EXCAVATION 37.83 CU.M.

column footing
location length width depth volume (cu.m.)
A/1 1.2 1.2 1.4 2.02
A/2 1.2 1.2 1.4 2.02
A/3 1.2 1.2 1.4 2.02
A/4 1.2 1.2 1.4 2.02
B/1 1.2 1.2 1.4 2.02
B/2 1.2 1.2 1.4 2.02
B/3 1.2 1.2 1.4 2.02
B/4 1.2 1.2 1.4 2.02
C/1 1.2 1.2 1.4 2.02
C/2 1.2 1.2 1.4 2.02
C/3 1.2 1.2 1.4 2.02
C/4 1.2 1.2 1.4 2.02
volume (cu.m.) 24.19

WALL FOOTING 1
location length width depth volume (cu.m.)
G.L. A/1-4 9.45 0.4 1.1 4.16
G.L. C/1-4 9.45 0.4 1.1 4.16
G.L.A-C/1 6.05 0.4 1.1 2.66
G.L.A-C/4 6.05 0.4 1.1 2.66
VOLUME (CU.M) 13.64

BACKFILLING & COMPACTION

COLUMN FTG. 5.18


WALL FTG. 3.75
COLUMN 1.08
EMBED WALL 0.68
VOLUME OF
DISPOSAL 10.69

VOL. OF EXC. VOL. OF DISPOSAL VOL. OF BACKFILL


37.83 10.69 27.14
Add'l 30% for compaction 35.28

IMPORTED FILL
length width depth volume (cu.m.)
10.35 6.65 0.4 27.53
Add'l 30% for compaction 35.79

GRAVEL BEDDING 13.26 CU.M. 4.93


COLUMN FOOTING
location length width depth
A/1 1.2 1.2 0.1 0.14
A/2 1.2 1.2 0.1 0.14
A/3 1.2 1.2 0.1 0.14
A/4 1.2 1.2 0.1 0.14
B/1 1.2 1.2 0.1 0.14
B/2 1.2 1.2 0.1 0.14
B/3 1.2 1.2 0.1 0.14
B/4 1.2 1.2 0.1 0.14
C/1 1.2 1.2 0.1 0.14
C/2 1.2 1.2 0.1 0.14
C/3 1.2 1.2 0.1 0.14
C/4 1.2 1.2 0.1 0.14
volume (cu.m.) 1.73

WALL FOOTING 1
location length width depth volume
G.L. A/1-4 10.65 0.4 0.1 0.43
G.L. C/1-4 10.65 0.4 0.1 0.43
G.L.A-C/1 6.95 0.4 0.1 0.28
G.L.A-C/4 6.95 0.4 0.1 0.28
VOLUME (CU.M) 1.41

SOG
length width depth volume
10.65 6.95 0.1 7.40

TIE BEAM
location length width depth volume
G.L. A/1-4 10.65 0.3 0.1 0.32
G.L. C/1-4 10.65 0.3 0.1 0.32
G.L.A-C/1 6.95 0.3 0.1 0.21
G.L.A-C/4 6.95 0.3 0.1 0.21
G.L. B/1-4 10.65 0.3 0.1 0.32
G.L. 2/A-C 6.95 0.3 0.1 0.21
G.L. 3/A-C 6.95 0.3 0.1 0.21
VOLUME (CU.M) 1.79
WALL FOOTING 2
location length width depth volume
interior 23.2 0.4 0.1 0.93
0.93

SOIL POISONING 124.89 SQ.M.


COLUMN FOOTING
location length width area (sq.m.)
A/1 1.2 1.2 1.44
A/2 1.2 1.2 1.44
A/3 1.2 1.2 1.44
A/4 1.2 1.2 1.44
B/1 1.2 1.2 1.44
B/2 1.2 1.2 1.44
B/3 1.2 1.2 1.44
B/4 1.2 1.2 1.44
C/1 1.2 1.2 1.44
C/2 1.2 1.2 1.44
C/3 1.2 1.2 1.44
C/4 1.2 1.2 1.44
17.28

WALL FOOTING 1
location length width area(sq.m.)
G.L. A/1-4 10.35 0.4 4.14
G.L. C/1-4 10.35 0.4 4.14
G.L.A-C/1 6.65 0.4 2.66
G.L.A-C/4 6.65 0.4 2.66
13.6

SOG
length width area (sq.m.
10.65 6.95 74.02
74.02

TIE BEAM
location length width area (sq.m.)
G.L. A/1-4 10.35 0.2 2.07
G.L. C/1-4 10.35 0.2 2.07
G.L.A-C/1 6.65 0.2 1.33
G.L.A-C/4 6.65 0.2 1.33
G.L. B/1-4 10.35 0.2 2.07
G.L. 2/A-C 6.65 0.2 1.33
G.L. 3/A-C 6.65 0.2 1.33
11.53

WALL FOOTING 2
location length width area (sq.m.)
interior 21.15 0.4 8.46
8.46

CONCRETE

column footing
location length width depth
A/1 1.2 1.2 0.3 0.43
A/2 1.2 1.2 0.3 0.43
A/3 1.2 1.2 0.3 0.43
A/4 1.2 1.2 0.3 0.43
B/1 1.2 1.2 0.3 0.43
B/2 1.2 1.2 0.3 0.43
B/3 1.2 1.2 0.3 0.43
B/4 1.2 1.2 0.3 0.43
C/1 1.2 1.2 0.3 0.43
C/2 1.2 1.2 0.3 0.43
C/3 1.2 1.2 0.3 0.43
C/4 1.2 1.2 0.3 0.43
volume (cu.m.) 5.18

WALL FOOTING 1&2 3.75 CU.M.

