NCR No: 0563-EKL-NCR-003

NON COMFORMANCE REPORT


(NCR)
Date: 28-Nov-2014

Project Name ARL Up gradation Project Job Number 563


Process / Product Piping Related Doc. No. LHTP012010404
Part Name / No. ISOM NACE Pipe Line Location ISOM site area

Description NACE material pipe line erected with non NACE Material/ Cutting of fabricated spool.

Nonconforming Condition

It is observe that In ISOM area Rack No. 1, Joint No. 06, Drawing No.LHTP012010404, Rev 0, Dia 4" of NACE
material pipe line erected with non NACE material.
Execution team have cut the fabricated (Non NACE) spool of ISMVF010010101 Sp, and erect with NACE
material and RT was also done of that spool.
Discription of fabriceted/cutted spool is given below.
Drawing No. ISMVF010010101
Rev: 1
Dia: 4"
Welder Stamp: EKL-066
Welding Date: Aug 05, 2014.
Fabricated for: VF
Attachment 1: Fit Up
Attachment 2: Welding
Attachment 3: Pictures
Attachment 4: RT Report

Disposition From Initiator / Date

Completion Deadline Approved / Date

Disposition Detail

Use - As - is Repair / Rework Reject Others

Completion Date Approved / Date

Technical Justification Review (if necessary)

Review Date Approved / Date

Final verification
Acceptable Not Acceptable

Verified Date Approved / Date


NCR No: 0563-EKL-NCR-003

Date: 28-Nov-2014

563
LHTP012010404
ISOM site area

al pipe line erected with non NACE Material/ Cutting of fabricated spool.

Nonconforming Condition

No. 1, Joint No. 06, Drawing No.LHTP012010404, Rev 0, Dia 4" of NACE
NACE material.
ated (Non NACE) spool of ISMVF010010101 Sp, and erect with NACE
at spool.
ool is given below.

Disposition Detail

hnical Justification Review (if necessary)

Final verification