Anda di halaman 1dari 171

DESIGN OF PILE FOUNDATION

FOR
BR #01
(Box Portion)
INDEX

Sl No. Description
1 Load Calculation for STAAD.Pro Analysis
2 Frame Analysis Report
3 Base Design Output Report
4 Ground Beam Loading
5 Beam Analysis Report
6 Beam Design Output Report
7 Pile Capacity Calculation
8 RCC Design of Pile
Design of Quadruple Cell Box Culvert :

For the purpose of design one metre length of box culvert is considered.
1. Data :
Clear Span = 5.00 m
Height of Cell = 5.50 m
No. of Cell = 4
3
Unit weight of Soil, g = 17.80 kN/m (113 lb/ft3)
3
Unit weight of Concrete = 23.00 kN/m (146 lb/ft3)
Angle of internal friction, ɸ = 25 deg.
Coefficient of Earth Pressure at rest, Ko = 1 - Sinɸ = 0.577
Coefficient of active Earth Pressure (Static), Ka = (1 - Sinɸ) / (1 + Sinɸ) = 0.406
Coefficient of active Earth Pressure (Dynamic), Ka = 0.108
Width of Surcharge load distribution at F.L (25t) B = 3.00 m (IRS 5.8.1)
Length of failure wedge = 0.577 * 6.375 = 3.68 m
DL Surcharge per unit length, V V = 12.544 kN/m
LL Surcharge per unit length, (Slip no. 28 - 32.5t) S = 159.9 kN/m ( 16300 Kg/m) (IRS 5.8.1)
Axle load of Train (Loco) = 318.83 kN ( 32.5 t)
Coefficient of Dynamic Augment (CDA) = 0.15 + 8 / (6 + L) = 0.84
if the depth of fill < 900mm, i.e.depth of fill = 0.50 m = [2 - (d/0.9)]*½*CDA
= 0.61 (IRS 2.4.2.1),Bridge Rules
Width of Load dispersion Ld = 2 (¼ * 5.55 + ½ * 0.65) + 2.75
= 6.175 m (IRS 2.3.4.2),Bridge Rules
Design Axle load of Train (Loco/Wagon)/m width = 95.158 kN
Standard width of Box for Single Truck (RDSO), = 38.76 m
Length of Abutment / Side wall L = 38.76 m
2. Design Criteria :
Strength of Concrete, fc' = 35.00 MPa(N/mm2) ( 5073 psi)
(Minimum 28 day Cube Compressive Strength of Concrete)
Strength of Concrete, fc' = 30.00 MPa(N/mm2) ( 4348 psi)
(Minimum 28 days Cylinder Crushing Strength of Concrete)
Permissible Stress, fc = 0.85f'c = 0.85*30 = 25.50 MPa(N/mm2)
= 0.40f'c = 0.4*30 = 12.00 MPa(N/mm2)
Modulus of rupture, fcra = 0.623√f'c = 0.623 * √30 = 3.412 MPa(N/mm2)
Permissible,
Concrete in tension, ft = 0.21*fcra = 0.21 * 3.412 = 0.717 MPa(N/mm2)
Concrete in shear, fcv = 0.079√f'c = 0.079 * √30 = 0.433 MPa(N/mm2)
Modulus of Elasticity of Concrete,
Ec = 0.428W 1.5√f'c = 0.428 * 23^1.5 * √30
= 25858 MPa(N/mm2)
Modulus of Elasticity Ec = 31 kN/mm 2 (Cl. 5.2.2.1 of IRS Concrete Bridge Code-1977)
= 31000 MPa(N/mm2)
Yield strength of Steel, fy = 413.7 MPa(N/mm2) (60000 psi)
Permissible Stress, 0.40fy = 0.4*413.7 = 165.48 MPa(N/mm2)
Modulus of Elasticity of Steel, Es (Cl. 4.6.2.1 of IRS Concrete bridge Code)
2
Es = 200000 MPa(N/mm )
Coefficient of thermal expansion & contraction CL 2.6.2 of Bridge Rules
a = 0.0000117 per deg Celcius

0.85 β1fc'  599.843





Balanced reinf. ratio, Pb = = 0.03101
fy  599.843  f 
 y 
Maxm. ratio of reinf. P max = 0.75 * P b = 0.75 * 0.03101 = 0.0232575
Modular Ratio n = Es/Ec = 8
r = fs/fc = 13.79
K = n/(n+r) = 0.367
j = 1-k/3 = 0.878
R = 0.5*fc*j*k = 1.933 MPa(N/mm2)
3. Details of Box Culvert and Rails :
Weight of Rail = 0.589 kN/m ( 60.00 kg/m)
3
Unit Weight of Ballast = 18.80 kN/m
Thickness of Ballast = 400 mm CL 2.2.2 of Bridge Rules
Height of Earth Fill = 500 mm
Length of Sleeper = 2750 mm
Width of Sleeper = 220 mm
Thickness of Sleeper = 250 mm
Spacing of Sleeper = 600 mm c/c
Ht. of Ballast / Earth retainer = 1000 mm
Avg. width of B/Earth retainer = 350 mm
No. of Sleeper on approch = 49 nos.
No. of Sleeper on top slab = 266 nos.

Rail, Sleeper,Earth Fill and Ballast load = 15328.70 kN


Paraphats load on top of the Slab = 357.42 kN
Total = 15686.12 kN
Uniformly distributed load / m = 18.23 kN/m
Weight of wearing coat = 1.84 kN/m
Total Super Imposed Dead Load = 20.07 kN/m
Assume top slab thickness = 550 mm
Assume bottom slab thickness= 1200 mm
Assume side wall thickness = 550 mm
= 550 mm
Assume partition wall thickness
The effective Span = 5*4+0.55*3+0.55 = 22.200 m
The effective Height = 5.5+0.55/2+1.2/2 = 6.375 m
Length Width deference = L-B = 35.76 m ≥ h = 6.375 m

5.55 m 5.55 m 5.55 m 5.55 m

A B 550 mm C D E

450 mm
5500 mm
550 mm

550 mm

5000 mm

450 mm

J I 1200 mm H G F
4. Design Consideration for STAAD.Pro Analysis :
EUDL for Moment = 911.47 Kn
EUDL for Shear = 1087.47 Kn
Coefficent of Dynamic Augment (CDA) = 0.609
Design EUDL for Moment = 42.8 Kn/m
Design EUDL for Shear = 51.1 Kn/m

Computation of Earth Pressure Coefficient due to Seismic Effect :

αh = β.I.α0
α0 = Basic horizontal coefficient = 0.08
A coefficient depending upon the importance of structure, I (Cl. 2.12.4.4 Bridge Rules)
= 1.5
A coefficient depending upon the Soil-Foundation system (Type II), β (Table. Cl 2.12.4.3 Bridge Rules))
= 1.2
αh = β.I.α0 = 0.144
W = Unit of of soil = 17.80 kN/m3
Vertical seismic coefficient =αv =αh/2 = 0.072
ϕ = angle of internal friction of soil = 25 degree = 0.436 radian
δ = ⅓ϕ (for concrete structure) = 8.3333 degree = 0.145 radian (IRS 5.7.1)
⅔ϕ (for mansonry structure)
i = Slopes of earthfill = 0
α = Angle which earth face of the wall makes = 0
with the vertical
αh/(1±αv) considering negative sign = 0.1343
λ = tan-1 αh/(1±αv) = 7.649 degree
= 0.1335002 radian
For Active earth pressure
(1+αv) = 1.072
(1- αv) = 0.928

cos2(ϕ - α - λ) = 0.9113
cosλ * cos2α * cos(δ + α + λ) = 0.9529
sin(ϕ + δ) * sin(ϕ - i - λ) = 0.1635
cos(α - i)cos(δ + α + λ ) = 0.9615
sin(    ) * sin(   i   ) 1 2 2
[1  ( ) ] = 1.99
cos( a  i ) * cos(   a   )

(1av ) *cos2 ( a  ) sin(   ) *sin(  i  ) 12 2


Ca = *1/[1 ( ) ] = 0.514
cos *cos2 a *cos(  a  ) cos(a  i) *cos( a  )
Coefficient of active Earth Pressure (Static), Ka = (1 - Sinɸ) / (1 + Sinɸ) = 0.406
Coefficient of active Earth Pressure (Dynamic), Ka = 0.108

51.1 Kn/m

42.8 Kn/m

33.16673 Kn/m 20.07 Kn/m

10.61 Kn/m² 65.48 12.26


Kn/m² Kn/m²
LL
Static EP Dynamic EP
Surcharge
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 1
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Job Information
Engineer Checked Approved

Name:
Date: 11-Jun-19

Project ID
Project Name

Structure Type PLANE FRAME

Number of Nodes 50 Highest Node 50


Number of Elements 53 Highest Beam 53

Number of Basic Load Cases 7


Number of Combination Load Cases 12

Included in this printout are data for:


All The Whole Structure

Included in this printout are results for load cases:


Type L/C Name

Primary 1 DL
Primary 2 SIDL
Primary 3 EP
Primary 4 LL (MOMENT)
Primary 5 LL (SHEAR)
Primary 6 SURCH (ONE SIDE)
Primary 7 SURCH (OTHER SIDE)
Combination 8 COMB. 01: DL+SIDL+EP+SURCH+LL(MO
Combination 9 COMB. 02: DL+SIDL+EP+SURCH+LL(SHE
Combination 10 COMB. 03: DL+SIDL+EP+SURCH-ULS
Combination 11 COMB. 04: DL+SIDL+EP+SURCH (ONE S
Combination 12 COMB. 05: DL+SIDL+EP+SURCH (ONE S
Combination 13 COMB. 06: DL+SIDL+EP+SURCH (ONE S
Combination 14 COMB. 07: DL+SIDL+EP+SURCH+LL(MO
Combination 15 COMB. 08: DL+SIDL+EP+SURCH+LL(SHE
Combination 16 COMB. 09: DL+SIDL+EP+SURCH-SLS
Combination 17 COMB. 10: DL+SIDL+EP+SURCH (ONE S
Combination 18 COMB. 11: DL+SIDL+EP+SURCH (ONE S
Combination 19 COMB. 12: DL+SIDL+EP+SURCH (ONE S

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 1 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 2
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Nodes
Node X Y Z
(m) (m) (m)
1 0.000 0.000 0.000
2 1.200 0.000 0.000
3 6.750 0.000 0.000
4 12.300 0.000 0.000
5 17.850 0.000 0.000
6 23.400 0.000 0.000
7 24.600 0.000 0.000
8 1.200 5.975 0.000
9 6.750 5.975 0.000
10 12.300 5.975 0.000
11 17.850 5.975 0.000
12 23.400 5.975 0.000
13 1.755 0.000 0.000
14 2.310 0.000 0.000
15 2.865 0.000 0.000
16 3.420 0.000 0.000
17 3.975 0.000 0.000
18 4.530 0.000 0.000
19 5.085 0.000 0.000
20 5.640 0.000 0.000
21 6.195 0.000 0.000
22 7.305 0.000 0.000
23 7.860 0.000 0.000
24 8.415 0.000 0.000
25 8.970 0.000 0.000
26 9.525 0.000 0.000
27 10.080 0.000 0.000
28 10.635 0.000 0.000
29 11.190 0.000 0.000
30 11.745 0.000 0.000
31 12.855 0.000 0.000
32 13.410 0.000 0.000
33 13.965 0.000 0.000
34 14.520 0.000 0.000
35 15.075 0.000 0.000
36 15.630 0.000 0.000
37 16.185 0.000 0.000
38 16.740 0.000 0.000
39 17.295 0.000 0.000
40 18.405 0.000 0.000
41 18.960 0.000 0.000
42 19.515 0.000 0.000
43 20.070 0.000 0.000
44 20.625 0.000 0.000
45 21.180 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 2 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 3
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Nodes Cont...
Node X Y Z
(m) (m) (m)
46 21.735 0.000 0.000
47 22.290 0.000 0.000
48 22.845 0.000 0.000
49 0.600 0.000 0.000
50 24.000 0.000 0.000

Beams
Beam Node A Node B Length Property 
(m) (degrees)
1 1 49 0.600 3 0
2 2 13 0.555 3 0
3 3 22 0.555 3 0
4 4 31 0.555 3 0
5 5 40 0.555 3 0
6 6 50 0.600 3 0
7 2 8 5.975 2 0
8 3 9 5.975 2 0
9 4 10 5.975 2 0
10 5 11 5.975 2 0
11 6 12 5.975 2 0
12 8 9 5.550 1 0
13 9 10 5.550 1 0
14 10 11 5.550 1 0
15 11 12 5.550 1 0
16 13 14 0.555 3 0
17 14 15 0.555 3 0
18 15 16 0.555 3 0
19 16 17 0.555 3 0
20 17 18 0.555 3 0
21 18 19 0.555 3 0
22 19 20 0.555 3 0
23 20 21 0.555 3 0
24 21 3 0.555 3 0
25 22 23 0.555 3 0
26 23 24 0.555 3 0
27 24 25 0.555 3 0
28 25 26 0.555 3 0
29 26 27 0.555 3 0
30 27 28 0.555 3 0
31 28 29 0.555 3 0
32 29 30 0.555 3 0
33 30 4 0.555 3 0
34 31 32 0.555 3 0

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 3 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 4
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beams Cont...
Beam Node A Node B Length Property 
(m) (degrees)
35 32 33 0.555 3 0
36 33 34 0.555 3 0
37 34 35 0.555 3 0
38 35 36 0.555 3 0
39 36 37 0.555 3 0
40 37 38 0.555 3 0
41 38 39 0.555 3 0
42 39 5 0.555 3 0
43 40 41 0.555 3 0
44 41 42 0.555 3 0
45 42 43 0.555 3 0
46 43 44 0.555 3 0
47 44 45 0.555 3 0
48 45 46 0.555 3 0
49 46 47 0.555 3 0
50 47 48 0.555 3 0
51 48 6 0.555 3 0
52 49 2 0.600 3 0
53 50 7 0.600 3 0

Section Properties
Prop Section Area Iyy Izz J Material
(in2) (in4) (in4) (in4)
1 Rect 21.65x39.37 852.498 110E+3 33.3E+3 87.4E+3 CONCRETE
2 Rect 21.65x39.37 852.498 110E+3 33.3E+3 87.4E+3 CONCRETE
3 Rect 15.75x39.37 619.999 80.1E+3 12.8E+3 38.4E+3 CONCRETE

Materials
Mat Name E  Density 
(kip/in2) (kN/m3) (/°F)
1 STEEL 29E+3 0.300 76.822 6E -6
2 STAINLESSSTEEL 28E+3 0.300 76.822 10E -6
3 ALUMINUM 10E+3 0.330 26.603 13E -6
4 CONCRETE 3.15E+3 0.170 23.617 5E -6

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 4 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 5
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Supports
Node X Y Z rX rY rZ
(kN/m) (kN/m) (kN/m) (kN-m/deg) (kN-m/deg) (kN-m/deg)
1 - 3.6E+3 - - - -
2 - 2.56E+6 - - - -
3 - 2.56E+6 - - - -
4 - 2.56E+6 - - - -
5 - 2.56E+6 - - - -
6 - 2.56E+6 - - - -
7 - 3.6E+3 - - - -
13 - 3.3E+3 - - - -
14 - 3.3E+3 - - - -
15 - 3.3E+3 - - - -
16 - 3.3E+3 - - - -
17 - 3.3E+3 - - - -
18 - 3.3E+3 - - - -
19 - 3.3E+3 - - - -
20 - 3.3E+3 - - - -
21 - 3.3E+3 - - - -
22 - 3.3E+3 - - - -
23 - 3.3E+3 - - - -
24 - 3.3E+3 - - - -
25 - 3.3E+3 - - - -
26 - 3.3E+3 - - - -
27 - 3.3E+3 - - - -
28 - 3.3E+3 - - - -
29 - 3.3E+3 - - - -
30 - 3.3E+3 - - - -
31 - 3.3E+3 - - - -
32 - 3.3E+3 - - - -
33 - 3.3E+3 - - - -
34 - 3.3E+3 - - - -
35 - 3.3E+3 - - - -
36 - 3.3E+3 - - - -
37 - 3.3E+3 - - - -
38 - 3.3E+3 - - - -
39 - 3.3E+3 - - - -
40 - 3.3E+3 - - - -
41 - 3.3E+3 - - - -
42 - 3.3E+3 - - - -
43 - 3.3E+3 - - - -
44 - 3.3E+3 - - - -
45 - 3.3E+3 - - - -
46 - 3.3E+3 - - - -
47 - 3.3E+3 - - - -
48 - 3.3E+3 - - - -
49 - 3.6E+3 - - - -
50 - 3.6E+3 - - - -

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 5 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 6
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Y
Z X
Load 0

Whole Structure

Primary Load Cases


Number Name Type

1 DL Dead
2 SIDL Dead
3 EP Dead
4 LL (MOMENT) Live
5 LL (SHEAR) Live
6 SURCH (ONE SIDE) Live
7 SURCH (OTHER SIDE) Live

Combination Load Cases


Comb. Combination L/C Name Primary Primary L/C Name Factor

8 COMB. 01: DL+SIDL+EP+SURCH+LL(MO 1 DL 1.40


2 SIDL 2.00
3 EP 1.70
6 SURCH (ONE SIDE) 1.70
7 SURCH (OTHER SIDE) 1.70
4 LL (MOMENT) 2.00
9 COMB. 02: DL+SIDL+EP+SURCH+LL(SHE 1 DL 1.40
2 SIDL 2.00
3 EP 1.70
6 SURCH (ONE SIDE) 1.70
7 SURCH (OTHER SIDE) 1.70
5 LL (SHEAR) 2.00

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 6 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 7
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Combination Load Cases Cont...


Comb. Combination L/C Name Primary Primary L/C Name Factor

10 COMB. 03: DL+SIDL+EP+SURCH-ULS 1 DL 1.40


2 SIDL 2.00
3 EP 1.70
6 SURCH (ONE SIDE) 1.70
7 SURCH (OTHER SIDE) 1.70
11 COMB. 04: DL+SIDL+EP+SURCH (ONE S 1 DL 1.40
2 SIDL 2.00
3 EP 1.70
6 SURCH (ONE SIDE) 1.70
4 LL (MOMENT) 2.00
12 COMB. 05: DL+SIDL+EP+SURCH (ONE S 1 DL 1.40
2 SIDL 2.00
3 EP 1.70
6 SURCH (ONE SIDE) 1.70
5 LL (SHEAR) 2.00
13 COMB. 06: DL+SIDL+EP+SURCH (ONE S 1 DL 1.40
2 SIDL 2.00
3 EP 1.70
6 SURCH (ONE SIDE) 1.70
14 COMB. 07: DL+SIDL+EP+SURCH+LL(MO 1 DL 1.00
2 SIDL 1.20
3 EP 1.00
6 SURCH (ONE SIDE) 1.00
7 SURCH (OTHER SIDE) 1.00
4 LL (MOMENT) 1.10
15 COMB. 08: DL+SIDL+EP+SURCH+LL(SHE 1 DL 1.00
2 SIDL 1.20
3 EP 1.00
6 SURCH (ONE SIDE) 1.00
7 SURCH (OTHER SIDE) 1.00
5 LL (SHEAR) 1.10
16 COMB. 09: DL+SIDL+EP+SURCH-SLS 1 DL 1.00
2 SIDL 1.20
3 EP 1.00
6 SURCH (ONE SIDE) 1.00
7 SURCH (OTHER SIDE) 1.00
17 COMB. 10: DL+SIDL+EP+SURCH (ONE S 1 DL 1.00
2 SIDL 1.20
3 EP 1.00
6 SURCH (ONE SIDE) 1.00
4 LL (MOMENT) 1.10
18 COMB. 11: DL+SIDL+EP+SURCH (ONE S 1 DL 1.00
2 SIDL 1.20
3 EP 1.00
6 SURCH (ONE SIDE) 1.00

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 7 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 8
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Combination Load Cases Cont...


Comb. Combination L/C Name Primary Primary L/C Name Factor

5 LL (SHEAR) 1.10
19 COMB. 12: DL+SIDL+EP+SURCH (ONE S 1 DL 1.00
2 SIDL 1.20
3 EP 1.00
6 SURCH (ONE SIDE) 1.00

1 DL : Selfweight
Direction Factor Assigned Geometry

Y -1.000 ALL

2 SIDL : Beam Loads


Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
12 UNI kN/m GY -20.071 - - - -
13 UNI kN/m GY -20.071 - - - -
14 UNI kN/m GY -20.071 - - - -
15 UNI kN/m GY -20.071 - - - -

3 EP : Beam Loads
Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
7 LIN kN/m Y -12.260 - 0.000 - -
LIN kN/m Y -65.482 - 0.000 - -
11 LIN kN/m Y 12.260 - 0.000 - -
LIN kN/m Y 65.482 - 0.000 - -

4 LL (MOMENT) : Beam Loads


Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
12 UNI kN/m GY -42.801 - - - -
13 UNI kN/m GY -42.801 - - - -
14 UNI kN/m GY -42.801 - - - -
15 UNI kN/m GY -42.801 - - - -

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 8 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 9
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

5 LL (SHEAR) : Beam Loads


Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
12 UNI kN/m GY -51.101 - - - -
13 UNI kN/m GY -51.101 - - - -
14 UNI kN/m GY -51.101 - - - -
15 UNI kN/m GY -51.101 - - - -

6 SURCH (ONE SIDE) : Beam Loads


Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
11 TRAP kN/m GX -10.610 - -33.168 - -

7 SURCH (OTHER SIDE) : Beam Loads


Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
7 TRAP kN/m GX 10.610 - 33.168 - -

Beam Maximum Moments


Distances to maxima are given from beam end A.
Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
1 1 0.600 1:DL Max +ve 0.000 0.000 0.600 1.598
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000 0.000 0.000
Max -ve 0.000 0.000 0.600 -0.165
3:EP Max +ve 0.000 0.000 0.600 1.492
Max -ve 0.000 0.000 0.000 -0.000
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.000
Max -ve 0.000 0.000 0.600 -0.351
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 0.000
Max -ve 0.000 0.000 0.600 -0.420
6:SURCH (ONE Max +ve 0.000 0.000 0.000 0.000
Max -ve 0.000 0.000 0.600 -0.748
7:SURCH (OTH Max +ve 0.000 0.000 0.600 1.472
Max -ve 0.000 0.000 0.000 -0.000
8:COMB. 01: D Max +ve 0.000 0.000 0.600 4.973
Max -ve 0.000 0.000 0.000 -0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.600 4.837
Max -ve 0.000 0.000 0.000 -0.000
10:COMB. 03: Max +ve 0.000 0.000 0.600 5.676
Max -ve 0.000 0.000 0.000 -0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.600 2.471
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 9 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 10
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
12:COMB. 05: Max +ve 0.000 0.000 0.600 2.335
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.600 3.174
Max -ve 0.000 0.000 0.000 -0.000
14:COMB. 07: Max +ve 0.000 0.000 0.600 3.230
Max -ve 0.000 0.000 0.000 -0.000
15:COMB. 08: Max +ve 0.000 0.000 0.600 3.155
Max -ve 0.000 0.000 0.000 -0.000
16:COMB. 09: Max +ve 0.000 0.000 0.600 3.617
Max -ve 0.000 0.000 0.000 -0.000
17:COMB. 10: Max +ve 0.000 0.000 0.600 1.758
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.600 1.684
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.600 2.145
Max -ve 0.000 0.000 0.000 -0.000
2 2 0.555 1:DL Max +ve 0.000 0.000 0.000 19.365
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000 0.000 4.225
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -51.388
4:LL (MOMENT Max +ve 0.000 0.000 0.000 9.011
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 10.758
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 33.166
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -58.282
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -76.472
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -72.977
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -94.494
11:COMB. 04: D Max +ve 0.000 0.000 0.000 22.607
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 26.102
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 4.585
Max -ve 0.000 0.000 0.555 -8.129
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.185 -42.315
15:COMB. 08: Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 10 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 11
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 0.231 -40.503
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -52.068
17:COMB. 10: Max +ve 0.000 0.000 0.000 16.126
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 18.048
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 6.214
Max -ve 0.000 0.000 0.555 -3.273
3 3 0.555 1:DL Max +ve 0.000 0.000 0.000 20.910
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.751
3:EP Max +ve 0.000 0.000 0.000 7.466
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -3.734
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -4.458
6:SURCH (ONE Max +ve 0.000 0.000 0.000 26.974
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -23.395
8:COMB. 01: D Max +ve 0.000 0.000 0.000 37.082
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 35.634
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 44.549
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 76.854
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 75.406
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 84.321
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 25.747
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 24.951
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 29.854
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 49.142
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 48.346
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 11 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 12
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
19:COMB. 12: Max +ve 0.000 0.000 0.000 53.249
Max -ve 0.000 0.000
4 4 0.555 1:DL Max +ve 0.000 0.000 0.000 21.249
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000 0.555 0.073
Max -ve 0.000 0.000 0.000 -0.133
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.872
4:LL (MOMENT Max +ve 0.000 0.000 0.555 0.156
Max -ve 0.000 0.000 0.000 -0.283
5:LL (SHEAR) Max +ve 0.000 0.000 0.555 0.186
Max -ve 0.000 0.000 0.000 -0.338
6:SURCH (ONE Max +ve 0.000 0.000 0.000 25.594
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -27.004
8:COMB. 01: D Max +ve 0.000 0.000 0.000 21.639
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 21.529
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 22.205
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 67.545
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 67.436
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 68.111
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 16.497
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 16.437
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 16.808
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 43.501
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 43.441
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 43.812
Max -ve 0.000 0.000
5 5 0.555 1:DL Max +ve 0.000 0.000 0.000 21.810
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.678
3:EP Max +ve 0.000 0.000 0.000 13.133

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 12 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 13
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -3.579
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -4.273
6:SURCH (ONE Max +ve 0.000 0.000 0.000 34.348
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -27.788
8:COMB. 01: D Max +ve 0.000 0.000 0.000 53.498
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 52.110
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 60.655
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 100.737
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 99.349
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 107.895
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 35.552
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 34.789
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 39.489
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 63.340
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 62.577
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 67.277
Max -ve 0.000 0.000
6 6 0.600 1:DL Max +ve 0.000 0.000 0.000 6.490
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.434
3:EP Max +ve 0.000 0.000 0.000 3.734
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.925
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.104
6:SURCH (ONE Max +ve 0.000 0.000 0.000 3.594
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 13 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 14
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.782
8:COMB. 01: D Max +ve 0.000 0.000 0.000 15.797
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 15.438
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 17.647
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 18.826
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 18.467
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 20.676
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 10.498
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 10.301
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 11.516
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 12.280
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 12.082
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 13.297
Max -ve 0.000 0.000
7 2 5.975 1:DL Max +ve 0.000 0.000 5.975 18.834
Max -ve 0.000 0.000 0.000 -12.875
2:SIDL Max +ve 0.000 0.000 5.975 24.902
Max -ve 0.000 0.000 0.000 -4.659
3:EP Max +ve 0.000 0.000 5.975 76.179
Max -ve 0.000 0.000 2.490 -114.116
4:LL (MOMENT Max +ve 0.000 0.000 5.975 53.105
Max -ve 0.000 0.000 0.000 -9.936
5:LL (SHEAR) Max +ve 0.000 0.000 5.975 63.403
Max -ve 0.000 0.000 0.000 -11.863
6:SURCH (ONE Max +ve 0.000 0.000 5.975 46.189
Max -ve 0.000 0.000 0.000 -35.092
7:SURCH (OTH Max +ve 0.000 0.000 0.000 61.987
Max -ve 0.000 0.000 3.485 -70.534
8:COMB. 01: D Max +ve 0.000 0.000 5.975 394.335
Max -ve 0.000 0.000 2.490 -241.425
9:COMB. 02: D Max +ve 0.000 0.000 5.975 414.932
Max -ve 0.000 0.000 2.490 -235.091
10:COMB. 03: Max +ve 0.000 0.000 5.975 288.126

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 14 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 15
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 2.490 -274.087
11:COMB. 04: D Max +ve 0.000 0.000 5.975 390.407
Max -ve 0.000 0.000 1.494 -170.326
12:COMB. 05: Max +ve 0.000 0.000 5.975 411.004
Max -ve 0.000 0.000 1.494 -168.067
13:COMB. 06: Max +ve 0.000 0.000 5.975 284.198
Max -ve 0.000 0.000 1.992 -192.081
14:COMB. 07: Max +ve 0.000 0.000 5.975 231.811
Max -ve 0.000 0.000 2.490 -143.024
15:COMB. 08: Max +ve 0.000 0.000 5.975 243.139
Max -ve 0.000 0.000 2.490 -139.540
16:COMB. 09: Max +ve 0.000 0.000 5.975 173.396
Max -ve 0.000 0.000 2.490 -160.988
17:COMB. 10: Max +ve 0.000 0.000 5.975 229.500
Max -ve 0.000 0.000 1.494 -101.446
18:COMB. 11: D Max +ve 0.000 0.000 5.975 240.828
Max -ve 0.000 0.000 1.494 -100.204
19:COMB. 12: Max +ve 0.000 0.000 5.975 171.085
Max -ve 0.000 0.000 1.992 -113.273
8 3 5.975 1:DL Max +ve 0.000 0.000 0.000 0.900
Max -ve 0.000 0.000 5.975 -2.154
2:SIDL Max +ve 0.000 0.000 0.000 0.073
Max -ve 0.000 0.000 5.975 -3.471
3:EP Max +ve 0.000 0.000 5.975 9.877
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.155
Max -ve 0.000 0.000 5.975 -7.402
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 0.185
Max -ve 0.000 0.000 5.975 -8.837
6:SURCH (ONE Max +ve 0.000 0.000 5.975 67.786
Max -ve 0.000 0.000 0.000 -55.947
7:SURCH (OTH Max +ve 0.000 0.000 0.000 58.940
Max -ve 0.000 0.000 5.975 -62.079
8:COMB. 01: D Max +ve 0.000 0.000 0.000 16.437
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 16.497
Max -ve 0.000 0.000 5.975 -1.141
10:COMB. 03: Max +ve 0.000 0.000 5.975 16.534
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 5.975 107.265
Max -ve 0.000 0.000 0.000 -83.762
12:COMB. 05: Max +ve 0.000 0.000 5.975 104.394
Max -ve 0.000 0.000 0.000 -83.702
13:COMB. 06: Max +ve 0.000 0.000 5.975 122.069
Max -ve 0.000 0.000 0.000 -84.072