WALL FOOTING 1
location length width depth volume
G.L. A/1-4 9.45 0.4 0.2 0.76
G.L. C/1-4 9.45 0.4 0.2 0.76
G.L.A-C/1 6.05 0.4 0.2 0.48
G.L.A-C/4 6.05 0.4 0.2 0.48
VOLUME (CU.M) 2.48

TIE BEAM
location length width depth volume
G.L. A/1-4 9.45 0.3 0.20 0.57
G.L. C/1-4 9.45 0.3 0.20 0.57
G.L.A-C/1 6.05 0.3 0.20 0.36
G.L.A-C/4 6.05 0.3 0.20 0.36
G.L. B/1-4 9.45 0.3 0.20 0.57
G.L. 2/A-C 6.05 0.3 0.20 0.36
G.L. 3/A-C 6.05 0.3 0.20 0.36
3.15

SOG
length width depth volume
10.35 6.65 0.10 6.88
7.23

WALL FOOTING 2
location length width depth volume
interior 21.15 0.3 0.2 1.27
1.27

COLUMN
NO. OF COLUMN width length height volume (cu.m.)
12 0.3 0.30 4.40 4.75
4.75

BEAM
location length base height volume
B1
G.L. A-C/4 6.05 0.2 0.4 0.48
G.L. A-C/3 6.05 0.2 0.4 0.48
G.L. A-C/2 6.05 0.2 0.4 0.48
G.L. A-C/1 6.05 0.2 0.4 0.48
G.L. A/1-4 9.45 0.2 0.4 0.76
G.L. B/1-4 9.45 0.2 0.4 0.76
G.L. C/1-4 9.45 0.2 0.4 0.76
IB
ALL 31.95 0.15 0.2 0.96
5.16

ROOF DECK SLAB


desc. length width depth volume
S-2 10.65 6.95 0.1 7.40
S-1 9.85 0.7 0.15 2.07
9.47

REINFORCING STEEL BAR

COLUMN FOOTING
LENGTH (M.) NO.OF RSB NO.OF FTG. DIAMETER UNIT WEIGHT
1.2 12 12 0.016 7850

WALL FTG. 1&2 221.38 KGS.


WALL FTG. 1
(LONGITUDINAL BAR)
LOCATION LENGTH DIAMETER NO. OF BAR UNIT WEIGHT
A-B/4 4.45 0.012 3 7850
B-C/4 2.8 0.012 3 7850
A-B/1 4.45 0.012 3 7850
B-C/1 2.8 0.012 3 7850
A/1-4 10.65 0.012 3 7850
C/1-4 10.65 0.012 3 7850

(TRANSVERSE BAR)
LOCATION LENGTH DIAMETER NO. OF BAR UNIT WEIGHT
A-B/4 0.4 0.01 12 7850
B-C/4 0.4 0.01 7 7850
A-B/1 0.4 0.01 12 7850
B-C/1 0.4 0.01 7 7850
A/1-4 0.4 0.01 27 7850
C/1-4 0.4 0.01 27 7850

WALL FTG. 2
(LONGITUDINAL BAR)
LOCATION LENGTH DIAMETER NO. OF BAR UNIT WEIGHT
21.15 0.012 4 7850

(TRANSVERSE BAR)
LOCATION LENGTH DIAMETER NO. OF BAR UNIT WEIGHT
0.6 0.012 53 7850

COLUMN 678.29 KGS. HEIGHT OF COL.


5.3
MAIN BAR
LOCATION LENGTH OF VERT. BNO. OF VERT. DIAMETER NO. OF COLUMN
4.5 4 0.016 12

LAT. TIES
LOCATION HEIGHT OF COL. LENGTH OF BAR NO. OF LAT. TIES DIAMETER
4.5 1.2 38 0.01

TIE BEAM 515.15 KGS.


