NEPAL ELECTRICITY AUTHORITY

(An Undertaking of Government of Nepal)


Project Management Directorate

KATHMANDU VALLEY TRANSMISSION CAPACITY REINFORCEMENT PROJECT

Contract No: PMD/PTDEEP/KTCEP-073/74-01

BILL OF QUANTITIES
Dibysha Balaram Sharma

S.No Description Unit Quantity Rate Total Rate Total

A STONE COLUMN (GRAVEL PILE)


1 Drilling (500mm diameter)
1.1 Phutung (7 m) m 6,507.24 800.00 5,205,795.92 900 5,856,520.41
1.2 Mulpani (15m) m 16,488.50 1,000.00 16,488,500.00 1000 16,488,500.00
2 Gravel Compact
2.1 Phutung (7 m) m3 1,278.00 1,273.89 1,628,025.48 1,273.89 1,628,025.48
2.2 Mulpani (15m) m 3
3,238.00 1,273.89 4,124,840.76 1,273.89 4,124,840.76
3 Gravel Bed
3.1 Phutung (7 m) m3 1,067.00 - -
3.2 Mulpani (15m) m 3
1,440.00 - -
Sum of A 27,447,162.16 28,097,886.65

B RCC PILE WORKS


4 Drilling
4.1 Phutung
a 500mm diameter 7 m depth m 2,135.00 800.00 1,708,000.00 900 1,921,500.00
b 700mm diameter 7 m depth m 1,344.00 1,250.00 1,680,000.00 1500 2,016,000.00
-
4.2 Mulpani -
a 500mm diameter 7 m depth m 5,295.00 800.00 4,236,000.00 1000 5,295,000.00
b 700mm diameter 15 m depth m 2,880.00 1,450.00 4,176,000.00 1500 4,320,000.00
-
5 Concrete -
5.1 Phutung m3 937.00 1,500.00 1,405,500.00 1500 1,405,500.00
5.2 Mulpani m3 2,149.00 1,500.00 3,223,500.00 1500 3,223,500.00
Sum of B 16,429,000.00 18,181,500.00
Total A+B 43,876,162.16 46,279,386.65
alaram Sharma

Difference

650,724.49
-

- 5.0955414
- 0.19625

-
-
650,724.49

213,500.00
336,000.00

1,059,000.00
144,000.00

-
-
1,752,500.00
2,403,224.49
NEPAL ELECTRICITY AUTHORITY
(An Undertaking of Government of Nepal)
Project Management Directorate

KATHMANDU VALLEY TRANSMISSION CAPACITY REINFORCEMENT PROJECT

Contract No: PMD/PTDEEP/KTCEP-073/74-01


RCC Pile Quantity Summary

Number Boring Concrete


S.No Description
L B Length Breadth Total 7 meter Area
1 Control Building 31.50 23.10 16.00 12.00 192.00 1,344.00 0.38
2 Tower 6.30 6.30 4.00 4.00 16.00 112.00 0.20
3 Pump House 12.60 8.40 7.00 5.00 35.00 245.00 0.20
4 Water Tank 16.80 8.40 9.00 5.00 45.00 315.00 0.20
5 Guard House 4.20 4.20 3.00 3.00 9.00 63.00 0.20
6 Boundary wall & Retaining wall 200.00 1,400.00 0.20
Total Number for Phutung Site 497.00 3,479.00
Number Boring Concrete
S.No Description
L B Length Breadth Total 15 meter Area
1 Control Building 31.50 23.10 16.00 12.00 192.00 2,880.00 0.38
Pump House 12.60 8.40 7.00 5.00 35.00 525.00 0.20
2 Water Tank 16.80 8.40 9.00 5.00 45.00 675.00 0.20
3 Guard House 4.20 4.20 3.00 3.00 9.00 135.00 0.20
4 Boundary wall & Retaining wall 200.00 3,000.00 0.20
5 Tower 1 6.30 6.30 4.00 4.00 16.00 240.00 0.20
6 Tower 2 6.30 6.30 4.00 4.00 16.00 240.00 0.20
7 Tower 3 6.30 6.30 4.00 4.00 16.00 240.00 0.20
8 Tower 4 6.30 6.30 4.00 4.00 16.00 240.00 0.20
Total Number for Mulpani Site 545.00 8,175.00
Total Number (P+M) Substation 1,042.00 11,654.00
NT PROJECT