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 15 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 16
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
14:COMB. 07: Max +ve 0.000 0.000 0.000 9.817
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 9.850
Max -ve 0.000 0.000 5.975 -0.457
16:COMB. 09: Max +ve 0.000 0.000 0.000 9.647
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 5.975 63.201
Max -ve 0.000 0.000 0.000 -49.123
18:COMB. 11: D Max +ve 0.000 0.000 5.975 61.622
Max -ve 0.000 0.000 0.000 -49.090
19:COMB. 12: Max +ve 0.000 0.000 5.975 71.343
Max -ve 0.000 0.000 0.000 -49.294
9 4 5.975 1:DL Max +ve 0.000 0.000 5.975 0.000
Max -ve 0.000 0.000 0.000 -0.000
2:SIDL Max +ve 0.000 0.000 5.975 0.000
Max -ve 0.000 0.000 0.000 -0.000
3:EP Max +ve 0.000 0.000 0.000 0.000
Max -ve 0.000 0.000 5.975 -0.000
4:LL (MOMENT Max +ve 0.000 0.000 5.975 0.000
Max -ve 0.000 0.000 0.000 -0.000
5:LL (SHEAR) Max +ve 0.000 0.000 5.975 0.000
Max -ve 0.000 0.000 0.000 -0.000
6:SURCH (ONE Max +ve 0.000 0.000 5.975 65.086
Max -ve 0.000 0.000 0.000 -52.763
7:SURCH (OTH Max +ve 0.000 0.000 0.000 52.763
Max -ve 0.000 0.000 5.975 -65.030
8:COMB. 01: D Max +ve 0.000 0.000 5.477 0.162
Max -ve 0.000 0.000 0.000 -0.000
9:COMB. 02: D Max +ve 0.000 0.000 5.477 0.162
Max -ve 0.000 0.000 0.000 -0.000
10:COMB. 03: Max +ve 0.000 0.000 5.477 0.162
Max -ve 0.000 0.000 0.000 -0.000
11:COMB. 04: D Max +ve 0.000 0.000 5.975 110.647
Max -ve 0.000 0.000 0.000 -89.697
12:COMB. 05: Max +ve 0.000 0.000 5.975 110.647
Max -ve 0.000 0.000 0.000 -89.697
13:COMB. 06: Max +ve 0.000 0.000 5.975 110.647
Max -ve 0.000 0.000 0.000 -89.697
14:COMB. 07: Max +ve 0.000 0.000 5.477 0.095
Max -ve 0.000 0.000 0.000 -0.000
15:COMB. 08: Max +ve 0.000 0.000 5.477 0.095
Max -ve 0.000 0.000 0.000 -0.000
16:COMB. 09: Max +ve 0.000 0.000 5.477 0.095
Max -ve 0.000 0.000 0.000 -0.000
17:COMB. 10: Max +ve 0.000 0.000 5.975 65.086

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 16 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 17
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 0.000 -52.763
18:COMB. 11: D Max +ve 0.000 0.000 5.975 65.086
Max -ve 0.000 0.000 0.000 -52.763
19:COMB. 12: Max +ve 0.000 0.000 5.975 65.086
Max -ve 0.000 0.000 0.000 -52.763
10 5 5.975 1:DL Max +ve 0.000 0.000 5.975 2.154
Max -ve 0.000 0.000 0.000 -0.900
2:SIDL Max +ve 0.000 0.000 5.975 3.471
Max -ve 0.000 0.000 0.000 -0.073
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 5.975 -9.877
4:LL (MOMENT Max +ve 0.000 0.000 5.975 7.402
Max -ve 0.000 0.000 0.000 -0.155
5:LL (SHEAR) Max +ve 0.000 0.000 5.975 8.837
Max -ve 0.000 0.000 0.000 -0.185
6:SURCH (ONE Max +ve 0.000 0.000 5.975 59.706
Max -ve 0.000 0.000 0.000 -57.014
7:SURCH (OTH Max +ve 0.000 0.000 0.000 54.026
Max -ve 0.000 0.000 5.975 -65.424
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -16.426
9:COMB. 02: D Max +ve 0.000 0.000 5.975 1.120
Max -ve 0.000 0.000 0.000 -16.486
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 5.975 -16.554
11:COMB. 04: D Max +ve 0.000 0.000 5.975 109.470
Max -ve 0.000 0.000 0.000 -108.271
12:COMB. 05: Max +ve 0.000 0.000 5.975 112.341
Max -ve 0.000 0.000 0.000 -108.331
13:COMB. 06: Max +ve 0.000 0.000 5.975 94.667
Max -ve 0.000 0.000 0.000 -107.961
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.811
15:COMB. 08: Max +ve 0.000 0.000 5.975 0.445
Max -ve 0.000 0.000 0.000 -9.844
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.641
17:COMB. 10: Max +ve 0.000 0.000 5.975 64.290
Max -ve 0.000 0.000 0.000 -63.837
18:COMB. 11: D Max +ve 0.000 0.000 5.975 65.869
Max -ve 0.000 0.000 0.000 -63.870
19:COMB. 12: Max +ve 0.000 0.000 5.975 56.148
Max -ve 0.000 0.000 0.000 -63.667
11 6 5.975 1:DL Max +ve 0.000 0.000 0.000 12.875
Max -ve 0.000 0.000 5.975 -18.834

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 17 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 18
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
2:SIDL Max +ve 0.000 0.000 0.000 4.659
Max -ve 0.000 0.000 5.975 -24.902
3:EP Max +ve 0.000 0.000 2.490 114.116
Max -ve 0.000 0.000 5.975 -76.179
4:LL (MOMENT Max +ve 0.000 0.000 0.000 9.936
Max -ve 0.000 0.000 5.975 -53.104
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 11.863
Max -ve 0.000 0.000 5.975 -63.403
6:SURCH (ONE Max +ve 0.000 0.000 3.485 69.917
Max -ve 0.000 0.000 0.000 -60.221
7:SURCH (OTH Max +ve 0.000 0.000 0.000 33.276
Max -ve 0.000 0.000 5.975 -43.833
8:COMB. 01: D Max +ve 0.000 0.000 2.490 241.327
Max -ve 0.000 0.000 5.975 -394.259
9:COMB. 02: D Max +ve 0.000 0.000 2.490 234.993
Max -ve 0.000 0.000 5.975 -414.855
10:COMB. 03: Max +ve 0.000 0.000 2.490 273.989
Max -ve 0.000 0.000 5.975 -288.050
11:COMB. 04: D Max +ve 0.000 0.000 2.490 239.400
Max -ve 0.000 0.000 5.975 -319.743
12:COMB. 05: Max +ve 0.000 0.000 2.490 233.066
Max -ve 0.000 0.000 5.975 -340.339
13:COMB. 06: Max +ve 0.000 0.000 2.490 272.062
Max -ve 0.000 0.000 5.975 -213.534
14:COMB. 07: Max +ve 0.000 0.000 2.490 142.966
Max -ve 0.000 0.000 5.975 -231.765
15:COMB. 08: Max +ve 0.000 0.000 2.490 139.483
Max -ve 0.000 0.000 5.975 -243.094
16:COMB. 09: Max +ve 0.000 0.000 2.490 160.930
Max -ve 0.000 0.000 5.975 -173.351
17:COMB. 10: Max +ve 0.000 0.000 2.490 141.833
Max -ve 0.000 0.000 5.975 -187.933
18:COMB. 11: D Max +ve 0.000 0.000 2.490 138.349
Max -ve 0.000 0.000 5.975 -199.261
19:COMB. 12: Max +ve 0.000 0.000 2.490 159.797
Max -ve 0.000 0.000 5.975 -129.518
12 8 5.550 1:DL Max +ve 0.000 0.000 5.550 37.475
Max -ve 0.000 0.000 2.312 -22.020
2:SIDL Max +ve 0.000 0.000 5.550 59.229
Max -ve 0.000 0.000 2.312 -35.924
3:EP Max +ve 0.000 0.000 0.000 76.179
Max -ve 0.000 0.000 5.550 -24.509
4:LL (MOMENT Max +ve 0.000 0.000 5.550 126.308
Max -ve 0.000 0.000 2.312 -76.610
5:LL (SHEAR) Max +ve 0.000 0.000 5.550 150.803

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 18 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 19
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 2.312 -91.467
6:SURCH (ONE Max +ve 0.000 0.000 0.000 46.175
Max -ve 0.000 0.000 5.550 -37.348
7:SURCH (OTH Max +ve 0.000 0.000 5.550 22.015
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000 0.000 394.280
Max -ve 0.000 0.000 2.775 -179.110
9:COMB. 02: D Max +ve 0.000 0.000 0.000 414.877
Max -ve 0.000 0.000 2.775 -208.233
10:COMB. 03: Max +ve 0.000 0.000 0.000 288.071
Max -ve 0.000 0.000 3.237 -38.104
11:COMB. 04: D Max +ve 0.000 0.000 0.000 390.382
Max -ve 0.000 0.000 2.775 -199.772
12:COMB. 05: Max +ve 0.000 0.000 0.000 410.979
Max -ve 0.000 0.000 2.775 -228.895
13:COMB. 06: Max +ve 0.000 0.000 0.000 284.173
Max -ve 0.000 0.000 3.237 -61.559
14:COMB. 07: Max +ve 0.000 0.000 0.000 231.778
Max -ve 0.000 0.000 2.775 -104.302
15:COMB. 08: Max +ve 0.000 0.000 0.000 243.106
Max -ve 0.000 0.000 2.775 -120.320
16:COMB. 09: Max +ve 0.000 0.000 0.000 173.363
Max -ve 0.000 0.000 3.237 -26.462
17:COMB. 10: Max +ve 0.000 0.000 0.000 229.485
Max -ve 0.000 0.000 2.775 -116.456
18:COMB. 11: D Max +ve 0.000 0.000 0.000 240.813
Max -ve 0.000 0.000 2.775 -132.474
19:COMB. 12: Max +ve 0.000 0.000 0.000 171.070
Max -ve 0.000 0.000 3.237 -40.260
13 9 5.550 1:DL Max +ve 0.000 0.000 0.000 35.321
Max -ve 0.000 0.000 2.775 -16.100
2:SIDL Max +ve 0.000 0.000 0.000 55.758
Max -ve 0.000 0.000 2.775 -24.562
3:EP Max +ve 0.000 0.000 5.550 6.550
Max -ve 0.000 0.000 0.000 -14.631
4:LL (MOMENT Max +ve 0.000 0.000 0.000 118.906
Max -ve 0.000 0.000 2.775 -52.380
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 141.965
Max -ve 0.000 0.000 2.775 -62.537
6:SURCH (ONE Max +ve 0.000 0.000 0.000 30.513
Max -ve 0.000 0.000 5.550 -30.599
7:SURCH (OTH Max +ve 0.000 0.000 5.550 34.859
Max -ve 0.000 0.000 0.000 -40.063
8:COMB. 01: D Max +ve 0.000 0.000 5.550 375.052
Max -ve 0.000 0.000 2.775 -187.790

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 19 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 20
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
9:COMB. 02: D Max +ve 0.000 0.000 5.550 416.133
Max -ve 0.000 0.000 2.775 -208.106
10:COMB. 03: Max +ve 0.000 0.000 5.550 163.212
Max -ve 0.000 0.000 2.775 -83.031
11:COMB. 04: D Max +ve 0.000 0.000 0.000 425.777
Max -ve 0.000 0.000 2.775 -183.367
12:COMB. 05: Max +ve 0.000 0.000 0.000 471.895
Max -ve 0.000 0.000 2.775 -203.682
13:COMB. 06: Max +ve 0.000 0.000 0.000 187.964
Max -ve 0.000 0.000 3.237 -79.370
14:COMB. 07: Max +ve 0.000 0.000 5.550 219.423
Max -ve 0.000 0.000 2.775 -109.879
15:COMB. 08: Max +ve 0.000 0.000 5.550 242.017
Max -ve 0.000 0.000 2.775 -121.052
16:COMB. 09: Max +ve 0.000 0.000 5.550 102.911
Max -ve 0.000 0.000 2.775 -52.261
17:COMB. 10: Max +ve 0.000 0.000 0.000 248.909
Max -ve 0.000 0.000 2.775 -107.276
18:COMB. 11: D Max +ve 0.000 0.000 0.000 274.274
Max -ve 0.000 0.000 2.775 -118.450
19:COMB. 12: Max +ve 0.000 0.000 0.000 118.112
Max -ve 0.000 0.000 3.237 -49.865
14 10 5.550 1:DL Max +ve 0.000 0.000 5.550 35.321
Max -ve 0.000 0.000 2.775 -16.100
2:SIDL Max +ve 0.000 0.000 5.550 55.758
Max -ve 0.000 0.000 2.775 -24.562
3:EP Max +ve 0.000 0.000 0.000 6.550
Max -ve 0.000 0.000 5.550 -14.631
4:LL (MOMENT Max +ve 0.000 0.000 5.550 118.907
Max -ve 0.000 0.000 2.775 -52.380
5:LL (SHEAR) Max +ve 0.000 0.000 5.550 141.966
Max -ve 0.000 0.000 2.775 -62.538
6:SURCH (ONE Max +ve 0.000 0.000 0.000 34.497
Max -ve 0.000 0.000 5.550 -39.330
7:SURCH (OTH Max +ve 0.000 0.000 5.550 29.767
Max -ve 0.000 0.000 0.000 -30.230
8:COMB. 01: D Max +ve 0.000 0.000 0.000 375.063
Max -ve 0.000 0.000 2.775 -187.797
9:COMB. 02: D Max +ve 0.000 0.000 0.000 416.144
Max -ve 0.000 0.000 2.775 -208.113
10:COMB. 03: Max +ve 0.000 0.000 0.000 163.223
Max -ve 0.000 0.000 2.775 -83.037
11:COMB. 04: D Max +ve 0.000 0.000 0.000 426.455
Max -ve 0.000 0.000 2.775 -187.403
12:COMB. 05: Max +ve 0.000 0.000 0.000 467.536

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 20 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 21
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 2.775 -207.719
13:COMB. 06: Max +ve 0.000 0.000 0.000 214.614
Max -ve 0.000 0.000 3.237 -88.520
14:COMB. 07: Max +ve 0.000 0.000 0.000 219.429
Max -ve 0.000 0.000 2.775 -109.883
15:COMB. 08: Max +ve 0.000 0.000 0.000 242.024
Max -ve 0.000 0.000 2.775 -121.056
16:COMB. 09: Max +ve 0.000 0.000 0.000 102.917
Max -ve 0.000 0.000 2.775 -52.265
17:COMB. 10: Max +ve 0.000 0.000 0.000 249.660
Max -ve 0.000 0.000 2.775 -109.651
18:COMB. 11: D Max +ve 0.000 0.000 0.000 272.254
Max -ve 0.000 0.000 2.775 -120.824
19:COMB. 12: Max +ve 0.000 0.000 0.000 133.148
Max -ve 0.000 0.000 3.237 -55.141
15 11 5.550 1:DL Max +ve 0.000 0.000 0.000 37.475
Max -ve 0.000 0.000 3.237 -22.020
2:SIDL Max +ve 0.000 0.000 0.000 59.229
Max -ve 0.000 0.000 3.237 -35.924
3:EP Max +ve 0.000 0.000 5.550 76.179
Max -ve 0.000 0.000 0.000 -24.509
4:LL (MOMENT Max +ve 0.000 0.000 0.000 126.308
Max -ve 0.000 0.000 3.237 -76.610
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 150.803
Max -ve 0.000 0.000 3.237 -91.466
6:SURCH (ONE Max +ve 0.000 0.000 0.000 20.358
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000 5.550 43.816
Max -ve 0.000 0.000 0.000 -35.673
8:COMB. 01: D Max +ve 0.000 0.000 5.550 394.249
Max -ve 0.000 0.000 2.775 -179.109
9:COMB. 02: D Max +ve 0.000 0.000 5.550 414.845
Max -ve 0.000 0.000 2.775 -208.231
10:COMB. 03: Max +ve 0.000 0.000 5.550 288.040
Max -ve 0.000 0.000 2.312 -38.098
11:COMB. 04: D Max +ve 0.000 0.000 0.000 416.484
Max -ve 0.000 0.000 2.775 -186.030
12:COMB. 05: Max +ve 0.000 0.000 0.000 465.472
Max -ve 0.000 0.000 2.775 -215.153
13:COMB. 06: Max +ve 0.000 0.000 5.550 213.553
Max -ve 0.000 0.000 2.775 -35.856
14:COMB. 07: Max +ve 0.000 0.000 5.550 231.760
Max -ve 0.000 0.000 2.775 -104.302
15:COMB. 08: Max +ve 0.000 0.000 5.550 243.088
Max -ve 0.000 0.000 2.775 -120.319

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 21 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 22
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
16:COMB. 09: Max +ve 0.000 0.000 5.550 173.345
Max -ve 0.000 0.000 2.312 -26.459
17:COMB. 10: Max +ve 0.000 0.000 0.000 243.338
Max -ve 0.000 0.000 2.775 -108.373
18:COMB. 11: D Max +ve 0.000 0.000 0.000 270.282
Max -ve 0.000 0.000 2.775 -124.390
19:COMB. 12: Max +ve 0.000 0.000 5.550 129.529
Max -ve 0.000 0.000 2.775 -25.777
16 13 0.555 1:DL Max +ve 0.000 0.000 0.000 8.071
Max -ve 0.000 0.000 0.555 -0.487
2:SIDL Max +ve 0.000 0.000 0.000 3.588
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -41.966
4:LL (MOMENT Max +ve 0.000 0.000 0.000 7.652
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 9.136
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 26.302
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -46.796
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -72.403
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -69.435
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -87.707
11:COMB. 04: D Max +ve 0.000 0.000 0.000 7.151
Max -ve 0.000 0.000 0.555 -4.911
12:COMB. 05: Max +ve 0.000 0.000 0.000 10.119
Max -ve 0.000 0.000 0.555 -2.467
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -17.510
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -41.666
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -40.034
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -50.083
17:COMB. 10: Max +ve 0.000 0.000 0.000 5.130
Max -ve 0.000 0.000 0.555 -3.387
18:COMB. 11: D Max +ve 0.000 0.000 0.000 6.762
Max -ve 0.000 0.000 0.555 -2.043
19:COMB. 12: Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 22 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 23
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 0.555 -10.316
17 14 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -6.418
2:SIDL Max +ve 0.000 0.000 0.000 2.954
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -33.025
4:LL (MOMENT Max +ve 0.000 0.000 0.000 6.300
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 7.522
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 19.650
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -35.770
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -65.720
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -63.277
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -78.320
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -13.944
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -12.005
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -23.948
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -39.157
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -37.813
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -46.087
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.662
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -8.596
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.164
18 15 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.828
2:SIDL Max +ve 0.000 0.000 0.000 2.345
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -24.837

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 23 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 24
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
4:LL (MOMENT Max +ve 0.000 0.000 0.000 5.002
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 5.972
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 13.276
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -25.389
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -57.106
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -55.166
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -67.109
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -20.262
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -18.799
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -27.808
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -35.052
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -33.985
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -40.553
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -13.900
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -13.095
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -18.051
19 16 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.462 -10.833
2:SIDL Max +ve 0.000 0.000 0.000 1.769
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -17.513
4:LL (MOMENT Max +ve 0.000 0.000 0.000 3.773
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 4.505
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 7.167
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 24 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 25
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 0.000 -15.696
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -46.945
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -45.481
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -54.491
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -24.106
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -23.096
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.462 -29.349
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -29.596
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -28.791
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -33.746
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -16.255
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.699
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.462 -19.145
20 17 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.792
2:SIDL Max +ve 0.000 0.000 0.000 1.222
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -11.044
4:LL (MOMENT Max +ve 0.000 0.000 0.000 2.606
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 3.111
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 1.248
Max -ve 0.000 0.000 0.555 -4.593
7:SURCH (OTH Max +ve 0.000 0.000 0.555 2.036
Max -ve 0.000 0.000 0.000 -6.607
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -35.338
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -34.327
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -40.549

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 25 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 26
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.462 -25.650
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -25.048
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.185 -29.520
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -22.862
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -22.306
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -25.728
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.370 -16.951
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.416 -16.572
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.139 -19.223
21 18 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.335
2:SIDL Max +ve 0.000 0.000 0.000 0.691
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -5.335
4:LL (MOMENT Max +ve 0.000 0.000 0.000 1.473
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 1.759
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.475
7:SURCH (OTH Max +ve 0.000 0.000 0.555 10.424
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -22.158
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -21.587
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -25.104
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.185 -25.808
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.231 -25.397
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -28.566
14:COMB. 07: Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 26 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 27
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 0.000 -14.778
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -14.464
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -16.398
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.046 -16.823
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.092 -16.537
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -18.434
22 19 0.555 1:DL Max +ve 0.000 0.000 0.555 0.996
Max -ve 0.000 0.000 0.000 -5.430
2:SIDL Max +ve 0.000 0.000 0.000 0.157
Max -ve 0.000 0.000 0.555 -0.401
3:EP Max +ve 0.000 0.000 0.555 4.427
Max -ve 0.000 0.000 0.000 -0.237
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.335
Max -ve 0.000 0.000 0.555 -0.855
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 0.400
Max -ve 0.000 0.000 0.555 -1.020
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -16.491
7:SURCH (OTH Max +ve 0.000 0.000 0.555 18.737
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000 0.555 10.229
Max -ve 0.000 0.000 0.000 -7.106
9:COMB. 02: D Max +ve 0.000 0.000 0.555 9.897
Max -ve 0.000 0.000 0.000 -6.976
10:COMB. 03: Max +ve 0.000 0.000 0.555 11.938
Max -ve 0.000 0.000 0.000 -7.777
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -24.826
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -24.696
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -25.497
14:COMB. 07: Max +ve 0.000 0.000 0.555 6.248
Max -ve 0.000 0.000 0.000 -5.160
15:COMB. 08: Max +ve 0.000 0.000 0.555 6.066
Max -ve 0.000 0.000 0.000 -5.089
16:COMB. 09: Max +ve 0.000 0.000 0.555 7.188
Max -ve 0.000 0.000 0.000 -5.529
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -15.584

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 27 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 28
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -15.512
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -15.953
23 20 0.555 1:DL Max +ve 0.000 0.000 0.555 10.044
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -1.006
3:EP Max +ve 0.000 0.000 0.555 8.831
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -2.144
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -2.560
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -22.687
7:SURCH (OTH Max +ve 0.000 0.000 0.555 27.108
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000 0.555 30.291
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.555 29.459
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.555 34.580
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -21.625
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -21.957
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -19.916
14:COMB. 07: Max +ve 0.000 0.000 0.555 19.731
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.555 19.274
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.555 22.090
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -12.489
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -12.671
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -11.549
24 21 0.555 1:DL Max +ve 0.000 0.000 0.555 21.810
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 28 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 29
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 0.555 -1.678
3:EP Max +ve 0.000 0.000 0.555 13.132
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -3.579
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -4.273
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -29.025
7:SURCH (OTH Max +ve 0.000 0.000 0.555 35.573
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000 0.555 53.478
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.555 52.090
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.555 60.635
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -15.792
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -16.624
13:COMB. 06: Max +ve 0.000 0.000 0.555 0.160
Max -ve 0.000 0.000 0.000 -11.503
14:COMB. 07: Max +ve 0.000 0.000 0.555 35.540
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.555 34.777
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.555 39.477
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -7.377
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -7.834
19:COMB. 12: Max +ve 0.000 0.000 0.555 3.904
Max -ve 0.000 0.000 0.000 -5.018
25 22 0.555 1:DL Max +ve 0.000 0.000 0.000 9.410
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.195
3:EP Max +ve 0.000 0.000 0.000 6.045
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.547
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -3.042

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 29 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 30
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
6:SURCH (ONE Max +ve 0.000 0.000 0.000 21.225
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -18.332
8:COMB. 01: D Max +ve 0.000 0.000 0.000 20.884
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 19.896
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 25.979
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 52.048
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 51.060
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 57.143
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 14.112
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 13.569
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 16.914
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 32.444
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 31.900
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 35.246
Max -ve 0.000 0.000
26 23 0.555 1:DL Max +ve 0.000 0.000 0.000 0.627
Max -ve 0.000 0.000 0.555 -5.535
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.730
3:EP Max +ve 0.000 0.000 0.000 4.695
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.556
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.858
6:SURCH (ONE Max +ve 0.000 0.000 0.000 15.630
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -13.387
8:COMB. 01: D Max +ve 0.000 0.000 0.000 8.102
Max -ve 0.000 0.000 0.555 -1.327
9:COMB. 02: D Max +ve 0.000 0.000 0.000 7.498

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 30 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 31
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 0.555 -1.623
10:COMB. 03: Max +ve 0.000 0.000 0.000 11.213
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 30.860
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 30.257
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 33.972
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 4.978
Max -ve 0.000 0.000 0.555 -1.707
15:COMB. 08: Max +ve 0.000 0.000 0.000 4.646
Max -ve 0.000 0.000 0.555 -1.870
16:COMB. 09: Max +ve 0.000 0.000 0.000 6.690
Max -ve 0.000 0.000 0.555 -0.868
17:COMB. 10: Max +ve 0.000 0.000 0.000 18.365
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 18.033
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 20.077
Max -ve 0.000 0.000
27 24 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.173
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.358
3:EP Max +ve 0.000 0.000 0.000 3.451
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.763
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.911
6:SURCH (ONE Max +ve 0.000 0.000 0.000 10.240
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -8.594
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.501
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.565
10:COMB. 03: Max +ve 0.000 0.000 0.000 0.198
Max -ve 0.000 0.000 0.555 -7.172
11:COMB. 04: D Max +ve 0.000 0.000 0.000 13.283
Max -ve 0.000 0.000 0.555 -0.837
12:COMB. 05: Max +ve 0.000 0.000 0.000 12.987
Max -ve 0.000 0.000 0.555 -0.901

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 31 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 32
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
13:COMB. 06: Max +ve 0.000 0.000 0.000 14.809
Max -ve 0.000 0.000 0.555 -0.508
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -6.020
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -6.055
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -5.840
17:COMB. 10: Max +ve 0.000 0.000 0.000 6.887
Max -ve 0.000 0.000 0.555 -2.100
18:COMB. 11: D Max +ve 0.000 0.000 0.000 6.724
Max -ve 0.000 0.000 0.555 -2.135
19:COMB. 12: Max +ve 0.000 0.000 0.000 7.726
Max -ve 0.000 0.000 0.555 -1.920
28 25 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.509 -10.370
2:SIDL Max +ve 0.000 0.000 0.555 0.116
Max -ve 0.000 0.000 0.000 -0.077
3:EP Max +ve 0.000 0.000 0.000 2.322
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000 0.555 0.246
Max -ve 0.000 0.000 0.000 -0.164
5:LL (SHEAR) Max +ve 0.000 0.000 0.555 0.294
Max -ve 0.000 0.000 0.000 -0.196
6:SURCH (ONE Max +ve 0.000 0.000 0.000 5.024
Max -ve 0.000 0.000 0.555 -0.094
7:SURCH (OTH Max +ve 0.000 0.000 0.555 0.710
Max -ve 0.000 0.000 0.000 -3.920
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.512
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.416
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -11.005
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -11.720
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -11.624
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -12.213
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -8.027
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.975
16:COMB. 09: Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 32 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 33
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 0.555 -8.299
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -8.738
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -8.685
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.009
29 26 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.046 -10.365
2:SIDL Max +ve 0.000 0.000 0.555 0.224
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000 0.000 1.304
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000 0.555 0.478
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.555 0.571
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -5.217
7:SURCH (OTH Max +ve 0.000 0.000 0.555 5.390
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.277 -10.973
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.231 -10.834
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.324 -11.714
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -19.578
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -19.393
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -20.534
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.231 -8.272
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.231 -8.199
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.277 -8.659
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -13.156
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -13.054
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -13.682

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 33 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 34
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
30 27 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.112
2:SIDL Max +ve 0.000 0.000 0.555 0.252
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000 0.000 0.378
Max -ve 0.000 0.000 0.555 -0.478
4:LL (MOMENT Max +ve 0.000 0.000 0.555 0.537
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.555 0.641
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.447
7:SURCH (OTH Max +ve 0.000 0.000 0.555 10.210
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.415
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.230
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -11.371
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -24.569
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -24.361
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -25.644
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -7.766
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -7.664
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -8.292
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.442
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.328
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -16.033
31 28 0.555 1:DL Max +ve 0.000 0.000 0.555 0.818
Max -ve 0.000 0.000 0.000 -5.411
2:SIDL Max +ve 0.000 0.000 0.000 0.252
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -1.291
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.537

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 34 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 35
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 0.641
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.861
7:SURCH (OTH Max +ve 0.000 0.000 0.555 15.234
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -7.212
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -7.003
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -8.286
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -26.751
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -26.585
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -27.610
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -5.232
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -5.118
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -5.823
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.324 -15.899
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.324 -15.798
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.277 -16.426
32 29 0.555 1:DL Max +ve 0.000 0.000 0.555 9.673
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000 0.000 0.201
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -2.083
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.429
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 0.512
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -21.484
7:SURCH (OTH Max +ve 0.000 0.000 0.555 20.476
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 35 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 36
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
8:COMB. 01: D Max +ve 0.000 0.000 0.555 8.746
Max -ve 0.000 0.000 0.000 -0.853
9:COMB. 02: D Max +ve 0.000 0.000 0.555 8.806
Max -ve 0.000 0.000 0.000 -0.687
10:COMB. 03: Max +ve 0.000 0.000 0.555 8.435
Max -ve 0.000 0.000 0.000 -1.712
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.185 -26.975
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.185 -26.844
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.092 -27.687
14:COMB. 07: Max +ve 0.000 0.000 0.555 6.842
Max -ve 0.000 0.000 0.000 -0.386
15:COMB. 08: Max +ve 0.000 0.000 0.555 6.875
Max -ve 0.000 0.000 0.000 -0.294
16:COMB. 09: Max +ve 0.000 0.000 0.555 6.670
Max -ve 0.000 0.000 0.000 -0.858
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -15.620
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -15.528
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -16.092
33 30 0.555 1:DL Max +ve 0.000 0.000 0.555 21.249
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000 0.000 0.073
Max -ve 0.000 0.000 0.555 -0.133
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -2.872
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.156
Max -ve 0.000 0.000 0.555 -0.283
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 0.186
Max -ve 0.000 0.000 0.555 -0.338
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -27.264
7:SURCH (OTH Max +ve 0.000 0.000 0.555 25.877
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000 0.555 21.677
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.555 21.567
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.555 22.243
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 36 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 37
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 0.000 -26.064
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -26.003
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -26.375
14:COMB. 07: Max +ve 0.000 0.000 0.555 16.520
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.555 16.459
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.555 16.831
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -13.635
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -13.602
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -13.806
34 31 0.555 1:DL Max +ve 0.000 0.000 0.000 9.673
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000 0.555 0.201
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.083
4:LL (MOMENT Max +ve 0.000 0.000 0.555 0.429
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.555 0.512
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 20.270
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -21.296
8:COMB. 01: D Max +ve 0.000 0.000 0.000 8.715
Max -ve 0.000 0.000 0.555 -0.877
9:COMB. 02: D Max +ve 0.000 0.000 0.000 8.776
Max -ve 0.000 0.000 0.555 -0.711
10:COMB. 03: Max +ve 0.000 0.000 0.000 8.404
Max -ve 0.000 0.000 0.555 -1.735
11:COMB. 04: D Max +ve 0.000 0.000 0.000 44.918
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 44.978
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 44.607
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 6.824
Max -ve 0.000 0.000 0.555 -0.400