MAIN BAR
LOCATION LENGTH OF MAIN BDIAMETER NO. OF MAIN BAR UNIT WEIGHT
G.L. A-B/1 4.45 0.016 4.00 7850
G.L. B-C/1 2.8 0.016 4.00 7850
G.L. A-B/2 4.45 0.016 4.00 7850
G.L. B-C/2 2.8 0.016 4.00 7850
G.L. A-B/3 4.45 0.016 4.00 7850
G.L. B-C/3 2.8 0.016 4.00 7850
G.L. A-B/4 4.45 0.016 4.00 7850
G.L. B-C/4 2.8 0.016 4.00 7850
G.L. A/1-2 2.65 0.016 4.00 7850
G.L. A/2-3 5.2 0.016 4.00 7850
G.L. A/3-4 3.4 0.016 4.00 7850
G.L. B/1-2 2.65 0.016 4.00 7850
G.L. B/2-3 5.2 0.016 4.00 7850
G.L. B/3-4 3.4 0.016 4.00 7850
G.L. C/1-2 2.65 0.016 4.00 7850
G.L. C/2-3 5.2 0.016 4.00 7850
G.L. C/3-4 3.4 0.016 4.00 7850

STIRRUPS
LOCATION LENGTH OF MAIN BLENGTH OF STIRRUPDIAMETER NO. OF STIRRUPS
G.L. A-B/1 4.45 1 0.010 15.00
G.L. B-C/1 2.8 1 0.010 7.00
G.L. A-B/2 4.45 1 0.010 15.00
G.L. B-C/2 2.8 1 0.010 7.00
G.L. A-B/3 4.45 1 0.010 15.00
G.L. B-C/3 2.8 1 0.010 7.00
G.L. A-B/4 4.45 1 0.010 15.00
G.L. B-C/4 2.8 1 0.010 7.00
G.L. A/1-2 2.65 1 0.010 6.00
G.L. A/2-3 5.2 1 0.010 19.00
G.L. A/3-4 3.4 1 0.010 10.00
G.L. B/1-2 2.65 1 0.010 6.00
G.L. B/2-3 5.2 1 0.010 19.00
G.L. B/3-4 3.4 1 0.010 10.00
G.L. C/1-2 2.65 1 0.010 6.00
G.L. C/2-3 5.2 1 0.010 19.00
G.L. C/3-4 3.4 1 0.010 10.00

SOG
ALONG SHORT SPAN
LENGTH NO. OF BARS DIAMETER S.W.
6.95 27 0.01 7850
ALONG LONG SPAN
LENGTH NO. OF BARS DIAMETER S.W.
10.65 18 0.01 7850

BEAMS 913.16 KGS.


INTERMEDIATE BEAM
MAIN BAR
LOCATION LENGTH OF MAIN BDIAMETER NO. OF BAR UNIT WEIGHT
G.L. A'-C'/2' 8.65 0.016 4.00 7850
G.L. A'/1'-2 1.85 0.016 4.00 7850
G.L. A'/2-3 4.9 0.016 4.00 7850
G.L. A'/3-4 3.1 0.016 4.00 7850
G.L. A'-A/2 0.7 0.016 4.00 7850
G.L. A'-A/3 0.7 0.016 4.00 7850
G.L. A'-A/4 0.7 0.016 4.00 7850
G.L. A'/1'-2 1.85 0.016 4.00 7850
G.L. A'/2-3 4.9 0.016 4.00 7850
G.L. A'/3-4 3.1 0.016 4.00 7850
G.L. A'-A/2 0.7 0.016 4.00 7850
G.L. A'-A/3 0.7 0.016 4.00 7850
G.L. A'-A/4 0.7 0.016 4.00 7850

STIRRUPS
LOCATION LENGTH OF BAR DIAMETER NO. OF BAR UNIT WEIGHT
G.L. A'-C'/2' 0.8 0.010 33.00 7850
G.L. A'/1'-2 0.8 0.010 2.00 7850
G.L. A'/2-3 0.8 0.010 17.00 7850
G.L. A'/3-4 0.8 0.010 8.00 7850
G.L. A'-A/2 0.8 0.010 1.00 7850
G.L. A'-A/3 0.8 0.010 1.00 7850
G.L. A'-A/4 0.8 0.010 1.00 7850
G.L. A'/1'-2 0.8 0.010 2.00 7850
G.L. A'/2-3 0.8 0.010 17.00 7850
G.L. A'/3-4 0.8 0.010 8.00 7850
G.L. A'-A/2 0.8 0.010 1.00 7850
G.L. A'-A/3 0.8 0.010 1.00 7850
G.L. A'-A/4 0.8 0.010 1.00 7850

ROOF BEAM
MAIN BAR (TOP & BOTTOM BARS)
NO. OF MAIN BAR
LOCATION SPAN DIAMETER LEFT SUPPORT MID SPAN
G.L. A-B/1 4.45 0.016 3 2
G.L. B-C/1 2.8 0.016 3 2
G.L. A-B/2 4.45 0.016 3 2
G.L. B-C/2 2.8 0.016 3 2
G.L. A-B/3 4.45 0.016 3 2
G.L. B-C/3 2.8 0.016 3 2
G.L. A-B/4 4.45 0.016 3 2
G.L. B-C/4 2.8 0.016 3 2
G.L. A/1-2 2.65 0.016 3 2
G.L. A/2-3 5.2 0.016 3 2
G.L. A/3-4 3.4 0.016 3 2
G.L. B/1-2 2.65 0.016 3 2
G.L. B/2-3 5.2 0.016 3 2
G.L. B/3-4 3.4 0.016 3 2
G.L. C/1-2 2.65 0.016 3 2
G.L. C/2-3 5.2 0.016 3 2
G.L. C/3-4 3.4 0.016 3 2

