PRIMER NIVEL
PUNTOS TUBERIA (φ ) SEL CONDUCTOR (φ) LUMINARIAS LAMPARAS INTERRUPTORES CAJAS CURVAS
DE A 25 (mm) 20 (mm) 15 (mm) 2.5 (mm2) TIPO CANT. TIPO CAT. S 2S S3 2S3 OCTG. RECT. 25 (mm) 20 (mm) 15 (mm)
T.G L1 2.50 m 5.60 m A 1 a 1 1 2
L1 2S3 3.50 m 19.05 m 1 1 2
L1 L2 2.43 m 5.46 m B 1 b 1 1 2
L2 2S 2.90 m 9.60 m 1 1 2
L2 L3 1.84 m 4.28 m B 1 b 1 1 2
L1 L4 2.57 m 5.74 m C 1 c 1 1 2
L4 S3 2.97 m 9.81 m 1 1 2
L4 S3 3.33 m 10.89 m 1 1 2
L4 L5 1.55 m 3.70 m D 1 d 1 1 2
L5 S 2.56 m 2.72 m 1 1 2
L1 L6 2.70 m 21.00 m A 1 a 1 1 2
L6 L7 3.25 m 7.10 m E 1 e 1 1 2
L7 S3 3.41 m 11.13 m 1 1 2
L7 S3 3.88 m 12.54 m 1 1 2
L7 L8 2.83 m 6.26 m D 1 d 1 1 2
L8 S 2.50 m 5.60 m 1 1 2
L6 L9 2.70 m 21.00 m A 1 a 1 1 2
L9 2S3 3.51 m 22.86 m 1 1 2
L9 Caja 4.30 m 9.20 m 1 3
Caja L10 4.31 m 9.22 m D 1 d 1 1 1
L10 2S 5.77 m 18.21 m 1 1 2
L10 L11 10.43 m 21.46 m D 1 d 1 1 2
TOTAL 5.40 m 7.01 m 63.33 m 242.43 m 11 11 2 2 4 2 12 10 4 4 36
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
LUMINARIAS LAMPARAS
TIPO TIPO
DESCRIPCION POTENCIA EN WATTS
A BCS460 LED48/840 PSD W22L124 MLO-PC ACL - 2100 a 2100
B BCS460 LED48/840 PSD W22L124 MLO-PC ACL - 3500 b 3500
C BCS640 LED24/840 PSD W15L125 MLO-PC - 1700 c 1700
D 9A19/LED/830 DIM 120V - 800 FOCO d 800
E BCS640 LED48/840 PSD W21L125 LIN-PC 4250 e 4250
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
3
2
1
4
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
PRIMER NIVEL
CIRCUITO 1
PUNTOS TUBERIA (φ ) SEL CONDUCTOR (φ) TOMACORRIENTE CAJA CURVAS
DE A 15 (mm) 4 (mm2) SIMPLE DOBLE PASO RECT. (15mm)
T.D INT1 5.31 m 16.83 m - 1 1 2
INT1 INT2 4.01 m 12.93 m - 1 1 2
INT1 INT3 2.05 m 7.05 m - 1 1 1
INT3 INT4 2.82 m 9.36 m - 1 1 2
INT4 INT5 3.92 m 12.66 m - 1 1 2
INT1 INT6 2.89 m 9.57 m - 1 1 2
INT6 INT7 3.40 m 11.10 m - 1 1 2
INT7 INT8 3.13 m 10.29 m - 1 1 2
INT8 Caja 0.25 m 0.75 m 1
Caja INT9 1.91 m 6.63 m 1 1 2
Caja INT10 2.79 m 9.27 m - 1 1 2
TOTAL 32.48 m 106.44 m - 10 1 10 19
CIRCUITO 2
PUNTOS TUBERIA (φ ) SEL CONDUCTOR (φ) TOMACORRIENTE CAJA RECTANGULAR CURVAS
DE A 15 (mm) 4 (mm2) SIMPLE DOBLE PASO RECTANG. (15mm)
T.D INT1 2.86 m 9.48 m - 1 1 3
INT1 INT2 3.91 m 12.63 m - 1 1 2
INT2 INT3 3.19 m 10.47 m - 1 1 3
INT3 INT4 3.29 m 10.77 m - 1 1 2
INT4 INT5 2.42 m 8.16 m - 1 1 2
INT5 INT6 3.25 m 10.65 m - 1 1 2
INT6 CAJA P 1.85 m 6.45 m - 1 2
CAJA P INT7 0.25 m 3.15 m - 1 1
CAJA P INT8 2.80 m 9.30 m - 1 1 3
INT6 INT9 2.60 m 8.70 m - 1 1 3
TOTAL 26.42 m 89.76 m - 9 1 9 22
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
MEDIDOR - TG
PUNTOS TUBERÍA (Φ) - SAP CONDUCTOR (Φ) CAJA SALIDA CURVAS
DE A 20 mm (3/4") 10 (mm2) RECTANGULAR 20 mm (3/4")
Kw T.G 5.44 m 5.74 m 0 UND 3 UND
SUBTOTAL 5.44 m 5.74 m 0 UND 3 UND
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
PLANILLA DE METRADOS
04.00.00 INSTALACIONES ELECTRICAS
OBRA : VIVIENDA UNIFAMILIAR - PRIMER NIVEL
TRABAJO : PRIMERA PARTE
Nº Dimensiones
Item Descripción Veces
Parcial Total Unid
Largo Ancho Alto
04.00.00 INSTALACIONES ELECTRICAS
04.01.00 SALIDAS PARA ALUMBRADO, TOMACORRIENTES Y PULSADOR
0.4.01.01 SALIDAS
04.01.01.01 SALIDAS PARA ALUMBRADO PTO
0.4.01.01.01.01 SALIDAS PARA ALUMBRADO (TECHO) 9 PTO
Estudio 2 - - - 2
Sala comedor 3 - - - 3
Cocina 1 - - - 1
Baño 1 - - - 1
Hall 1 - - - 1
Pasillo 1 - - - 1
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
04.03.00 ARTEFACTOS
0.4.03.01 LAMPARAS UND
0.4.03.01.01 Luminaria BCS460 LED48/840 PS +Lampara Fluorecente 2100 W 3 - - - 3 UND
0.4.03.01.02 Luminaria BCS460 LED48/840 PSD + Lampara Fluorecente 3500 W 2 - - - 2 UND
0.4.03.01.03 Luminaria BCS640 LED24/840 PSD +Lamapara Fluorecente 1700 W 1 - - - 1 UND
0.4.03.01.04 Soquet 9A19/LED/830 DIM 120V + Foco 800 W 4 - - - 4 UND
0.4.03.01.05 Luminaria BCS640 LED48/840 PSD W21 Lampara Fluorecente 4250 W 1 - - - 1 UND