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 37 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 38
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
15:COMB. 08: Max +ve 0.000 0.000 0.000 6.857
Max -ve 0.000 0.000 0.555 -0.308
16:COMB. 09: Max +ve 0.000 0.000 0.000 6.652
Max -ve 0.000 0.000 0.555 -0.872
17:COMB. 10: Max +ve 0.000 0.000 0.000 28.119
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 28.153
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 27.948
Max -ve 0.000 0.000
35 32 0.555 1:DL Max +ve 0.000 0.000 0.000 0.818
Max -ve 0.000 0.000 0.555 -5.411
2:SIDL Max +ve 0.000 0.000 0.555 0.252
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.291
4:LL (MOMENT Max +ve 0.000 0.000 0.555 0.537
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.555 0.642
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 15.105
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -15.746
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.229
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.021
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -8.304
11:COMB. 04: D Max +ve 0.000 0.000 0.000 25.892
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 26.058
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 25.033
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -5.242
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -5.128
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -5.834
17:COMB. 10: Max +ve 0.000 0.000 0.000 15.347
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 15.438

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 38 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 39
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 14.875
Max -ve 0.000 0.000
36 33 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.112
2:SIDL Max +ve 0.000 0.000 0.000 0.252
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000 0.555 0.378
Max -ve 0.000 0.000 0.000 -0.478
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.537
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 0.642
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 10.161
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.409
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.426
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.241
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -11.383
11:COMB. 04: D Max +ve 0.000 0.000 0.000 10.466
Max -ve 0.000 0.000 0.555 -1.484
12:COMB. 05: Max +ve 0.000 0.000 0.000 10.674
Max -ve 0.000 0.000 0.555 -1.299
13:COMB. 06: Max +ve 0.000 0.000 0.000 9.391
Max -ve 0.000 0.000 0.555 -2.440
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.773
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.671
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -8.298
17:COMB. 10: Max +ve 0.000 0.000 0.000 5.166
Max -ve 0.000 0.000 0.555 -2.512
18:COMB. 11: D Max +ve 0.000 0.000 0.000 5.281
Max -ve 0.000 0.000 0.555 -2.411
19:COMB. 12: Max +ve 0.000 0.000 0.000 4.575
Max -ve 0.000 0.000 0.555 -3.038
37 34 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.509 -10.365
2:SIDL Max +ve 0.000 0.000 0.000 0.224
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 39 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 40
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
3:EP Max +ve 0.000 0.000 0.555 1.304
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.478
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 0.571
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 5.426
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -5.260
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.277 -10.982
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.324 -10.842
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.231 -11.723
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.135
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.039
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.628
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.324 -8.277
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.324 -8.204
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.277 -8.664
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.805
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.753
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -8.077
38 35 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.046 -10.370
2:SIDL Max +ve 0.000 0.000 0.000 0.116
Max -ve 0.000 0.000 0.555 -0.077
3:EP Max +ve 0.000 0.000 0.555 2.322
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.246
Max -ve 0.000 0.000 0.555 -0.164
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 0.294
Max -ve 0.000 0.000 0.555 -0.196
6:SURCH (ONE Max +ve 0.000 0.000 0.000 0.838

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 40 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 41
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 0.555 -3.691
7:SURCH (OTH Max +ve 0.000 0.000 0.555 4.794
Max -ve 0.000 0.000 0.000 -0.226
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.518
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.423
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -11.011
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.652
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.715
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.323
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -8.031
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -7.978
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -8.302
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.815
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.850
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.634
39 36 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.173
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -0.358
3:EP Max +ve 0.000 0.000 0.555 3.451
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -0.763
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -0.911
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -8.253
7:SURCH (OTH Max +ve 0.000 0.000 0.555 9.900
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -7.502
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -7.566

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 41 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 42
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
10:COMB. 03: Max +ve 0.000 0.000 0.555 0.202
Max -ve 0.000 0.000 0.000 -7.173
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -18.153
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -18.449
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.462 -16.693
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -6.021
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -6.056
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -5.840
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.416 -11.680
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.462 -11.817
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.324 -11.065
40 37 0.555 1:DL Max +ve 0.000 0.000 0.555 0.627
Max -ve 0.000 0.000 0.000 -5.535
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -0.730
3:EP Max +ve 0.000 0.000 0.555 4.695
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -1.556
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -1.858
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -12.922
7:SURCH (OTH Max +ve 0.000 0.000 0.555 15.170
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000 0.555 8.110
Max -ve 0.000 0.000 0.000 -1.323
9:COMB. 02: D Max +ve 0.000 0.000 0.555 7.507
Max -ve 0.000 0.000 0.000 -1.619
10:COMB. 03: Max +ve 0.000 0.000 0.555 11.222
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.231 -18.450
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.277 -18.874
13:COMB. 06: Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 42 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 43
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 0.000 -16.628
14:COMB. 07: Max +ve 0.000 0.000 0.555 4.983
Max -ve 0.000 0.000 0.000 -1.705
15:COMB. 08: Max +ve 0.000 0.000 0.555 4.651
Max -ve 0.000 0.000 0.000 -1.868
16:COMB. 09: Max +ve 0.000 0.000 0.555 6.695
Max -ve 0.000 0.000 0.000 -0.866
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -11.605
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.046 -11.775
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.766
41 38 0.555 1:DL Max +ve 0.000 0.000 0.555 9.410
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -1.195
3:EP Max +ve 0.000 0.000 0.555 6.045
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -2.547
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -3.041
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -17.732
7:SURCH (OTH Max +ve 0.000 0.000 0.555 20.632
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000 0.555 20.897
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.555 19.909
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.555 25.992
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -17.678
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -18.282
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -14.566
14:COMB. 07: Max +ve 0.000 0.000 0.555 14.120
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.555 13.576
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.555 16.922
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 43 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 44
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.186
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.518
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -8.475
42 39 0.555 1:DL Max +ve 0.000 0.000 0.555 20.910
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -1.751
3:EP Max +ve 0.000 0.000 0.555 7.466
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -3.734
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -4.458
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -22.654
7:SURCH (OTH Max +ve 0.000 0.000 0.555 26.243
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000 0.555 37.099
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.555 35.651
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.555 44.566
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -14.177
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -15.165
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.082
14:COMB. 07: Max +ve 0.000 0.000 0.555 25.757
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.555 24.961
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.555 29.864
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -6.512
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -7.056
19:COMB. 12: Max +ve 0.000 0.000 0.555 3.621
Max -ve 0.000 0.000 0.000 -3.710
43 40 0.555 1:DL Max +ve 0.000 0.000 0.000 10.044

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 44 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 45
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.006
3:EP Max +ve 0.000 0.000 0.000 8.831
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.144
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.560
6:SURCH (ONE Max +ve 0.000 0.000 0.000 26.157
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -21.730
8:COMB. 01: D Max +ve 0.000 0.000 0.000 30.302
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 29.470
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 34.590
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 67.242
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 66.410
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 71.531
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 19.737
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 19.280
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 22.096
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 41.467
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 41.009
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 43.826
Max -ve 0.000 0.000
44 41 0.555 1:DL Max +ve 0.000 0.000 0.000 0.996
Max -ve 0.000 0.000 0.555 -5.430
2:SIDL Max +ve 0.000 0.000 0.555 0.157
Max -ve 0.000 0.000 0.000 -0.401
3:EP Max +ve 0.000 0.000 0.000 4.427
Max -ve 0.000 0.000 0.555 -0.237
4:LL (MOMENT Max +ve 0.000 0.000 0.555 0.335
Max -ve 0.000 0.000 0.000 -0.855

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 45 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 46
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
5:LL (SHEAR) Max +ve 0.000 0.000 0.555 0.400
Max -ve 0.000 0.000 0.000 -1.020
6:SURCH (ONE Max +ve 0.000 0.000 0.000 18.057
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -15.810
8:COMB. 01: D Max +ve 0.000 0.000 0.000 10.229
Max -ve 0.000 0.000 0.555 -7.115
9:COMB. 02: D Max +ve 0.000 0.000 0.000 9.898
Max -ve 0.000 0.000 0.555 -6.985
10:COMB. 03: Max +ve 0.000 0.000 0.000 11.938
Max -ve 0.000 0.000 0.555 -7.785
11:COMB. 04: D Max +ve 0.000 0.000 0.000 37.106
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 36.774
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 38.815
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 6.249
Max -ve 0.000 0.000 0.555 -5.166
15:COMB. 08: Max +ve 0.000 0.000 0.000 6.067
Max -ve 0.000 0.000 0.555 -5.094
16:COMB. 09: Max +ve 0.000 0.000 0.000 7.189
Max -ve 0.000 0.000 0.555 -5.534
17:COMB. 10: Max +ve 0.000 0.000 0.000 22.059
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 21.876
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 22.999
Max -ve 0.000 0.000
45 42 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.335
2:SIDL Max +ve 0.000 0.000 0.555 0.691
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -5.335
4:LL (MOMENT Max +ve 0.000 0.000 0.555 1.473
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.555 1.759
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 10.002
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.055
8:COMB. 01: D Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 46 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 47
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 0.555 -22.164
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -21.593
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -25.111
11:COMB. 04: D Max +ve 0.000 0.000 0.000 9.984
Max -ve 0.000 0.000 0.555 -14.613
12:COMB. 05: Max +ve 0.000 0.000 0.000 10.114
Max -ve 0.000 0.000 0.555 -14.042
13:COMB. 06: Max +ve 0.000 0.000 0.000 9.314
Max -ve 0.000 0.000 0.555 -17.560
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -14.782
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -14.467
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -16.402
17:COMB. 10: Max +ve 0.000 0.000 0.000 4.893
Max -ve 0.000 0.000 0.555 -10.340
18:COMB. 11: D Max +ve 0.000 0.000 0.000 4.964
Max -ve 0.000 0.000 0.555 -10.026
19:COMB. 12: Max +ve 0.000 0.000 0.000 4.524
Max -ve 0.000 0.000 0.555 -11.960
46 43 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.791
2:SIDL Max +ve 0.000 0.000 0.555 1.222
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -11.044
4:LL (MOMENT Max +ve 0.000 0.000 0.555 2.606
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.555 3.111
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 1.881
Max -ve 0.000 0.000 0.555 -6.493
7:SURCH (OTH Max +ve 0.000 0.000 0.555 1.129
Max -ve 0.000 0.000 0.000 -4.442
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -35.347
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -34.336
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -40.559
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -37.267

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 47 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 48
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -36.256
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -42.478
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -22.867
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -22.311
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -25.734
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -23.996
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -23.441
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -26.863
47 44 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.093 -10.833
2:SIDL Max +ve 0.000 0.000 0.555 1.769
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -17.513
4:LL (MOMENT Max +ve 0.000 0.000 0.555 3.773
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.555 4.505
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.306
7:SURCH (OTH Max +ve 0.000 0.000 0.555 6.770
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -46.957
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -45.494
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -54.504
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -58.466
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -57.003
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -66.013
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -29.603
15:COMB. 08: Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 48 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 49
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 0.555 -28.798
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -33.754
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -36.373
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -35.568
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -40.524
48 45 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.828
2:SIDL Max +ve 0.000 0.000 0.555 2.345
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -24.837
4:LL (MOMENT Max +ve 0.000 0.000 0.555 5.002
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.555 5.972
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -24.710
7:SURCH (OTH Max +ve 0.000 0.000 0.555 12.587
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -57.123
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -55.183
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -67.126
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -78.521
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -76.581
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -88.524
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -35.062
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -33.995
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -40.563
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -47.649
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -46.582

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 49 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 50
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -53.150
49 46 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -6.418
2:SIDL Max +ve 0.000 0.000 0.555 2.954
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -33.025
4:LL (MOMENT Max +ve 0.000 0.000 0.555 6.300
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.555 7.521
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -34.786
7:SURCH (OTH Max +ve 0.000 0.000 0.555 18.654
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -65.741
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -63.298
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -78.341
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -97.453
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -95.009
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -110.052
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -39.169
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -37.826
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -46.099
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -57.823
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -56.479
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -64.753
50 47 0.555 1:DL Max +ve 0.000 0.000 0.555 8.071
Max -ve 0.000 0.000 0.000 -0.487
2:SIDL Max +ve 0.000 0.000 0.555 3.588
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 50 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 51
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 0.555 -41.966
4:LL (MOMENT Max +ve 0.000 0.000 0.555 7.652
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.555 9.136
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -45.492
7:SURCH (OTH Max +ve 0.000 0.000 0.555 24.982
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -72.430
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -69.462
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -87.733
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -114.900
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -111.932
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -130.203
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -41.682
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -40.050
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -50.099
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -66.664
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -65.032
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -75.081
51 48 0.555 1:DL Max +ve 0.000 0.000 0.555 19.365
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000 0.555 4.225
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -51.388
4:LL (MOMENT Max +ve 0.000 0.000 0.555 9.011
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.555 10.758
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -56.616

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 51 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 52
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
7:SURCH (OTH Max +ve 0.000 0.000 0.555 31.494
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -76.484
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -72.989
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -94.506
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -130.024
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -126.529
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -148.046
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.370 -42.326
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.324 -40.515
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -52.075
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -73.657
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -71.735
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -83.569
52 49 0.600 1:DL Max +ve 0.000 0.000 0.600 6.490
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -0.434
3:EP Max +ve 0.000 0.000 0.600 3.734
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -0.925
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -1.104
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -1.882
7:SURCH (OTH Max +ve 0.000 0.000 0.600 3.693
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000 0.600 15.794
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.600 15.436
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.600 17.644

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 52 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 53
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.600 9.516
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.600 9.157
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.600 11.366
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.600 10.497
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.600 10.299
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.600 11.514
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.600 6.803
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.600 6.606
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.600 7.821
Max -ve 0.000 0.000
53 50 0.600 1:DL Max +ve 0.000 0.000 0.000 1.598
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.165
3:EP Max +ve 0.000 0.000 0.000 1.492
Max -ve 0.000 0.000 0.600 -0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.351
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.420
6:SURCH (ONE Max +ve 0.000 0.000 0.000 1.432
Max -ve 0.000 0.000 0.600 -0.000
7:SURCH (OTH Max +ve 0.000 0.000 0.600 -0.000
Max -ve 0.000 0.000 0.000 -0.708
8:COMB. 01: D Max +ve 0.000 0.000 0.000 4.974
Max -ve 0.000 0.000 0.600 -0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 4.838
Max -ve 0.000 0.000 0.600 -0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 5.677
Max -ve 0.000 0.000 0.600 -0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 6.177
Max -ve 0.000 0.000 0.600 -0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 6.041
Max -ve 0.000 0.000 0.600 -0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 6.880
Max -ve 0.000 0.000 0.600 -0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 53 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 54
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
14:COMB. 07: Max +ve 0.000 0.000 0.000 3.231
Max -ve 0.000 0.000 0.600 -0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 3.156
Max -ve 0.000 0.000 0.600 -0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 3.617
Max -ve 0.000 0.000 0.600 -0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 3.938
Max -ve 0.000 0.000 0.600 -0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 3.863
Max -ve 0.000 0.000 0.600 -0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 4.325
Max -ve 0.000 0.000 0.600 -0.000

Beam Maximum Shear Forces


Distances to maxima are given from beam end A.
Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
1 1 0.600 1:DL Max +ve 0.000 0.000 0.000 0.170
Max -ve 0.000 0.000 0.600 -5.497
2:SIDL Max +ve 0.000 0.000 0.000 0.275
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.487
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.586
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 0.699
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 1.246
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.453
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -12.256
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -12.029
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -13.427
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -8.086
12:COMB. 05: Max +ve 0.000 0.000 0.000 0.076
Max -ve 0.000 0.000 0.600 -7.859
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -9.257
14:COMB. 07: Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 54 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 55
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000 0.600 -8.218
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -8.093
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -8.862
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -5.765
18:COMB. 11: D Max +ve 0.000 0.000 0.000 0.028
Max -ve 0.000 0.000 0.600 -5.640
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -6.409
2 2 0.555 1:DL Max +ve 0.000 0.000 0.000 22.970
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000 0.000 1.148
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -16.976
4:LL (MOMENT Max +ve 0.000 0.000 0.000 2.449
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 2.924
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 12.343
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -20.676
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -11.012
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.062
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.910
11:COMB. 04: D Max +ve 0.000 0.000 0.000 31.476
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 32.426
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 26.579
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 1.733
Max -ve 0.000 0.000 0.555 -3.510
15:COMB. 08: Max +ve 0.000 0.000 0.000 2.256
Max -ve 0.000 0.000 0.555 -2.987
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -6.203
17:COMB. 10: Max +ve 0.000 0.000 0.000 22.409
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 55 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 56
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
18:COMB. 11: D Max +ve 0.000 0.000 0.000 22.931
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 19.715
Max -ve 0.000 0.000
3 3 0.555 1:DL Max +ve 0.000 0.000 0.000 23.341
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.002
3:EP Max +ve 0.000 0.000 0.000 2.561
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.137
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.552
6:SURCH (ONE Max +ve 0.000 0.000 0.000 10.359
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.123
8:COMB. 01: D Max +ve 0.000 0.000 0.000 32.854
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 32.025
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 37.128
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 48.364
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 47.535
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 52.638
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 23.585
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 23.129
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 25.936
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 32.708
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 32.252
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 35.059
Max -ve 0.000 0.000
4 4 0.555 1:DL Max +ve 0.000 0.000 0.000 23.479
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 56 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 57
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000 0.000 -0.371
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.422
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.790
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.944
6:SURCH (ONE Max +ve 0.000 0.000 0.000 9.593
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.285
8:COMB. 01: D Max +ve 0.000 0.000 0.000 26.956
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 26.649
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 28.536
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 44.440
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 44.133
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 46.020
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 20.051
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 19.883
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 20.921
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 30.336
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 30.167
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 31.205
Max -ve 0.000 0.000
5 5 0.555 1:DL Max +ve 0.000 0.000 0.000 23.821
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.212
3:EP Max +ve 0.000 0.000 0.000 7.750
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.584
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -3.085

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 57 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 58
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
6:SURCH (ONE Max +ve 0.000 0.000 0.000 14.759
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.916
8:COMB. 01: D Max +ve 0.000 0.000 0.000 45.465
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 44.463
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 50.634
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 64.022
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 63.020
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 69.191
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 31.117
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 30.566
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 33.960
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 42.033
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 41.482
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 44.876
Max -ve 0.000 0.000
6 6 0.600 1:DL Max +ve 0.000 0.000 0.000 10.987
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.448
3:EP Max +ve 0.000 0.000 0.000 3.736
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.956
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.141
6:SURCH (ONE Max +ve 0.000 0.000 0.000 3.603
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.790
8:COMB. 01: D Max +ve 0.000 0.000 0.000 22.006
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 21.635

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 58 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 59
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 23.918
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 25.049
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 24.678
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 26.961
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 14.946
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 14.742
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 15.998
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 16.736
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 16.532
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 17.788
Max -ve 0.000 0.000
7 2 5.975 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -5.307
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -4.947
3:EP Max +ve 0.000 0.000 0.000 151.308
Max -ve 0.000 0.000 5.975 -80.941
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.551
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -12.597
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -13.591
7:SURCH (OTH Max +ve 0.000 0.000 0.000 64.155
Max -ve 0.000 0.000 5.975 -66.628
8:COMB. 01: D Max +ve 0.000 0.000 0.000 304.756
Max -ve 0.000 0.000 5.975 -312.398
9:COMB. 02: D Max +ve 0.000 0.000 0.000 300.664
Max -ve 0.000 0.000 5.975 -316.490
10:COMB. 03: Max +ve 0.000 0.000 0.000 325.858
Max -ve 0.000 0.000 5.975 -291.296
11:COMB. 04: D Max +ve 0.000 0.000 0.000 195.692
Max -ve 0.000 0.000 5.975 -199.130
12:COMB. 05: Max +ve 0.000 0.000 0.000 191.600
Max -ve 0.000 0.000 5.975 -203.222

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 59 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 60
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
13:COMB. 06: Max +ve 0.000 0.000 0.000 216.794
Max -ve 0.000 0.000 5.975 -178.029
14:COMB. 07: Max +ve 0.000 0.000 0.000 179.022
Max -ve 0.000 0.000 5.975 -184.009
15:COMB. 08: Max +ve 0.000 0.000 0.000 176.772
Max -ve 0.000 0.000 5.975 -186.260
16:COMB. 09: Max +ve 0.000 0.000 0.000 190.628
Max -ve 0.000 0.000 5.975 -172.404
17:COMB. 10: Max +ve 0.000 0.000 0.000 114.867
Max -ve 0.000 0.000 5.975 -117.382
18:COMB. 11: D Max +ve 0.000 0.000 0.000 112.616
Max -ve 0.000 0.000 5.975 -119.632
19:COMB. 12: Max +ve 0.000 0.000 0.000 126.473
Max -ve 0.000 0.000 5.975 -105.776
8 3 5.975 1:DL Max +ve 0.000 0.000 0.000 0.511
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000 0.000 0.593
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.705
4:LL (MOMENT Max +ve 0.000 0.000 0.000 1.265
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 1.510
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -20.707
7:SURCH (OTH Max +ve 0.000 0.000 0.000 20.259
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000 0.000 2.472
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 2.963
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.057
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -31.968
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -31.478
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -34.498
14:COMB. 07: Max +ve 0.000 0.000 0.000 1.462
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 1.731
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 0.070

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 60 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 61
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -18.798
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -18.528
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -20.189
9 4 5.975 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.000
3:EP Max +ve 0.000 0.000 0.000 0.000
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.000
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.000
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -19.729
7:SURCH (OTH Max +ve 0.000 0.000 0.000 19.712
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.030
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.030
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.030
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -33.540
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -33.540
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -33.540
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.017
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.017
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.017
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -19.729
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -19.729
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -19.729

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 61 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 62
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
10 5 5.975 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.511
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.593
3:EP Max +ve 0.000 0.000 0.000 0.705
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.265
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.510
6:SURCH (ONE Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -19.542
7:SURCH (OTH Max +ve 0.000 0.000 0.000 19.993
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.467
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.957
10:COMB. 03: Max +ve 0.000 0.000 0.000 0.062
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -36.455
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -36.945
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -33.925
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.459
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.728
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.067
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -21.451
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -21.721
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -20.060
11 6 5.975 1:DL Max +ve 0.000 0.000 0.000 5.307
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000 0.000 4.947
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000 5.975 80.941
Max -ve 0.000 0.000 0.000 -151.308
4:LL (MOMENT Max +ve 0.000 0.000 0.000 10.551

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 62 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 63
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 12.597
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 5.975 67.312
Max -ve 0.000 0.000 0.000 -63.472
7:SURCH (OTH Max +ve 0.000 0.000 0.000 12.911
Max -ve 0.000 0.000
8:COMB. 01: D Max +ve 0.000 0.000 5.975 312.403
Max -ve 0.000 0.000 0.000 -304.751
9:COMB. 02: D Max +ve 0.000 0.000 5.975 316.495
Max -ve 0.000 0.000 0.000 -300.659
10:COMB. 03: Max +ve 0.000 0.000 5.975 291.301
Max -ve 0.000 0.000 0.000 -325.853
11:COMB. 04: D Max +ve 0.000 0.000 5.975 290.454
Max -ve 0.000 0.000 0.000 -326.700
12:COMB. 05: Max +ve 0.000 0.000 5.975 294.546
Max -ve 0.000 0.000 0.000 -322.608
13:COMB. 06: Max +ve 0.000 0.000 5.975 269.353
Max -ve 0.000 0.000 0.000 -347.801
14:COMB. 07: Max +ve 0.000 0.000 5.975 184.012
Max -ve 0.000 0.000 0.000 -179.019
15:COMB. 08: Max +ve 0.000 0.000 5.975 186.263
Max -ve 0.000 0.000 0.000 -176.769
16:COMB. 09: Max +ve 0.000 0.000 5.975 172.407
Max -ve 0.000 0.000 0.000 -190.625
17:COMB. 10: Max +ve 0.000 0.000 5.975 171.102
Max -ve 0.000 0.000 0.000 -191.930
18:COMB. 11: D Max +ve 0.000 0.000 5.975 173.352
Max -ve 0.000 0.000 0.000 -189.680
19:COMB. 12: Max +ve 0.000 0.000 5.975 159.496
Max -ve 0.000 0.000 0.000 -203.536
12 8 5.550 1:DL Max +ve 0.000 0.000 0.000 32.685
Max -ve 0.000 0.000 5.550 -39.403
2:SIDL Max +ve 0.000 0.000 0.000 49.509
Max -ve 0.000 0.000 5.550 -61.879
3:EP Max +ve 0.000 0.000 0.000 18.142
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000 0.000 105.580
Max -ve 0.000 0.000 5.550 -131.960
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 126.055
Max -ve 0.000 0.000 5.550 -157.550
6:SURCH (ONE Max +ve 0.000 0.000 0.000 15.049
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -3.554

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 63 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 64
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
8:COMB. 01: D Max +ve 0.000 0.000 0.000 406.322
Max -ve 0.000 0.000 5.550 -392.459
9:COMB. 02: D Max +ve 0.000 0.000 0.000 447.271
Max -ve 0.000 0.000 5.550 -443.639
10:COMB. 03: Max +ve 0.000 0.000 0.000 195.161
Max -ve 0.000 0.000 5.550 -128.539
11:COMB. 04: D Max +ve 0.000 0.000 0.000 412.363
Max -ve 0.000 0.000 5.550 -386.418
12:COMB. 05: Max +ve 0.000 0.000 0.000 453.312
Max -ve 0.000 0.000 5.550 -437.598
13:COMB. 06: Max +ve 0.000 0.000 0.000 201.202
Max -ve 0.000 0.000 5.550 -122.497
14:COMB. 07: Max +ve 0.000 0.000 0.000 237.872
Max -ve 0.000 0.000 5.550 -229.176
15:COMB. 08: Max +ve 0.000 0.000 0.000 260.394
Max -ve 0.000 0.000 5.550 -257.326
16:COMB. 09: Max +ve 0.000 0.000 0.000 121.733
Max -ve 0.000 0.000 5.550 -84.020
17:COMB. 10: Max +ve 0.000 0.000 0.000 241.425
Max -ve 0.000 0.000 5.550 -225.623
18:COMB. 11: D Max +ve 0.000 0.000 0.000 263.948
Max -ve 0.000 0.000 5.550 -253.772
19:COMB. 12: Max +ve 0.000 0.000 0.000 125.287
Max -ve 0.000 0.000 5.550 -80.467
13 9 5.550 1:DL Max +ve 0.000 0.000 0.000 36.552
Max -ve 0.000 0.000 5.550 -35.535
2:SIDL Max +ve 0.000 0.000 0.000 56.791
Max -ve 0.000 0.000 5.550 -54.597
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -3.816
4:LL (MOMENT Max +ve 0.000 0.000 0.000 121.110
Max -ve 0.000 0.000 5.550 -116.430
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 144.596
Max -ve 0.000 0.000 5.550 -139.009
6:SURCH (ONE Max +ve 0.000 0.000 0.000 11.011
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -13.499
8:COMB. 01: D Max +ve 0.000 0.000 0.000 396.257
Max -ve 0.000 0.000 5.550 -402.521
9:COMB. 02: D Max +ve 0.000 0.000 0.000 443.229
Max -ve 0.000 0.000 5.550 -447.678
10:COMB. 03: Max +ve 0.000 0.000 0.000 154.037
Max -ve 0.000 0.000 5.550 -169.661
11:COMB. 04: D Max +ve 0.000 0.000 0.000 419.206

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 64 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 65
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000 5.550 -379.572
12:COMB. 05: Max +ve 0.000 0.000 0.000 466.178
Max -ve 0.000 0.000 5.550 -424.729
13:COMB. 06: Max +ve 0.000 0.000 0.000 176.987
Max -ve 0.000 0.000 5.550 -146.712
14:COMB. 07: Max +ve 0.000 0.000 0.000 231.618
Max -ve 0.000 0.000 5.550 -235.429
15:COMB. 08: Max +ve 0.000 0.000 0.000 257.453
Max -ve 0.000 0.000 5.550 -260.266
16:COMB. 09: Max +ve 0.000 0.000 0.000 98.397
Max -ve 0.000 0.000 5.550 -107.356
17:COMB. 10: Max +ve 0.000 0.000 0.000 245.117
Max -ve 0.000 0.000 5.550 -221.930
18:COMB. 11: D Max +ve 0.000 0.000 0.000 270.952
Max -ve 0.000 0.000 5.550 -246.766
19:COMB. 12: Max +ve 0.000 0.000 0.000 111.896
Max -ve 0.000 0.000 5.550 -93.857
14 10 5.550 1:DL Max +ve 0.000 0.000 0.000 35.535
Max -ve 0.000 0.000 5.550 -36.552
2:SIDL Max +ve 0.000 0.000 0.000 54.597
Max -ve 0.000 0.000 5.550 -56.791
3:EP Max +ve 0.000 0.000 0.000 3.816
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000 0.000 116.430
Max -ve 0.000 0.000 5.550 -121.110
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 139.009
Max -ve 0.000 0.000 5.550 -144.596
6:SURCH (ONE Max +ve 0.000 0.000 0.000 13.302
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.810
8:COMB. 01: D Max +ve 0.000 0.000 0.000 402.527
Max -ve 0.000 0.000 5.550 -396.252
9:COMB. 02: D Max +ve 0.000 0.000 0.000 447.685
Max -ve 0.000 0.000 5.550 -443.224
10:COMB. 03: Max +ve 0.000 0.000 0.000 169.667
Max -ve 0.000 0.000 5.550 -154.032
11:COMB. 04: D Max +ve 0.000 0.000 0.000 420.905
Max -ve 0.000 0.000 5.550 -377.874
12:COMB. 05: Max +ve 0.000 0.000 0.000 466.062
Max -ve 0.000 0.000 5.550 -424.847
13:COMB. 06: Max +ve 0.000 0.000 0.000 188.045
Max -ve 0.000 0.000 5.550 -135.654
14:COMB. 07: Max +ve 0.000 0.000 0.000 235.433
Max -ve 0.000 0.000 5.550 -231.615

