power port
Signal port
To AC outlet
AE EUT
0.1m
EFT/B Test
System
CLAMP
0.5m ±0.05m
Note: As a result of test performed based on Test plan, EUT passed the test.
[AC100V 50Hz]
Coupling Injection method Test voltage (kV) Polarity (+/-) Test result
AC power port + PASS
CDN 2
Line - PASS
AC power port + PASS
CDN 2
Neutral - PASS
AC power port + PASS*
CDN 2
Ground - PASS
AC power port + PASS
CDN 2
Line + Neutral + Ground - PASS
Signal port + PASS
Clamp 1
LAN - PASS
PASS*: Barcode Scanner connection stopped when applying disturbance. Barcode scanner is reconnected
by removing and inserting of the connector after the test. However the test result is “PASS” because
manufacturer judged that this degradation of performance does not endanger patient, and it doesn't
influence the essential performance.
[AC120V 60Hz]
Coupling Injection method Test voltage (kV) Polarity (+/-) Test result
AC power port + PASS
CDN 2
Line - PASS
AC power port + PASS
CDN 2
Neutral - PASS
AC power port + PASS*
CDN 2
Ground - PASS
AC power port + PASS
CDN 2
Line + Neutral + Ground - PASS
Signal port + PASS
Clamp 1
LAN - PASS
PASS*: Barcode Scanner connection stopped when applying disturbance. Barcode scanner is reconnected
by removing and inserting of the connector after the test. However the test result is “PASS” because
manufacturer judged that this degradation of performance does not endanger patient, and it doesn't
influence the essential performance.
[AC240V 50Hz]
Coupling Injection method Test voltage (kV) Polarity (+/-) Test result
AC power port + PASS
CDN 2
Line - PASS
AC power port + PASS
CDN 2
Neutral - PASS
AC power port + PASS*
CDN 2
Ground - PASS
AC power port + PASS
CDN 2
Line + Neutral + Ground - PASS
Signal port + PASS
Clamp 1
LAN - PASS
PASS*: Barcode Scanner connection stopped when applying disturbance. Barcode scanner is reconnected
by removing and inserting of the connector after the test. However the test result is “PASS” because
manufacturer judged that this degradation of performance does not endanger patient, and it doesn't
influence the essential performance.
Items Description
Test method IEC 61000-4-5
The equipment and/or system continued to perform its intended
Performance criterion
function as specified by the manufacturer.
Line – Line: ±0.5 kV, ±1.0 kV
Test level
Line – Ground: ±0.5 kV, ±1.0 kV, ±2.0 kV
Spec. of wave form
Open-circuit voltage
Front time/ Time to half value 1.2 μs / 50μs
Short-circuit current
Front time/ Time to half value 8 μs / 20μs
AC power port : 90°, 180°, 270°
Phase angle Signal port : Asynchronous
DC power port : Asynchronous
Number of test 5 times
Repetition rate 1 min.
Note: As a result of test performed based on Test plan, EUT passed the test.
[AC100V 50Hz]
Coupling Test voltage (kV) Phase angle Polarity (+/-) Test result
AC power port + PASS
Line - Neutral 0.5 90º
- PASS
+ PASS
0.5 180º
- PASS
+ PASS
0.5 270º
- PASS
+ PASS
1.0 90º
- PASS
+ PASS
1.0 180º
- PASS
+ PASS
1.0 270º
- PASS
AC power port + PASS
Line – Ground 0.5 90º
- PASS
+ PASS
0.5 180º
- PASS
+ PASS
0.5 270º
- PASS
+ PASS
1.0 90º
- PASS
+ PASS
1.0 180º
- PASS
+ PASS
1.0 270º
- PASS
+ PASS
2.0 90º
- PASS
+ PASS
2.0 180º
- PASS
+ PASS
2.0 270º
- PASS
[AC100V 50Hz]
Coupling Test voltage (kV) Phase angle Polarity (+/-) Test result
AC power port + PASS
Neutral - Ground 0.5 90º
- PASS
+ PASS
0.5 180º
- PASS
+ PASS
0.5 270º
- PASS
+ PASS
1.0 90º
- PASS
+ PASS
1.0 180º
- PASS
+ PASS
1.0 270º
- PASS
+ PASS
2.0 90º
- PASS
+ PASS
2.0 180º
- PASS
+ PASS
2.0 270º
