b = 100 mm b = 100
d = 130 mm d = 130
fc` = 22.5 Mpa fc` = 22.5
fy = 240 Mpa fy = 240
1 Penulangan sengkang benda uji 1 2 Penulangan sengkang bend
P1 = P/2 ton P2 = qxl ton
P1 = 1.615 ton P2 = 1.059 ton P = 5.625
R1 = 0.5 * P R2 = 0.5 * P R = 0.5
= 0.5 * 1.615 = 0.5 * 1.059 = 0.5
= 0.8075 ton = 0.5295 ton = 2.8125
sehingga sehingga
Vu = 1.337 ton Vu = 2.8125
= 1337 kg = 2812.5
Menghitung Vs pada tempat dukungan balok: maka gaya geser normal yan
Karena Vu > Ø Vc maka perlu tulangan geser Karena Vu > Ø Vc maka perl
Besar gaya geser yang harus diterima baja tulangan : Besar gaya geser yang harus
Vs = Vn - Vc Vs = Vn -
= 2228.333 - 1027.740 = 4687.5
= 1200.593 Kg = 3659.76
Av = (1/4) * π * D² Av = (1/4) *
= (1/4) * π * 0,6² = (1/4) *
= 0.283 cm² = 0.283
Karena 2 sisi Karena 2 sisi
Av = 2 * 0.283 Av = 2 * 0.283
= 0.565714 cm² = 0.566
Av * fy * d S perlu =
S perlu =
Vs
= 0.56571 * 2400 * 13 =
1200.593
= 14.7013 cm =
kontrol : kontrol :
⅓ √fc` * bw * d = ⅓ √(22,5) * 100 * 130 ⅓ √fc` *
= 20554.804791 N
= 2055.4804791 kg
Karena Karena
Vs = 1200.593 kg < ⅓ √fc` * bw * d = 2055.48048 kg Vs = 3659.760
5.625 ton
* P
* 5.625
2.8125 ton
2.8125 ton
2812.5 kg
maka gaya geser normal yang bekerja :
4687.500 kg
* √(fc`) * bw * d
* √(22,5) * 100 * 130
10277.402 N
1027.740 kg
Vc
4687.5 - 1027.74
3659.76 Kg
π * D²
π * 0,6²
cm²
0.283
cm²
Av * fy * d
Vs
0.565714 * 2400 * 13
3659.76
4.822799 cm ~ 5 cm
= 20554.805 N
= 2055.480 kg
6- 50 mm
data :
b = 100 mm
d = 130 mm
fc` = 22.5 Mpa
fy = 240 Mpa
1 Penulangan sengkang benda uji 1
P1 = P/2 P2 = qxl
P1 = 2.50939 Kn P2 = 1.059 Kn
R1 = 0.5 * P R2 = 0.5 * P
= 0.5 * 2.50939 = 0.5 * 1.059
= 1.254695 Kn = 0.5295 Kn
sehingga
Vu = 1.784195 Kn
Vc = (1/6) * √(fc`) * bw * d
= (1/6) * √(22,5) * 100 * 130 * 10^(-3)
= 10.277 Kn
Vc = (1/6) * √(fc`) * bw * d
= (1/6) * √(22,5) * 100 * 130 * 10^(-3)
= 10.277 Kn
Vc = (1/6) * √(fc`) * bw * d
= (1/6) * √(22,5) * 100 * 130 * 10^(-3)
= 10.277 Kn
Kemiringan diagram :
Vu : 1m = Wu 0.353
=
Ø 0.6
= 0.58833
Vs perlu
=
Vu : 1 m
= 0.58
0.5883333
= 0.9846019 m
Karena Vs perlu yang didapatkan hasilnya negatif, untuk penulangan dipakai 1/2 d
1/2 d = 1/2 ( 130 )
= 65.000 mm
= 20.555 Kn
Vc = (1/6) * √(fc`) * bw * d
= (1/6) * √(22,5) * 100 * 130 * 10^(-3)
= 10.277 Kn
Kemiringan diagram :
Vu : 1m = Wu 0.353
=
Ø 0.6
= 0.58833
Vs perlu
=
Vu : 1 m
= 0.69
0.5883333
= 1.174391 m
Karena Vs perlu yang didapatkan hasilnya negatif, untuk penulangan dipakai 1/2 d
1/2 d = 1/2 ( 130 )
= 65.000 mm
= 20.555 Kn
Vc = (1/6) * √(fc`) * bw * d
= (1/6) * √(22,5) * 100 * 130 * 10^(-3)
= 10.277 Kn
Kemiringan diagram :
Vu : 1m = Wu 0.353
=
Ø 0.6
= 0.58833
Vs perlu
=
Vu : 1 m
= 0.84
0.5883333
= 1.435255 m
Karena Vs perlu yang didapatkan hasilnya negatif, untuk penulangan dipakai 1/2 d
1/2 d = 1/2 ( 130 )
= 65.000 mm