STIRRUPS

LOCATION SPAN DIAMETER NO. OF BAR LENGTH OF BARS


G.L. A-B/1 4.45 0.010 15 1.4
G.L. B-C/1 2.8 0.010 7 1.4
G.L. A-B/2 4.45 0.010 15 1.4
G.L. B-C/2 2.8 0.010 7 1.4
G.L. A-B/3 4.45 0.010 15 1.4
G.L. B-C/3 2.8 0.010 7 1.4
G.L. A-B/4 4.45 0.010 15 1.4
G.L. B-C/4 2.8 0.010 7 1.4
G.L. A/1-2 2.65 0.010 6 1.4
G.L. A/2-3 5.2 0.010 19 1.4
G.L. A/3-4 3.4 0.010 10 1.4
G.L. B/1-2 2.65 0.010 6 1.4
G.L. B/2-3 5.2 0.010 19 1.4
G.L. B/3-4 3.4 0.010 10 1.4
G.L. C/1-2 2.65 0.010 6 1.4
G.L. C/2-3 5.2 0.010 19 1.4
G.L. C/3-4 3.4 0.010 10 1.4

ROOF DECK SLAB 1137.32 KGS.


S-2
TOP BARS

PERPENDICULAR
LOCATION DIAMETER SPAN SPAN (ALONG) NO. OF BARS
OFFICE
ALONG SHORT 0.012 4.15 3.1 22.00
ALONG LONG 0.012 3.1 4.15 12.00
LOCK-UP
ALONG SHORT 0.012 3.1 2.5 17.00
ALONG LONG 0.012 2.5 3.1 10.00

PANTRY, DRESSNG
RM. & F.E.
ALONG SHORT 0.012 4.15 4.9 22.00
ALONG LONG 0.012 4.9 4.15 18.00
MULTI-PURPOSE
CONFE. RM.
ALONG SHORT 0.012 2.5 4.9 14.00
ALONG LONG 0.012 4.9 2.5 18.00
LOBBY
ALONG SHORT 0.012 1.85 4.15 11.00
ALONG LONG 0.012 4.15 1.85 15.00
PORCH
ALONG SHORT 0.012 1.85 2.5 11.00
ALONG LONG 0.012 2.5 1.85 10.00
BOTTOM BARS
SPAN LENGTH OF BAR NO. OF BARS DIAMETER

ALONG SHORT SPAN 10.35 6.65 36.00 0.012

ALONG LONG SPAN 6.65 10.35 24.00 0.012

S-1
TOP BARS

LOCATION DIAMETER PERPENDICULAR SPAN (ALONG) NO. OF BARS


OFFICE
ALONG SHORT 0.012 0.7 3.1 5.00
ALONG LONG 0.012 3.1 0.7 17.00
LOCK-UP
ALONG SHORT 0.012 0.7 3.1 5.00
ALONG LONG 0.012 3.1 0.7 17.00

PANTRY, DRESSNG
RM. & F.E.
ALONG SHORT 0.012 0.7 4.9 5.00
ALONG LONG 0.012 4.9 0.7 26.00
MULTI-PURPOSE
CONFE. RM.
ALONG SHORT 0.012 0.7 4.9 5.00
ALONG LONG 0.012 4.9 0.7 26.00
LOBBY
ALONG SHORT 0.012 0.7 1.85 5.00
ALONG LONG 0.012 1.85 0.7 11.00
PORCH
ALONG SHORT 0.012 0.7 1.85 5.00
ALONG LONG 0.012 1.85 0.7 11.00

BOTTOM BARS
SPAN LENGTH OF BAR NO. OF BARS DIAMETER

ALONG SHORT SPAN 10.35 1.4 70.00 0.012

ALONG LONG SPAN 1.40 10.35 11.00 0.012

MASONRY 107.14

6" CHB WALL (BELOW NGL)


location LENGTH HEIGHT AREA
G.L. A/1-4 9.45 1 9.45
G.L. C/1-4 9.45 1 9.45
G.L.A-C/1 6.05 1 6.05
G.L.A-C/4 6.05 1 6.05
31

6" CHB WALL (ABOVE NGL)


location LENGTH HEIGHT AREA OF WALL AREA OF OPENING
G.L. A/1-4 9.45 3.2 30.24 4.44
G.L. C/1-4 9.45 3.2 30.24 8.07
G.L.A-C/1 6.05 3.2 19.36 7.2
G.L.A-C/4 6.05 3.2 19.36 3.35

PLUMBING

SANITARY SEWER
LINE
100mm dia PVC Pipes 10.35
75mm dia PVC Pipes
50mm dia PVC Pipes
25mm dia PVC Pipes 14

Water Line
20mm dia PVC Pipes 20

CONCRETE
TIE BEAM
LENGTH WIDTH AREA (SQ.M.) VOLUME (CU.M.)
35.8 0.3 0.30 3.22

TIE BEAM #REF! KG.