04.04.00 VARIOS
04.04.01 Cajas de Paso Octogonales 3 - - - 3 UND
04.04.02 CURVAS UND
Curva Φ 25 mm PVC - SEL 4 - - - 4 UND
Curva Φ 20 mm PVC - SAP 3 - - - 3 UND
Curva Φ 20 mm PVC - SEL 4 - - - 4 UND
Curva Φ 15 mm PVC - SEL 77 - - - 77 UND
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
PLANILLA DE METRADOS
05.00.00 INSTALACIONES DE COMUNICACIONES
OBRA : VIVIENDA UNIFAMILIAR - PRIMER NIVEL
TRABAJO : PRIMERA PARTE
Nº Dimensiones
Item Descripción Veces
Parcial Total Unid
Largo Ancho Alto
05.00.00 INSTALACIONES DE COMUNICACIONES
05.01.00 CABLEADO ESTRUCTURADO EN INTERIORES
0.5.01.01 CABLES EN TUBERIAS m
0.5.01.01.01 CABLE TELEFONICO Y TV XPT O SIMILAR DE 4x22AWG 9.24 - - - 9.24 m
0.5.01.0.1.02 CABLE 4 mm2 - TW (Timbre) 18.46 18.46 m
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONAL DE ING.CIVIL
PRIMER NIVEL
INTALACIONES EN EDIFICACIONES
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONAL DE ING.CIVIL
LUMINARIAS LAPARAS
TIPO TIPO
DESCRIPCION DESCRIPCION
A BCS460 LED48/840 PSD W22L124 MLO-PC ACL - 2100 a 2100
C BCS640 LED24/840 PSD W15L125 MLO-PC - 1700 c 1700
D 9A19/LED/830 DIM 120V - 800 FOCO d 800
INTALACIONES EN EDIFICACIONES
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONAL DE ING.CIVIL
INTALACIONES EN EDIFICACIONES
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
SEGUNDO NIVEL
CIRCUITO 1
PUNTOS TUBERIA (φ ) CONDUCTOR (φ) TOMACORRIENTE CAJA RECTANGULAR CURVAS
DE A 15 (mm) 4 (mm2) SIMPLE DOBLE PASO RECTANG. (15mm)
T.D INT1 3.92 m 10.89 m - 1 1 2
INT1 INT2 3.58 m 11.64 m - 1 1 2
INT1 INT3 3.54 m 11.52 m - 1 1 2
INT3 INT4 2.64 m 8.82 m - 1 1 2
INT4 INT5 4.04 m 13.02 m - 1 1 2
INT5 INT6 4.94 m 15.72 m - 1 1 2
INT6 INT7 3.91 m 12.63 m - 1 1 2
TOTAL 26.57 m 84.24 m - 7 0 7 14
CIRCUITO 2
PUNTOS TUBERIA (φ ) CONDUCTOR (φ) TOMACORRIENTE CAJA RECTANGULAR CURVAS
DE A 15 (mm) 4 (mm2) SIMPLE DOBLE PASO RECTANG. (15mm)
T.D INT1 4.10 m 16.20 m 1 1 2
INT1 INT2 1.80 m 6.30 m 1 1
INT1 INT3 2.28 m 7.74 m 1 1 2
INT3 INT4 2.45 m 8.25 m 1 1 2
INT1 INT5 2.87 m 9.51 m 1 1 2
INT5 CAJA P 3.31 m 10.83 m 1 2
CAJA P INT6 0.25 m 1.65 m 1 1
CAJA P INT7 2.59 m 8.67 m 1 1 2
INT7 INT8 0.25 m 1.65 m 1 1
INT6 INT9 4.13 m 13.29 m 1 1 2
INT9 INT10 4.24 m 13.62 m 1 1 2
TOTAL 28.27 m 97.71 m 10 1 10 16
TOTAL SEGUNDO NIVEL 54.84 m 181.95 m - 17.0 1 17 30
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
SALIDAS PARA TV
PUNTOS TUBERÍA (Φ) CONDUCTOR (Φ) CAJA SALIDA CURVAS
DE A 20 mm (1") 10 (mm2) RECTANGULAR 20 mm (1")
CAJA TV1 5.41 m 5.71 m 1 UND 2 UND
CAJA TV2 6.90 m 7.20 m 1 UND 3 UND
CAJA TV3 1.80 m 2.10 m 1 UND 0 UND
SUBTOTAL 14.11 m 15.01 m 3 UND 5 UND
ALIMENTADOR T.G - TD
PUNTOS TUBERÍA (Φ) - SAP CONDUCTOR (Φ) CAJA SALIDA CURVAS
DE A 20 mm (3/4") 10 (mm2) RECTANGULAR 20 mm (3/4")
T.G T.D 2.70 m 3.00 m 0 UND 0 UND
SUBTOTAL 2.70 m 3.00 m 0 UND 0 UND
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
PLANILLA DE METRADOS
04.00.00 INSTALACIONES ELECTRICAS
OBRA : VIVIENDA UNIFAMILIAR - PRIMER NIVEL
TRABAJO : PRIMERA PARTE
Nº Dimensiones
Item Descripción Veces
Parcial Total Unid
Largo Ancho Alto
04.00.00 INSTALACIONES ELECTRICAS
04.01.00 SALIDAS PARA ALUMBRADO, TOMACORRIENTES Y PULSADOR
0.4.01.01 SALIDA
04.01.01.01 SALIDAS PARA ALUMBRADO
SALIDAS PARA ALUMBRADO (TECHO) 11 PTO
Estar 1 - - - 1
Hall 1 - - - 1
Dormitorio 1 1 - - - 1
Dormitorio 2 2 - - - 2
Dormitorio 3 2 - - - 2
Baño 1 - - - 1
Pasillo 1 - - - 1
Escalera 2 - - - 2
SALIDAS PARA ALUMBRADO (PARED) 1 PTO
Escalera 1 1
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
Pasillo 1 - - - 1
04.01.01.03 SALIDAS PARA INRERRUPTORES
INTERRUPTORES SIMPLES "S" (UNIPOLAR) 2 PTO
Baño 1 - - - 1
Hall 1 - - - 1
INTERRUPTORES DE COMUTACION SIMPLE "S3"(UNIPOLAR) 8 PTO
Dormitorio 1 2 - - - 2
Estar 2 - - - 2
Pasillo 4 - - - 4
INTERRUPTORES DE COMUTACION DOBLE "2S3"(UNIPOLAR) 4 PTO
