SERVICE LOADS

Dead Loads= 480.75 kN


Live Loads= 115.00 kN

PILE CAPACITY/PILE
Working Load= 90.00 kN
Ultimate Load= 180.00 kN

COLUMN DIMENSION
b= 500 mm
h= 600 mm

DESIGN STRENGTH
f''c= 21 MPa
fy = 276 MPa
Step 1 . Determine the no. of piles
a) Column load
P= 595.75 kN

b) Assume weight of footing to be 10% of column load


W= 59.57 kN

c) No. of piles
n= 8 piles

d) ultimate load per pile


Pu= 760.90 kN
R= 95.11 kN ok !

e) Footing dimensions
pile spacing = 900 mm
B= 1800 mm

Step 2. Compute "d" for beam shear.


a) Shear force
Vu= 285.34 kN
d= 0.24 m (controls)

Step 3) Compute "d" for punching shear


a) Shear force
Vu= 760.90 kN
d= 0.21 m

Step 4) Compute the flexural steel


a) Factored moment
Mu= 123.65 kN-m
b) Moment resistance coefficient
Ru= 1.28 MPa
c) Strength ratio
m= 15.46
d) Required steel ratio
ρ= 0.004818
e) Minimum steel ratio
ρmin= 0.005072
f) Steel area
As= 2229 mm²
Ø bars= 16 mm²
Ab= 201 mm²
n= 12 use 12 -16 mm Ø bars bothways
g) Check spacings of bars
s= 133 mm OK ! OK !
Step 5. Solve dowel requirement
a) factored bearing stress
fc = 2.536 MPa
b) bearing capacity
fc = 12.50 MPa OK !
c) minimum dowel requirement
min As= 1500 mm²
n= 8 use 8- 16 mm Ø bars
Step 6. Compute development lengths
a) 20 mm Ø tension bars
Ld/db= 21.68

Ld/db= 28.91

Ld= 462.55 mm
b) 20 mm Ø dowel bars
Ldb= 240.91 mm OK !

use Ldb= 240.91 mm

Step 7. Check weight of footing


a) thickness of footing
t= 344 mm
b) volume of footing=
V= 1.12 cu.m
c) weight of footing
W= 26.21 kN OK
s bothways