- PASS
[AC120V 60Hz]
Coupling Test voltage (kV) Phase angle Polarity (+/-) Test result
AC power port + PASS
Line - Neutral 0.5 90º
- PASS
+ PASS
0.5 180º
- PASS
+ PASS
0.5 270º
- PASS
+ PASS
1.0 90º
- PASS
+ PASS
1.0 180º
- PASS
+ PASS
1.0 270º
- PASS
AC power port + PASS
Line – Ground 0.5 90º
- PASS
+ PASS
0.5 180º
- PASS
+ PASS
0.5 270º
- PASS
+ PASS
1.0 90º
- PASS
+ PASS
1.0 180º
- PASS
+ PASS
1.0 270º
- PASS
+ PASS
2.0 90º
- PASS
+ PASS
2.0 180º
- PASS
+ PASS
2.0 270º
- PASS
AC power port + PASS
Neutral - Ground 0.5 90º
- PASS
+ PASS
0.5 180º
- PASS
+ PASS
0.5 270º
- PASS
+ PASS
1.0 90º
- PASS
+ PASS
1.0 180º
- PASS
+ PASS
1.0 270º
- PASS
+ PASS
2.0 90º
- PASS
+ PASS
2.0 180º
- PASS
+ PASS
2.0 270º
- PASS
[AC240V 50Hz]
Coupling Test voltage (kV) Phase angle Polarity (+/-) Test result
AC power port + PASS
Line - Neutral 0.5 90º
- PASS
+ PASS
0.5 180º
- PASS
+ PASS
0.5 270º
- PASS
+ PASS
1.0 90º
- PASS
+ PASS
1.0 180º
- PASS
+ PASS
1.0 270º
- PASS
AC power port + PASS
Line – Ground 0.5 90º
- PASS
+ PASS
0.5 180º
- PASS
+ PASS
0.5 270º
- PASS
+ PASS
1.0 90º
- PASS
+ PASS
1.0 180º
- PASS
+ PASS
1.0 270º
- PASS
+ PASS
2.0 90º
- PASS
+ PASS
2.0 180º
- PASS
+ PASS
2.0 270º
- PASS
AC power port + PASS
Neutral - Ground 0.5 90º
- PASS
+ PASS
0.5 180º
- PASS
+ PASS
0.5 270º
- PASS
+ PASS
1.0 90º
- PASS
+ PASS
1.0 180º
- PASS
+ PASS
1.0 270º
- PASS
+ PASS
2.0 90º
- PASS
+ PASS
2.0 180º
- PASS
+ PASS
2.0 270º
- PASS
Items Description
Test method IEC 61000-4-6
The equipment and/or system continued to perform its intended
Performance criterion
function as specified by the manufacturer.
Power port : 3V (e.m.f.)
Test level
Signal port : 3V (e.m.f.)
Frequency range 0.15MHz to 80MHz
Frequency step 1%
Dwell time 3.0 sec.
Modulation AM 80% 1kHz
CDN-M3 (AC power port): For EUT(Internal cable length of CDN:200mm)
CDN-M3 (AC power port): For Peripheral
Coupling & decoupling device CDN-S4 (Signal port)
CDN-S9 (Signal port)
EM clamp (Signal port)
Power port
Signal port
Note: As a result of test performed based on Test plan, EUT passed the test.
[AC100V 50Hz]
Test level
Test port Injection method Test result
(e.m.f.)
AC power port 3V CDN-M3 PASS
Signal port
3V EM clamp PASS
LAN
Signal port
3V CDN-S4 PASS
USB
Signal port
3V CDN-S9 PASS
Serial
[AC120V 60Hz]
Test level
Test port Injection method Test result
(e.m.f.)
AC power port 3V CDN-M3 PASS
Signal port
3V EM clamp PASS
LAN
Signal port
3V CDN-S4 PASS
USB
Signal port
3V CDN-S9 PASS
Serial
[AC230V 50Hz]
Test level
Test port Injection method Test result
(e.m.f.)
AC power port 3V CDN-M3 PASS
Signal port
3V EM clamp PASS
LAN
Signal port
3V CDN-S4 PASS
USB
Signal port
3V CDN-S9 PASS
Serial
Items Description
Test method IEC 61000-4-8
The equipment and/or system continued to perform its intended
Performance criterion
function as specified by the manufacturer.
Test level 3 A/m
Power frequency 50 Hz, 60 Hz
Test duration 1 min.
Induction coil 1m × 1m Square coil
Note: As a result of test performed based on Test plan, EUT passed the test.
[AC100V 50Hz]
Test axis Test level (A/m) Test result
X axis 3 PASS
Y axis 3 PASS
Z axis 3 PASS
[AC120V 50Hz]
Test axis Test level (A/m) Test result
X axis 3 PASS
Y axis 3 PASS
Z axis 3 PASS
[AC230V 50Hz]
Test axis Test level (A/m) Test result
X axis 3 PASS
Y axis 3 PASS
Z axis 3 PASS
Description
Items
Voltage dips Voltage interruptions
Test method IEC 61000-4-11
The equipment and/or system continued to perform its intended
Performance criterion
function as specified by the manufacturer.