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 65 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 66
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
15:COMB. 08: Max +ve 0.000 0.000 0.000 260.269
Max -ve 0.000 0.000 5.550 -257.450
16:COMB. 09: Max +ve 0.000 0.000 0.000 107.360
Max -ve 0.000 0.000 5.550 -98.394
17:COMB. 10: Max +ve 0.000 0.000 0.000 246.243
Max -ve 0.000 0.000 5.550 -220.804
18:COMB. 11: D Max +ve 0.000 0.000 0.000 271.080
Max -ve 0.000 0.000 5.550 -246.639
19:COMB. 12: Max +ve 0.000 0.000 0.000 118.170
Max -ve 0.000 0.000 5.550 -87.583
15 11 5.550 1:DL Max +ve 0.000 0.000 0.000 39.403
Max -ve 0.000 0.000 5.550 -32.685
2:SIDL Max +ve 0.000 0.000 0.000 61.879
Max -ve 0.000 0.000 5.550 -49.509
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -18.142
4:LL (MOMENT Max +ve 0.000 0.000 0.000 131.960
Max -ve 0.000 0.000 5.550 -105.580
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 157.550
Max -ve 0.000 0.000 5.550 -126.055
6:SURCH (ONE Max +ve 0.000 0.000 0.000 2.833
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -14.322
8:COMB. 01: D Max +ve 0.000 0.000 0.000 392.469
Max -ve 0.000 0.000 5.550 -406.310
9:COMB. 02: D Max +ve 0.000 0.000 0.000 443.650
Max -ve 0.000 0.000 5.550 -447.259
10:COMB. 03: Max +ve 0.000 0.000 0.000 128.549
Max -ve 0.000 0.000 5.550 -195.150
11:COMB. 04: D Max +ve 0.000 0.000 0.000 416.817
Max -ve 0.000 0.000 5.550 -381.962
12:COMB. 05: Max +ve 0.000 0.000 0.000 467.998
Max -ve 0.000 0.000 5.550 -422.911
13:COMB. 06: Max +ve 0.000 0.000 0.000 152.897
Max -ve 0.000 0.000 5.550 -170.802
14:COMB. 07: Max +ve 0.000 0.000 0.000 229.182
Max -ve 0.000 0.000 5.550 -237.865
15:COMB. 08: Max +ve 0.000 0.000 0.000 257.332
Max -ve 0.000 0.000 5.550 -260.387
16:COMB. 09: Max +ve 0.000 0.000 0.000 84.026
Max -ve 0.000 0.000 5.550 -121.727
17:COMB. 10: Max +ve 0.000 0.000 0.000 243.505
Max -ve 0.000 0.000 5.550 -223.543
18:COMB. 11: D Max +ve 0.000 0.000 0.000 271.654

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 66 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 67
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000 5.550 -246.065
19:COMB. 12: Max +ve 0.000 0.000 0.000 98.349
Max -ve 0.000 0.000 5.550 -107.405
16 13 0.555 1:DL Max +ve 0.000 0.000 0.000 18.041
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000 0.000 1.142
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -16.110
4:LL (MOMENT Max +ve 0.000 0.000 0.000 2.436
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 2.908
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 11.986
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -19.867
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.711
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -14.767
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -20.583
11:COMB. 04: D Max +ve 0.000 0.000 0.000 25.402
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 26.347
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 20.530
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.143
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -6.623
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.823
17:COMB. 10: Max +ve 0.000 0.000 0.000 17.967
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 18.486
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 15.287
Max -ve 0.000 0.000
17 14 0.555 1:DL Max +ve 0.000 0.000 0.000 13.308
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000 0.000 1.097
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 67 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 68
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -14.753
4:LL (MOMENT Max +ve 0.000 0.000 0.000 2.339
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 2.793
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 11.485
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -18.704
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -19.190
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -18.283
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -23.868
11:COMB. 04: D Max +ve 0.000 0.000 0.000 19.947
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 20.854
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 15.269
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.018
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.519
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -12.591
17:COMB. 10: Max +ve 0.000 0.000 0.000 13.929
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 14.428
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 11.356
Max -ve 0.000 0.000
18 15 0.555 1:DL Max +ve 0.000 0.000 0.000 8.766
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000 0.000 1.038
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -13.196
4:LL (MOMENT Max +ve 0.000 0.000 0.000 2.213
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 2.643
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 11.006

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 68 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 69
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -17.466
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -21.979
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -21.121
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -26.406
11:COMB. 04: D Max +ve 0.000 0.000 0.000 15.053
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 15.912
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 10.626
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -12.452
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -11.980
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -14.887
17:COMB. 10: Max +ve 0.000 0.000 0.000 10.257
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 10.729
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 7.822
Max -ve 0.000 0.000
19 16 0.555 1:DL Max +ve 0.000 0.000 0.000 4.358
Max -ve 0.000 0.000 0.555 -0.885
2:SIDL Max +ve 0.000 0.000 0.000 0.986
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -11.655
4:LL (MOMENT Max +ve 0.000 0.000 0.000 2.103
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 2.511
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 10.665
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -16.376
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -24.583
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -23.768

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 69 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 70
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -28.790
11:COMB. 04: D Max +ve 0.000 0.000 0.000 10.596
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 11.412
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 6.390
Max -ve 0.000 0.000 0.555 -0.950
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -14.755
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -14.306
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -17.068
17:COMB. 10: Max +ve 0.000 0.000 0.000 6.864
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 7.313
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 4.551
Max -ve 0.000 0.000 0.555 -0.692
20 17 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -5.246
2:SIDL Max +ve 0.000 0.000 0.000 0.957
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.287
4:LL (MOMENT Max +ve 0.000 0.000 0.000 2.041
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 2.437
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 10.525
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -15.572
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -27.416
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -26.625
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -31.499
11:COMB. 04: D Max +ve 0.000 0.000 0.000 6.397
Max -ve 0.000 0.000 0.555 -0.943
12:COMB. 05: Max +ve 0.000 0.000 0.000 7.188
Max -ve 0.000 0.000 0.555 -0.152
13:COMB. 06: Max +ve 0.000 0.000 0.000 2.315

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 70 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 71
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000 0.555 -5.025
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -17.187
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -16.751
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -19.432
17:COMB. 10: Max +ve 0.000 0.000 0.000 3.629
Max -ve 0.000 0.000 0.555 -1.614
18:COMB. 11: D Max +ve 0.000 0.000 0.000 4.064
Max -ve 0.000 0.000 0.555 -1.179
19:COMB. 12: Max +ve 0.000 0.000 0.000 1.383
Max -ve 0.000 0.000 0.555 -3.859
21 18 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.657
2:SIDL Max +ve 0.000 0.000 0.000 0.961
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.187
4:LL (MOMENT Max +ve 0.000 0.000 0.000 2.050
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 2.448
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 10.597
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -15.113
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -30.791
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -29.996
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -34.891
11:COMB. 04: D Max +ve 0.000 0.000 0.000 2.241
Max -ve 0.000 0.000 0.555 -5.099
12:COMB. 05: Max +ve 0.000 0.000 0.000 3.036
Max -ve 0.000 0.000 0.555 -4.304
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.200
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -19.951
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -19.513
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -22.206

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 71 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 72
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
17:COMB. 10: Max +ve 0.000 0.000 0.000 0.405
Max -ve 0.000 0.000 0.555 -4.838
18:COMB. 11: D Max +ve 0.000 0.000 0.000 0.842
Max -ve 0.000 0.000 0.555 -4.400
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.093
22 19 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -14.200
2:SIDL Max +ve 0.000 0.000 0.000 1.005
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -8.403
4:LL (MOMENT Max +ve 0.000 0.000 0.000 2.144
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 2.559
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 10.840
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -14.980
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -34.903
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -34.072
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -39.191
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.438
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -8.607
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -13.725
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -23.178
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -22.720
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -25.536
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -8.198
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.741
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.556
23 20 0.555 1:DL Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 72 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 73
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000 0.555 -18.924
2:SIDL Max +ve 0.000 0.000 0.000 1.090
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -7.936
4:LL (MOMENT Max +ve 0.000 0.000 0.000 2.324
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 2.775
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 11.163
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -15.081
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -39.818
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -38.917
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -44.467
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -14.180
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -13.279
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -18.828
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -26.914
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -26.418
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -29.471
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -11.833
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -11.337
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -14.389
24 21 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -23.821
2:SIDL Max +ve 0.000 0.000 0.000 1.212
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -7.750
4:LL (MOMENT Max +ve 0.000 0.000 0.000 2.584
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 73 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 74
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 3.085
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 11.421
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -15.254
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -45.448
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -44.446
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -50.616
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -19.517
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -18.514
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -24.685
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -31.107
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -30.556
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -33.949
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.853
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.302
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -18.696
25 22 0.555 1:DL Max +ve 0.000 0.000 0.000 18.447
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.838
3:EP Max +ve 0.000 0.000 0.000 2.432
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.787
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.133
6:SURCH (ONE Max +ve 0.000 0.000 0.000 10.080
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -8.909
8:COMB. 01: D Max +ve 0.000 0.000 0.000 26.701

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 74 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 75
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 26.008
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 30.275
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 41.847
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 41.154
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 45.420
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 19.079
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 18.698
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 21.044
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 27.988
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 27.607
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 29.954
Max -ve 0.000 0.000
26 23 0.555 1:DL Max +ve 0.000 0.000 0.000 13.724
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.670
3:EP Max +ve 0.000 0.000 0.000 2.242
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.429
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.706
6:SURCH (ONE Max +ve 0.000 0.000 0.000 9.713
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -8.636
8:COMB. 01: D Max +ve 0.000 0.000 0.000 20.658
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 20.104
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 23.517
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 35.340
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 75 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 76
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
12:COMB. 05: Max +ve 0.000 0.000 0.000 34.785
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 38.198
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 14.667
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 14.363
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 16.239
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 23.303
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 22.999
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 24.876
Max -ve 0.000 0.000
27 24 0.555 1:DL Max +ve 0.000 0.000 0.000 9.176
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.506
3:EP Max +ve 0.000 0.000 0.000 2.033
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.078
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.287
6:SURCH (ONE Max +ve 0.000 0.000 0.000 9.397
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -8.422
8:COMB. 01: D Max +ve 0.000 0.000 0.000 14.794
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 14.376
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 16.950
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 29.112
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 28.694
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 31.268
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 10.392
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 10.162

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 76 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 77
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 11.578
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 18.815
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 18.585
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 20.000
Max -ve 0.000 0.000
28 25 0.555 1:DL Max +ve 0.000 0.000 0.000 4.755
Max -ve 0.000 0.000 0.555 -0.488
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.347
3:EP Max +ve 0.000 0.000 0.000 1.835
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.740
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.884
6:SURCH (ONE Max +ve 0.000 0.000 0.000 9.222
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -8.343
8:COMB. 01: D Max +ve 0.000 0.000 0.000 9.095
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 8.808
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 10.576
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 23.278
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 22.991
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 24.759
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 6.238
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 6.080
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 7.052
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 14.581
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 14.423
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 77 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 78
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
19:COMB. 12: Max +ve 0.000 0.000 0.000 15.395
Max -ve 0.000 0.000
29 26 0.555 1:DL Max +ve 0.000 0.000 0.000 0.377
Max -ve 0.000 0.000 0.555 -4.865
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.196
3:EP Max +ve 0.000 0.000 0.000 1.667
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.417
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.498
6:SURCH (ONE Max +ve 0.000 0.000 0.000 9.231
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -8.432
8:COMB. 01: D Max +ve 0.000 0.000 0.000 3.495
Max -ve 0.000 0.000 0.555 -3.845
9:COMB. 02: D Max +ve 0.000 0.000 0.000 3.333
Max -ve 0.000 0.000 0.555 -4.007
10:COMB. 03: Max +ve 0.000 0.000 0.000 4.329
Max -ve 0.000 0.000 0.555 -3.010
11:COMB. 04: D Max +ve 0.000 0.000 0.000 17.830
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 17.668
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 18.664
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 2.150
Max -ve 0.000 0.000 0.555 -3.093
15:COMB. 08: Max +ve 0.000 0.000 0.000 2.061
Max -ve 0.000 0.000 0.555 -3.182
16:COMB. 09: Max +ve 0.000 0.000 0.000 2.609
Max -ve 0.000 0.000 0.555 -2.634
17:COMB. 10: Max +ve 0.000 0.000 0.000 10.582
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 10.493
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 11.041
Max -ve 0.000 0.000
30 27 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.291
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.050
3:EP Max +ve 0.000 0.000 0.000 1.543

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 78 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 79
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.107
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.128
6:SURCH (ONE Max +ve 0.000 0.000 0.000 9.424
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -8.685
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.441
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.483
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.228
11:COMB. 04: D Max +ve 0.000 0.000 0.000 12.662
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 12.621
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 12.876
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.186
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.209
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.069
17:COMB. 10: Max +ve 0.000 0.000 0.000 6.741
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 6.718
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 6.859
Max -ve 0.000 0.000
31 28 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -13.845
2:SIDL Max +ve 0.000 0.000 0.000 0.091
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000 0.000 1.464
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.195
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 0.233
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 9.754
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 79 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 80
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.052
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.127
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.051
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.517
11:COMB. 04: D Max +ve 0.000 0.000 0.000 7.602
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 7.677
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 7.212
Max -ve 0.000 0.000 0.555 -0.128
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -11.354
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -11.312
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -11.568
17:COMB. 10: Max +ve 0.000 0.000 0.000 2.941
Max -ve 0.000 0.000 0.555 -2.302
18:COMB. 11: D Max +ve 0.000 0.000 0.000 2.983
Max -ve 0.000 0.000 0.555 -2.260
19:COMB. 12: Max +ve 0.000 0.000 0.000 2.727
Max -ve 0.000 0.000 0.555 -2.516
32 29 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -18.576
2:SIDL Max +ve 0.000 0.000 0.000 0.231
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000 0.000 1.428
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.493
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 0.588
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 10.131
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.446
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -20.966
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -20.775
10:COMB. 03: Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 80 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 81
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000 0.555 -21.952
11:COMB. 04: D Max +ve 0.000 0.000 0.000 2.431
Max -ve 0.000 0.000 0.555 -4.909
12:COMB. 05: Max +ve 0.000 0.000 0.000 2.622
Max -ve 0.000 0.000 0.555 -4.718
13:COMB. 06: Max +ve 0.000 0.000 0.000 1.445
Max -ve 0.000 0.000 0.555 -5.894
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.643
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.538
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -16.185
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -6.198
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -6.093
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -6.740
33 30 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -23.479
2:SIDL Max +ve 0.000 0.000 0.000 0.371
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000 0.000 1.422
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.790
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 0.944
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 10.415
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.731
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -26.969
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -26.662
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -28.549
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.427
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.120
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -12.007

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 81 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 82
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -20.059
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -19.890
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -20.928
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.328
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.160
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -11.198
34 31 0.555 1:DL Max +ve 0.000 0.000 0.000 18.576
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.231
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.428
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.493
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.588
6:SURCH (ONE Max +ve 0.000 0.000 0.000 9.306
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.999
8:COMB. 01: D Max +ve 0.000 0.000 0.000 20.954
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 20.763
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 21.939
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 37.952
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 37.761
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 38.937
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 15.636
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 15.531
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 16.178
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 25.635

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 82 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 83
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 25.530
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 26.177
Max -ve 0.000 0.000
35 32 0.555 1:DL Max +ve 0.000 0.000 0.000 13.845
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.091
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.464
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.195
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.233
6:SURCH (ONE Max +ve 0.000 0.000 0.000 8.908
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.617
8:COMB. 01: D Max +ve 0.000 0.000 0.000 15.115
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 15.040
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 15.505
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 31.464
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 31.388
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 31.854
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 11.347
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 11.306
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 11.562
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 20.964
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 20.923
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 21.179
Max -ve 0.000 0.000
36 33 0.555 1:DL Max +ve 0.000 0.000 0.000 9.291
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 83 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 84
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
2:SIDL Max +ve 0.000 0.000 0.000 0.050
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.543
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.107
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 0.128
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 8.532
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.277
8:COMB. 01: D Max +ve 0.000 0.000 0.000 9.431
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 9.472
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 9.217
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 25.202
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 25.243
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 24.988
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 7.180
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 7.203
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 7.062
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 16.457
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 16.480
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 16.340
Max -ve 0.000 0.000
37 34 0.555 1:DL Max +ve 0.000 0.000 0.000 4.865
Max -ve 0.000 0.000 0.555 -0.377
2:SIDL Max +ve 0.000 0.000 0.000 0.196
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.667
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.417
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 0.498

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 84 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 85
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 8.267
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.071
8:COMB. 01: D Max +ve 0.000 0.000 0.000 3.835
Max -ve 0.000 0.000 0.555 -3.505
9:COMB. 02: D Max +ve 0.000 0.000 0.000 3.997
Max -ve 0.000 0.000 0.555 -3.343
10:COMB. 03: Max +ve 0.000 0.000 0.000 3.001
Max -ve 0.000 0.000 0.555 -4.339
11:COMB. 04: D Max +ve 0.000 0.000 0.000 19.256
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 19.417
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 18.421
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 3.087
Max -ve 0.000 0.000 0.555 -2.156
15:COMB. 08: Max +ve 0.000 0.000 0.000 3.176
Max -ve 0.000 0.000 0.555 -2.067
16:COMB. 09: Max +ve 0.000 0.000 0.000 2.628
Max -ve 0.000 0.000 0.555 -2.614
17:COMB. 10: Max +ve 0.000 0.000 0.000 12.158
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 12.247
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 11.699
Max -ve 0.000 0.000
38 35 0.555 1:DL Max +ve 0.000 0.000 0.000 0.488
Max -ve 0.000 0.000 0.555 -4.755
2:SIDL Max +ve 0.000 0.000 0.000 0.347
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.835
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.740
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 0.884
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 8.160
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.045
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.105

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 85 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 86
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -8.818
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.585
11:COMB. 04: D Max +ve 0.000 0.000 0.000 13.611
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 13.898
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 12.130
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -6.243
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -6.085
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.057
17:COMB. 10: Max +ve 0.000 0.000 0.000 8.044
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 8.202
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 7.230
Max -ve 0.000 0.000
39 36 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.177
2:SIDL Max +ve 0.000 0.000 0.000 0.506
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.033
4:LL (MOMENT Max +ve 0.000 0.000 0.000 1.078
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 1.287
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 8.220
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.200
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -14.803
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -14.385
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -16.959
11:COMB. 04: D Max +ve 0.000 0.000 0.000 8.177
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 8.595

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 86 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 87
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 6.021
Max -ve 0.000 0.000 0.555 -1.319
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.397
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -10.168
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -11.583
17:COMB. 10: Max +ve 0.000 0.000 0.000 4.045
Max -ve 0.000 0.000 0.555 -1.198
18:COMB. 11: D Max +ve 0.000 0.000 0.000 4.275
Max -ve 0.000 0.000 0.555 -0.968
19:COMB. 12: Max +ve 0.000 0.000 0.000 2.859
Max -ve 0.000 0.000 0.555 -2.384
40 37 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -13.724
2:SIDL Max +ve 0.000 0.000 0.000 0.670
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.242
4:LL (MOMENT Max +ve 0.000 0.000 0.000 1.429
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 1.706
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 8.413
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.495
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -20.667
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -20.112
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -23.525
11:COMB. 04: D Max +ve 0.000 0.000 0.000 2.814
Max -ve 0.000 0.000 0.555 -4.526
12:COMB. 05: Max +ve 0.000 0.000 0.000 3.368
Max -ve 0.000 0.000 0.555 -3.971
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -7.384
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -14.672
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -14.367

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 87 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 88
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -16.244
17:COMB. 10: Max +ve 0.000 0.000 0.000 0.065
Max -ve 0.000 0.000 0.555 -5.178
18:COMB. 11: D Max +ve 0.000 0.000 0.000 0.370
Max -ve 0.000 0.000 0.555 -4.873
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -6.750
41 38 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -18.447
2:SIDL Max +ve 0.000 0.000 0.000 0.838
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.432
4:LL (MOMENT Max +ve 0.000 0.000 0.000 1.787
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 2.133
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 8.667
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -9.842
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -26.710
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -26.017
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -30.283
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.977
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.284
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -13.551
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -19.084
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -18.703
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -21.049
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -9.241
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -8.860
19:COMB. 12: Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 88 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 89
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000 0.555 -11.207
42 39 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -23.341
2:SIDL Max +ve 0.000 0.000 0.000 1.002
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.561
4:LL (MOMENT Max +ve 0.000 0.000 0.000 2.137
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 2.552
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 8.869
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.110
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -32.862
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -32.033
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -37.136
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.676
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -14.847
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -19.950
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -23.589
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -23.134
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -25.940
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -13.480
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -13.024
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -15.831
43 40 0.555 1:DL Max +ve 0.000 0.000 0.000 18.924
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.090
3:EP Max +ve 0.000 0.000 0.000 7.936
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 89 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 90
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.324
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.775
6:SURCH (ONE Max +ve 0.000 0.000 0.000 14.595
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.666
8:COMB. 01: D Max +ve 0.000 0.000 0.000 39.836
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 38.934
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 44.484
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 57.969
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 57.067
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 62.617
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 26.924
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 26.429
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 29.481
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 37.591
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 37.095
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 40.148
Max -ve 0.000 0.000
44 41 0.555 1:DL Max +ve 0.000 0.000 0.000 14.200
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.005
3:EP Max +ve 0.000 0.000 0.000 8.403
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.144
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.559
6:SURCH (ONE Max +ve 0.000 0.000 0.000 14.503
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 90 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 91
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000 0.000 -10.353
8:COMB. 01: D Max +ve 0.000 0.000 0.000 34.921
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 34.090
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 39.209
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 52.521
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 51.690
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 56.808
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 23.188
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 22.731
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 25.546
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 33.541
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 33.084
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 35.899
Max -ve 0.000 0.000
45 42 0.555 1:DL Max +ve 0.000 0.000 0.000 9.657
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.961
3:EP Max +ve 0.000 0.000 0.000 9.187
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.050
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.448
6:SURCH (ONE Max +ve 0.000 0.000 0.000 14.633
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.114
8:COMB. 01: D Max +ve 0.000 0.000 0.000 30.795
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 30.000
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 34.896
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 91 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 92
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
11:COMB. 04: D Max +ve 0.000 0.000 0.000 47.990
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 47.194
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 52.090
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 19.953
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 19.516
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 22.209
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 30.068
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 29.630
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 32.323
Max -ve 0.000 0.000
46 43 0.555 1:DL Max +ve 0.000 0.000 0.000 5.246
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.957
3:EP Max +ve 0.000 0.000 0.000 10.287
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.041
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.437
6:SURCH (ONE Max +ve 0.000 0.000 0.000 15.088
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.038
8:COMB. 01: D Max +ve 0.000 0.000 0.000 27.422
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 26.630
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 31.504
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 44.486
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 43.695
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 48.568
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 17.190

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 92 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 93
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 16.754
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 19.435
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 27.228
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 26.792
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 29.473
Max -ve 0.000 0.000
47 44 0.555 1:DL Max +ve 0.000 0.000 0.000 0.885
Max -ve 0.000 0.000 0.555 -4.358
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.986
3:EP Max +ve 0.000 0.000 0.000 11.656
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.103
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.511
6:SURCH (ONE Max +ve 0.000 0.000 0.000 15.878
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.164
8:COMB. 01: D Max +ve 0.000 0.000 0.000 24.590
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 23.774
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 28.796
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 41.868
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 41.052
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 46.074
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 14.758
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 14.310
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 17.072
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 24.922
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 93 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 94
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
18:COMB. 11: D Max +ve 0.000 0.000 0.000 24.473
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 27.235
Max -ve 0.000 0.000
48 45 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -8.766
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.038
3:EP Max +ve 0.000 0.000 0.000 13.196
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.213
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.643
6:SURCH (ONE Max +ve 0.000 0.000 0.000 16.945
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.481
8:COMB. 01: D Max +ve 0.000 0.000 0.000 21.987
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 21.128
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 26.414
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 39.804
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 38.946
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 44.231
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 12.456
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 11.984
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 14.891
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 22.937
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 22.465
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 25.372
Max -ve 0.000 0.000
49 46 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -13.308
2:SIDL Max +ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 94 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 95
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000 0.000 -1.097
3:EP Max +ve 0.000 0.000 0.000 14.753
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.339
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.793
6:SURCH (ONE Max +ve 0.000 0.000 0.000 18.155
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -10.931
8:COMB. 01: D Max +ve 0.000 0.000 0.000 19.198
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 18.291
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 23.876
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 37.781
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 36.874
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 42.459
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 10.023
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 9.524
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 12.596
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 20.954
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 20.455
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 23.527
Max -ve 0.000 0.000
50 47 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -18.041
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.142
3:EP Max +ve 0.000 0.000 0.000 16.110
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.436
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.908

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 95 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 96
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
6:SURCH (ONE Max +ve 0.000 0.000 0.000 19.289
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -11.403
8:COMB. 01: D Max +ve 0.000 0.000 0.000 15.721
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 14.776
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 20.593
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 35.106
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 34.161
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 39.978
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 7.148
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 6.629
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 9.828
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 18.551
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 18.032
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 21.231
Max -ve 0.000 0.000
51 48 0.555 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.555 -22.970
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.148
3:EP Max +ve 0.000 0.000 0.000 16.976
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.449
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -2.924
6:SURCH (ONE Max +ve 0.000 0.000 0.000 20.044
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -11.733
8:COMB. 01: D Max +ve 0.000 0.000 0.000 10.975
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 10.025

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 96 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 97
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 15.873
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 30.921
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 29.971
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 35.819
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 3.488
Max -ve 0.000 0.000 0.555 -1.755
15:COMB. 08: Max +ve 0.000 0.000 0.000 2.965
Max -ve 0.000 0.000 0.555 -2.277
16:COMB. 09: Max +ve 0.000 0.000 0.000 6.182
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 15.221
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 14.698
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 17.914
Max -ve 0.000 0.000
52 49 0.600 1:DL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -10.987
2:SIDL Max +ve 0.000 0.000 0.000 0.448
Max -ve 0.000 0.000
3:EP Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -3.736
4:LL (MOMENT Max +ve 0.000 0.000 0.000 0.956
Max -ve 0.000 0.000
5:LL (SHEAR) Max +ve 0.000 0.000 0.000 1.141
Max -ve 0.000 0.000
6:SURCH (ONE Max +ve 0.000 0.000 0.000 1.891
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -3.702
8:COMB. 01: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -22.003
9:COMB. 02: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -21.632
10:COMB. 03: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -23.915
11:COMB. 04: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -15.709
12:COMB. 05: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -15.338

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 97 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 98
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
13:COMB. 06: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -17.621
14:COMB. 07: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -14.944
15:COMB. 08: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -14.740
16:COMB. 09: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -15.996
17:COMB. 10: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -11.242
18:COMB. 11: D Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -11.038
19:COMB. 12: Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.600 -12.294
53 50 0.600 1:DL Max +ve 0.000 0.000 0.000 5.497
Max -ve 0.000 0.000 0.600 -0.170
2:SIDL Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.275
3:EP Max +ve 0.000 0.000 0.000 2.487
Max -ve 0.000 0.000
4:LL (MOMENT Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.586
5:LL (SHEAR) Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -0.699
6:SURCH (ONE Max +ve 0.000 0.000 0.000 2.387
Max -ve 0.000 0.000
7:SURCH (OTH Max +ve 0.000 0.000
Max -ve 0.000 0.000 0.000 -1.179
8:COMB. 01: D Max +ve 0.000 0.000 0.000 12.257
Max -ve 0.000 0.000
9:COMB. 02: D Max +ve 0.000 0.000 0.000 12.030
Max -ve 0.000 0.000
10:COMB. 03: Max +ve 0.000 0.000 0.000 13.429
Max -ve 0.000 0.000
11:COMB. 04: D Max +ve 0.000 0.000 0.000 14.262
Max -ve 0.000 0.000
12:COMB. 05: Max +ve 0.000 0.000 0.000 14.035
Max -ve 0.000 0.000
13:COMB. 06: Max +ve 0.000 0.000 0.000 15.433
Max -ve 0.000 0.000
14:COMB. 07: Max +ve 0.000 0.000 0.000 8.219
Max -ve 0.000 0.000
15:COMB. 08: Max +ve 0.000 0.000 0.000 8.094
Max -ve 0.000 0.000
16:COMB. 09: Max +ve 0.000 0.000 0.000 8.863

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 98 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 99
Part
Software licensed to
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_101.std Date/Time 11-Jun-2019 16:56

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
Max -ve 0.000 0.000
17:COMB. 10: Max +ve 0.000 0.000 0.000 9.398
Max -ve 0.000 0.000
18:COMB. 11: D Max +ve 0.000 0.000 0.000 9.273
Max -ve 0.000 0.000
19:COMB. 12: Max +ve 0.000 0.000 0.000 10.042
Max -ve 0.000 0.000

Print Time/Date: 12/06/2019 14:47 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 99 of 99
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 1
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Job Information
Engineer Checked Approved

Name:
Date: 11-Jun-19

Structure Type SPACE FRAME

Number of Nodes 50 Highest Node 50


Number of Elements 53 Highest Element 53
Number of Plates 0 Highest Plate 0

Number of Design Groups 1


Number of Design Slabs 0
Number of Load Cases 19
Number of Design Briefs 1

Included in this printout are data for:


Design Group Design Brief Design Code Members

G1: Design Group 1 B1: BASE ACI 318-99 Beam M1, M2, M3, M4, M5, M6

Design Group Summary - Design Group 1


Member Design Span Type Main Bars Shear Span
Hog Sag Bars Depth
M1 Initial 1 Beam Ok Ok Ok Ok
2 Beam Ok Ok Ok Ok
M2 Initial 1 Beam Ok Ok Ok Ok
2 Beam Ok Ok Ok Ok
3 Beam Ok Ok Ok Ok
4 Beam Ok Ok Ok Ok
5 Beam Ok Ok Ok Ok
6 Beam Ok Ok Ok Ok
7 Beam Ok Ok Ok Ok
8 Beam Ok Ok Ok Ok
9 Beam Ok Ok Ok Ok
10 Beam Ok Ok Ok Ok
M3 Initial 1 Beam Ok Ok Ok Ok
2 Beam Ok Ok Ok Ok
3 Beam Ok Ok Ok Ok
4 Beam Ok Ok Ok Ok
5 Beam Ok Ok Ok Ok
6 Beam Ok Ok Ok Ok
7 Beam Ok Ok Ok Ok
8 Beam Ok Ok Ok Ok
9 Beam Ok Ok Ok Ok
10 Beam Ok Ok Ok Ok

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 1 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 2
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Design Group Summary - Design Group 1 Cont...