Dormitorio 2 2 - - - 2
Dormitorio 3 2 - - - 2
0.4.01.02 SUMINISTRO E INSTALACION DE TUBERIAS
0.4.01.02.01 TUBERIAS
Tubería Φ 25 mm PVC - SEL 2.50 - - - 2.5 m
Tubería Φ 20 mm PVC - SAP 2.70 - - - 2.7 m
Tubería Φ 20 mm PVC - SEL 12.89 - - - 12.89 m
Tubería Φ 15 mm PVC - SEL 119.14 - - - 119.14 m
0.4.01.03 CONDUCTORES Y CABLES DE ENERGÍA EN TUBERÍAS
CABLE 10 mm2 - TW 3.00 - - - 3 m
CABLE 4 mm2 - TW 184.95 - - - 184.95 m
CABLE 2.5 mm2 - TW 301.01 - - - 301.01 m
0.4.01.04 TABLEROS DE DISTRIBUCIÓN
04.01.04.01 TABLERO DE DISTRIBUCION INSTALADO Y EQUIPADO 1 - - - 1 UND
Interruptor Diferencial de 30 mA 1 - - - 1 UND
Interruptor Termomagnético de 2x16 A (alumbrado) 1 - - - 1 UND
Interruptor Termomagnético de 2x20 A (Tomacorrientes C-1) 1 - - - 1 UND
Interruptor Termomagnético de 2x20 A (Tomacorrientes C-2) 1 - - - 1 UND
Interruptor Termomagnético de 2x20 A (Reserva) 1 - - - 1 UND
Tablero Adosable PVC 8 polos 1 - - - 1
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
04.02.00 ARTEFACTOS
0.4.02.01 LAMPARAS
0.4.02.01.01 Luminarias BCS460 LED48/840 PSD + Lampara 2100 W 2 - - - 2 UND
0.4.02.01.02 Luminarias BCS640 LED24/840 PSD + Lampara 1700 6 - - - 6 UND
0.4.02.01.03 Soquet 9A19/LED/830 DIM 120V + Foco 800 W 4 - - - 4 UND
04.04.00 VARIOS
04.04.01 Cajas de Paso Octogonales 3 - - - 3 UND
04.04.02 CURVAS UND
Curva Φ 20 mm PVC - SEL 10 - - - 10 UND
Curva Φ 15 mm PVC - SEL 84 - - - 84 UND
PLANILLA DE METRADOS
05.00.00 INSTALACIONES DE COMUNICACIONES
OBRA : VIVIENDA UNIFAMILIAR - PRIMER NIVEL
TRABAJO : PRIMERA PARTE
Nº Dimensiones
Item Descripción Veces
Parcial Total Unid
Largo Ancho Alto
05.00.00 INSTALACIONES DE COMUNICACIONES
05.01.00 CABLEADO ESTRUCTURADO EN INTERIORES
0.5.01.01 CABLES EN TUBERIAS
0.5.01.01.01 CABLE TELEFONICO Y TV XPT O SIMILAR DE 4x22AWG 32.26 - - - 32.26 m
0.5.02.00 CANALETAS, CONDUCTOS Y/O TUBERIAS
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONAL ING.CIVIL
TERCER NIVEL
LUMINARIAS LAPARAS
TIPO TIPO
DESCRIPCION DESCRIPCION
C BCS640 LED24/840 PSD W15L125 MLO-PC - 1700 c 1700
D 9A19/LED/830 DIM 120V - 800 FOCO d 800
F TCS649 1x80W/840 HFP A ALU f 6550
INTALACIONES EN EDIFICACIONES
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONAL ING.CIVIL
INTALACIONES EN EDIFICACIONES
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
TERCER NIVEL
CIRCUITO 1
PUNTOS TUBERIA (φ ) CONDUCTOR (φ) TOMACORRIENTE CAJA CURVAS
DE A 15 (mm) 4 (mm2) SIMPLE DOBLE PASO RECTANG. (15mm)
T.D INT1 3.92 m 10.89 m - 1 1 2
INT1 INT2 2.90 m 9.60 m - 1 1 3
INT2 INT3 3.46 m 11.28 m 1 1 3
INT1 INT4 4.49 m 14.37 m 1 1 2
INT4 INT5 0.25 m 1.65 m 1 1
INT4 INT6 3.95 m 12.74 m 1 1 2
INT6 INT7 4.24 m 13.62 m 1 1 2
INT7 INT8 2.61 m 8.73 m 1 1 2
T.D (2) INT. LAVAD. 5.66 m 17.88 m 1 1 3
T.D (2) INT. THERMA 4.81 m 15.33 m 1 1 3
TOTAL 36.29 m 116.09 m - 10 10 22
SALIDAS PARA TV
PUNTOS TUBERÍA (Φ) CONDUCTOR (Φ) CAJA CURVAS
DE A 20 mm (1") 10 (mm2) DE PASO SALIDA RECT. 20 mm (1")
CP1 CP1' 7.50 m 7.80 m 1 UND 1 UND 2 UND
CP1' TV1 2.05 m 2.35 m 1 UND 1 UND 1 UND
SUBTOTAL 9.55 m 10.15 m 4 UND 3 UND
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
PLANILLA DE METRADOS
04.00.00 INSTALACIONES ELECTRICAS
OBRA : VIVIENDA UNIFAMILIAR - PRIMER NIVEL
TRABAJO : PRIMERA PARTE
Nº Dimensiones
Item Descripción Veces
Parcial Total Unid
Largo Ancho Alto
04.00.00 INSTALACIONES ELECTRICAS
04.01.00 SALIDAS PARA ALUMBRADO, TOMACORRIENTES Y PULSADOR
0.4.01.01 SALIDA
04.01.01.01 SALIDAS PARA ALUMBRADO
SALIDAS PARA ALUMBRADO (TECHO) 5 PTO
Dormitorio 2 - - - 2
Baño 1 - - - 1
Lavanderia 1 - - - 1
Hall 1 - - - 1
SALIDAS PARA ALUMBRADO (PARED) 1 PTO
Azotea 1 1
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
Lavanderia 1 - - - 1
INTERRUPTORES DE COMUTACION SIMPLE "S3"(UNIPOLAR) 2 PTO
Azotea 2 - - - 2