AC 100V 50Hz AC 100V 50Hz
Nominal voltage AC 120V 60Hz AC 120V 60Hz
AC 240V 50Hz AC 240V 50Hz
>95% Reduction, 0.5 periods
Test level 60% Reduction, 5 periods >95% Reduction, 5 second
30% Reduction, 25 periods
Repeat time 3 times (Interval time of 10 sec.) 3 times (Interval time of 10 sec.)
Phase angle 0º, 180º 0º, 180º
Note: As a result of test performed based on Test plan, EUT passed the test.
[Voltage dips]
Nominal voltage (V) Reduction (%) Output Voltage (V) Periods Phase angle Test result
>95 0 0.5 0° PASS
>95 0 0.5 180° PASS
60 40 5 0° PASS
100
60 40 5 180° PASS
30 70 25 0° PASS
30 70 25 180° PASS
>95 0 0.5 0° PASS
>95 0 0.5 180° PASS
60 48 5 0° PASS
120
60 48 5 180° PASS
30 84 25 0° PASS
30 84 25 180° PASS
>95 0 0.5 0° PASS
>95 0 0.5 180° PASS
60 96 5 0° PASS
240
60 96 5 180° PASS
30 168 25 0° PASS
30 168 25 180° PASS
[Voltage interruptions]
Nominal voltage (V) Reduction (%) Output Voltage (V) Second Phase angle Test result
>95 0 5 0° PASS*
100
>95 0 5 180° PASS*
>95 0 5 0° PASS*
120
>95 0 5 180° PASS*
>95 0 5 0° PASS*
240
>95 0 5 180° PASS*
PASS*: Power of the EUT was turned off. EUT is recoverable to normal operation by re-setting up the system
after the test. However the test result is “PASS” because manufacturer judged that this degradation
of performance doesn't endanger the patient, and it doesn't influence the essential performance.
3) FCC filing:
Site name Registration Number Expiry Date
Site 3 91065 Oct. 1, 2017
3m Semi-anechoic chamber
10m Semi-anechoic chamber No.1
540072 Feb. 20, 2017
10m Semi-anechoic chamber No.2
Shielded room No.1
Radiated emission
Equipment Company Model No. Serial No. Cal. due Cal. date
EMI Receiver ROHDE&SCHWARZ ESCI 100451 Dec. 31, 2015 Dec. 25, 2014
Biconical antenna Schwarzbeck VHA9103/BBA9106 1627 Aug. 31, 2016 Aug. 6, 2015
Log periodic antenna Schwarzbeck UHALP9108A 0398 Aug. 31, 2016 Aug. 6, 2015
Attenuator TDC TAT-43B-03 N/A(S396) Jun. 30, 2016 Jun. 23, 2015
Attenuator TME CFA-01NPJ-3 N/A(S271) Jun. 30, 2016 Jun. 23, 2015
Coaxial cable FUJIKURA 8D-SFA/15m OATS#3R-001 May. 31, 2016 May. 29, 2015
Coaxial cable FUJIKURA 8D-SFA/15m OATS#3R-002 May. 31, 2016 May. 29, 2015
Coaxial cable FUJIKURA 8D-2W/8m OATS#3R-003 May. 31, 2016 May. 29, 2015
Coaxial cable FUJIKURA 5D-2W/1m OATS#3RC-001 May. 31, 2016 May. 29, 2015
Coaxial cable FUJIKURA 5D-2W/1m OATS#3RC-002 May. 31, 2016 May. 29, 2015
Preamplifier ANRITSU MH648A M96157 May. 31, 2016 May. 29, 2015
Coaxial switch ANRITSU MP59B 6201280329 May. 31, 2016 May. 29, 2015
Normalized Site Attenuation TÜV SÜD Zacta Ltd. N/A OATS#3 Aug. 31, 2016 Aug. 28, 2015
PC NEC PC-MY18AEZE4 7Y007681A N/A N/A
Software TOYO Corporation EP5/RE-AJ 0611193/V5.4.011 N/A N/A
Spectrum analyzer Agilent Technologies 8568B 2732A03847 Mar. 31, 2016 Mar. 11, 2015
Spectrum analyzer Display Agilent Technologies 85662A 2648A14093 Mar. 31, 2016 Mar. 11, 2015
Surge immunity
Equipment Company Model No. Serial No. Cal. due Cal. Date
Ultra compact simulator EM TEST UCS500M4 V0550100978 Aug. 31, 2016 Aug. 22, 2014
Radiated emission
[AC100V 50Hz]
Radiated emission
[AC120V 60Hz]
Radiated emission
[AC230V 50Hz]
Surge immunity