Member Design Span Type Main Bars Shear Span
Hog Sag Bars Depth
M4 Initial 1 Beam Ok Ok Ok Ok
2 Beam Ok Ok Ok Ok
3 Beam Ok Ok Ok Ok
4 Beam Ok Ok Ok Ok
5 Beam Ok Ok Ok Ok
6 Beam Ok Ok Ok Ok
7 Beam Ok Ok Ok Ok
8 Beam Ok Ok Ok Ok
9 Beam Ok Ok Ok Ok
10 Beam Ok Ok Ok Ok
M5 Initial 1 Beam Ok Ok Ok Ok
2 Beam Ok Ok Ok Ok
3 Beam Ok Ok Ok Ok
4 Beam Ok Ok Ok Ok
5 Beam Ok Ok Ok Ok
6 Beam Ok Ok Ok Ok
7 Beam Ok Ok Ok Ok
8 Beam Ok Ok Ok Ok
9 Beam Ok Ok Ok Ok
10 Beam Ok Ok Ok Ok
M6 Initial 1 Beam Ok Ok Ok Ok
2 Beam Ok Ok Ok Ok
Summary: the group is safe

Beam Spans
Cover
Member Span Type Length Top Btm Side Link Size
(m) (cm) (cm) (cm)
M1 1 Beam 0.600 7.6 7.6 7.6 #3
2 Beam 0.600 7.6 7.6 7.6 #3
M2 1 Beam 0.555 7.6 7.6 7.6 #3
2 Beam 0.555 7.6 7.6 7.6 #3
3 Beam 0.555 7.6 7.6 7.6 #3
4 Beam 0.555 7.6 7.6 7.6 #3
5 Beam 0.555 7.6 7.6 7.6 #3
6 Beam 0.555 7.6 7.6 7.6 #3
7 Beam 0.555 7.6 7.6 7.6 #3
8 Beam 0.555 7.6 7.6 7.6 #3
9 Beam 0.555 7.6 7.6 7.6 #3
10 Beam 0.555 7.6 7.6 7.6 #3
M3 1 Beam 0.555 7.6 7.6 7.6 #3
2 Beam 0.555 7.6 7.6 7.6 #3
3 Beam 0.555 7.6 7.6 7.6 #3

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 2 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 3
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Beam Spans Cont...


Cover
Member Span Type Length Top Btm Side Link Size
(m) (cm) (cm) (cm)
4 Beam 0.555 7.6 7.6 7.6 #3
5 Beam 0.555 7.6 7.6 7.6 #3
6 Beam 0.555 7.6 7.6 7.6 #3
7 Beam 0.555 7.6 7.6 7.6 #3
8 Beam 0.555 7.6 7.6 7.6 #3
9 Beam 0.555 7.6 7.6 7.6 #3
10 Beam 0.555 7.6 7.6 7.6 #3
M4 1 Beam 0.555 7.6 7.6 7.6 #3
2 Beam 0.555 7.6 7.6 7.6 #3
3 Beam 0.555 7.6 7.6 7.6 #3
4 Beam 0.555 7.6 7.6 7.6 #3
5 Beam 0.555 7.6 7.6 7.6 #3
6 Beam 0.555 7.6 7.6 7.6 #3
7 Beam 0.555 7.6 7.6 7.6 #3
8 Beam 0.555 7.6 7.6 7.6 #3
9 Beam 0.555 7.6 7.6 7.6 #3
10 Beam 0.555 7.6 7.6 7.6 #3
M5 1 Beam 0.555 7.6 7.6 7.6 #3
2 Beam 0.555 7.6 7.6 7.6 #3
3 Beam 0.555 7.6 7.6 7.6 #3
4 Beam 0.555 7.6 7.6 7.6 #3
5 Beam 0.555 7.6 7.6 7.6 #3
6 Beam 0.555 7.6 7.6 7.6 #3
7 Beam 0.555 7.6 7.6 7.6 #3
8 Beam 0.555 7.6 7.6 7.6 #3
9 Beam 0.555 7.6 7.6 7.6 #3
10 Beam 0.555 7.6 7.6 7.6 #3
M6 1 Beam 0.600 7.6 7.6 7.6 #3
2 Beam 0.600 7.6 7.6 7.6 #3

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 3 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 4
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

M1 M1 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M4 M4 M4 M4 M4 M4 M4 M4 M4 M4 M5 M5 M5 M5 M5 M5 M5 M5 M5 M5 M6 M6

Y
Z X

Whole Structure <Zoom>

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 4 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 5
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Beam Supports
Member Node Length Support Col. Width
(m) Type (cm)
M1 N1 0.600 Simple 0.0
N49 0.600 Simple 0.0
N2 Simple 0.0
M2 N2 0.555 Simple 0.0
N13 0.555 Simple 0.0
N14 0.555 Simple 0.0
N15 0.555 Simple 0.0
N16 0.555 Simple 0.0
N17 0.555 Simple 0.0
N18 0.555 Simple 0.0
N19 0.555 Simple 0.0
N20 0.555 Simple 0.0
N21 0.555 Simple 0.0
N3 Simple 0.0
M3 N3 0.555 Simple 0.0
N22 0.555 Simple 0.0
N23 0.555 Simple 0.0
N24 0.555 Simple 0.0
N25 0.555 Simple 0.0
N26 0.555 Simple 0.0
N27 0.555 Simple 0.0
N28 0.555 Simple 0.0
N29 0.555 Simple 0.0
N30 0.555 Simple 0.0
N4 Simple 0.0
M4 N4 0.555 Simple 0.0
N31 0.555 Simple 0.0
N32 0.555 Simple 0.0
N33 0.555 Simple 0.0
N34 0.555 Simple 0.0
N35 0.555 Simple 0.0
N36 0.555 Simple 0.0
N37 0.555 Simple 0.0
N38 0.555 Simple 0.0
N39 0.555 Simple 0.0
N5 Simple 0.0
M5 N5 0.555 Simple 0.0
N40 0.555 Simple 0.0
N41 0.555 Simple 0.0
N42 0.555 Simple 0.0
N43 0.555 Simple 0.0
N44 0.555 Simple 0.0
N45 0.555 Simple 0.0
N46 0.555 Simple 0.0
N47 0.555 Simple 0.0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 5 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 6
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Beam Supports Cont...


Member Node Length Support Col. Width
(m) Type (cm)
N48 0.555 Simple 0.0
N6 Simple 0.0
M6 N6 0.600 Simple 0.0
N50 0.600 Simple 0.0
N7 Simple 0.0

Member 1 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 0.000 0 0 0 8#8 4052
0.000 0 0
0.050 1 0.291 1066 0 0 8#8 4052
0.000 0 0
0.100 1 0.615 1066 0 0 8#8 4052
0.000 0 0
0.150 1 0.973 1066 0 0 8#8 4052
0.000 0 0
0.200 1 1.363 1066 0 0 8#8 4052
0.000 0 0
0.250 1 1.786 1066 0 0 8#8 4052
0.000 0 0
0.300 1 2.243 1066 0 0 8#8 4052
0.000 0 0
0.350 1 2.732 1066 0 0 8#8 4052
0.000 0 0
0.400 1 3.255 1066 0 0 8#8 4052
0.000 0 0
0.450 1 3.810 1066 0 0 8#8 4052
0.000 0 0
0.500 1 4.399 1066 0 0 8#8 4052
0.000 0 0
0.550 1 5.021 1066 0 0 8#8 4052
0.000 0 0
0.600 1(e) 5.676 1066 0 0 8#8 4052
0.000 0 0
0.600 2(s) 5.676 1066 0 0 8#8 4052
0.000 0 0
0.650 2 6.491 1066 0 0 8#8 4052
0.000 0 0
0.700 2 7.340 1066 0 0 8#8 4052
0.000 0 0
0.750 2 8.222 1066 0 0 8#8 4052
0.000 0 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 6 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 7
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 1 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.800 2 9.136 1066 0 0 8#8 4052
0.000 0 0
0.850 2 10.084 1066 0 0 8#8 4052
0.000 0 0
0.900 2 11.065 1066 0 0 8#8 4052
0.000 0 0
0.950 2 12.079 1066 0 0 8#8 4052
0.000 0 0
1.000 2 13.126 1066 0 0 8#8 4052
0.000 0 0
1.050 2 14.206 1066 0 0 8#8 4052
0.000 0 0
1.100 2 15.319 1066 0 0 8#8 4052
0.000 0 0
1.150 2 16.465 1066 0 0 8#8 4052
0.000 0 0
1.200 2(e) 17.644 1066 0 0 8#8 4052
0.000 0 0
Summary: the member is safe

Member 2 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 26.102 1066 0 8#8 4052 8#8 4052
-94.494 1066 0
0.046 1 24.616 1066 0 8#8 4052 8#8 4052
-94.084 1066 0
0.092 1 23.159 1066 0 8#8 4052 8#8 4052
-93.645 1066 0
0.139 1 21.730 1066 0 8#8 4052 8#8 4052
-93.178 1066 0
0.185 1 20.329 1066 0 8#8 4052 8#8 4052
-92.682 1066 0
0.231 1 18.957 1066 0 8#8 4052 8#8 4052
-92.159 1066 0
0.277 1 17.613 1066 0 8#8 4052 8#8 4052
-91.607 1066 0
0.324 1 16.297 1066 0 8#8 4052 8#8 4052
-91.026 1066 0
0.370 1 15.009 1066 0 8#8 4052 8#8 4052
-90.418 1066 0
0.416 1 13.750 1066 0 8#8 4052 8#8 4052
-89.781 1066 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 7 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 8
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 2 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.462 1 12.519 1066 0 8#8 4052 8#8 4052
-89.116 1066 0
0.509 1 11.316 1066 0 8#8 4052 8#8 4052
-88.423 1066 0
0.555 1(e) 10.142 1066 0 8#8 4052 8#8 4052
-87.701 1066 0
0.555 2(s) 10.119 1066 0 8#8 4052 8#8 4052
-87.707 1066 0
0.601 2 8.914 1066 0 8#8 4052 8#8 4052
-87.080 1066 0
0.647 2 7.738 1066 0 8#8 4052 8#8 4052
-86.425 1066 0
0.694 2 6.590 1066 0 8#8 4052 8#8 4052
-85.742 1066 0
0.740 2 5.471 1066 0 8#8 4052 8#8 4052
-85.030 1066 0
0.786 2 4.379 1066 0 8#8 4052 8#8 4052
-84.290 1066 0
0.832 2 3.317 1066 0 8#8 4052 8#8 4052
-83.522 1066 0
0.879 2 2.282 1066 0 8#8 4052 8#8 4052
-82.726 1066 0
0.925 2 1.275 1066 0 8#8 4052 8#8 4052
-81.901 1066 0
0.971 2 0.297 1066 0 8#8 4052 8#8 4052
-81.048 1066 0
1.017 2 0.000 0 0 8#8 4052 8#8 4052
-80.167 1066 0
1.064 2 0.000 0 0 8#8 4052 0
-79.257 1066 0
1.110 2(e) 0.000 0 0 8#8 4052 0
-78.320 1066 0
1.110 3(s) 0.000 0 0 8#8 4052 0
-78.320 1066 0
1.156 3 0.000 0 0 8#8 4052 0
-77.541 1066 0
1.202 3 0.000 0 0 8#8 4052 0
-76.734 1066 0
1.249 3 0.000 0 0 8#8 4052 0
-75.899 1066 0
1.295 3 0.000 0 0 8#8 4052 0
-75.035 1066 0
1.341 3 0.000 0 0 8#8 4052 0
-74.144 1066 0
1.388 3 0.000 0 0 8#8 4052 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 8 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 9
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 2 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
-73.224 1066 0
1.434 3 0.000 0 0 8#8 4052 0
-72.275 1066 0
1.480 3 0.000 0 0 8#8 4052 0
-71.299 1066 0
1.526 3 0.000 0 0 8#8 4052 0
-70.294 1066 0
1.573 3 0.000 0 0 8#8 4052 0
-69.261 1066 0
1.619 3 0.000 0 0 8#8 4052 0
-68.199 1066 0
1.665 3(e) 0.000 0 0 8#8 4052 0
-67.109 1066 0
1.665 4(s) 0.000 0 0 8#8 4052 0
-67.109 1066 0
1.711 4 0.000 0 0 8#8 4052 0
-66.213 1066 0
1.758 4 0.000 0 0 8#8 4052 0
-65.289 1066 0
1.804 4 0.000 0 0 8#8 4052 0
-64.337 1066 0
1.850 4 0.000 0 0 8#8 4052 0
-63.356 1066 0
1.896 4 0.000 0 0 8#8 4052 0
-62.347 1066 0
1.943 4 0.000 0 0 8#8 4052 0
-61.309 1066 0
1.989 4 0.000 0 0 8#8 4052 0
-60.244 1066 0
2.035 4 0.000 0 0 8#8 4052 0
-59.150 1066 0
2.081 4 0.000 0 0 8#8 4052 0
-58.027 1066 0
2.128 4 0.000 0 0 8#8 4052 0
-56.877 1066 0
2.174 4 0.000 0 0 8#8 4052 0
-55.698 1066 0
2.220 4(e) 0.000 0 0 8#8 4052 0
-54.491 1066 0
2.220 5(s) 0.000 0 0 8#8 4052 0
-54.491 1066 0
2.266 5 0.000 0 0 8#8 4052 0
-53.485 1066 0
2.313 5 0.000 0 0 8#8 4052 0
-52.450 1066 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 9 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 10
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 2 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
2.359 5 0.000 0 0 8#8 4052 0
-51.387 1066 0
2.405 5 0.000 0 0 8#8 4052 0
-50.296 1066 0
2.451 5 0.000 0 0 8#8 4052 0
-49.177 1066 0
2.498 5 0.000 0 0 8#8 4052 0
-48.029 1066 0
2.544 5 0.000 0 0 8#8 4052 0
-46.853 1066 0
2.590 5 0.000 0 0 8#8 4052 0
-45.649 1066 0
2.636 5 0.000 0 0 8#8 4052 0
-44.417 1066 0
2.683 5 0.000 0 0 8#8 4052 0
-43.156 1066 0
2.729 5 0.000 0 0 8#8 4052 0
-41.867 1066 0
2.775 5(e) 0.000 0 0 8#8 4052 0
-40.549 1066 0
2.775 6(s) 0.000 0 0 8#8 4052 0
-40.549 1066 0
2.821 6 0.000 0 0 8#8 4052 0
-39.418 1066 0
2.868 6 0.000 0 0 8#8 4052 0
-38.258 1066 0
2.914 6 0.000 0 0 8#8 4052 0
-37.070 1066 0
2.960 6 0.000 0 0 8#8 4052 0
-35.854 1066 0
3.006 6 0.000 0 0 8#8 4052 0
-34.609 1066 0
3.053 6 0.000 0 0 8#8 4052 0
-33.336 1066 0
3.099 6 0.000 0 0 8#8 4052 0
-32.035 1066 0
3.145 6 0.000 0 0 8#8 4052 0
-30.705 1066 0
3.191 6 0.000 0 0 8#8 4052 0
-29.348 1066 0
3.238 6 0.000 0 0 8#8 4052 0
-28.974 1066 0
3.284 6 0.000 0 0 8#8 4052 0
-28.784 1066 0
3.330 6(e) 0.000 0 0 8#8 4052 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 10 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 11
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 2 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
-28.566 1066 0
3.330 7(s) 0.000 0 0 8#8 4052 0
-28.566 1066 0
3.376 7 0.000 0 0 8#8 4052 0
-28.466 1066 0
3.423 7 0.000 0 0 8#8 4052 0
-28.337 1066 0
3.469 7 0.000 0 0 8#8 4052 0
-28.180 1066 0
3.515 7 0.000 0 0 8#8 4052 0
-27.995 1066 0
3.561 7 0.000 0 0 8#8 4052 0
-27.782 1066 0
3.608 7 0.000 0 0 8#8 4052 0
-27.541 1066 0
3.654 7 0.000 0 0 8#8 4052 0
-27.271 1066 0
3.700 7 0.000 0 0 8#8 4052 0
-26.972 1066 0
3.746 7 0.000 0 0 8#8 4052 0
-26.646 1066 0
3.793 7 0.000 0 0 8#8 4052 0
-26.291 1066 0
3.839 7 0.000 0 0 8#8 4052 0
-25.908 1066 0
3.885 7(e) 0.000 0 0 8#8 4052 0
-25.497 1066 0
3.885 8(s) 0.000 0 0 8#8 4052 0
-25.497 1066 0
3.931 8 0.000 0 0 8#8 4052 0
-25.187 1066 0
3.978 8 0.000 0 0 8#8 4052 0
-24.850 1066 0
4.024 8 0.000 0 0 8#8 4052 0
-24.484 1066 0
4.070 8 0.000 0 0 8#8 4052 0
-24.236 1066 0
4.116 8 0.000 0 0 8#8 4052 8#8 4052
-24.050 1066 0
4.163 8 1.571 1066 0 8#8 4052 8#8 4052
-23.836 1066 0
4.209 8 3.228 1066 0 8#8 4052 8#8 4052
-23.593 1066 0
4.255 8 4.914 1066 0 8#8 4052 8#8 4052
-23.322 1066 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 11 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 12
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 2 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
4.301 8 6.627 1066 0 8#8 4052 8#8 4052
-23.023 1066 0
4.348 8 8.369 1066 0 8#8 4052 8#8 4052
-22.696 1066 0
4.394 8 10.139 1066 0 8#8 4052 8#8 4052
-22.340 1066 0
4.440 8(e) 11.938 1066 0 8#8 4052 8#8 4052
-21.957 1066 0
4.440 9(s) 11.938 1066 0 8#8 4052 8#8 4052
-21.957 1066 0
4.486 9 13.669 1066 0 8#8 4052 8#8 4052
-21.668 1066 0
4.533 9 15.428 1066 0 8#8 4052 8#8 4052
-21.351 1066 0
4.579 9 17.216 1066 0 8#8 4052 8#8 4052
-21.005 1066 0
4.625 9 19.032 1066 0 8#8 4052 8#8 4052
-20.632 1066 0
4.671 9 20.877 1066 0 8#8 4052 8#8 4052
-20.230 1066 0
4.718 9 22.749 1066 0 8#8 4052 8#8 4052
-19.799 1066 0
4.764 9 24.650 1066 0 8#8 4052 8#8 4052
-19.341 1066 0
4.810 9 26.580 1066 0 8#8 4052 8#8 4052
-18.854 1066 0
4.856 9 28.537 1066 0 8#8 4052 8#8 4052
-18.339 1066 0
4.903 9 30.523 1066 0 8#8 4052 8#8 4052
-17.795 1066 0
4.949 9 32.537 1066 0 8#8 4052 8#8 4052
-17.224 1066 0
4.995 9(e) 34.580 1066 0 8#8 4052 8#8 4052
-16.624 1066 0
4.995 10(s) 34.580 1066 0 8#8 4052 8#8 4052
-16.624 1066 0
5.041 10 36.595 1066 0 8#8 4052 8#8 4052
-16.093 1066 0
5.087 10 38.639 1066 0 8#8 4052 8#8 4052
-15.534 1066 0
5.134 10 40.712 1066 0 8#8 4052 8#8 4052
-14.946 1066 0
5.180 10 42.812 1066 0 8#8 4052 8#8 4052
-14.330 1066 0
5.226 10 44.941 1066 0 8#8 4052 8#8 4052

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 12 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 13
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 2 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
-13.686 1066 0
5.272 10 47.098 1066 0 8#8 4052 8#8 4052
-13.014 1066 0
5.319 10 49.284 1066 0 8#8 4052 8#8 4052
-12.313 1066 0
5.365 10 51.497 1066 0 8#8 4052 8#8 4052
-11.584 1066 0
5.411 10 53.739 1066 0 8#8 4052 8#8 4052
-10.827 1066 0
5.457 10 56.010 1066 0 8#8 4052 8#8 4052
-10.041 1066 0
5.504 10 58.308 1066 0 8#8 4052 8#8 4052
-9.227 1066 0
5.550 10(e) 60.635 1066 0 8#8 4052 8#8 4052
-8.385 1066 0
Summary: the member is safe

Member 3 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 84.321 1066 0 0 8#8 4052
0.000 0 0
0.046 1 81.901 1066 0 0 8#8 4052
0.000 0 0
0.093 1 79.509 1066 0 0 8#8 4052
0.000 0 0
0.139 1 77.145 1066 0 0 8#8 4052
0.000 0 0
0.185 1 74.809 1066 0 0 8#8 4052
0.000 0 0
0.231 1 72.502 1066 0 0 8#8 4052
0.000 0 0
0.278 1 70.223 1066 0 0 8#8 4052
0.000 0 0
0.324 1 67.972 1066 0 0 8#8 4052
0.000 0 0
0.370 1 65.750 1066 0 0 8#8 4052
0.000 0 0
0.416 1 63.556 1066 0 0 8#8 4052
0.000 0 0
0.463 1 61.390 1066 0 0 8#8 4052
0.000 0 0
0.509 1 59.252 1066 0 0 8#8 4052

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 13 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 14
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 3 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.000 0 0
0.555 1(e) 57.143 1066 0 0 8#8 4052
0.000 0 0
0.555 2(s) 57.143 1066 0 0 8#8 4052
0.000 0 0
0.601 2 55.057 1066 0 0 8#8 4052
0.000 0 0
0.648 2 52.998 1066 0 0 8#8 4052
0.000 0 0
0.694 2 50.968 1066 0 0 8#8 4052
0.000 0 0
0.740 2 48.967 1066 0 0 8#8 4052
0.000 0 0
0.786 2 46.993 1066 0 0 8#8 4052
0.000 0 0
0.833 2 45.048 1066 0 0 8#8 4052
0.000 0 0
0.879 2 43.131 1066 0 0 8#8 4052
0.000 0 0
0.925 2 41.243 1066 0 0 8#8 4052
0.000 0 0
0.971 2 39.383 1066 0 0 8#8 4052
0.000 0 0
1.018 2 37.551 1066 0 0 8#8 4052
0.000 0 0
1.064 2 35.747 1066 0 0 8#8 4052
0.000 0 0
1.110 2(e) 33.972 1066 0 0 8#8 4052
0.000 0 0
1.110 3(s) 33.972 1066 0 0 8#8 4052
0.000 0 0
1.156 3 32.219 1066 0 0 8#8 4052
0.000 0 0
1.203 3 30.495 1066 0 0 8#8 4052
0.000 0 0
1.249 3 28.799 1066 0 0 8#8 4052
0.000 0 0
1.295 3 27.131 1066 0 0 8#8 4052
0.000 0 0
1.341 3 25.492 1066 0 0 8#8 4052
0.000 0 0
1.388 3 23.881 1066 0 0 8#8 4052
0.000 0 0
1.434 3 22.298 1066 0 0 8#8 4052
0.000 0 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 14 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 15
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 3 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
1.480 3 20.744 1066 0 0 8#8 4052
0.000 0 0
1.526 3 19.217 1066 0 8#8 4052 8#8 4052
0.000 0 0
1.573 3 17.720 1066 0 8#8 4052 8#8 4052
-0.385 1066 0
1.619 3 16.250 1066 0 8#8 4052 8#8 4052
-1.018 1066 0
1.665 3(e) 14.809 1066 0 8#8 4052 8#8 4052
-1.623 1066 0
1.665 4(s) 14.809 1066 0 8#8 4052 8#8 4052
-1.623 1066 0
1.711 4 13.377 1066 0 8#8 4052 8#8 4052
-2.273 1066 0
1.758 4 11.973 1066 0 8#8 4052 8#8 4052
-2.896 1066 0
1.804 4 10.597 1066 0 8#8 4052 8#8 4052
-3.490 1066 0
1.850 4 9.250 1066 0 8#8 4052 8#8 4052
-4.056 1066 0
1.896 4 7.931 1066 0 8#8 4052 8#8 4052
-4.594 1066 0
1.943 4 6.641 1066 0 8#8 4052 8#8 4052
-5.103 1066 0
1.989 4 5.379 1066 0 8#8 4052 8#8 4052
-5.584 1066 0
2.035 4 4.145 1066 0 8#8 4052 8#8 4052
-6.037 1066 0
2.081 4 2.939 1066 0 8#8 4052 8#8 4052
-6.461 1066 0
2.128 4 1.762 1066 0 8#8 4052 8#8 4052
-6.857 1066 0
2.174 4 0.612 1066 0 8#8 4052 8#8 4052
-7.225 1066 0
2.220 4(e) 0.000 0 0 8#8 4052 8#8 4052
-7.565 1066 0
2.220 5(s) 0.000 0 0 8#8 4052 0
-7.565 1066 0
2.266 5 0.000 0 0 8#8 4052 0
-7.958 1066 0
2.313 5 0.000 0 0 8#8 4052 0
-8.323 1066 0
2.359 5 0.000 0 0 8#8 4052 0
-8.659 1066 0
2.405 5 0.000 0 0 8#8 4052 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 15 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 16
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 3 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
-8.968 1066 0
2.451 5 0.000 0 0 8#8 4052 0
-9.264 1066 0
2.498 5 0.000 0 0 8#8 4052 0
-9.598 1066 0
2.544 5 0.000 0 0 8#8 4052 0
-9.903 1066 0
2.590 5 0.000 0 0 8#8 4052 0
-10.180 1066 0
2.636 5 0.000 0 0 8#8 4052 0
-10.429 1066 0
2.683 5 0.000 0 0 8#8 4052 0
-10.649 1066 0
2.729 5 0.000 0 0 8#8 4052 0
-11.393 1066 0
2.775 5(e) 0.000 0 0 8#8 4052 0
-12.213 1066 0
2.775 6(s) 0.000 0 0 8#8 4052 0
-12.213 1066 0
2.821 6 0.000 0 0 8#8 4052 0
-13.062 1066 0
2.868 6 0.000 0 0 8#8 4052 0
-13.882 1066 0
2.914 6 0.000 0 0 8#8 4052 0
-14.675 1066 0
2.960 6 0.000 0 0 8#8 4052 0
-15.439 1066 0
3.006 6 0.000 0 0 8#8 4052 0
-16.175 1066 0
3.052 6 0.000 0 0 8#8 4052 0
-16.883 1066 0
3.099 6 0.000 0 0 8#8 4052 0
-17.562 1066 0
3.145 6 0.000 0 0 8#8 4052 0
-18.213 1066 0
3.191 6 0.000 0 0 8#8 4052 0
-18.836 1066 0
3.237 6 0.000 0 0 8#8 4052 0
-19.430 1066 0
3.284 6 0.000 0 0 8#8 4052 0
-19.996 1066 0
3.330 6(e) 0.000 0 0 8#8 4052 0
-20.534 1066 0
3.330 7(s) 0.000 0 0 8#8 4052 0
-20.534 1066 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 16 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 17
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 3 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
3.376 7 0.000 0 0 8#8 4052 0
-21.116 1066 0
3.422 7 0.000 0 0 8#8 4052 0
-21.669 1066 0
3.469 7 0.000 0 0 8#8 4052 0
-22.194 1066 0
3.515 7 0.000 0 0 8#8 4052 0
-22.690 1066 0
3.561 7 0.000 0 0 8#8 4052 0
-23.158 1066 0
3.607 7 0.000 0 0 8#8 4052 0
-23.598 1066 0
3.654 7 0.000 0 0 8#8 4052 0
-24.010 1066 0
3.700 7 0.000 0 0 8#8 4052 0
-24.393 1066 0
3.746 7 0.000 0 0 8#8 4052 0
-24.748 1066 0
3.792 7 0.000 0 0 8#8 4052 0
-25.075 1066 0
3.839 7 0.000 0 0 8#8 4052 0
-25.373 1066 0
3.885 7(e) 0.000 0 0 8#8 4052 0
-25.644 1066 0
3.885 8(s) 0.000 0 0 8#8 4052 0
-25.644 1066 0
3.931 8 0.000 0 0 8#8 4052 0
-25.963 1066 0
3.977 8 0.000 0 0 8#8 4052 0
-26.254 1066 0
4.024 8 0.000 0 0 8#8 4052 0
-26.517 1066 0
4.070 8 0.000 0 0 8#8 4052 0
-26.752 1066 0
4.116 8 0.000 0 0 8#8 4052 0
-26.958 1066 0
4.162 8 0.000 0 0 8#8 4052 0
-27.136 1066 0
4.209 8 0.000 0 0 8#8 4052 0
-27.285 1066 0
4.255 8 0.000 0 0 8#8 4052 0
-27.407 1066 0
4.301 8 0.000 0 0 8#8 4052 0
-27.500 1066 0
4.347 8 0.000 0 0 8#8 4052 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 17 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 18
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 3 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
-27.565 1066 0
4.394 8 0.000 0 0 8#8 4052 0
-27.601 1066 0
4.440 8(e) 0.000 0 0 8#8 4052 0
-27.610 1066 0
4.440 9(s) 0.000 0 0 8#8 4052 0
-27.610 1066 0
4.486 9 0.000 0 0 8#8 4052 8#8 4052
-27.662 1066 0
4.532 9 0.612 1066 0 8#8 4052 8#8 4052
-27.687 1066 0
4.579 9 1.305 1066 0 8#8 4052 8#8 4052
-27.683 1066 0
4.625 9 2.025 1066 0 8#8 4052 8#8 4052
-27.651 1066 0
4.671 9 2.774 1066 0 8#8 4052 8#8 4052
-27.590 1066 0
4.717 9 3.551 1066 0 8#8 4052 8#8 4052
-27.501 1066 0
4.764 9 4.356 1066 0 8#8 4052 8#8 4052
-27.384 1066 0
4.810 9 5.189 1066 0 8#8 4052 8#8 4052
-27.239 1066 0
4.856 9 6.051 1066 0 8#8 4052 8#8 4052
-27.066 1066 0
4.902 9 6.941 1066 0 8#8 4052 8#8 4052
-26.864 1066 0
4.949 9 7.860 1066 0 8#8 4052 8#8 4052
-26.633 1066 0
4.995 9(e) 8.806 1066 0 8#8 4052 8#8 4052
-26.375 1066 0
4.995 10(s) 8.806 1066 0 8#8 4052 8#8 4052
-26.375 1066 0
5.041 10 9.714 1066 0 8#8 4052 8#8 4052
-26.145 1066 0
5.087 10 10.650 1066 0 8#8 4052 8#8 4052
-25.887 1066 0
5.134 10 11.615 1066 0 8#8 4052 8#8 4052
-25.600 1066 0
5.180 10 12.607 1066 0 8#8 4052 8#8 4052
-25.285 1066 0
5.226 10 13.693 1066 0 8#8 4052 8#8 4052
-25.007 1066 0
5.272 10 14.830 1066 0 8#8 4052 8#8 4052
-24.723 1066 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 18 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 19
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 3 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
5.319 10 15.995 1066 0 8#8 4052 8#8 4052
-24.410 1066 0
5.365 10 17.188 1066 0 8#8 4052 8#8 4052
-24.069 1066 0
5.411 10 18.409 1066 0 8#8 4052 8#8 4052
-23.700 1066 0
5.457 10 19.659 1066 0 8#8 4052 8#8 4052
-23.303 1066 0
5.504 10 20.937 1066 0 8#8 4052 8#8 4052
-22.878 1066 0
5.550 10(e) 22.243 1066 0 8#8 4052 8#8 4052
-22.424 1066 0
Summary: the member is safe