INTERRUPTORES DE COMUTACION DOBLE "2S3"(UNIPOLAR) 2 PTO
Dormitorio 2 - - - 2
04.01.02 SUMINISTRO E INSTALACION DE TUBERIAS
04.01.02.01 TUBERIAS
Tubería Φ 25 mm PVC - SEL 2.50 - - - 2.5 m
Tubería Φ 20 mm PVC - SAP 2.70 - - - 2.7 m
Tubería Φ 20 mm PVC - SEL 4.99 - - - 4.99 m
Tubería Φ 15 mm PVC - SEL 58.91 - - - 58.91 m
04.01.03 CONDUCTORES Y CABLES DE ENERGÍA EN TUBERÍAS
CABLE 10 mm2 - TW 3.00 - - - 3 m
CABLE 4 mm2 - TW 119.09 - - - 119.09 m
CABLE 2.5 mm2 - TW 99.578 - - - 99.578 m
04.01.04 TABLEROS DE DISTRIBUCIÓN
04.01.04.01 TABLERO DE DISTRIBUCION INSTALADO Y EQUIPADO
Interruptor Diferencial de 30 mA 1 - - - 1 UND
Interruptor Termomagnético de 2x16 A (alumbrado) 1 - - - 1 UND
Interruptor Termomagnético de 2x20 A (Tomacorrientes C-1) 1 - - - 1 UND
Interruptor Termomagnético de 2x20 A (Lavadora) 1 - - - 1 UND
Interruptor Termomagnético de 2x20 A (Therma) 1 - - - 1 UND
Interruptor Termomagnético de 2x20 A (Reserva) 1 - - - 1 UND
Tablero Adosable PVC 8 polos 1 - - - 1 UND
04.02.00 ARTEFACTOS
0.4.02.01 LAMPARAS
0.4.02.01.01 Luminaria BCS640 LED24/840 PSD + Lampara 1700 W 3 - - - 3 UND
0.4.02.01.02 Luminaria TCS649 1x80W/840 HFP + Lampara ALU 1 - - - 1 UND
0.4.02.01.03 Soquet 9A19/LED/830 DIM 120V + Foco 800 w 2 - - - 2 UND
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
04.03.00 VARIOS
04.03.01 Cajas de Paso Octogonales 1 - - - 1 UND
04.03.02 CURVAS
Curva Φ 25 mm PVC - SEL 2 - - - 2 UND
Curva Φ 20 mm PVC - SEL 4 - - - 4 UND
Curva Φ 15 mm PVC - SEL 40 - - - 40 UND
PLANILLA DE METRADOS
05.00.00 INSTALACIONES DE COMUNICACIONES
OBRA : VIVIENDA UNIFAMILIAR - PRIMER NIVEL
TRABAJO : PRIMERA PARTE
Nº Dimensiones
Item Descripción Veces
Parcial Total Unid
Largo Ancho Alto
05.00.00 INSTALACIONES DE COMUNICACIONES
05.01.00 CABLEADO ESTRUCTURADO EN INTERIORES
0.5.01.01 CABLES EN TUBERIAS
0.5.01.01.01 CABLE TELEFONICO Y TV XPT O SIMILAR DE 4x22AWG 10.15 - - - 10.15
0.5.02.00 CANALETAS, CONDUCTOS Y/O TUBERIAS
05.02.01 Tubería Φ 20 mm PVC - SEL (TV) 9.55 - - - 9.55
0.5.03.00 SALIDAS DE COMUNICACIONES
0.5.03.01 Salidas para TV 1 - - - 1
0.5.04.00 CAJAS DE PASE
05.04.01 Cajas Rectagulares 2 - - - 2 UND
05.04.02 Curvas
Curva Φ 20 mm PVC - SEL 3 - - - 3 UND
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 30.064
OPERARIO hh 1 0.8 21.79 17.432
PEON hh 1 0.8 15.79 12.632
MATERIALES 3.08238
CONECTOR PVC SEL A CAJA UND 2 0.33 0.656
CAJA OCTOGONAL SEMIPESADA METALICA 3/4" UND 1 2.38 2.378
CINTA AISLANTE DE VINIL DE 3/4" POR 20 m UND 0.01 4.84 0.048
EQUIPOS Y/O HERRAMIENTAS 0.902
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 30.064 0.902
PARTIDA N° 0.4.01.01.01.02 SALIDAS PARA ALUMBRADO (PARED)
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 30.064
OPERARIO hh 1 0.8 21.79 17.432
PEON hh 1 0.8 15.79 12.632
MATERIALES 3.08238
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 30.064
OPERARIO hh 1 0.8 21.79 17.432
PEON hh 1 0.8 15.79 12.632
MATERIALES 11.69238
CONECTOR PVC SEL A CAJA UND 2 0.33 0.656
CAJA RECTANGULAR SEMIPESADA 3/4" UND 1 2.05 2.050
TOMACORRIENTE DOBLE CON LINEA A TIERRA UNIVERSAL UND 1 8.938 8.938
CINTA AISLANTE DE VINIL DE 3/4" POR 20 m UND 0.01 4.838 0.048
EQUIPOS Y/O HERRAMIENTAS 0.902
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 30.064 0.902
PARTIDA N° 04.01.01.03.01 SALIDAS PARA INTERRUPTORES SIMPLES (S)
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 30.064
OPERARIO hh 1 0.8 21.79 17.432
PEON hh 1 0.8 15.79 12.632
MATERIALES 11.69238
CONECTOR PVC SEL A CAJA UND 2 0.328 0.656
CAJA RECTANGULAR SEMIPESADA 3/4" UND 1 2.050 2.050
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 30.064
OPERARIO hh 1 0.8 21.79 17.432
PEON hh 1 0.8 15.79 12.632
MATERIALES 17.43238
CONECTOR PVC SEL A CAJA UND 2 0.328 0.656
CAJA RECTANGULAR SEMIPESADA 3/4" UND 1 2.050 2.050