STIRRUPS
LOCATION LENGTH NO. OF BAR DIAMETER
A-B/4 4.45 4 0.016
B-C/4 2.8 4 0.016
A-B/1 4.45 4 0.016
B-C/1 2.8 4 0.016
A/1-2 2.65 4 0.016
A/2-3 5.2 4 0.016
A/3-4 3.4 4 0.016
C/1-2 2.65 4 0.016
C/2-3 5.2 4 0.016
C/3-4 3.4 4 0.016

STIRRUPS
LOCATION LENGTH LENGTH OF STIRRUPNO. OFSTIRRUPS
A-B/4 4.45 1.4 33
B-C/4 2.8 1.4 25
A-B/1 4.45 1.4 33
B-C/1 2.8 1.4 25
A/1-2 2.65 1.4 24
A/2-3 5.2 1.4 37
A/3-4 3.4 1.4 28
C/1-2 2.65 1.4 24
C/2-3 5.2 1.4 37
C/3-4 3.4 1.4 28

JUNE 1-8, 2018

IMPORTED FILL
LOCATION LENGTH WIDTH
OFFICE 3.1 2.7
LOCK-UP 3.95 3.1
PANTRY 4.15 0.85
DRESSING RM. 4.15 1.5
NEAR E. EXIT 4.15 0.96
LOBBY 4.15 3.39
TOILET 2.5 1.2
CONFE. RM. 3.7 2.5
PORCH 2.5 2.35

* NAG BIGAY MUNA AKO NG 80% , PAPALITAN YUNG DIMENSI


GRAVEL BEDDING
3.0 CU.M.

BACKFILLING
23.61 CU.M.
SOIL POISONING
COLUMN FOOTING
LENGTH WIDTH NO. OF FTG.
1.2 1.2 12

WALL FOOTING 1
LENGTH WIDTH AREA (SQ.M.)
35.8 0.4 14.32

WALL FOOTING 2
LENGTH WIDTH (2) AREA (SQ.M.)
12.4 0.2 2.48

TIE BEAM
LENGTH WIDTH AREA (SQ.M.)
35.8 0.3 10.74

SLAB
LOCATION LENGTH WIDTH
OFFICE 3.1 2.7
LOCK-UP 3.95 3.1
PANTRY 4.15 0.85
DRESSING RM. 4.15 1.5
NEAR E. EXIT 4.15 0.96
LOBBY 4.15 3.39
TOILET 2.5 1.2
CONFE. RM. 3.7 2.5
PORCH 2.5 2.35

TOTAL AREA

CONCRETE
*BELOW FLOOR SLAB
COLUMN
location length width HEIGHT
A/1 0.3 0.3 1
A/2 0.3 0.3 1
A/3 0.3 0.3 1
A/4 0.3 0.3 1
B/1 0.3 0.3 1
B/2 0.3 0.3 1
B/3 0.3 0.3 1
B/4 0.3 0.3 1
C/1 0.3 0.3 1
C/2 0.3 0.3 1
C/3 0.3 0.3 1
C/4 0.3 0.3 1
RES.2
WEIGHT (KG.)
272.74
272.74

WEIGHT (KG.)
11.85
7.46
11.85
7.46
28.37
28.37
95.35

WEIGHT (KG.)
2.96
1.73
2.96
1.73
6.66
6.66
22.69

WEIGHT (KG.)
75.11
75.11

WEIGHT (KG.)
28.23
28.23

DEV. LENGTH
1049.8

UNIT WEIGHT WEIGHT (KGS.)


7850 340.92

NO. OF COLUMN UNIT WEIGHT WEIGHT (KGS.)


12 7850 337.37

WEIGHT (KGS.)
28.09
17.68
28.09
17.68
28.09
17.68
28.09
17.68
16.73
32.83
21.47
16.73
32.83
21.47
16.73
32.83
21.47
396.16

UNIT WEIGHT WEIGHT (KGS.)


7850 9.25
7850 4.32
7850 9.25
7850 4.32
7850 9.25
7850 4.32
7850 9.25
7850 4.32
7850 3.70
7850 11.71
7850 6.17
7850 3.70
7850 11.71
7850 6.17
7850 3.70
7850 11.71
7850 6.17
118.99

WEIGHT (KGS.)
115.69

WEIGHT (KGS.)
118.19
233.88

WEIGHT (KGS.)
54.61
11.68
30.94
19.57
4.42
4.42
4.42
11.68
30.94
19.57
4.42
4.42
4.42
205.50

WEIGHT (KGS.)
16.28
0.99
8.38
3.95
0.49
0.49
0.49
0.99
8.38
3.95
0.49
0.49
0.49
45.87

MAIN BAR
RIGHT SUPPORT LENGTH OF BARS SPECIFIC WEIGHT WEIGHT
3 22.25 7850 35.12
3 14 7850 22.10
3 22.25 7850 35.12
3 14 7850 22.10
3 22.25 7850 35.12
3 14 7850 22.10
3 22.25 7850 35.12
3 14 7850 22.10
3 13.25 7850 20.91
3 26 7850 41.04
3 17 7850 26.83
3 13.25 7850 20.91
3 26 7850 41.04
3 17 7850 26.83
3 13.25 7850 20.91
3 26 7850 41.04
3 17 7850 26.83
495.20