Member 4 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 68.111 1066 0 0 8#8 4052
0.000 0 0
0.046 1 65.997 1066 0 0 8#8 4052
0.000 0 0
0.092 1 63.911 1066 0 0 8#8 4052
0.000 0 0
0.139 1 61.853 1066 0 0 8#8 4052
0.000 0 0
0.185 1 59.824 1066 0 0 8#8 4052
0.000 0 0
0.231 1 57.823 1066 0 0 8#8 4052
0.000 0 0
0.277 1 55.850 1066 0 0 8#8 4052
0.000 0 0
0.324 1 53.905 1066 0 0 8#8 4052
0.000 0 0
0.370 1 52.012 1066 0 0 8#8 4052
0.000 0 0
0.416 1 50.211 1066 0 0 8#8 4052
0.000 0 0
0.462 1 48.438 1066 0 0 8#8 4052
0.000 0 0
0.509 1 46.694 1066 0 0 8#8 4052
0.000 0 0
0.555 1(e) 44.978 1066 0 0 8#8 4052
0.000 0 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 19 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 20
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 4 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.555 2(s) 44.978 1066 0 0 8#8 4052
0.000 0 0
0.601 2 43.246 1066 0 0 8#8 4052
0.000 0 0
0.647 2 41.542 1066 0 0 8#8 4052
0.000 0 0
0.694 2 39.866 1066 0 0 8#8 4052
0.000 0 0
0.740 2 38.219 1066 0 0 8#8 4052
0.000 0 0
0.786 2 36.600 1066 0 0 8#8 4052
0.000 0 0
0.832 2 35.009 1066 0 0 8#8 4052
0.000 0 0
0.879 2 33.447 1066 0 0 8#8 4052
0.000 0 0
0.925 2 31.912 1066 0 0 8#8 4052
0.000 0 0
0.971 2 30.406 1066 0 8#8 4052 8#8 4052
0.000 0 0
1.017 2 28.929 1066 0 8#8 4052 8#8 4052
-0.328 1066 0
1.064 2 27.479 1066 0 8#8 4052 8#8 4052
-1.046 1066 0
1.110 2(e) 26.058 1066 0 8#8 4052 8#8 4052
-1.735 1066 0
1.110 3(s) 26.058 1066 0 8#8 4052 8#8 4052
-1.735 1066 0
1.156 3 24.620 1066 0 8#8 4052 8#8 4052
-2.438 1066 0
1.202 3 23.211 1066 0 8#8 4052 8#8 4052
-3.113 1066 0
1.249 3 21.830 1066 0 8#8 4052 8#8 4052
-3.759 1066 0
1.295 3 20.477 1066 0 8#8 4052 8#8 4052
-4.378 1066 0
1.341 3 19.153 1066 0 8#8 4052 8#8 4052
-4.967 1066 0
1.387 3 17.857 1066 0 8#8 4052 8#8 4052
-5.529 1066 0
1.434 3 16.589 1066 0 8#8 4052 8#8 4052
-6.062 1066 0
1.480 3 15.350 1066 0 8#8 4052 8#8 4052
-6.567 1066 0
1.526 3 14.138 1066 0 8#8 4052 8#8 4052

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 20 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 21
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 4 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
-7.044 1066 0
1.572 3 12.955 1066 0 8#8 4052 8#8 4052
-7.492 1066 0
1.619 3 11.801 1066 0 8#8 4052 8#8 4052
-7.912 1066 0
1.665 3(e) 10.674 1066 0 8#8 4052 8#8 4052
-8.304 1066 0
1.665 4(s) 10.674 1066 0 8#8 4052 8#8 4052
-8.304 1066 0
1.711 4 9.521 1066 0 8#8 4052 8#8 4052
-8.716 1066 0
1.757 4 8.396 1066 0 8#8 4052 8#8 4052
-9.100 1066 0
1.804 4 7.299 1066 0 8#8 4052 8#8 4052
-9.455 1066 0
1.850 4 6.231 1066 0 8#8 4052 8#8 4052
-9.783 1066 0
1.896 4 5.190 1066 0 8#8 4052 8#8 4052
-10.082 1066 0
1.942 4 4.178 1066 0 8#8 4052 8#8 4052
-10.352 1066 0
1.989 4 3.195 1066 0 8#8 4052 8#8 4052
-10.595 1066 0
2.035 4 2.239 1066 0 8#8 4052 8#8 4052
-10.809 1066 0
2.081 4 1.312 1066 0 8#8 4052 8#8 4052
-10.995 1066 0
2.127 4 0.414 1066 0 8#8 4052 8#8 4052
-11.152 1066 0
2.174 4 0.000 0 0 8#8 4052 8#8 4052
-11.282 1066 0
2.220 4(e) 0.000 0 0 8#8 4052 0
-11.383 1066 0
2.220 5(s) 0.000 0 0 8#8 4052 0
-11.383 1066 0
2.266 5 0.000 0 0 8#8 4052 0
-11.507 1066 0
2.312 5 0.000 0 0 8#8 4052 0
-11.604 1066 0
2.359 5 0.000 0 0 8#8 4052 0
-11.672 1066 0
2.405 5 0.000 0 0 8#8 4052 0
-11.711 1066 0
2.451 5 0.000 0 0 8#8 4052 0
-11.723 1066 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 21 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 22
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 4 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
2.497 5 0.000 0 0 8#8 4052 0
-11.706 1066 0
2.544 5 0.000 0 0 8#8 4052 0
-11.661 1066 0
2.590 5 0.000 0 0 8#8 4052 0
-11.588 1066 0
2.636 5 0.000 0 0 8#8 4052 0
-11.486 1066 0
2.682 5 0.000 0 0 8#8 4052 0
-11.356 1066 0
2.729 5 0.000 0 0 8#8 4052 0
-11.198 1066 0
2.775 5(e) 0.000 0 0 8#8 4052 0
-11.011 1066 0
2.775 6(s) 0.000 0 0 8#8 4052 0
-11.011 1066 0
2.821 6 0.000 0 0 8#8 4052 0
-11.174 1066 0
2.867 6 0.000 0 0 8#8 4052 0
-11.693 1066 0
2.914 6 0.000 0 0 8#8 4052 0
-12.183 1066 0
2.960 6 0.000 0 0 8#8 4052 0
-12.645 1066 0
3.006 6 0.000 0 0 8#8 4052 0
-13.079 1066 0
3.052 6 0.000 0 0 8#8 4052 0
-13.485 1066 0
3.099 6 0.000 0 0 8#8 4052 0
-13.862 1066 0
3.145 6 0.000 0 0 8#8 4052 0
-14.276 1066 0
3.191 6 0.000 0 0 8#8 4052 0
-14.678 1066 0
3.237 6 0.000 0 0 8#8 4052 0
-15.052 1066 0
3.284 6 0.000 0 0 8#8 4052 0
-15.398 1066 0
3.330 6(e) 0.000 0 0 8#8 4052 0
-15.715 1066 0
3.330 7(s) 0.000 0 0 8#8 4052 0
-15.715 1066 0
3.376 7 0.000 0 0 8#8 4052 0
-16.099 1066 0
3.422 7 0.000 0 0 8#8 4052 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 22 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 23
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 4 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
-16.454 1066 0
3.469 7 0.000 0 0 8#8 4052 0
-16.781 1066 0
3.515 7 0.000 0 0 8#8 4052 0
-17.079 1066 0
3.561 7 0.000 0 0 8#8 4052 0
-17.349 1066 0
3.607 7 0.000 0 0 8#8 4052 0
-17.591 1066 0
3.654 7 0.000 0 0 8#8 4052 0
-17.805 1066 0
3.700 7 0.000 0 0 8#8 4052 0
-17.990 1066 0
3.746 7 0.000 0 0 8#8 4052 0
-18.147 1066 0
3.792 7 0.000 0 0 8#8 4052 0
-18.276 1066 0
3.839 7 0.000 0 0 8#8 4052 8#8 4052
-18.377 1066 0
3.885 7(e) 0.202 1066 0 8#8 4052 8#8 4052
-18.449 1066 0
3.885 8(s) 0.202 1066 0 8#8 4052 8#8 4052
-18.449 1066 0
3.931 8 0.965 1066 0 8#8 4052 8#8 4052
-18.590 1066 0
3.977 8 1.756 1066 0 8#8 4052 8#8 4052
-18.704 1066 0
4.024 8 2.575 1066 0 8#8 4052 8#8 4052
-18.789 1066 0
4.070 8 3.423 1066 0 8#8 4052 8#8 4052
-18.846 1066 0
4.116 8 4.299 1066 0 8#8 4052 8#8 4052
-18.874 1066 0
4.162 8 5.203 1066 0 8#8 4052 8#8 4052
-18.874 1066 0
4.209 8 6.135 1066 0 8#8 4052 8#8 4052
-18.846 1066 0
4.255 8 7.096 1066 0 8#8 4052 8#8 4052
-18.790 1066 0
4.301 8 8.085 1066 0 8#8 4052 8#8 4052
-18.705 1066 0
4.347 8 9.102 1066 0 8#8 4052 8#8 4052
-18.592 1066 0
4.394 8 10.148 1066 0 8#8 4052 8#8 4052
-18.451 1066 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 23 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 24
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 4 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
4.440 8(e) 11.222 1066 0 8#8 4052 8#8 4052
-18.282 1066 0
4.440 9(s) 11.222 1066 0 8#8 4052 8#8 4052
-18.282 1066 0
4.486 9 12.297 1066 0 8#8 4052 8#8 4052
-18.177 1066 0
4.532 9 13.401 1066 0 8#8 4052 8#8 4052
-18.045 1066 0
4.579 9 14.533 1066 0 8#8 4052 8#8 4052
-17.884 1066 0
4.625 9 15.693 1066 0 8#8 4052 8#8 4052
-17.695 1066 0
4.671 9 16.881 1066 0 8#8 4052 8#8 4052
-17.478 1066 0
4.717 9 18.098 1066 0 8#8 4052 8#8 4052
-17.233 1066 0
4.764 9 19.343 1066 0 8#8 4052 8#8 4052
-16.959 1066 0
4.810 9 20.616 1066 0 8#8 4052 8#8 4052
-16.657 1066 0
4.856 9 21.918 1066 0 8#8 4052 8#8 4052
-16.326 1066 0
4.902 9 23.248 1066 0 8#8 4052 8#8 4052
-15.968 1066 0
4.949 9 24.606 1066 0 8#8 4052 8#8 4052
-15.581 1066 0
4.995 9(e) 25.992 1066 0 8#8 4052 8#8 4052
-15.165 1066 0
4.995 10(s) 25.992 1066 0 8#8 4052 8#8 4052
-15.165 1066 0
5.041 10 27.384 1066 0 8#8 4052 8#8 4052
-14.804 1066 0
5.087 10 28.805 1066 0 8#8 4052 8#8 4052
-14.414 1066 0
5.134 10 30.254 1066 0 8#8 4052 8#8 4052
-13.997 1066 0
5.180 10 31.731 1066 0 8#8 4052 8#8 4052
-13.550 1066 0
5.226 10 33.236 1066 0 8#8 4052 8#8 4052
-13.076 1066 0
5.272 10 34.770 1066 0 8#8 4052 8#8 4052
-12.573 1066 0
5.319 10 36.332 1066 0 8#8 4052 8#8 4052
-12.042 1066 0
5.365 10 37.922 1066 0 8#8 4052 8#8 4052

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 24 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 25
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 4 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
-11.483 1066 0
5.411 10 39.541 1066 0 8#8 4052 8#8 4052
-10.895 1066 0
5.457 10 41.188 1066 0 8#8 4052 8#8 4052
-10.279 1066 0
5.504 10 42.863 1066 0 8#8 4052 8#8 4052
-9.635 1066 0
5.550 10(e) 44.566 1066 0 8#8 4052 8#8 4052
-8.962 1066 0
Summary: the member is safe

Member 5 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 107.895 1066 0 0 8#8 4052
0.000 0 0
0.046 1 104.709 1066 0 0 8#8 4052
0.000 0 0
0.092 1 101.551 1066 0 0 8#8 4052
0.000 0 0
0.139 1 98.422 1066 0 0 8#8 4052
0.000 0 0
0.185 1 95.321 1066 0 0 8#8 4052
0.000 0 0
0.231 1 92.248 1066 0 0 8#8 4052
0.000 0 0
0.277 1 89.203 1066 0 0 8#8 4052
0.000 0 0
0.324 1 86.187 1066 0 0 8#8 4052
0.000 0 0
0.370 1 83.199 1066 0 0 8#8 4052
0.000 0 0
0.416 1 80.240 1066 0 0 8#8 4052
0.000 0 0
0.462 1 77.308 1066 0 0 8#8 4052
0.000 0 0
0.509 1 74.405 1066 0 0 8#8 4052
0.000 0 0
0.555 1(e) 71.531 1066 0 0 8#8 4052
0.000 0 0
0.555 2(s) 71.531 1066 0 0 8#8 4052
0.000 0 0
0.601 2 68.649 1066 0 0 8#8 4052

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 25 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 26
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 5 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.000 0 0
0.647 2 65.795 1066 0 0 8#8 4052
0.000 0 0
0.694 2 62.970 1066 0 0 8#8 4052
0.000 0 0
0.740 2 60.173 1066 0 0 8#8 4052
0.000 0 0
0.786 2 57.404 1066 0 0 8#8 4052
0.000 0 0
0.832 2 54.664 1066 0 0 8#8 4052
0.000 0 0
0.879 2 51.951 1066 0 0 8#8 4052
0.000 0 0
0.925 2 49.268 1066 0 0 8#8 4052
0.000 0 0
0.971 2 46.612 1066 0 0 8#8 4052
0.000 0 0
1.017 2 43.985 1066 0 0 8#8 4052
0.000 0 0
1.064 2 41.386 1066 0 0 8#8 4052
0.000 0 0
1.110 2(e) 38.815 1066 0 0 8#8 4052
0.000 0 0
1.110 3(s) 38.815 1066 0 0 8#8 4052
0.000 0 0
1.156 3 36.202 1066 0 0 8#8 4052
0.000 0 0
1.202 3 33.617 1066 0 0 8#8 4052
0.000 0 0
1.249 3 31.060 1066 0 0 8#8 4052
0.000 0 0
1.295 3 28.532 1066 0 0 8#8 4052
0.000 0 0
1.341 3 26.032 1066 0 0 8#8 4052
0.000 0 0
1.387 3 23.560 1066 0 8#8 4052 8#8 4052
0.000 0 0
1.434 3 21.116 1066 0 8#8 4052 8#8 4052
-0.446 1066 0
1.480 3 18.701 1066 0 8#8 4052 8#8 4052
-1.810 1066 0
1.526 3 16.404 1066 0 8#8 4052 8#8 4052
-3.236 1066 0
1.572 3 14.282 1066 0 8#8 4052 8#8 4052
-4.781 1066 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 26 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 27
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 5 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
1.619 3 12.189 1066 0 8#8 4052 8#8 4052
-6.297 1066 0
1.665 3(e) 10.124 1066 0 8#8 4052 8#8 4052
-7.785 1066 0
1.665 4(s) 10.114 1066 0 8#8 4052 8#8 4052
-7.780 1066 0
1.711 4 7.945 1066 0 8#8 4052 8#8 4052
-9.380 1066 0
1.757 4 5.805 1066 0 8#8 4052 8#8 4052
-10.952 1066 0
1.804 4 3.693 1066 0 8#8 4052 8#8 4052
-12.495 1066 0
1.850 4 1.609 1066 0 8#8 4052 8#8 4052
-14.010 1066 0
1.896 4 0.000 0 0 8#8 4052 8#8 4052
-15.496 1066 0
1.942 4 0.000 0 0 8#8 4052 0
-16.955 1066 0
1.989 4 0.000 0 0 8#8 4052 0
-18.385 1066 0
2.035 4 0.000 0 0 8#8 4052 0
-19.787 1066 0
2.081 4 0.000 0 0 8#8 4052 0
-21.160 1066 0
2.127 4 0.000 0 0 8#8 4052 0
-22.505 1066 0
2.174 4 0.000 0 0 8#8 4052 0
-23.822 1066 0
2.220 4(e) 0.000 0 0 8#8 4052 0
-25.111 1066 0
2.220 5(s) 0.000 0 0 8#8 4052 0
-25.111 1066 0
2.266 5 0.000 0 0 8#8 4052 0
-26.554 1066 0
2.312 5 0.000 0 0 8#8 4052 0
-27.968 1066 0
2.359 5 0.000 0 0 8#8 4052 0
-29.355 1066 0
2.405 5 0.000 0 0 8#8 4052 0
-30.713 1066 0
2.451 5 0.000 0 0 8#8 4052 0
-32.042 1066 0
2.497 5 0.000 0 0 8#8 4052 0
-33.344 1066 0
2.544 5 0.000 0 0 8#8 4052 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 27 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 28
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 5 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
-34.617 1066 0
2.590 5 0.000 0 0 8#8 4052 0
-35.862 1066 0
2.636 5 0.000 0 0 8#8 4052 0
-37.079 1066 0
2.682 5 0.000 0 0 8#8 4052 0
-38.608 1066 0
2.729 5 0.000 0 0 8#8 4052 0
-40.557 1066 0
2.775 5(e) 0.000 0 0 8#8 4052 0
-42.478 1066 0
2.775 6(s) 0.000 0 0 8#8 4052 0
-42.478 1066 0
2.821 6 0.000 0 0 8#8 4052 0
-44.595 1066 0
2.867 6 0.000 0 0 8#8 4052 0
-46.684 1066 0
2.914 6 0.000 0 0 8#8 4052 0
-48.744 1066 0
2.960 6 0.000 0 0 8#8 4052 0
-50.776 1066 0
3.006 6 0.000 0 0 8#8 4052 0
-52.779 1066 0
3.052 6 0.000 0 0 8#8 4052 0
-54.755 1066 0
3.099 6 0.000 0 0 8#8 4052 0
-56.702 1066 0
3.145 6 0.000 0 0 8#8 4052 0
-58.621 1066 0
3.191 6 0.000 0 0 8#8 4052 0
-60.511 1066 0
3.237 6 0.000 0 0 8#8 4052 0
-62.373 1066 0
3.284 6 0.000 0 0 8#8 4052 0
-64.207 1066 0
3.330 6(e) 0.000 0 0 8#8 4052 0
-66.013 1066 0
3.330 7(s) 0.000 0 0 8#8 4052 0
-66.013 1066 0
3.376 7 0.000 0 0 8#8 4052 0
-68.044 1066 0
3.422 7 0.000 0 0 8#8 4052 0
-70.047 1066 0
3.469 7 0.000 0 0 8#8 4052 0
-72.022 1066 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 28 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 29
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 5 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
3.515 7 0.000 0 0 8#8 4052 0
-73.969 1066 0
3.561 7 0.000 0 0 8#8 4052 0
-75.888 1066 0
3.607 7 0.000 0 0 8#8 4052 0
-77.778 1066 0
3.654 7 0.000 0 0 8#8 4052 0
-79.639 1066 0
3.700 7 0.000 0 0 8#8 4052 0
-81.473 1066 0
3.746 7 0.000 0 0 8#8 4052 0
-83.278 1066 0
3.792 7 0.000 0 0 8#8 4052 0
-85.055 1066 0
3.839 7 0.000 0 0 8#8 4052 0
-86.804 1066 0
3.885 7(e) 0.000 0 0 8#8 4052 0
-88.524 1066 0
3.885 8(s) 0.000 0 0 8#8 4052 0
-88.524 1066 0
3.931 8 0.000 0 0 8#8 4052 0
-90.474 1066 0
3.977 8 0.000 0 0 8#8 4052 0
-92.395 1066 0
4.024 8 0.000 0 0 8#8 4052 0
-94.288 1066 0
4.070 8 0.000 0 0 8#8 4052 0
-96.153 1066 0
4.116 8 0.000 0 0 8#8 4052 0
-97.989 1066 0
4.162 8 0.000 0 0 8#8 4052 0
-99.797 1066 0
4.209 8 0.000 0 0 8#8 4052 0
-101.577 1066 0
4.255 8 0.000 0 0 8#8 4052 0
-103.329 1066 0
4.301 8 0.000 0 0 8#8 4052 0
-105.052 1066 0
4.347 8 0.000 0 0 8#8 4052 0
-106.747 1066 0
4.394 8 0.000 0 0 8#8 4052 0
-108.414 1066 0
4.440 8(e) 0.000 0 0 8#8 4052 0
-110.052 1066 0
4.440 9(s) 0.000 0 0 8#8 4052 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 29 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 30
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 5 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
-110.052 1066 0
4.486 9 0.000 0 0 8#8 4052 0
-111.887 1066 0
4.532 9 0.000 0 0 8#8 4052 0
-113.694 1066 0
4.579 9 0.000 0 0 8#8 4052 0
-115.472 1066 0
4.625 9 0.000 0 0 8#8 4052 0
-117.222 1072 0
4.671 9 0.000 0 0 8#8 4052 0
-118.943 1088 0
4.717 9 0.000 0 0 8#8 4052 0
-120.637 1104 0
4.764 9 0.000 0 0 8#8 4052 0
-122.302 1120 0
4.810 9 0.000 0 0 8#8 4052 0
-123.939 1135 0
4.856 9 0.000 0 0 8#8 4052 0
-125.547 1151 0
4.902 9 0.000 0 0 8#8 4052 0
-127.127 1166 0
4.949 9 0.000 0 0 8#8 4052 0
-128.679 1180 0
4.995 9(e) 0.000 0 0 8#8 4052 0
-130.203 1195 0
4.995 10(s) 0.000 0 0 8#8 4052 0
-130.203 1195 0
5.041 10 0.000 0 0 8#8 4052 0
-131.846 1210 0
5.087 10 0.000 0 0 8#8 4052 0
-133.460 1225 0
5.134 10 0.000 0 0 8#8 4052 0
-135.046 1240 0
5.180 10 0.000 0 0 8#8 4052 0
-136.603 1255 0
5.226 10 0.000 0 0 8#8 4052 0
-138.132 1270 0
5.272 10 0.000 0 0 8#8 4052 0
-139.633 1284 0
5.319 10 0.000 0 0 8#8 4052 0
-141.106 1298 0
5.365 10 0.000 0 0 8#8 4052 0
-142.551 1312 0
5.411 10 0.000 0 0 8#8 4052 0
-143.967 1325 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 30 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 31
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 5 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
5.457 10 0.000 0 0 8#8 4052 0
-145.355 1338 0
5.504 10 0.000 0 0 8#8 4052 0
-146.714 1351 0
5.550 10(e) 0.000 0 0 8#8 4052 0
-148.046 1364 0
Summary: the member is safe

Member 6 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 20.676 1066 0 0 8#8 4052
0.000 0 0
0.050 1 19.344 1066 0 0 8#8 4052
0.000 0 0
0.100 1 18.046 1066 0 0 8#8 4052
0.000 0 0
0.150 1 16.780 1066 0 0 8#8 4052
0.000 0 0
0.200 1 15.548 1066 0 0 8#8 4052
0.000 0 0
0.250 1 14.349 1066 0 0 8#8 4052
0.000 0 0
0.300 1 13.182 1066 0 0 8#8 4052
0.000 0 0
0.350 1 12.049 1066 0 0 8#8 4052
0.000 0 0
0.400 1 10.949 1066 0 0 8#8 4052
0.000 0 0
0.450 1 9.882 1066 0 0 8#8 4052
0.000 0 0
0.500 1 8.848 1066 0 0 8#8 4052
0.000 0 0
0.550 1 7.847 1066 0 0 8#8 4052
0.000 0 0
0.600 1(e) 6.880 1066 0 0 8#8 4052
0.000 0 0
0.600 2(s) 6.880 1066 0 0 8#8 4052
0.000 0 0
0.650 2 6.124 1066 0 0 8#8 4052
0.000 0 0
0.700 2 5.402 1066 0 0 8#8 4052
0.000 0 0

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 31 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 32
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Member 6 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.750 2 4.713 1066 0 0 8#8 4052
0.000 0 0
0.800 2 4.057 1066 0 0 8#8 4052
0.000 0 0
0.850 2 3.435 1066 0 0 8#8 4052
0.000 0 0
0.900 2 2.845 1066 0 0 8#8 4052
0.000 0 0
0.950 2 2.288 1066 0 0 8#8 4052
0.000 0 0
1.000 2 1.764 1066 0 0 8#8 4052
0.000 0 0
1.050 2 1.274 1066 0 0 8#8 4052
0.000 0 0
1.100 2 0.816 1066 0 0 8#8 4052
0.000 0 0
1.150 2 0.391 1066 0 0 8#8 4052
0.000 0 0
1.200 2(e) 0.000 0 0 0 8#8 4052
0.000 0 0
Summary: the member is safe

Span / Depth
Member Span Length Type Basic Modified Span
(m) Limit Limit Depth
M1 1 0.600 Beam 16.0 16.0 1.5
2 0.600 Beam 16.0 16.0 1.5
M2 1 0.555 Beam 16.0 16.0 1.4
2 0.555 Beam 21.0 21.0 1.4
3 0.555 Beam 21.0 21.0 1.4
4 0.555 Beam 21.0 21.0 1.4
5 0.555 Beam 21.0 21.0 1.4
6 0.555 Beam 21.0 21.0 1.4
7 0.555 Beam 21.0 21.0 1.4
8 0.555 Beam 21.0 21.0 1.4
9 0.555 Beam 21.0 21.0 1.4
10 0.555 Beam 16.0 16.0 1.4
M3 1 0.555 Beam 16.0 16.0 1.4
2 0.555 Beam 21.0 21.0 1.4
3 0.555 Beam 21.0 21.0 1.4
4 0.555 Beam 21.0 21.0 1.4
5 0.555 Beam 21.0 21.0 1.4
6 0.555 Beam 21.0 21.0 1.4

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 32 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 33
Part

Job Title Ref

By Date 11-Jun-19 Chd

Client File Date/Time

Span / Depth Cont...