INTERRUPTOR DOBLE SENCIA UNIPOLAR UND 1 14.678 14.678
CINTA AISLANTE DE VINIL DE 3/4" POR 20 m UND 0.01 4.838 0.048
EQUIPOS Y/O HERRAMIENTAS 0.902
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 30.064 0.902
PARTIDA N° 04.01.01.03.02 SALIDAS PARA INTERRUPTORES DE CONMUTACION SIMPLE (S3)
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 30.064
OPERARIO hh 1 0.8 21.79 17.432
PEON hh 1 0.8 15.79 12.632
MATERIALES 14.97238
CONECTOR PVC SEL A CAJA UND 2 0.328 0.656
CAJA RECTANGULAR SEMIPESADA 3/4" UND 1 2.050 2.050
INTERRUPTOR DE CONMUTACION SIMPLE MODUS STYLE UND 1 12.218 12.218
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 30.064
OPERARIO hh 1 0.8 21.79 17.432
PEON hh 1 0.8 15.79 12.632
MATERIALES 18.25238
CONECTOR PVC SEL A CAJA UND 2 0.328 0.656
CAJA RECTANGULAR SEMIPESADA 3/4" UND 1 2.050 2.050
INTERRUPTOR DE CONMUTACION DOBLE MODUS STYLE UND 1 15.498 15.498
CINTA AISLANTE DE VINIL DE 3/4" POR 18 m UND 0.01 4.838 0.048
EQUIPOS Y/O HERRAMIENTAS 0.902
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 30.064 0.902
PARTIDA N° 04.01.02.01.01 SUMINISTRO E INSTALACION DE TUBERIAS Φ = 25 mm
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 8.8272
OPERARIO hh 1 0.16 21.79 3.4864
OFICIAL hh 1 0.16 17.59 2.8144
PEON hh 1 0.16 15.79 2.5264
MATERIALES 2.47674
PEGAMENTO PARA PVC GLN 0.005 31.74 0.159
TUBERIA PVC SEL (1X3m) SEL Φ = 25 mm m 1.05 2.017 2.118
UNION PARA PVC SEL PARA TUBERIA ELECTRICA Φ = 25 mm UND 0.40 0.500 0.200
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 8.8272
OPERARIO hh 1 0.16 21.79 3.4864
OFICIAL hh 1 0.16 17.59 2.8144
PEON hh 1 0.16 15.79 2.5264
MATERIALES 2.62313
PEGAMENTO PARA PVC GLN 0.005 31.74 0.159
TUBERIA PVC SEL (1X3m) SAP Φ = 20 mm m 1.05 2.16 2.264
UNION PARA PVC SAP PARA TUBERIA ELECTRICA Φ = 20 mm UND 0.40 0.50 0.200
EQUIPOS Y/O HERRAMIENTAS 0.265
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 8.8272 0.265
PARTIDA N° 04.01.02.01.01 SUMINISTRO E INSTALACION DE TUBERIAS SEL Φ = 20 mm
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 8.8272
OPERARIO hh 1 0.16 21.79 3.4864
OFICIAL hh 1 0.16 17.59 2.8144
PEON hh 1 0.16 15.79 2.5264
MATERIALES 2.10653
PEGAMENTO PARA PVC GLN 0.005 31.74 0.159
TUBERIA PVC SEL (1X3m) SEL Φ = 20 mm m 1.05 1.665 1.748
UNION PARA PVC SEL PARA TUBERIA ELECTRICA Φ = 20 mm UND 0.40 0.500 0.200
EQUIPOS Y/O HERRAMIENTAS 0.265
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 8.8272
OPERARIO hh 1 0.16 21.79 3.4864
OFICIAL hh 1 0.16 17.59 2.8144
PEON hh 1 0.16 15.79 2.5264
MATERIALES 2.10653
PEGAMENTO PARA PVC GLN 0.005 31.74 0.159
TUBERIA PVC SEL (1X3m) SEL Φ = 15 mm m 1.05 1.66 1.748
UNION PARA PVC SEL PARA TUBERIA ELECTRICA Φ = 15 mm UND 0.40 0.50 0.200
EQUIPOS Y/O HERRAMIENTAS 0.265
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 8.8272 0.265
PARTIDA N° 04.01.03.01 CONDUCTORES Y CABLES DE ENERGIA THW 10 mm2
RENDIMIENTO: m/DIA 120 EQUIPO: 120 COSTO UNITARIO POR METRO: 5.727
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 3.678
OPERARIO hh 1 0.067 21.79 1.453
OFICIAL hh 1 0.067 17.59 1.173
PEON hh 1 0.067 15.79 1.053
MATERIALES 1.93838
CABLE THW 10 mm2 m 1.05 1.800 1.890
CINTA AISLANTE DE VINIL DE 3/4" POR 18 m UND 0.01 4.838 0.048
EQUIPOS Y/O HERRAMIENTAS 0.110
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 3.678 0.110
PARTIDA N° 04.01.03.02 CONDUCTORES Y CABLES DE ENERGIA 4 mm2
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
RENDIMIENTO: m/DIA 150 EQUIPO: 150 COSTO UNITARIO POR METRO: 4.581
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 2.942
OPERARIO hh 1 0.053 21.79 1.162
OFICIAL hh 1 0.053 17.59 0.938
PEON hh 1 0.053 15.79 0.842
MATERIALES 1.54988
CABLE TW 4 mm2 m 1.05 1.430 1.502
CINTA AISLANTE DE VINIL DE 3/4" POR 18 m UND 0.01 4.838 0.048
EQUIPOS Y/O HERRAMIENTAS 0.088
