Summary:
Project Manager having eight year experience in LSTK as well as Turnkey Project. Presently serving as Deputy
Manager – Projects at DEE DEVELOPMENT ENGINEERS LTD after CASE NEUBERG SOLUTIONS (P) LTD.
Experienced in Planning, execution, monitoring, control and troubleshooting for hindrances in EPC projects.
Conversant in managing various activities with proven abilities in reduced downtime and enhancing resources
efficiencies of the same.
Professional Skills
1. Project Planning, Execution and Monitoring.
2. Erection and Fabrication,
3. Planning Softwares – Microsoft Projects and Primavera
4. Drafting and 3D -Modeling – Auto CAD and CATIA.
5. Microsoft Offices Suite – Word, Excel, VBA, Power Point etc.
Industrial Experience:
Present Company
Project executed
1. Malwa Power Plant – Prefabrication Piping supplies and Erection.
2. MHPS V – Olkaria Geothermal Power plant – Prefabrication Piping
3. Siemens – Modular Piping – Prefabricated Piping and Erection
4. CMI – HRSG Piping
Proficiency forte
Project Planning, Execution and Management
Responsibilities
1. Purchasing
a. Work with Project Manager to ensure good decisions for the company and project during the buyout
process.
b. Assists PM in completing project buyout within specified time limit.
c. Assists in preparation of complete subcontract Scope of Work.
d. Fully reviews drawings & specifications for preparation of subcontractor scope.
2. Documentation
a. Maintains & assists PM with preparation of Weekly Project Update accurately and on time.
b. Maintains and updates Purchasing Schedule.
c. Maintains and updates a complete Submittal Log.
d. Reviews submittals for conformance to contract documents.
e. Identifies lead times for materials purchases and tracks project execution.
f. Maintains and updates Subcontractor Change Order Log.
g. Maintains and updates RFI Log.
h. Generates subcontractor meeting agendas and minutes.
i. Accurate and timely documentation of project issues.
j. Maintains project document list.
3. Subcontractor Management
a. Maintains open communication with subcontractors.
b. Works with PMs and Superintendents to recognize underperforming subcontractors timely with
project notifications.
c. Reviews subcontractor change order proposals for accuracy of quantities, conformance with contract
documents and subcontractor scope of work
4. Project Schedule
a. Distributes overall project schedule monthly (min.).
b. Review project schedule and if necessary take necessary actions to maintain or improve project
schedule
5. Project Closeout
a. Performs pre-punch list walk thru with PM and Superintendent.
b. Review records of scope changes, additional work performed, Change Orders, Cash flow.
c. Makes closing out the project a priority.
d. Enforces contract close-out timeline and notifies subcontractors.
Educational credentials:
B. Tech (Mechanical Engineering), 2010
Institute of Engineering & Technology, Bundelkhand University, Jhansi, 66.01%
XII, 2004
Kendriya Vidyalaya No.1, Kota (CBSE Board), 74.4%
X, 2002
Kendriya Vidyalaya No.1, Kota (CBSE Board), 61.4%
B.Tech. Project
Study of Mechanical Behaviour of Glass Fibre Reinforcement Composites. Result Buckling Strength of triangular
shaped fibre is more than circular as well as rectangular-2009
Presented Paper on “Orientation of Fibre & Buckling Strength of Glass Fibre Reinforcement Composites” in NSS
2010, B.S.A. – Mathura
Presentation on Ferry Car Design Improvements at CASE Annual Conference Chail in 2012.
Professional training
Six weeks training at Pariccha Thermal Power Plant a unit of Uttar Pradesh Vidyut Nigam Limited (UPVCL),
Pariccha in Division of BMD-III (Boilers). Training was confined to “Working of Thermal Power Plant”.
Two weeks training at Diesel Loco Shed, Jhansi encompassing “WDG3 Cylinder Head Design & Overhauling”.
Personal details:
Date of Birth: Mar 29, 1986
PAN Card: CZFPS8218C
Driving License: RJ-20/DLC/2004/103586
Passport No: Z-4269647
Permanent Address: Village- Manikpur, Post- Kanheypur, District- Farrukhabad-209743 (U.P.)
Declaration
I here solemnly declare that all information furnished above is true to the best of my knowledge.
Place: ( )
Date: (Avnesh Kr. Shakya)