SPECIFIC WEIGHT WEIGHT


7850 12.95
7850 6.04
7850 12.95
7850 6.04
7850 12.95
7850 6.04
7850 12.95
7850 6.04
7850 5.18
7850 16.40
7850 8.63
7850 5.18
7850 16.40
7850 8.63
7850 5.18
7850 16.40
7850 8.63
166.59

LENGTH OF BARS SET/S S.W. WEIGHT

1.08 2 7850 41.99


1.34 2 7851 28.50

0.93 2 7850 27.92


1.08 2 7851 19.09

1.53 2 7850 59.57


1.34 2 7851 42.75

1.53 2 7850 37.91


0.93 2 7851 29.57

1.34 2 7850 26.12


0.76 2 7851 20.31

0.93 2 7850 18.07


0.76 2 7851 13.54
365.36
S.W. WEIGHT

7850 212.54

7850 220.53
433.08

LENGTH OF BARS SET/S S.W. WEIGHT

1.08 2 7850 9.54


0.48 2 7851 14.34

1.08 2 7850 9.54


0.48 2 7851 14.34

1.53 2 7850 13.54


0.48 2 7851 21.93

1.53 2 7850 13.54


0.48 2 7851 21.93

0.76 2 7850 6.77


0.48 2 7851 9.28

0.76 2 7850 6.77


0.48 2 7851 9.28
150.81

S.W. WEIGHT

7850 87.01

7850 101.08
188.08
W1 7.2
W2 3.15
W3 1.05
TOTAL AREA W4 0.2
25.80 W3,W3,D3,W4,W4 W5 0.2
22.17 W2,W4,W5,W5,D1 D1 4.32
12.16 W1 D3 1.935
16.01 W2,W5
76.14
80% , PAPALITAN YUNG DIMENSION
NATIONA
Northern and Cent
ABSTRACT OF P
Period Covered

Project : CONSTRUCTION OF ONE (1) UNIT COMMUNITY POLICE ACTION CENTER


Location : Balagtas Heights Resettlement Project, Brgy. Santol, Balagtas, Bulacan
Contractor : CSE Builders

ITEM

I.
A

II.
A

D
E

III.

A
1
2
3
4
5
6
7
B
1
2
3
4
5
6
7

IV.

A
B
V.

A
1
2
3
B
1
C
D
1
2
3
4
5
6
7
E
1
2
3
4
5
F
1
2
G

VI.

A
1
2
3
4
B
1
C
D
E
1
2
3
4
5
6
7
8

VII.

A
B
C
D
E
NATIONAL HOU
Northern and Central Luzo
ABSTRACT OF PHYSIC
Period Covered : Ma

Project : CONSTRUCTION OF ONE (1) UNIT COMMUNITY POLICE ACTION CENTER


Location : Balagtas Heights Resettlement Project, Brgy. Santol, Balagtas, Bulacan
Contractor : CSE Builders

DESCRIPTION

GENERAL REQUIREMENTS
Mobilization and Demobilization
Provision of transporting equipment and manpower from contractor's
depot to the project site and vice versa.
TEMFACIL (Including electrical and water consumption)
Supply materials and labor for the erection and dismantling of plant/
backyard and NHA field office, installation of power and water
system.
Personal Protective Equipment (NHA staff, workers & contractor)
Supply all materials for personal and protective equipment for safety
and health of personnel.
Permits & Licenses
Provisional sum for the application of building permits and other
licenses necessary for the construction of the building.
Sub-Total - General Requirements
GENERAL EARTHWORKS
Clearing and Grubbing
Supply all labor, equipment and tools in the clearing of the
site, cleared of rubbish, roots and other perishable and
objectionable matters to suitable subgrade.
Excavation
Supply all labor, equipment and tools needed for the excavation of
of footings, wall footings and tie beams to the specified lines and grades
as specified/shown in plans.
Gravel Bedding (Supply, Place and Compact)
Supply all materials, labor, tools, and equipment needed for
the spreading and compaction of gravel filling materials to the
specified lines and grades as shown in plans.
Backfill and Compact Trenches with Excavated Materials
Supply all labor, equipment and tools needed for the
backfilling and compaction of selected excavated materials
to lines and grades prior to placement of gravel bedding and
concrete pouring.
Imported Earthfill
Supply all materials, labor, tools and equipment needed for
the spreading and compaction of filling materials to the specified location
all in accordance to the specified lines and grades shown in plans.
Soil Poisoning
Supply all materials, labor and tools needed for the soil poisoning of
foundation.
Sub-Total - General Earthworks
CONCRETE WORKS
Supply all materials, labor, equipment and tools needed for
the placing of ready mix concrete on slab on fill, footing, wall
footings, tie beams, beams, column, roof deck, reinforcing bars, tie wires, spacers,
formworks and other incidentals necessary as specified/shown in plans.
Concreting Including Formworks
Column Footing
Wall Footing
Tie Beam
Slab on Fill
Columns
Beams
Suspended Slab/Roof Deck