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 2.942 0.088
PARTIDA N° 04.01.03.01 CONDUCTORES Y CABLES DE ENERGIA 2.5 mm2
RENDIMIENTO: m/DIA 150 EQUIPO: 150 COSTO UNITARIO POR METRO: 4.581
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 2.942
OPERARIO hh 1 0.053 21.79 1.162
OFICIAL hh 1 0.053 17.59 0.938
PEON hh 1 0.053 15.79 0.842
MATERIALES 1.54988
CABLE TW 2.5 mm2 m 1.05 1.430 1.502
CINTA AISLANTE DE VINIL DE 3/4" POR 18 m UND 0.01 4.838 0.048
EQUIPOS Y/O HERRAMIENTAS 0.088
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 2.942 0.088
PARTIDA N° 04.01.04.01 TABLERO GENERAL
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 110.340
OPERARIO hh 1 2.000 21.79 43.580
OFICIAL hh 1 2.000 17.59 35.180
PEON hh 1 2.000 15.79 31.580
MATERIALES 294.052
Interruptor Termomagnético de 2x40 A UND 1 32.144 32.144
Interruptor Diferencial de 30 mA UND 1 102.418 102.418
Interruptor Termomagnético de 2x16 A (alumbrado) UND 1 24.272 24.272
Interruptor Termomagnético de 2x20 A (Tomacorrientes C-1) UND 1 24.272 24.272
Interruptor Termomagnético de 2x20 A (Reserva) UND 1 24.272 24.272
Interruptor Termomagnético de 2x20 A (Tomacorrientes C-2) UND 1 24.272 24.272
Interruptor Termomagnético de 2x30 A (T.D Segundo Nivel) UND 1 24.272 24.272
Interruptor Termomagnético de 2x30 A (T.D Tercer Nivel) UND 1 24.272 24.272
Tablero Adosable PVC 8 polos UND 1 13.858 13.858
EQUIPOS Y/O HERRAMIENTAS 3.310
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 110.340 3.310
PARTIDA N° 0.4.02.01 POZO DE PUESTA A TIERRA EXCAVACION
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 95.835
OPERARIO hh 0.2 0.533 21.79 11.621
PEON hh 2 5.333 15.79 84.213
EQUIPOS Y/O HERRAMIENTAS 2.875
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 95.835 2.875
PARTIDA N° 0.4.02.02 Instalacion, Relleno y Compactacion de Puesta a Tierra
RENDIMIENTO: UND/DIA 1.5 EQUIPO: 1.5 COSTO UNITARIO POR: UND 983.693
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 284.640
OPERARIO hh 1 5.333 21.79 116.213
PEON hh 2 10.667 15.79 168.427
MATERIALES 690.514
TIERRA AGRICOLA m3 2.14 65 139.100
CONECTOR TIPO AB PARA VARILLA DE COBRE 5/8" DE DIAM UND 1 5.93 5.930
CONECTOR TIPO AB PARA VARILLA DE 2" DE DIAM UND 0.4 6.06 2.424
CAJA DE REGISTRO Y TAPA UND 1 33.9 33.900
CEMENTO CONDUCTIVO 25KG BOL 2 101.69 203.380
BENTONITA SODICA DE 30 KG BOL 6 26.66 159.960
VARILLA DE COBRE DE 5/8" DE DIAM. x 2.40 DE LONG UND 1 144.07 144.070
AGUA m3 0.02 3.5 0.070
CURVA PVC SEL (Elect.) Ø 20mm UND 4 0.42 1.680
EQUIPOS Y/O HERRAMIENTAS 8.539
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 284.640 8.539
PARTIDA N° 0.4.03.01.01 LUMINARIA BCS460 LED48/840 PS + LAMPARA 2100 W
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 44.136
OPERARIO hh 1 0.800 21.79 17.432
OFICIAL hh 1 0.800 17.59 14.072
PEON hh 1 0.800 15.79 12.632
MATERIALES 69.66638
LUMINARIA BCS460 LED48/840 PS - 2100 m 1 69.618 69.618
CINTA AISLANTE DE VINIL DE 3/4" POR 18 m UND 0.01 4.838 0.048
EQUIPOS Y/O HERRAMIENTAS 1.324
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 44.136 1.324
PARTIDA N° 0.4.03.01.02 LUMINARIA BCS460 LED48/840 PSD + LAMPARA 3500 W
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 44.136
OPERARIO hh 1 0.800 21.79 17.432
OFICIAL hh 1 0.800 17.59 14.072
PEON hh 1 0.800 15.79 12.632
MATERIALES 70.50038
LUMINARIA BCS460 LED48/840 PS - 2100 m 1 70.452 70.452
CINTA AISLANTE DE VINIL DE 3/4" POR 18 m UND 0.01 4.838 0.048
EQUIPOS Y/O HERRAMIENTAS 1.324
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 44.136 1.324
PARTIDA N° 0.4.03.01.03 LUMINARIA BCS640 LED24/840 PSD + LAMPARA 1700 W
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 44.136
OPERARIO hh 1 0.800 21.79 17.432
OFICIAL hh 1 0.800 17.59 14.072
PEON hh 1 0.800 15.79 12.632
MATERIALES 56.90038