Concrete
Remarks
Volume
e
517.23 f
e
21.99 r
48.11
D
61.85 r
a
12.37 w
i
274.89 n
937.00
Concrete
Remarks
Volume
1,108.35
R
103.08 e
f
132.54 e
r
26.51
589.05 D
r
47.12 a
w
47.12 i
47.12 n
g
47.12
2,149.00
3,086.00
NEPAL ELECTRICITY AUTHORITY
(An Undertaking of Government of Nepal)
Project Management Directorate

KATHMANDU VALLEY TRANSMISSION CAPACITY REINFORCEMENT PROJECT

Contract No: PMD/PTDEEP/KTCEP-073/74-01


Stone Column Quantity Summary

Number Boring Gravel Compact Gravel Bed


S.No Description
L B Length Breadth Total 7 meter Area Volume m3 L B Area
1 Control Building 42.00 33.60 21.00 17.00 357.00 2,499.00 0.20 490.68 43.00 34.60 1,487.80
2 Tower 10.50 10.50 6.00 6.00 36.00 216.00 0.20 42.41 12.50 12.50 156.25
3 Pump House 14.70 18.90 8.00 10.00 80.00 480.00 0.20 94.25 16.70 20.90 349.03
4 Water Tank 23.10 14.70 12.00 8.00 96.00 576.00 0.20 113.10 25.10 16.70 419.17
5 Guard House 8.40 8.40 5.00 5.00 25.00 150.00 0.20 29.45 10.40 10.40 108.16
6 Boundary wall & Retaining wall 400.00 2,400.00 0.20 471.24 1,000.00
7 Power Equipments 3.75 3.75 2.79 2.79 31.04 186.24 0.20 36.57 5.75 5.75 33.06
Total Number for Phutung Site 1,025.04 6,507.24 1,278.00 3,553.47
Number Boring Gravel Compact Gravel Bed
S.No Description
L B Length Breadth Total 15 meter Area Volume m3 L B Area
1 Control Building 42.00 33.60 21.00 17.00 357.00 5,355.00 0.20 1,051.45 44.00 35.60 1,566.40
2 Pump House & Water Tank 37.80 33.60 19.00 17.00 323.00 3,795.25 0.20 745.20 39.80 35.60 1,416.88
3 Guard House 8.40 8.40 5.00 5.00 25.00 293.75 0.20 57.68 10.40 10.40 108.16
4 Boundary wall & Retaining wall 400.00 5,000.00 0.20 981.75 1,000.00
5 Tower 1 10.50 10.50 6.00 6.00 36.00 423.00 0.20 83.06 12.50 12.50 156.25
6 Tower 2 10.50 6.40 6.00 5.00 30.00 352.50 0.20 69.21 12.50 8.40 105.00
7 Tower 3 10.50 10.50 6.00 6.00 36.00 423.00 0.20 83.06 12.50 12.50 156.25
8 Tower 4 10.50 10.50 6.00 6.00 36.00 423.00 0.20 83.06 12.50 12.50 156.25
9 Power Equipments (4 Nos) 3.75 3.75 3.00 3.00 36.00 423.00 0.20 83.06 5.75 5.75 132.25
Total Number for Mulpani Site 1,279.00 16,488.50 3,238.00 4,797.44
Total Number (P+M) Substation 2,304.04 22,995.74 4,516.00 8,350.91
Gravel Bed
Remarks
Volume @ 0.3m3
e
446.34 f
e
46.88 r
104.71
D
125.75 r
a
32.45 w
i
300.00 n
9.92
1,067.00
Gravel Bed
Remarks
Volume @ 0.3m3
469.92
R
425.06 e
f
32.45 e
r
300.00
46.88 D
r
31.50 a
w
46.88 i
46.88 n
g
39.68
1,440.00
2,507.00