Member Span Length Type Basic Modified Span
(m) Limit Limit Depth
7 0.555 Beam 21.0 21.0 1.4
8 0.555 Beam 21.0 21.0 1.4
9 0.555 Beam 21.0 21.0 1.4
10 0.555 Beam 16.0 16.0 1.4
M4 1 0.555 Beam 16.0 16.0 1.4
2 0.555 Beam 21.0 21.0 1.4
3 0.555 Beam 21.0 21.0 1.4
4 0.555 Beam 21.0 21.0 1.4
5 0.555 Beam 21.0 21.0 1.4
6 0.555 Beam 21.0 21.0 1.4
7 0.555 Beam 21.0 21.0 1.4
8 0.555 Beam 21.0 21.0 1.4
9 0.555 Beam 21.0 21.0 1.4
10 0.555 Beam 16.0 16.0 1.4
M5 1 0.555 Beam 16.0 16.0 1.4
2 0.555 Beam 21.0 21.0 1.4
3 0.555 Beam 21.0 21.0 1.4
4 0.555 Beam 21.0 21.0 1.4
5 0.555 Beam 21.0 21.0 1.4
6 0.555 Beam 21.0 21.0 1.4
7 0.555 Beam 21.0 21.0 1.4
8 0.555 Beam 21.0 21.0 1.4
9 0.555 Beam 21.0 21.0 1.4
10 0.555 Beam 16.0 16.0 1.4
M6 1 0.600 Beam 16.0 16.0 1.5
2 0.600 Beam 16.0 16.0 1.5
Summary: the group is safe

Print Time/Date: 12/06/2019 12:17 STAAD.Pro - RC ACI 318-99 Version 1.10 Print Run 33 of 33
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD. 1
Part
Software licensed to TCCL
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_105.std Date/Time 11-Jun-2019 17:00

Job Information
Engineer Checked Approved

Name:
Date: 11-Jun-19

Structure Type PLANE FRAME

Number of Nodes 50 Highest Node 50


Number of Elements 53 Highest Beam 53

Number of Basic Load Cases 7


Number of Combination Load Cases 12

Included in this printout are data for:


All The Whole Structure

Included in this printout are results for load cases:


Type L/C Name

Primary 1 DL
Primary 2 SIDL
Primary 3 EP
Primary 4 LL (MOMENT)
Primary 5 LL (SHEAR)
Primary 6 SURCH (ONE SIDE)
Primary 7 SURCH (OTHER SIDE)
Combination 8 COMB. 01: DL+SIDL+EP+SURCH+LL(MOMENT)-ULS
Combination 9 COMB. 02: DL+SIDL+EP+SURCH+LL(SHEAR)-ULS
Combination 10 COMB. 03: DL+SIDL+EP+SURCH-ULS
Combination 11 COMB. 04: DL+SIDL+EP+SURCH (ONE SIDE)+LL(MOMENT)-ULS
Combination 12 COMB. 05: DL+SIDL+EP+SURCH (ONE SIDE)+LL(SHEAR)-ULS
Combination 13 COMB. 06: DL+SIDL+EP+SURCH (ONE SIDE)-ULS
Combination 14 COMB. 07: DL+SIDL+EP+SURCH+LL(MOMENT)-SLS
Combination 15 COMB. 08: DL+SIDL+EP+SURCH+LL(SHEAR)-SLS
Combination 16 COMB. 09: DL+SIDL+EP+SURCH-SLS
Combination 17 COMB. 10: DL+SIDL+EP+SURCH (ONE SIDE)+LL(MOMENT)-SLS
Combination 18 COMB. 11: DL+SIDL+EP+SURCH (ONE SIDE)+LL(SHEAR)-SLS
Combination 19 COMB. 12: DL+SIDL+EP+SURCH (ONE SIDE)-SLS

Print Time/Date: 02/07/2019 09:54 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 1 of 8
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD. 2
Part
Software licensed to TCCL
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_105.std Date/Time 11-Jun-2019 17:00

Beams
Beam Node A Node B Length Property 
(m) (degrees)
1 1 49 0.600 3 0
2 2 13 0.555 3 0
3 3 22 0.555 3 0
4 4 31 0.555 3 0
5 5 40 0.555 3 0
6 6 50 0.600 3 0
7 2 8 5.975 2 0
8 3 9 5.975 2 0
9 4 10 5.975 2 0
10 5 11 5.975 2 0
11 6 12 5.975 2 0
12 8 9 5.550 1 0
13 9 10 5.550 1 0
14 10 11 5.550 1 0
15 11 12 5.550 1 0
16 13 14 0.555 3 0
17 14 15 0.555 3 0
18 15 16 0.555 3 0
19 16 17 0.555 3 0
20 17 18 0.555 3 0
21 18 19 0.555 3 0
22 19 20 0.555 3 0
23 20 21 0.555 3 0
24 21 3 0.555 3 0
25 22 23 0.555 3 0
26 23 24 0.555 3 0
27 24 25 0.555 3 0
28 25 26 0.555 3 0
29 26 27 0.555 3 0
30 27 28 0.555 3 0
31 28 29 0.555 3 0
32 29 30 0.555 3 0
33 30 4 0.555 3 0
34 31 32 0.555 3 0
35 32 33 0.555 3 0
36 33 34 0.555 3 0
37 34 35 0.555 3 0
38 35 36 0.555 3 0
39 36 37 0.555 3 0
40 37 38 0.555 3 0
41 38 39 0.555 3 0
42 39 5 0.555 3 0
43 40 41 0.555 3 0
44 41 42 0.555 3 0
45 42 43 0.555 3 0

Print Time/Date: 02/07/2019 09:54 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 2 of 8
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD. 3
Part
Software licensed to TCCL
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_105.std Date/Time 11-Jun-2019 17:00

Beams Cont...
Beam Node A Node B Length Property 
(m) (degrees)
46 43 44 0.555 3 0
47 44 45 0.555 3 0
48 45 46 0.555 3 0
49 46 47 0.555 3 0
50 47 48 0.555 3 0
51 48 6 0.555 3 0
52 49 2 0.600 3 0
53 50 7 0.600 3 0

Section Properties
Prop Section Area Iyy Izz J Material
(cm2) (cm4) (cm4) (cm4)
1 Rect 0.55x1.00 5.5E+3 4.58E+6 1.39E+6 3.64E+6 CONCRETE
2 Rect 0.55x1.00 5.5E+3 4.58E+6 1.39E+6 3.64E+6 CONCRETE
3 Rect 0.40x1.00 4E+3 3.33E+6 533E+3 1.6E+6 CONCRETE

Materials
Mat Name E  Density 
(kN/mm 2) (kg/m3) (/°C)
1 STEEL 205.000 0.300 7.83E+3 12E -6
2 STAINLESSSTEEL 197.930 0.300 7.83E+3 18E -6
3 ALUMINUM 68.948 0.330 2.71E+3 23E -6
4 CONCRETE 21.718 0.170 2.41E+3 5E -6

Supports
Node X Y Z rX rY rZ
(kN/mm) (kN/mm) (kN/mm) (kN-m/deg) (kN-m/deg) (kN-m/deg)
1 - 3.600 - - - -
2 Fixed Fixed Fixed Fixed Fixed Fixed
3 Fixed Fixed Fixed Fixed Fixed Fixed
4 Fixed Fixed Fixed Fixed Fixed Fixed
5 Fixed Fixed Fixed Fixed Fixed Fixed
6 Fixed Fixed Fixed Fixed Fixed Fixed
7 - 3.600 - - - -
13 - 3.300 - - - -
14 - 3.300 - - - -
15 - 3.300 - - - -
16 - 3.300 - - - -
17 - 3.300 - - - -
18 - 3.300 - - - -

Print Time/Date: 02/07/2019 09:54 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 3 of 8
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD. 4
Part
Software licensed to TCCL
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_105.std Date/Time 11-Jun-2019 17:00

Supports Cont...
Node X Y Z rX rY rZ
(kN/mm) (kN/mm) (kN/mm) (kN-m/deg) (kN-m/deg) (kN-m/deg)
19 - 3.300 - - - -
20 - 3.300 - - - -
21 - 3.300 - - - -
22 - 3.300 - - - -
23 - 3.300 - - - -
24 - 3.300 - - - -
25 - 3.300 - - - -
26 - 3.300 - - - -
27 - 3.300 - - - -
28 - 3.300 - - - -
29 - 3.300 - - - -
30 - 3.300 - - - -
31 - 3.300 - - - -
32 - 3.300 - - - -
33 - 3.300 - - - -
34 - 3.300 - - - -
35 - 3.300 - - - -
36 - 3.300 - - - -
37 - 3.300 - - - -
38 - 3.300 - - - -
39 - 3.300 - - - -
40 - 3.300 - - - -
41 - 3.300 - - - -
42 - 3.300 - - - -
43 - 3.300 - - - -
44 - 3.300 - - - -
45 - 3.300 - - - -
46 - 3.300 - - - -
47 - 3.300 - - - -
48 - 3.300 - - - -
49 - 3.600 - - - -
50 - 3.600 - - - -

Primary Load Cases


Number Name Type

1 DL Dead
2 SIDL Dead
3 EP Dead
4 LL (MOMENT) Live
5 LL (SHEAR) Live
6 SURCH (ONE SIDE) Live
7 SURCH (OTHER SIDE) Live

Print Time/Date: 02/07/2019 09:54 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 4 of 8
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD. 5
Part
Software licensed to TCCL
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_105.std Date/Time 11-Jun-2019 17:00

Combination Load Cases


Comb. Combination L/C Name Primary Primary L/C Name Factor

8 COMB. 01: DL+SIDL+EP+SURCH+LL(MOMENT)-ULS


1 DL 1.40
2 SIDL 2.00
3 EP 1.70
6 SURCH (ONE SIDE) 1.70
7 SURCH (OTHER SIDE) 1.70
4 LL (MOMENT) 2.00
9 COMB. 02: DL+SIDL+EP+SURCH+LL(SHEAR)-ULS
1 DL 1.40
2 SIDL 2.00
3 EP 1.70
6 SURCH (ONE SIDE) 1.70
7 SURCH (OTHER SIDE) 1.70
5 LL (SHEAR) 2.00
10 COMB. 03: DL+SIDL+EP+SURCH-ULS 1 DL 1.40
2 SIDL 2.00
3 EP 1.70
6 SURCH (ONE SIDE) 1.70
7 SURCH (OTHER SIDE) 1.70
11 COMB. 04: DL+SIDL+EP+SURCH (ONE SIDE)+LL(MOMENT)-ULS
1 DL 1.40
2 SIDL 2.00
3 EP 1.70
6 SURCH (ONE SIDE) 1.70
4 LL (MOMENT) 2.00
12 COMB. 05: DL+SIDL+EP+SURCH (ONE SIDE)+LL(SHEAR)-ULS
1 DL 1.40
2 SIDL 2.00
3 EP 1.70
6 SURCH (ONE SIDE) 1.70
5 LL (SHEAR) 2.00
13 COMB. 06: DL+SIDL+EP+SURCH (ONE SIDE)-ULS
1 DL 1.40
2 SIDL 2.00
3 EP 1.70
6 SURCH (ONE SIDE) 1.70
14 COMB. 07: DL+SIDL+EP+SURCH+LL(MOMENT)-SLS
1 DL 1.00
2 SIDL 1.20
3 EP 1.00
6 SURCH (ONE SIDE) 1.00
7 SURCH (OTHER SIDE) 1.00
4 LL (MOMENT) 1.10
15 COMB. 08: DL+SIDL+EP+SURCH+LL(SHEAR)-SLS
1 DL 1.00
2 SIDL 1.20
3 EP 1.00
6 SURCH (ONE SIDE) 1.00
7 SURCH (OTHER SIDE) 1.00
5 LL (SHEAR) 1.10
16 COMB. 09: DL+SIDL+EP+SURCH-SLS 1 DL 1.00
2 SIDL 1.20

Print Time/Date: 02/07/2019 09:54 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 5 of 8
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD. 6
Part
Software licensed to TCCL
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_105.std Date/Time 11-Jun-2019 17:00

Combination Load Cases Cont...


Comb. Combination L/C Name Primary Primary L/C Name Factor

3 EP 1.00
6 SURCH (ONE SIDE) 1.00
7 SURCH (OTHER SIDE) 1.00
17 COMB. 10: DL+SIDL+EP+SURCH (ONE SIDE)+LL(MOMENT)-SLS
1 DL 1.00
2 SIDL 1.20
3 EP 1.00
6 SURCH (ONE SIDE) 1.00
4 LL (MOMENT) 1.10
18 COMB. 11: DL+SIDL+EP+SURCH (ONE SIDE)+LL(SHEAR)-SLS
1 DL 1.00
2 SIDL 1.20
3 EP 1.00
6 SURCH (ONE SIDE) 1.00
5 LL (SHEAR) 1.10
19 COMB. 12: DL+SIDL+EP+SURCH (ONE SIDE)-SLS
1 DL 1.00
2 SIDL 1.20
3 EP 1.00
6 SURCH (ONE SIDE) 1.00

1 DL : Selfweight
Direction Factor Assigned Geometry

Y -1.000 ALL

2 SIDL : Beam Loads


Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
12 UNI kN/m GY -20.070 - - - -
13 UNI kN/m GY -20.070 - - - -
14 UNI kN/m GY -20.070 - - - -
15 UNI kN/m GY -20.070 - - - -

3 EP : Beam Loads
Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
7 LIN kN/m Y -12.260 - 0.000 - -
LIN kN/m Y -65.480 - 0.000 - -
11 LIN kN/m Y 12.260 - 0.000 - -
LIN kN/m Y 65.480 - 0.000 - -

Print Time/Date: 02/07/2019 09:54 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 6 of 8
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD. 7
Part
Software licensed to TCCL
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_105.std Date/Time 11-Jun-2019 17:00

4 LL (MOMENT) : Beam Loads


Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
12 UNI kN/m GY -42.800 - - - -
13 UNI kN/m GY -42.800 - - - -
14 UNI kN/m GY -42.800 - - - -
15 UNI kN/m GY -42.800 - - - -

5 LL (SHEAR) : Beam Loads


Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
12 UNI kN/m GY -51.100 - - - -
13 UNI kN/m GY -51.100 - - - -
14 UNI kN/m GY -51.100 - - - -
15 UNI kN/m GY -51.100 - - - -

6 SURCH (ONE SIDE) : Beam Loads


Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
11 TRAP kN/m GX -10.610 - -33.167 - -

7 SURCH (OTHER SIDE) : Beam Loads


Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
7 TRAP kN/m GX 10.610 - 33.167 - -

Print Time/Date: 02/07/2019 09:54 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 7 of 8
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD. 8
Part
Software licensed to TCCL
Job Title Ref

By Date11-Jun-19 Chd

Client File trial_105.std Date/Time 11-Jun-2019 17:00

Y
Z X
Load 8

Whole Structure

Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 6 13:COMB. 06: DL+SIDL+EP+SURCH
403.658 318.367(ONE SIDE)-ULS
0.000 0.000 0.000 -468.621
Min FX 2 10:COMB. 03: DL+SIDL+EP+SURCH-ULS
-382.927 335.052 0.000 0.000 0.000 396.634
Max FY 3 12:COMB. 05: DL+SIDL+EP+SURCH
20.441 (ONE SIDE)+LL(SHEAR)-ULS
1.1E+3 0.000 0.000 0.000 -70.441
Min FY 5 3:EP -1.545 -12.750 0.000 0.000 0.000 2.580
Max FZ 1 1:DL 0.000 0.082 0.000 0.000 0.000 0.000
Min FZ 1 1:DL 0.000 0.082 0.000 0.000 0.000 0.000
Max MX 1 1:DL 0.000 0.082 0.000 0.000 0.000 0.000
Min MX 1 1:DL 0.000 0.082 0.000 0.000 0.000 0.000
Max MY 1 1:DL 0.000 0.082 0.000 0.000 0.000 0.000
Min MY 1 1:DL 0.000 0.082 0.000 0.000 0.000 0.000
Max MZ 2 10:COMB. 03: DL+SIDL+EP+SURCH-ULS
-382.927 335.052 0.000 0.000 0.000 396.634
Min MZ 6 13:COMB. 06: DL+SIDL+EP+SURCH
403.658 318.367(ONE SIDE)-ULS
0.000 0.000 0.000 -468.621

Print Time/Date: 02/07/2019 09:54 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 8 of 8
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 1
Part
Software licensed to
Job Title Ref

By Date15-Jun-19 Chd

Client File GB_104_REV_3.std Date/Time 15-Jun-2019 10:40

Job Information
Engineer Checked Approved

Name:
Date: 15-Jun-19

Project ID
Project Name

Structure Type PLANE FRAME

Number of Nodes 9 Highest Node 9


Number of Elements 8 Highest Beam 8

Number of Basic Load Cases 2


Number of Combination Load Cases 1

Included in this printout are data for:


All The Whole Structure

Included in this printout are results for load cases:


Type L/C Name

Primary 1 DL
Primary 2 SIDL
Combination 3 COMBINATION LOAD CASE 3

Nodes
Node X Y Z
(m) (m) (m)
1 0.000 0.000 0.000
2 2.730 0.000 0.000
3 8.280 0.000 0.000
4 13.830 0.000 0.000
5 19.380 0.000 0.000
6 24.930 0.000 0.000
7 30.480 0.000 0.000
8 36.030 0.000 0.000
9 38.760 0.000 0.000

Print Time/Date: 15/06/2019 10:53 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 1 of 6
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 2
Part
Software licensed to
Job Title Ref

By Date15-Jun-19 Chd

Client File GB_104_REV_3.std Date/Time 15-Jun-2019 10:40

Beams
Beam Node A Node B Length Property 
(m) (degrees)
1 1 2 2.730 1 0
2 2 3 5.550 1 0
3 3 4 5.550 1 0
4 4 5 5.550 1 0
5 5 6 5.550 1 0
6 6 7 5.550 1 0
7 7 8 5.550 1 0
8 8 9 2.730 1 0

Section Properties
Prop Section Area Iyy Izz J Material
(in2) (in4) (in4) (in4)
1 Rect 47.24x94.49 4.46E+3 3.32E+6 830E+3 2.28E+6 CONCRETE

Materials
Mat Name E  Density 
(kip/in2) (kN/m3) (/°F)
1 STEEL 29E+3 0.300 76.822 6E -6
2 STAINLESSSTEEL 28E+3 0.300 76.822 10E -6
3 ALUMINUM 10E+3 0.330 26.603 13E -6
4 CONCRETE 3.15E+3 0.170 23.617 5E -6

Supports
Node X Y Z rX rY rZ
(kN/m) (kN/m) (kN/m) (kN-m/deg) (kN-m/deg) (kN-m/deg)
2 - 2.56E+6 - - - -
3 - 2.56E+6 - - - -
4 - 2.56E+6 - - - -
5 - 2.56E+6 - - - -
6 - 2.56E+6 - - - -
7 - 2.56E+6 - - - -
8 - 2.56E+6 - - - -

Print Time/Date: 15/06/2019 10:53 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 2 of 6
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 3
Part
Software licensed to
Job Title Ref

By Date15-Jun-19 Chd

Client File GB_104_REV_3.std Date/Time 15-Jun-2019 10:40

Y
Z X
Load 1

Whole Structure

Primary Load Cases


Number Name Type

1 DL Dead
2 SIDL Dead

Combination Load Cases


Comb. Combination L/C Name Primary Primary L/C Name Factor

3 COMBINATION LOAD CASE 3 1 DL 1.00


2 SIDL 1.00

1 DL : Selfweight
Direction Factor Assigned Geometry

Y -1.000 ALL

Print Time/Date: 15/06/2019 10:53 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 3 of 6
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 4
Part
Software licensed to
Job Title Ref

By Date15-Jun-19 Chd

Client File GB_104_REV_3.std Date/Time 15-Jun-2019 10:40

2 SIDL : Beam Loads


Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
1 UNI kN/m GY -1.1E+3 - - - -
2 UNI kN/m GY -1.1E+3 - - - -
3 UNI kN/m GY -1.1E+3 - - - -
4 UNI kN/m GY -1.1E+3 - - - -
5 UNI kN/m GY -1.1E+3 - - - -
6 UNI kN/m GY -1.1E+3 - - - -
7 UNI kN/m GY -1.1E+3 - - - -
8 UNI kN/m GY -1.1E+3 - - - -

Beam Maximum Moments


Distances to maxima are given from beam end A.
Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
1 1 2.730 1:DL Max +ve 0.000 0.000 2.730 253.451
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000 2.730 4.09E+3
Max -ve 0.000 0.000
3:COMBINATIO Max +ve 0.000 0.000 2.730 4.34E+3
Max -ve 0.000 0.000
2 2 5.550 1:DL Max +ve 0.000 0.000 0.000 253.451
Max -ve 0.000 0.000 3.237 -53.412
2:SIDL Max +ve 0.000 0.000 0.000 4.09E+3
Max -ve 0.000 0.000 3.237 -861.654
3:COMBINATIO Max +ve 0.000 0.000 0.000 4.34E+3
Max -ve 0.000 0.000 3.237 -915.066
3 3 5.550 1:DL Max +ve 0.000 0.000 5.550 173.998
Max -ve 0.000 0.000 2.775 -92.944
2:SIDL Max +ve 0.000 0.000 5.550 2.81E+3
Max -ve 0.000 0.000 2.775 -1.5E+3
3:COMBINATIO Max +ve 0.000 0.000 5.550 2.98E+3
Max -ve 0.000 0.000 2.775 -1.59E+3
4 4 5.550 1:DL Max +ve 0.000 0.000 5.550 175.180
Max -ve 0.000 0.000 2.775 -87.284
2:SIDL Max +ve 0.000 0.000 5.550 2.83E+3
Max -ve 0.000 0.000 2.775 -1.41E+3
3:COMBINATIO Max +ve 0.000 0.000 5.550 3E+3
Max -ve 0.000 0.000 2.775 -1.5E+3
5 5 5.550 1:DL Max +ve 0.000 0.000 0.000 175.180
Max -ve 0.000 0.000 2.775 -87.292
2:SIDL Max +ve 0.000 0.000 0.000 2.83E+3
Max -ve 0.000 0.000 2.775 -1.41E+3
3:COMBINATIO Max +ve 0.000 0.000 0.000 3E+3
Max -ve 0.000 0.000 2.775 -1.5E+3
6 6 5.550 1:DL Max +ve 0.000 0.000 0.000 174.002

Print Time/Date: 15/06/2019 10:53 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 4 of 6
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 5
Part
Software licensed to
Job Title Ref

By Date15-Jun-19 Chd

Client File GB_104_REV_3.std Date/Time 15-Jun-2019 10:40

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kN-m) (m) (kN-m)
Max -ve 0.000 0.000 2.775 -92.943
2:SIDL Max +ve 0.000 0.000 0.000 2.81E+3
Max -ve 0.000 0.000 2.775 -1.5E+3
3:COMBINATIO Max +ve 0.000 0.000 0.000 2.98E+3
Max -ve 0.000 0.000 2.775 -1.59E+3
7 7 5.550 1:DL Max +ve 0.000 0.000 5.550 253.448
Max -ve 0.000 0.000 2.312 -53.412
2:SIDL Max +ve 0.000 0.000 5.550 4.09E+3
Max -ve 0.000 0.000 2.312 -861.651
3:COMBINATIO Max +ve 0.000 0.000 5.550 4.34E+3
Max -ve 0.000 0.000 2.312 -915.063
8 8 2.730 1:DL Max +ve 0.000 0.000 0.000 253.448
Max -ve 0.000 0.000
2:SIDL Max +ve 0.000 0.000 0.000 4.09E+3
Max -ve 0.000 0.000
3:COMBINATIO Max +ve 0.000 0.000 0.000 4.34E+3
Max -ve 0.000 0.000

Beam Maximum Shear Forces


Distances to maxima are given from beam end A.
Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
1 1 2.730 1:DL Max +ve 0.000 0.000 0.000 0.000
Max -ve 0.000 0.000 2.730 -185.678
2:SIDL Max +ve 0.000 0.000 0.000 0.000
Max -ve 0.000 0.000 2.730 -3E+3
3:COMBINATIO Max +ve 0.000 0.000 0.000 0.000
Max -ve 0.000 0.000 2.730 -3.18E+3
2 2 5.550 1:DL Max +ve 0.000 0.000 0.000 204.881
Max -ve 0.000 0.000 5.550 -172.595
2:SIDL Max +ve 0.000 0.000 0.000 3.31E+3
Max -ve 0.000 0.000 5.550 -2.78E+3
3:COMBINATIO Max +ve 0.000 0.000 0.000 3.51E+3
Max -ve 0.000 0.000 5.550 -2.96E+3
3 3 5.550 1:DL Max +ve 0.000 0.000 0.000 186.910
Max -ve 0.000 0.000 5.550 -190.564
2:SIDL Max +ve 0.000 0.000 0.000 3.02E+3
Max -ve 0.000 0.000 5.550 -3.07E+3
3:COMBINATIO Max +ve 0.000 0.000 0.000 3.2E+3
Max -ve 0.000 0.000 5.550 -3.26E+3
4 4 5.550 1:DL Max +ve 0.000 0.000 0.000 188.525
Max -ve 0.000 0.000 5.550 -188.950
2:SIDL Max +ve 0.000 0.000 0.000 3.04E+3
Max -ve 0.000 0.000 5.550 -3.05E+3

Print Time/Date: 15/06/2019 10:53 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 5 of 6
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 6
Part
Software licensed to
Job Title Ref

By Date15-Jun-19 Chd

Client File GB_104_REV_3.std Date/Time 15-Jun-2019 10:40

Beam Maximum Shear Forces Cont...


Beam Node A Length L/C d Max Fz d Max Fy
(m) (m) (kN) (m) (kN)
3:COMBINATIO Max +ve 0.000 0.000 0.000 3.23E+3
Max -ve 0.000 0.000 5.550 -3.24E+3
5 5 5.550 1:DL Max +ve 0.000 0.000 0.000 188.953
Max -ve 0.000 0.000 5.550 -188.529
2:SIDL Max +ve 0.000 0.000 0.000 3.05E+3
Max -ve 0.000 0.000 5.550 -3.04E+3
3:COMBINATIO Max +ve 0.000 0.000 0.000 3.24E+3
Max -ve 0.000 0.000 5.550 -3.23E+3
6 6 5.550 1:DL Max +ve 0.000 0.000 0.000 190.565
Max -ve 0.000 0.000 5.550 -186.910
2:SIDL Max +ve 0.000 0.000 0.000 3.07E+3
Max -ve 0.000 0.000 5.550 -3.02E+3
3:COMBINATIO Max +ve 0.000 0.000 0.000 3.26E+3
Max -ve 0.000 0.000 5.550 -3.2E+3
7 7 5.550 1:DL Max +ve 0.000 0.000 0.000 172.595
Max -ve 0.000 0.000 5.550 -204.880
2:SIDL Max +ve 0.000 0.000 0.000 2.78E+3
Max -ve 0.000 0.000 5.550 -3.31E+3
3:COMBINATIO Max +ve 0.000 0.000 0.000 2.96E+3
Max -ve 0.000 0.000 5.550 -3.51E+3
8 8 2.730 1:DL Max +ve 0.000 0.000 0.000 185.677
Max -ve 0.000 0.000 2.730 -0.000
2:SIDL Max +ve 0.000 0.000 0.000 3E+3
Max -ve 0.000 0.000 2.730 -0.000
3:COMBINATIO Max +ve 0.000 0.000 0.000 3.18E+3
Max -ve 0.000 0.000 2.730 -0.000

Print Time/Date: 15/06/2019 10:53 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 6 of 6
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 1
Part

Job Title Ref

By Date 15-Jun-19 Chd

Client File Date/Time

Job Information
Engineer Checked Approved

Name:
Date: 15-Jun-19

Structure Type SPACE FRAME

Number of Nodes 9 Highest Node 9


Number of Elements 8 Highest Element 8
Number of Plates 0 Highest Plate 0

Number of Design Groups 1


Number of Design Slabs 0
Number of Load Cases 3
Number of Design Briefs 1

Included in this printout are data for:


Design Group Design Brief Design Code Members

G1: Design Group 1 B1: GB BRIEF ACI 318-05 Beam M1, M2, M3, M4, M5, M6, M7, M8

Design Group Summary - Design Group 1


Member Design Span Type Main Bars Shear Span
Hog Sag Bars Depth
M1 Initial 1 Cantilever Ok Ok Ok Ok
M2 Initial 1 Beam Ok Ok Ok Ok
M3 Initial 1 Beam Ok Ok Ok Ok
M4 Initial 1 Beam Ok Ok Ok Ok
M5 Initial 1 Beam Ok Ok Ok Ok
M6 Initial 1 Beam Ok Ok Ok Ok
M7 Initial 1 Beam Ok Ok Ok Ok
M8 Initial 1 Cantilever Ok Ok Ok Ok
Summary: the group is safe

Print Time/Date: 15/06/2019 10:52 STAAD.Pro - RC ACI 318-05 Version 1.0 Print Run 1 of 13
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 2
Part

Job Title Ref

By Date 15-Jun-19 Chd

Client File Date/Time

Beam Spans
Cover
Member Span Type Length Top Btm Side Link Size
(m) (cm) (cm) (cm)
M1 1 Cantilever 2.730 7.6 10.2 7.6 #5
M2 1 Beam 5.550 7.6 10.2 7.6 #5
M3 1 Beam 5.550 7.6 10.2 7.6 #5
M4 1 Beam 5.550 7.6 10.2 7.6 #5
M5 1 Beam 5.550 7.6 10.2 7.6 #5
M6 1 Beam 5.550 7.6 10.2 7.6 #5
M7 1 Beam 5.550 7.6 10.2 7.6 #5
M8 1 Cantilever 2.730 7.6 10.2 7.6 #5

Beam Supports
Member Node Length Support Col. Width
(m) Type (cm)
M1 N1 2.730 No Support 0.0
N2 Simple 0.0
M2 N2 5.550 Simple 0.0
N3 Simple 0.0
M3 N3 5.550 Simple 0.0
N4 Simple 0.0
M4 N4 5.550 Simple 0.0
N5 Simple 0.0
M5 N5 5.550 Simple 0.0
N6 Simple 0.0
M6 N6 5.550 Simple 0.0
N7 Simple 0.0
M7 N7 5.550 Simple 0.0
N8 Simple 0.0
M8 N8 2.730 Simple 0.0
N9 No Support 0.0

Print Time/Date: 15/06/2019 10:52 STAAD.Pro - RC ACI 318-05 Version 1.0 Print Run 2 of 13
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 3
Part

Job Title Ref

By Date 15-Jun-19 Chd

Client File Date/Time

M1 M2 M3 M4 M5 M6 M7 M8

Y
Z X

Whole Structure

Member 1 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.076 1 10.100 9293 0 0 22#8 11142
0.000 0 0
0.297 1 57.929 9293 0 0 22#8 11142
0.000 0 0
0.519 1 162.699 9293 0 0 22#8 11142
0.000 0 0
0.740 1 324.411 9293 0 0 22#8 11142
0.000 0 0
0.961 1 543.064 9293 0 0 22#8 11142
0.000 0 0
1.182 1 818.658 9293 0 0 22#8 11142
0.000 0 0
1.403 1 1.15E 3 9293 0 0 22#8 11142
0.000 0 0
1.624 1 1.54E 3 9293 0 0 22#8 11142
0.000 0 0
1.845 1 1.99E 3 9293 0 0 22#8 11142
0.000 0 0

Print Time/Date: 15/06/2019 10:52 STAAD.Pro - RC ACI 318-05 Version 1.0 Print Run 3 of 13
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 4
Part

Job Title Ref

By Date 15-Jun-19 Chd

Client File Date/Time

Member 1 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
2.067 1 2.49E 3 9293 0 0 22#8 11142
0.000 0 0
2.288 1 3.05E 3 9293 0 0 22#8 11142
0.000 0 0
2.509 1 3.65E 3 9293 0 0 22#8 11142
0.000 0 0
2.730 1(e) 4.34E 3 10972 0 0 22#8 11142
0.000 0 0
Summary: the member is safe