LUMINARIA BCS460 LED48/840 PS - 2100 m 1 56.852 56.852
CINTA AISLANTE DE VINIL DE 3/4" POR 18 m UND 0.01 4.838 0.048
EQUIPOS Y/O HERRAMIENTAS 1.324
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 44.136 1.324
PARTIDA N° 0.4.03.01.04 SOQUET 9A19/LED/830 DIM 120V + FOCO 800 W
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 44.136
OPERARIO hh 1 0.800 21.79 17.432
OFICIAL hh 1 0.800 17.59 14.072
PEON hh 1 0.800 15.79 12.632
MATERIALES 13.89838
LUMINARIA BCS460 LED48/840 PS - 2100 m 1 13.850 13.850
CINTA AISLANTE DE VINIL DE 3/4" POR 18 m UND 0.01 4.838 0.048
EQUIPOS Y/O HERRAMIENTAS 1.324
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 44.136 1.324
PARTIDA N° 0.4.03.01.05 LUMINARIA BCS640 LED48/840 PSD W21L125 LIN-PC + LAMPARA 4250 W
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 44.136
OPERARIO hh 1 0.800 21.79 17.432
OFICIAL hh 1 0.800 17.59 14.072
PEON hh 1 0.800 15.79 12.632
MATERIALES 75.59038
LUMINARIA BCS460 LED48/840 PS - 2100 m 1 75.542 75.542
CINTA AISLANTE DE VINIL DE 3/4" POR 18 m UND 0.01 4.838 0.048
EQUIPOS Y/O HERRAMIENTAS 1.324
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 44.136 1.324
PARTIDA N° 04.04.01 CAJAS DE PASO OCTOGONALES (PARED)
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 30.064
OPERARIO hh 1 0.8 21.79 17.432
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
MATERIALES 5.822
Curva Φ 25 mm PVC - SEL UND 1 2.54 2.542
Curva Φ 20 mm PVC - SAP UND 1 2.05 2.050
Curva Φ 20 mm PVC - SEL UND 1 0.74 0.738
Curva Φ 15 mm PVC - SEL UND 1 0.492 0.492
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
RENDIMIENTO: m/DIA 150 EQUIPO: 150 COSTO UNITARIO POR METRO: 3.713
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 2.100
OPERARIO hh 1 0.053 21.79 1.162
OFICIAL hh 1 0.053 17.59 0.938
MATERIALES 1.54988
CABLE THW 4 mm2 m 1.05 1.430 1.502
CINTA AISLANTE DE VINIL DE 3/4" POR 18 m UND 0.01 4.838 0.048
EQUIPOS Y/O HERRAMIENTAS 0.063
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 2.100 0.063
PARTIDA N° 05.02.01.01 SUMINISTRO E INSTALACION DE TUBERIAS SEL Φ = 20 mm PARA TV Y TELEFONIA
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 8.8272
OPERARIO hh 1 0.16 21.79 3.4864
OFICIAL hh 1 0.16 17.59 2.8144
PEON hh 1 0.16 15.79 2.5264
MATERIALES 2.10732
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 8.8272
OPERARIO hh 1 0.16 21.79 3.4864
OFICIAL hh 1 0.16 17.59 2.8144
PEON hh 1 0.16 15.79 2.5264
MATERIALES 2.10732
PEGAMENTO PARA PVC GLN 0.005 31.90 0.159
TUBERIA PVC SEL (1X3m) SEL Φ = 20 mm m 1.05 1.66 1.748
UNION PARA PVC SEL PARA TUBERIA ELECTRICA Φ = 20 mm UND 0.40 0.50 0.200
EQUIPOS Y/O HERRAMIENTAS 0.265
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 8.8272 0.265
PARTIDA N° 0.5.03.01 SALIDAS PARA TV
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 30.064
OPERARIO hh 1 0.80 21.79 17.432
PEON hh 1 0.80 15.79 12.632
MATERIALES 41.97
TOMA RJ11 (01 MODULO) UND 1 25.00 25.000
PACH CORD RJ11 TV UND 2 7.00 14.000
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 31.504
OPERARIO hh 1 0.80 21.79 17.432
OFICIAL hh 1 0.80 17.59 14.072
MATERIALES 23.388
TIMBRE ZUMBADOR UND 1 20.42 20.418
CAJA RECTANGULAR PESADA DE F°G° DE100x50x40mm UND 1.00 2.97 2.970
EQUIPOS Y/O HERRAMIENTAS 0.945
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 31.504 0.945
PARTIDA N° 0.5.03.03 SALIDAS PARA TELEFONIA E INTERNET
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 30.064
OPERARIO hh 1 0.80 21.79 17.432
PEON hh 1 0.80 15.79 12.632
MATERIALES 41.97
TOMA RJ11 (01 MODULO) UND 1 25.00 25.000
PACH CORD RJ11 TEELEFONICO UND 2 7.00 14.000
CAJA RECTANGULAR PESADA DE F°G° DE100x50x40mm UND 1.00 2.97 2.970
EQUIPOS Y/O HERRAMIENTAS 0.902
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 30.064 0.902
PARTIDA N° 0.5.03.04 SALIDAS PARA PULSADOR DE TIMBRE