Reinforcing Steel Bar


Column Footing
Wall Footing
Tie Beam
Slab on Fill
Columns
Beams
Suspended Slab/Roof Deck
Sub-Total - Concrete Works
MASONRY WORKS
Supply all materials, labor, equipment and tools needed for CHB masonry
walls, reinforcing bars, tie wires, mortars, batter board, scaffolding,
and other incidentals necessary as specified/shown in plans.
4" CHB Wall incl. Plastering
6" CHB Wall incl. Plastering
Sub-Total- Masonry Works
ARCHITECTURAL FINISHES
Supply all materials, labor, equipment and tools needed for the
fabrication and installation of tiles, ceiling, doors and windows, painting finish,
waterproofing and other incidentals necessary as specified/shown in plans.
Tiling Works
20cmx20cm Ceramic Unglazed Tiles
20cmx20cm Ceramic Glazed Tiles
60cmx60cm Vinyl Tiles
Ceiling Finishes
MR Gypsum Board on light metal framing
Floor Topping 25mm
Doors
2.1 x 0.9 Single Swing Aluminum Powder Coated Door W/ 1/4" Thk. Tinted Glass
2.1 x 0.8 Hollow Core Flush Door W/ 2"X5" Wood Door Jamb Painted Finish
2.1 x 0.8 Single Swing Door W/ Sched. 40 Steel Sheets W/ 2"X5" Steel Jamb
2.1 x 0.7 Hollow Core Flush Door W/ 2"X5" Wood Door Jamb Painted Finish
2.1 X 0.7 PVC Door With Louvers
2.1 x 0.7 Steel Door W/ Round Bar and Lockset
0.7 x 0.7 Steel Roofdeck Hatch W/ Lockset
Windows
2.4 x 3.0 Frameless Glass Window W/ Top & Bottom Aluminum Powder Coated Glass Holder W/ 1/4" Thk.
1.5 X 2.1 Sliding Window Aluminum Powder Coated On 1/4" Thk. Tinted Glass W/ Fixed Transom
1.5 X 0.7 Sliding Window Aluminum Powder Coated On 1/4" Thk. Tinted Glass W/ Fixed Transom
0.4 X 0.5 Sliding Window Aluminum Powder Coated On 1/4" Thk. Tinted Glass
0.4 X 0.5 Steel Fixed Window 2cm Ø Round Bar W/ 7cm Ø Spacing O.C.
Painting
Interior and Exterior
Ceiling
Waterproofing
Sub-Total- Architectural Works
PLUMBING WORKS
Supply all materials, labor, equipment and tools needed for the installation
of sewer line, water line, catch basin, septic tank (conventional), plumbing fixtures
and other incidentals necessary as specified/shown in plans.
Sanitary Sewer Line
100mm dia PVC Pipes
75mm dia PVC Pipes
50mm dia PVC Pipes
25mm dia PVC Pipes
Water Line
20mm dia PVC Pipes
Catch Basin
Septic Tank (Conventional)
Fixtures
Water Closet (Elongated) inc. Fittings
Lavatory including Fittings
Faucet
Floor Drain
Soap Holder
Tissue Holder
Kitchen Sink
Grease Trap
Sub-Total - Plumbing Works
ELECTRICAL WORKS
Supply all materials, labor, equipment and tools needed for the installation
of electrical roughing-in, wires and cables, wiring devices and lighting fixtures,
panel board, CB, nema enclosure, miscellaneous items and other incidentals
necessary as specified/shown in plans.
Roughing-in
Wires and Cables
Wiring Devices and Lighting Fixtures
Panel Board, CB, Nema Enclosure
Miscellaneous Items
Sub-Total - Electrical Works
GRAND TOTAL
NATIONAL HOUSING AUTHORITY
Northern and Central Luzon Area Management Office
ABSTRACT OF PHYSICAL ACCOMPLISHMENT
Period Covered : May 12, 2018 - June 30, 2018

Contract Duration :
Contract Cost :

PHYSICAL ACCOMPLISHMENT
CONTRACT
UNIT QTY. UNIT COST TO DATE PREVIOUS
COST
QTY. COST QTY.