Member 2 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 4.34E 3 10972 0 0 22#8 11142
0.000 0 0
0.462 1 2.84E 3 9293 0 0 22#8 11142
0.000 0 0
0.925 1 1.59E 3 9293 0 0 22#8 11142
0.000 0 0
1.387 1 593.578 9293 0 19#8 9623 22#8 11142
0.000 0 0
1.850 1 0.000 0 0 19#8 9623 22#8 11142
-157.458 9078 0
2.312 1 0.000 0 0 19#8 9623 0
-659.243 9078 0
2.775 1 0.000 0 0 19#8 9623 0
-911.779 9078 0
3.237 1 0.000 0 0 19#8 9623 0
-915.066 9078 0
3.700 1 0.000 0 0 19#8 9623 0
-669.103 9078 0
4.162 1 0.000 0 0 19#8 9623 22#8 11142
-173.891 9078 0
4.625 1 570.572 9293 0 19#8 9623 22#8 11142
0.000 0 0
5.087 1 1.56E 3 9293 0 0 22#8 11142
0.000 0 0
5.550 1(e) 2.81E 3 9293 0 0 22#8 11142
0.000 0 0
Summary: the member is safe

Print Time/Date: 15/06/2019 10:52 STAAD.Pro - RC ACI 318-05 Version 1.0 Print Run 4 of 13
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 5
Part

Job Title Ref

By Date 15-Jun-19 Chd

Client File Date/Time

Member 3 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 2.81E 3 9293 0 0 19#8 9623
0.000 0 0
0.462 1 1.45E 3 9293 0 0 19#8 9623
0.000 0 0
0.925 1 343.732 9293 0 19#8 9623 19#8 9623
0.000 0 0
1.387 1 0.000 0 0 19#8 9623 19#8 9623
-514.154 9078 0
1.850 1 0.000 0 0 19#8 9623 0
-1.12E 3 9078 0
2.312 1 0.000 0 0 19#8 9623 0
-1.48E 3 9078 0
2.775 1 0.000 0 0 19#8 9623 0
-1.59E 3 9078 0
3.237 1 0.000 0 0 19#8 9623 0
-1.45E 3 9078 0
3.700 1 0.000 0 0 19#8 9623 0
-1.06E 3 9078 0
4.162 1 0.000 0 0 19#8 9623 19#8 9623
-427.287 9078 0
4.625 1 459.555 9293 0 19#8 9623 19#8 9623
0.000 0 0
5.087 1 1.6E 3 9293 0 0 19#8 9623
0.000 0 0
5.550 1(e) 2.98E 3 9293 0 0 19#8 9623
0.000 0 0
Summary: the member is safe

Member 4 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 2.98E 3 9293 0 0 19#8 9623
0.000 0 0
0.462 1 1.61E 3 9293 0 0 19#8 9623
0.000 0 0
0.925 1 491.868 9293 0 19#8 9623 19#8 9623
0.000 0 0
1.387 1 0.000 0 0 19#8 9623 19#8 9623
-378.815 9078 0
1.850 1 0.000 0 0 19#8 9623 0
-1E 3 9078 0
2.312 1 0.000 0 0 19#8 9623 0
-1.37E 3 9078 0

Print Time/Date: 15/06/2019 10:52 STAAD.Pro - RC ACI 318-05 Version 1.0 Print Run 5 of 13
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 6
Part

Job Title Ref

By Date 15-Jun-19 Chd

Client File Date/Time

Member 4 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
2.775 1 0.000 0 0 19#8 9623 0
-1.5E 3 9078 0
3.237 1 0.000 0 0 19#8 9623 0
-1.37E 3 9078 0
3.700 1 0.000 0 0 19#8 9623 0
-993.503 9078 0
4.162 1 0.000 0 0 19#8 9623 19#8 9623
-368.695 9078 0
4.625 1 505.361 9293 0 19#8 9623 19#8 9623
0.000 0 0
5.087 1 1.63E 3 9293 0 0 19#8 9623
0.000 0 0
5.550 1(e) 3E 3 9293 0 0 19#8 9623
0.000 0 0
Summary: the member is safe

Member 5 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 3E 3 9293 0 0 19#8 9623
0.000 0 0
0.463 1 1.63E 3 9293 0 0 19#8 9623
0.000 0 0
0.925 1 505.282 9293 0 19#8 9623 19#8 9623
0.000 0 0
1.388 1 0.000 0 0 19#8 9623 19#8 9623
-368.800 9078 0
1.850 1 0.000 0 0 19#8 9623 0
-993.626 9078 0
2.313 1 0.000 0 0 19#8 9623 0
-1.37E 3 9078 0
2.775 1 0.000 0 0 19#8 9623 0
-1.5E 3 9078 0
3.238 1 0.000 0 0 19#8 9623 0
-1.37E 3 9078 0
3.700 1 0.000 0 0 19#8 9623 0
-1E 3 9078 0
4.163 1 0.000 0 0 19#8 9623 19#8 9623
-378.886 9078 0
4.625 1 491.834 9293 0 19#8 9623 19#8 9623
0.000 0 0
5.088 1 1.61E 3 9293 0 0 19#8 9623
0.000 0 0

Print Time/Date: 15/06/2019 10:52 STAAD.Pro - RC ACI 318-05 Version 1.0 Print Run 6 of 13
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 7
Part

Job Title Ref

By Date 15-Jun-19 Chd

Client File Date/Time

Member 5 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
5.550 1(e) 2.98E 3 9293 0 0 19#8 9623
0.000 0 0
Summary: the member is safe

Member 6 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 2.98E 3 9293 0 0 19#8 9623
0.000 0 0
0.462 1 1.6E 3 9293 0 0 19#8 9623
0.000 0 0
0.925 1 459.596 9293 0 19#8 9623 19#8 9623
0.000 0 0
1.387 1 0.000 0 0 19#8 9623 19#8 9623
-427.256 9078 0
1.850 1 0.000 0 0 19#8 9623 0
-1.06E 3 9078 0
2.312 1 0.000 0 0 19#8 9623 0
-1.45E 3 9078 0
2.775 1 0.000 0 0 19#8 9623 0
-1.59E 3 9078 0
3.237 1 0.000 0 0 19#8 9623 0
-1.48E 3 9078 0
3.700 1 0.000 0 0 19#8 9623 0
-1.12E 3 9078 0
4.162 1 0.000 0 0 19#8 9623 19#8 9623
-514.152 9078 0
4.625 1 343.735 9293 0 19#8 9623 19#8 9623
0.000 0 0
5.087 1 1.45E 3 9293 0 0 19#8 9623
0.000 0 0
5.550 1(e) 2.81E 3 9293 0 0 19#8 9623
0.000 0 0
Summary: the member is safe

Print Time/Date: 15/06/2019 10:52 STAAD.Pro - RC ACI 318-05 Version 1.0 Print Run 7 of 13
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 8
Part

Job Title Ref

By Date 15-Jun-19 Chd

Client File Date/Time

Member 7 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 2.81E 3 9293 0 0 22#8 11142
0.000 0 0
0.462 1 1.56E 3 9293 0 0 22#8 11142
0.000 0 0
0.925 1 570.582 9293 0 19#8 9623 22#8 11142
0.000 0 0
1.387 1 0.000 0 0 19#8 9623 22#8 11142
-173.882 9078 0
1.850 1 0.000 0 0 19#8 9623 0
-669.097 9078 0
2.312 1 0.000 0 0 19#8 9623 0
-915.063 9078 0
2.775 1 0.000 0 0 19#8 9623 0
-911.780 9078 0
3.237 1 0.000 0 0 19#8 9623 0
-659.249 9078 0
3.700 1 0.000 0 0 19#8 9623 22#8 11142
-157.469 9078 0
4.162 1 593.561 9293 0 19#8 9623 22#8 11142
0.000 0 0
4.625 1 1.59E 3 9293 0 0 22#8 11142
0.000 0 0
5.087 1 2.84E 3 9293 0 0 22#8 11142
0.000 0 0
5.550 1(e) 4.34E 3 10972 0 0 22#8 11142
0.000 0 0
Summary: the member is safe

Member 8 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 4.34E 3 10972 0 0 22#8 11142
0.000 0 0
0.221 1 3.65E 3 9293 0 0 22#8 11142
0.000 0 0
0.442 1 3.05E 3 9293 0 0 22#8 11142
0.000 0 0
0.663 1 2.49E 3 9293 0 0 22#8 11142
0.000 0 0
0.885 1 1.99E 3 9293 0 0 22#8 11142
0.000 0 0
1.106 1 1.54E 3 9293 0 0 22#8 11142
0.000 0 0

Print Time/Date: 15/06/2019 10:52 STAAD.Pro - RC ACI 318-05 Version 1.0 Print Run 8 of 13
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 9
Part

Job Title Ref

By Date 15-Jun-19 Chd

Client File Date/Time

Member 8 - Main Steel Summary Cont...


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kNm) (mm2) (mm2) Bars Area Bars Area
1.327 1 1.15E 3 9293 0 0 22#8 11142
0.000 0 0
1.548 1 818.651 9293 0 0 22#8 11142
0.000 0 0
1.769 1 543.059 9293 0 0 22#8 11142
0.000 0 0
1.990 1 324.408 9293 0 0 22#8 11142
0.000 0 0
2.211 1 162.698 9293 0 0 22#8 11142
0.000 0 0
2.433 1 57.928 9293 0 0 22#8 11142
0.000 0 0
2.654 1 10.100 9293 0 0 22#8 11142
0.000 0 0
Summary: the member is safe

Member 1 - Shear Results Summary


Distance Span Vu Vc Av Required
(m) (kN) (kN) (mm2)
0.076 1 88.790 2.56E 3 737
0.297 1 346.480 2.56E 3 737
0.519 1 604.171 2.56E 3 737
0.740 1 861.861 2.56E 3 737
0.961 1 1.12E 3 2.56E 3 737
1.182 1 1.38E 3 2.56E 3 737
1.403 1 1.63E 3 2.56E 3 737
1.624 1 1.89E 3 2.56E 3 737
1.845 1 2.15E 3 2.56E 3 737
2.067 1 2.41E 3 2.56E 3 737
2.288 1 2.67E 3 2.56E 3 737
2.509 1 2.92E 3 2.56E 3 597
2.730 1(e) 3.18E 3 2.56E 3 777
Summary: the member is safe

Print Time/Date: 15/06/2019 10:52 STAAD.Pro - RC ACI 318-05 Version 1.0 Print Run 9 of 13
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 10
Part

Job Title Ref

By Date 15-Jun-19 Chd

Client File Date/Time

Member 2 - Shear Results Summary


Distance Span Vu Vc Av Required
(m) (kN) (kN) (mm2)
0.000 1(s) 3.51E 3 2.56E 3 790
0.462 1 2.97E 3 2.56E 3 758
0.925 1 2.43E 3 2.56E 3 737
1.387 1 1.89E 3 2.56E 3 737
1.850 1 1.35E 3 2.5E 3 737
2.312 1 815.481 2.5E 3 737
2.775 1 276.564 2.5E 3 737
3.237 1 262.352 2.5E 3 737
3.700 1 801.270 2.5E 3 737
4.162 1 1.34E 3 2.5E 3 737
4.625 1 1.88E 3 2.56E 3 737
5.087 1 2.42E 3 2.56E 3 737
5.550 1(e) 2.96E 3 2.56E 3 744
Summary: the member is safe

Member 3 - Shear Results Summary


Distance Span Vu Vc Av Required
(m) (kN) (kN) (mm2)
0.000 1(s) 3.2E 3 2.56E 3 776
0.462 1 2.66E 3 2.56E 3 737
0.925 1 2.12E 3 2.56E 3 737
1.387 1 1.59E 3 2.5E 3 737
1.850 1 1.05E 3 2.5E 3 737
2.312 1 507.610 2.5E 3 737
2.775 1 31.304 2.5E 3 737
3.237 1 570.218 2.5E 3 737
3.700 1 1.11E 3 2.5E 3 737
4.162 1 1.65E 3 2.5E 3 737
4.625 1 2.19E 3 2.56E 3 737
5.087 1 2.73E 3 2.56E 3 559
5.550 1(e) 3.26E 3 2.56E 3 788
Summary: the member is safe

Print Time/Date: 15/06/2019 10:52 STAAD.Pro - RC ACI 318-05 Version 1.0 Print Run 10 of 13
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 11
Part

Job Title Ref

By Date 15-Jun-19 Chd

Client File Date/Time

Member 4 - Shear Results Summary


Distance Span Vu Vc Av Required
(m) (kN) (kN) (mm2)
0.000 1(s) 3.23E 3 2.56E 3 780
0.462 1 2.69E 3 2.56E 3 737
0.925 1 2.15E 3 2.56E 3 737
1.387 1 1.61E 3 2.5E 3 737
1.850 1 1.07E 3 2.5E 3 737
2.312 1 535.269 2.5E 3 737
2.775 1 3.647 2.5E 3 737
3.237 1 542.562 2.5E 3 737
3.700 1 1.08E 3 2.5E 3 737
4.162 1 1.62E 3 2.5E 3 737
4.625 1 2.16E 3 2.56E 3 737
5.087 1 2.7E 3 2.56E 3 571
5.550 1(e) 3.24E 3 2.56E 3 785
Summary: the member is safe

Member 5 - Shear Results Summary


Distance Span Vu Vc Av Required
(m) (kN) (kN) (mm2)
0.000 1(s) 3.24E 3 2.56E 3 785
0.463 1 2.7E 3 2.56E 3 737
0.925 1 2.16E 3 2.56E 3 737
1.388 1 1.62E 3 2.5E 3 737
1.850 1 1.08E 3 2.5E 3 737
2.313 1 542.560 2.5E 3 737
2.775 1 3.634 2.5E 3 737
3.238 1 535.291 2.5E 3 737
3.700 1 1.07E 3 2.5E 3 737
4.163 1 1.61E 3 2.5E 3 737
4.625 1 2.15E 3 2.56E 3 737
5.088 1 2.69E 3 2.56E 3 571
5.550 1(e) 3.23E 3 2.56E 3 780
Summary: the member is safe

Print Time/Date: 15/06/2019 10:52 STAAD.Pro - RC ACI 318-05 Version 1.0 Print Run 11 of 13
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 12
Part

Job Title Ref

By Date 15-Jun-19 Chd

Client File Date/Time

Member 6 - Shear Results Summary


Distance Span Vu Vc Av Required
(m) (kN) (kN) (mm2)
0.000 1(s) 3.26E 3 2.56E 3 788
0.462 1 2.73E 3 2.56E 3 737
0.925 1 2.19E 3 2.56E 3 737
1.387 1 1.65E 3 2.5E 3 737
1.850 1 1.11E 3 2.5E 3 737
2.312 1 570.230 2.5E 3 737
2.775 1 31.314 2.5E 3 737
3.237 1 507.602 2.5E 3 737
3.700 1 1.05E 3 2.5E 3 737
4.162 1 1.59E 3 2.5E 3 737
4.625 1 2.12E 3 2.56E 3 737
5.087 1 2.66E 3 2.56E 3 584
5.550 1(e) 3.2E 3 2.56E 3 776
Summary: the member is safe

Member 7 - Shear Results Summary


Distance Span Vu Vc Av Required
(m) (kN) (kN) (mm2)
0.000 1(s) 2.96E 3 2.56E 3 744
0.462 1 2.42E 3 2.56E 3 737
0.925 1 1.88E 3 2.56E 3 737
1.387 1 1.34E 3 2.5E 3 737
1.850 1 801.277 2.5E 3 737
2.312 1 262.361 2.5E 3 737
2.775 1 276.556 2.5E 3 737
3.237 1 815.472 2.5E 3 737
3.700 1 1.35E 3 2.5E 3 737
4.162 1 1.89E 3 2.56E 3 737
4.625 1 2.43E 3 2.56E 3 737
5.087 1 2.97E 3 2.56E 3 470
5.550 1(e) 3.51E 3 2.56E 3 790
Summary: the member is safe

Print Time/Date: 15/06/2019 10:52 STAAD.Pro - RC ACI 318-05 Version 1.0 Print Run 12 of 13
Job No Sheet No Rev
TOMA CONSTRUCTION & CO. LTD 13
Part

Job Title Ref

By Date 15-Jun-19 Chd

Client File Date/Time

Member 8 - Shear Results Summary


Distance Span Vu Vc Av Required
(m) (kN) (kN) (mm2)
0.000 1(s) 3.18E 3 2.56E 3 777
0.221 1 2.92E 3 2.56E 3 737
0.442 1 2.67E 3 2.56E 3 737
0.663 1 2.41E 3 2.56E 3 737
0.885 1 2.15E 3 2.56E 3 737
1.106 1 1.89E 3 2.56E 3 737
1.327 1 1.63E 3 2.56E 3 737
1.548 1 1.38E 3 2.56E 3 737
1.769 1 1.12E 3 2.56E 3 737
1.990 1 861.857 2.56E 3 737
2.211 1 604.168 2.56E 3 737
2.433 1 346.479 2.56E 3 737
2.654 1 88.790 2.56E 3 737
Summary: the member is safe

Span / Depth
Member Span Length Type Basic Modified Span
(m) Limit Limit Depth
M1 1 2.730 Cantilever 8.0 8.0 2.3
M2 1 5.550 Beam 16.0 16.0 4.6
M3 1 5.550 Beam 16.0 16.0 4.6
M4 1 5.550 Beam 16.0 16.0 4.6
M5 1 5.550 Beam 16.0 16.0 4.6
M6 1 5.550 Beam 16.0 16.0 4.6
M7 1 5.550 Beam 16.0 16.0 4.6
M8 1 2.730 Cantilever 8.0 8.0 2.3
Summary: the group is safe

Print Time/Date: 15/06/2019 10:52 STAAD.Pro - RC ACI 318-05 Version 1.0 Print Run 13 of 13
ALL-PILE Version 6 CivilTech Software www.civiltech.com Licensed to

Diameter more than 24in (61cm).


For bell section, select "Belled" in
Diameter Variation of Pile Section
FOUNDATION PROFILE & SOIL CONDITIONS Screen.

Depth FOUNDATION PROPERTIES SOIL PROPERTIES Depth


from from
Ground-m Ground-m
Depth Width-cm A'-cm2 Per.-cm I'-cm4 E -MP W -kN/m Depth  -kN/m3  C-kN/m2 k-MN/m3 e50 % Nspt
0 0
0.0 120 11309.7 377.0 10178760.0 20683 26.668 0.0 15 18 0.0 0.16873669 5
Concrete (smooth) FILLING SAND
2 2

4 4
4.5 18 23 0.0 0.50621009 20
SAND & SILT
6 6

8 8

10 10

12 12
12.0 18 25 0.0 1.05460436 37
DENSE SAND & SILT

14 14

16 16

18 18

20 20

22 22

23.0 18 28 0.0 1.05460436 42


24 BLACK SILT & FINE SAND 24

26 26

27.0 18 30 0.0 1.05460436 50


28 FINE SAND & SOME SILT 28

30 30
30.0 120 11309.7 377.0 10178760.0 20683 26.668
Pile Tip
Batter Angle=0 (Pile diameter not to scale) Surface Angle=0

CivilTech PILE CAPACITY CHECK BR-01


Software BORE HOLE #01 Figure 1
VERTICAL ANALYSIS Figure 1

Loads:
Load Factor for Vertical Loads= 1.0
Load Factor for Lateral Loads= 1.0
Loads Supported by Pile Cap= 0 %
Shear Condition: Static

Vertical Load, Q= 6100.0 -kN


Shear Load, P= 0.0 -kN
Slope Restain St= 0.00 -cm/-cm

Profile:
Pile Length, L= 30.0 -m
Top Height, H= 0.000 -m
Slope Angle, As= 0
Batter Angle, Ab= 0

Fixed Head Condition


Nocontributing Zone, Ln1=Ln2=Ln3=0.

Drilled Shaft (dia >24 in. or 61 cm)

Soil Data: Pile Data:


Depth Gamma Phi C K e50 or Dr Nspt Depth Width Area Per. I E Weight
-m -kN/m3 -kN/m2 -MN/m3 % -m -cm -cm2 -cm -cm4 -MP -kN/m
0.000 15 18 0.0 0.16873660 5 0.0 120 11309.7 377.0 10178760.020683 26.668
4.5 18 23 0.0 0.50621000 20 30.0 120 11309.7 377.0 10178760.020683 26.668
12 18 25 0.0 1.05460430 37
23 18 28 0.0 1.05460430 42
27 18 30 0.0 1.05460430 50

Vertical capacity:
Weight above Ground= 0.00 Total Weight= 467.54-kN *Soil Weight is not included
Side Resistance (Down)= 6452.964-kN Side Resistance (Up)= 3687.408-kN
Tip Resistance (Down)= 4883.235-kN Tip Resistance (Up)= 0.000-kN
Total Ultimate Capacity (Down)= 11336.199-kN Total Ultimate Capacity (Up)= 4154.946-kN
Total Allowable Capacity (Down)= 6255.270-kN Total Allowable Capacity (Up)= 2311.242-kN
OK! Qallow > Q

Settlement Calculation:
At Q= 6100.00-kN Settlement= 1.01108-cm
At Xallow= 2.50-cm Qallow= 8355.06152-kN

Note: If the program cannot find a result or the result exceeds the upper limit. The result will be displayed as 9999.

CivilTech PILE CAPACITY CHECK BR-01


Software BORE HOLE #01
ALL-PILE Version 6 CivilTech Software www.civiltech.com Licensed to

Vertical Load vs. Settlement

20000

18000

16000
Compression Load, Qdw -kN

14000

12000

10000

8000

6000

4000

2000

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Settlement, X -cm
Total Side Tip

CivilTech PILE CAPACITY CHECK BR-01


Software BORE HOLE #01 Figure 1
ALL-PILE Version 6 CivilTech Software www.civiltech.com Licensed to

Diameter more than 24in (61cm).


For bell section, select "Belled" in
Diameter Variation of Pile Section
FOUNDATION PROFILE & SOIL CONDITIONS Screen.

Depth FOUNDATION PROPERTIES SOIL PROPERTIES Depth


from from
Ground-m Ground-m
Depth Width-cm A'-cm2 Per.-cm I'-cm4 E -MP W -kN/m Depth  -kN/m3  C-kN/m2 k-MN/m3 e50 % Nspt
0 0
0.0 120 11309.7 377.0 10178760.0 20683 26.668 0.0 15 18 0.0 0.168736699113399975
Concrete (smooth) FILLING SAND
2 2

4 4

6 6
6.0 18 25 0.0 1.05460436945875 34
FINE SAND & SILT
8 8

10 10

12 12

14 14

16 16

18 18

20 20
20.0 18 28 0.0 1.05460436945875 39
BLACK SILT
22 22

23.0 18 30 0.0 1.05460436945875 50


24 FINE SAND & SILT 24

26 26

28 28

30 30
30.0 120 11309.7 377.0 10178760.0 20683 26.668
Pile Tip
Batter Angle=0 (Pile diameter not to scale) Surface Angle=0

CivilTech PILE CAPACITY CHECK BR-01


Software BORE HOLE #02 Figure 1
VERTICAL ANALYSIS Figure 1

Loads:
Load Factor for Vertical Loads= 1.0
Load Factor for Lateral Loads= 1.0
Loads Supported by Pile Cap= 0 %
Shear Condition: Static

Vertical Load, Q= 6100.0 -kN


Shear Load, P= 0.0 -kN
Slope Restain St= 0.00 -cm/-cm

Profile:
Pile Length, L= 30.0 -m
Top Height, H= 0.000 -m
Slope Angle, As= 0
Batter Angle, Ab= 0

Fixed Head Condition


Nocontributing Zone, Ln1=Ln2=Ln3=0.

Drilled Shaft (dia >24 in. or 61 cm)

Soil Data: Pile Data:


Depth Gamma Phi C K e50 or Dr Nspt Depth Width Area Per. I E Weight
-m -kN/m3 -kN/m2 -MN/m3 % -m -cm -cm2 -cm -cm4 -MP -kN/m
0.000 15 18 0.0 0.16873660 5 0.0 120 11309.7 377.0 10178760.020683 26.668
6 18 25 0.0 1.05460430 34 30.0 120 11309.7 377.0 10178760.020683 26.668
20 18 28 0.0 1.05460430 39
23 18 30 0.0 1.05460430 50

Vertical capacity:
Weight above Ground= 0.00 Total Weight= 467.54-kN *Soil Weight is not included
Side Resistance (Down)= 6639.793-kN Side Resistance (Up)= 3794.176-kN
Tip Resistance (Down)= 4830.648-kN Tip Resistance (Up)= 0.000-kN
Total Ultimate Capacity (Down)= 11470.441-kN Total Ultimate Capacity (Up)= 4261.713-kN
Total Allowable Capacity (Down)= 6358.788-kN Total Allowable Capacity (Up)= 2364.625-kN
OK! Qallow > Q

Settlement Calculation:
At Q= 6100.00-kN Settlement= 0.97852-cm
At Xallow= 2.54-cm Qallow= 8566.37109-kN

Note: If the program cannot find a result or the result exceeds the upper limit. The result will be displayed as 9999.

CivilTech PILE CAPACITY CHECK BR-01


Software BORE HOLE #02
ALL-PILE Version 6 CivilTech Software www.civiltech.com Licensed to

Vertical Load vs. Settlement

20000

18000

16000
Compression Load, Qdw -kN

14000

12000

10000

8000

6000

4000

2000

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Settlement, X -cm
Total Side Tip

CivilTech PILE CAPACITY CHECK BR-01


Software BORE HOLE #02 Figure 1
Company: RoundCol 20000104  1999 Techno Consultants
Address: User Registration No: Unregistered Copy
Tel Fax: Email: Made by Date Page No
Project: ALDLP UDAYAN July 2, 2019
Client: Checked Job No Revision
Element: A/4 2418 3-4 1200Dia 00/62051
Results Displayed for Load Case 1 Load Reference: 1.2DL+1.6LL Data Store No 001
fcu N/mm2 gmc Ecu X-direction End Conditions
35 1.5 0.0035 Stability At Top At Bottom
Braced Rigid Rigid

2 Unbraced Semi Rigid


fy N/mm gms Esu Semi Rigid
Braced Pinned Pinned
413 1.05 0.00197 X
Free Pinned

Section Number and Position of Height Pinned Height Factor


Dia mm Steel Bars Cover to cg Lo (m) ß (Table 3.19)
1200 16 75 35.000 1

.67fcu/gmc fy/gms Es for Steel Effective Height Slenderness to 3.8.1.3


15.6333 393.3333 200 kN/mm2 Lex (m) Ratio Status Max Lo/h Allowed
35.000 Lex/h=29.17 Slender 60 >29.2 hence OK
Design Data Summary
hs/h 0.8750 Steel dia hs Deflection Moments to Clause 3.8.3
N/h2 fcu 0.1210 1050 Kx (Eq 33) ßa x (Eq34) au x mm auav x mm Madd x=Nau x
100Asc/Ac 1.1374 >0.4% & <6%OK 1.0000 0.4253 510.4167 3113.5417
p fy/fcu 13.4216
M/h3 fcu 0.0609 Applied Axial Load, kN & Moments, kNm Notional BM *
Design BM
Nuz kN 22740.72 N, kN BM at Ends Applied Mxx kNm Nemin (h/20<=20) Mx kNm
Nbal xx kN 8461.28 6100 M2 ( >=M1) 396.63 122 3510.17
Mbal xx kNm 3786.01 M1 @ 2nd end 396.63 Bending: Single Curvature
NA x-Nbalxx mm 631.07 Critical Initial Moment Mi=0.4M1+0.6M2 >=0.4M2 = 396.63 kNm
*
Design Moment=Mi+Madd >M2, M1+Madd/2 & emin N

Steel Areas & Position (from Top Mid Point) Steel Strain, Stress, Force and Moment (about mid depth)
Area mm2 X-dist mm Y-dist mm Strain Es*Strain fs used N/mm2 Fs kN BM kNm
804 102.42 85.09 0.00293856 587.71 393.33 316.24 162.84
804 291.67 163.48 0.002421309 484.26 393.33 316.24 138.05
804 436.52 308.33 0.001465553 293.11 293.11 235.66 68.74
804 514.91 497.58 0.000216799 43.36 43.36 34.86 3.57
804 514.91 702.42 -0.001134843 -226.97 -226.97 -182.48 18.69
804 436.52 891.67 -0.002383598 -476.72 -393.33 -316.24 92.24
804 291.67 1036.52 -0.003339353 -667.87 -393.33 -316.24 138.05
804 102.42 1114.91 -0.003856604 -771.32 -393.33 -316.24 162.84
804 -102.42 1114.91 -0.003856604 -771.32 -393.33 -316.24 162.84
804 -291.67 1036.52 -0.003339353 -667.87 -393.33 -316.24 138.05
804 -436.52 891.67 -0.002383598 -476.72 -393.33 -316.24 92.24
804 -514.91 702.42 -0.001134843 -226.97 -226.97 -182.48 18.69
804 -514.91 497.58 0.000216799 43.36 43.36 34.86 3.57
804 -436.52 308.33 0.001465553 293.11 293.11 235.66 68.74
804 -291.67 163.48 0.002421309 484.26 393.33 316.24 138.05
804 -102.42 85.09 0.00293856 587.71 393.33 316.24 162.84

As=12864 Max=514.91 Max=1114.91  -456.40 1570.00


for 25 bars
Max dia=32 mm Neutral Stress Block Concrete Stress Block Size, Centroid, Force Magnitude & Moment
Min dia=32 mm Axis x mm Depth 0.9x mm Chord mm Area mm2 cg from top mm Fc kN BM kNm
Cover=59 mm 530.434 477.39 1174.68 419385.91 277.92 6,556.40 2,111.67
Available Section Capacity: 6100.00 3,681.67
Required Design Capacity: 6100.00 3,510.17
Design Mx=3,510.17 kNm < 3,681.67 kNm Hence OK
Applied Loading Cases:
Load Case Load Case Axial Load auav Initial End Moments Available Required Strength
No Display Reference N, kN mm Mx2 kNm Mx1 kNm BMx* kNm Mtx* kNm Check
Case 1 1.2DL+1.6LL 6100 396.63 396.63 3681.67 3510.17 OK
Case 2 2315.22 OK
Case 3 2315.22 OK
Case 4 2315.22 OK
Case 5 2315.22 OK
Case 6 2315.22 OK
Note: The moment of steel and concrete forces is taken and summed up about the mid depth.

File: RoundCol000104-1 Tab: RoundCol Date: 02-07-19

Anda mungkin juga menyukai