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 30.064
OPERARIO hh 1 0.80 21.79 17.432
PEON hh 1 0.80 15.79 12.632
MATERIALES 11.908
PULSADOR DE TIMBRE UND 1 8.94 8.938
CAJA RECTANGULAR PESADA DE F°G° DE100x50x40mm UND 1.00 2.97 2.970
EQUIPOS Y/O HERRAMIENTAS 0.902
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 30.064 0.902
PARTIDA N° 05.04.01 CAJAS DE PASO DE F° GALVANIZADO DE 200X200X50mm
DESCRIPCIOND DEL RECURSO Unidad Cuadrilla Cantidad Precio S/. ParcialS/. I.U
MANO DE OBRA 31.504
OPERARIO hh 1 0.8 21.79 17.432
PEON hh 1 0.8 17.59 14.072
MATERIALES 9.126
CONECTOR PVC SEL A CAJA UND 2 0.33 0.656
CAJA DE PASO F°G° DE 200x200x150mm UND 1 8.47 8.470
EQUIPOS Y/O HERRAMIENTAS 0.945
HERRAMIENTAS MANUALES (3% MO) %MO 0.03 31.504 0.945
PARTIDA N° 05.04.02 CURVAS
MATERIALES 1.230
Curva Φ 20 mm PVC - SEL UND 1 0.74 0.738
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
PLANILLA DE METRADOS
04.00.00 INSTALACIONES ELECTRICAS
OBRA : VIVIENDA UNIFAMILIAR - PRIMER NIVEL
TRABAJO : PRIMERA PARTE
Nº Dimensiones
Item Descripción Veces
Parcial Total
Largo Ancho Alto
04.00.00 INSTALACIONES ELECTRICAS
04.01.00 SALIDAS PARA ALUMBRADO, TOMACORRIENTES E INTERRUPTORES
0.4.01.01 SALIDAS
04.01.01.01 SALIDAS PARA ALUMBRADO
0.4.01.01.01.01 SALIDAS PARA ALUMBRADO (TECHO) 25
0.4.01.01.01.02 SALIDAS PARA ALUMBRADO (PARED) 4
04.01.01.02 SALIDAS PARA TOMACORRIENTES
04.01.01.02.01 TOMACORRIENTES DOBLES 46
04.01.01.03 SALIDAS PARA INRERRUPTORES
04.01.01.03.01 INTERRUPTORES SIMPLES "S" (UNIPOLAR) 8
04.01.01.03.02 INTERRUPTORES DOBLES "2S" (UNIPOLAR) 2
04.01.01.03.03 INTERRUPTORES DE COMUTACION SIMPLE "S3"(UNIPOLAR) 14
04.01.01.03.04 INTERRUPTORES DE COMUTACION DOBLE "2S3"(UNIPOLAR) 8
0.4.01.02 SUMINISTRO E INSTALACION DE TUBERIAS
04.01.02.01 TUBERIAS
04.01.02.01.01 Tubería Φ 25 mm PVC - SEL 10.40 - - - 10.4 10.4
04.01.02.01.02 Tubería Φ 20 mm PVC - SAP 10.84 - - - 10.84 10.84
04.01.02.01.03 Tubería Φ 20 mm PVC - SEL 24.89 - - - 24.89 24.89
04.01.02.01.04 Tubería Φ 15 mm PVC - SEL 305.65 - - - 305.65 305.65
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
04.03.00 ARTEFACTOS
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
0.4.03.01 LAMPARAS
0.4.03.01.01 Luminaria BCS460 LED48/840 PS +Lampara Fluorecente 2100 W 5 - - - 5 5
0.4.03.01.02 Luminaria BCS460 LED48/840 PSD + Lampara Fluorecente 3500 W 2 - - - 2 2
0.4.03.01.03 Luminaria BCS640 LED24/840 PSD +Lamapara Fluorecente 1700 W 10 - - - 10 10
0.4.03.01.04 Soquet 9A19/LED/830 DIM 120V + Foco 800 W 10 - - - 10 10
0.4.03.01.05 Luminaria BCS640 LED48/840 PSD + Lampara Fluorecente 4250 W 1 - - - 1 1
0.4.03.01.06 Luminaria TCS649 1x80W/840 HFP + Lampara ALU 1 - - - 1 1
04.04.00 VARIOS
04.04.01 Cajas de Paso Octogonales 7 - - - 7 7
04.04.02 CURVAS
Curva Φ 25 mm PVC - SEL 6 - - - 6 6
Curva Φ 20 mm PVC - SAP 3 - - - 3 3
Curva Φ 20 mm PVC - SEL 18 - - - 18 18
Curva Φ 15 mm PVC - SEL 201 - - - 201 201
PLANILLA DE METRADOS
05.00.00 INSTALACIONES DE COMUNICACIONES
OBRA : VIVIENDA UNIFAMILIAR - PRIMER NIVEL
TRABAJO : PRIMERA PARTE
Nº Dimensiones
Item Descripción Veces
Parcial Total
Largo Ancho Alto
05.00.00 INSTALACIONES DE COMUNICACIONES
05.01.00 CABLES EN TUBERIAS
05.01.01 CABLE XPT O SIMILAR DE 4x22AWG 51.65 - - - 51.65 51.65
05.01.02 CABLE 4 mm2 - TW (Timbre) 18.46 18.46 18.46
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
ANILLA DE METRADOS
0 INSTALACIONES ELECTRICAS
Unid
PTO
PTO
PTO
UND
UND
UND
UND
UND
m
m
m
m
m
m
m
m
m
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
m3
GLB
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
ANILLA DE METRADOS
STALACIONES DE COMUNICACIONES
Unid
m
m
m
INGENIERIA DE COSTOS
UNIVERSIDAD NACIONAL DE CAJAMARCA
ESCUELA ACADEMICO PROFESIONA ING.CIVIL
m
m
UND
UND
UND
UND
UND
UND
UND
INGENIERIA DE COSTOS