lot 1.00 104,230.61 104,230.61 0.70 72,961.43

lot 1.00 79,275.00 79,275.00 - -

lot 1.00 29,956.00 29,956.00 - -

p.s. 1.00 15,000.00 15,000.00 - -

228,461.61 72,961.43

sq.m. 81.38 378.00 30,761.64 81.38 30,761.64

cu.m. 34.86 882.00 30,746.52 33.25 29,326.50

cu.m. 14.25 2,856.00 40,698.00 13.07 37,327.92

cu.m. 33.12 946.00 31,331.52 32.12 30,385.52


cu.m. 10.42 1,722.00 17,943.24 10.21 17,581.62

sq.m. 217.88 392.00 85,408.96 113.25 44,394.00

236,889.88 189,777.200

cu.m. 5.18 8,620.00 44,651.60 5.08 43,789.60


cu.m. 4.27 8,689.00 37,102.03 4.18 36,359.99
cu.m. 3.15 8,780.00 27,657.00 3.00 26,340.00
cu.m. 6.95 8,468.00 58,852.60 6.80 57,582.40
cu.m. 4.75 8,845.00 42,013.75 - -
cu.m. 5.33 8,489.00 45,246.37 - -
cu.m. 13.55 8,778.00 118,941.90 - -

kg. 320.8 84.00 26,947.20 - -


kg. 225.04 87.00 19,578.48 - -
kg. 496.24 83.00 41,187.92 - -
kg. 239.61 88.00 21,085.68 - -
kg. 597.52 85.00 50,789.20 - -
kg. 1001.5 84.00 84,126.00 - -
kg. 1125.27 83.00 93,397.41 - -
711,577.14 164,071.99

sq.m. 73.32 971.00 71,193.72 - -


sq.m. 142.02 981.00 139,321.62 - -
210,515.34 -
sq.m. 2.59 886.00 2,294.74 - -
sq.m. 14.16 796.00 11,271.36 - -
sq.m. 57.17 143.00 8,175.31 - -

sq.m. 3 2,079.00 6,237.00 - -


sq.m. 134.33 203 27,268.99 - -

set 1 7275 7,275.00 - -


set 2 6572 13,144.00 - -
set 1 8345 8,345.00 - -
set 1 7275 7,275.00 - -
set 2 3869 7,738.00 - -
set 2 5989 11,978.00 - -
set 1 5510 5,510.00 - -

set 1 6740 6,740.00 - -


set 2 5989 11,978.00 - -
set 2 5601 11,202.00 - -
set 3 4544 13,632.00 - -
set 3 84 252.00 - -

sq.m. 413.97 199 82,380.03 - -


sq.m. 70.28 328 23,051.84 - -
sq.m. 65.5 382 25,021.00 - -
290,769.27 -

l.m. 55.3 382 21,124.60 5.53 2,112.46


l.m. 59 338 19,942.00 - -
l.m. 22 320 7,040.00 2.20 704.00
l.m. 13.75 287 3,946.25 - -

l.m. 13.75 191 2,626.25 1.35 257.85


set 9 3,578.00 32,202.00 - -
unit 1 19,364.00 19,364.00 - -

set 3.22 4,192.00 13,498.24 - -


set 1 4,440.00 4,440.00 - -
set 3 450 1,350.00 - -
set 12 105 1,260.00 - -
set 3 199 597.00 - -
set 3 495 1,485.00 - -
set 1 1,365.00 1,365.00 - -
set 1 937 937.00 - -
131,177.34 3,074.31

lot 1 6,740.00 6,740.00 0.20 1,348.00


lot 1 8,880.00 8,880.00 - -
lot 1 8,880.00 8,880.00 - -
lot 1 4,975.00 4,975.00 - -
lot 1 7,336.00 7,336.00 - -
36,811.00 1,348.00
1,846,201.583 431,232.930
150 Calendar Days
Php1,846,201.583

SICAL ACCOMPLISHMENT PERCENT OF


PREVIOUS THIS PERIOD ACCOMPLISHMENT
COST QTY. COST TO DATE PREVIOUS THIS PERIOD

- 0.70 72,961.43 70.00% 0.00% 70.00%

- - - 0.00% 0.00% 0.00%


-
-
-
- - 0.00% 0.00% 0.00%
-
-
- - 0.00% 0.00% 0.00%
-
-
- 72,961.43
-
- 81.38 30,761.64 100.00% 0.00% 100.00%
-
-
-
- 33.25 29,326.50 95.38% 0.00% 95.38%
-
-
-
- 13.07 37,327.92 91.72% 0.00% 91.72%
-
-
-
- 32.12 30,385.52 96.98% 0.00% 96.98%
-
-
-
-
- 10.21 17,581.62 97.98% 0.00% 97.98%

- 113.25 44,394.00 51.98% 0.00% 51.98%

- 189,777.200

- 5.08 43,789.60 98.07% 0.00% 98.07%


- 4.18 36,359.99 98.00% 0.00% 98.00%
- 3.00 26,340.00 95.24% 0.00% 95.24%
- 6.80 57,582.40 97.84% 0.00% 97.84%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
-
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- 164,071.99

- - 0.00% 0.00% 0.00%


- - 0.00% 0.00% 0.00%
- -
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
-
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
-
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
-
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
-
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- -

- 5.53 2,112.46 10.00% 0.00% 10.00%


- - 0.00% 0.00% 0.00%
- 2.20 704.00 10.00% 0.00% 10.00%
- - 0.00% 0.00% 0.00%
-
- 1.35 257.85 9.82% 0.00% 9.82%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
-
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- 3,074.31

- 0.20 1,348.00 20.00% 0.00% 20.00%


- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- - 0.00% 0.00% 0.00%
- 1,348.00
- 431,232.930 23.36% 0.01% 23.35%