Anda di halaman 1dari 1

MINUTES OF BRACKENFELL RESULTS – 3p5L

DATE: 15/10/18

Tests to be done at Brackenfell

 Transformer time response - Add more DC tests/data points


 Copper losses – (check time response on some interesting points/DC values that are
on the copper losses graph)
 Air search coils – add search coils within inner joints to capture stray flux
 THD and TDD – tests on 1.5kW load

Issues with graphs

 Include equations to characterize the core losses and THD etc.


 Use separate Y-axis for some graphs e.g. search coil graphs, THD graphs
 Include a section of comparison of 3p3L and 3p5L transformer responses
 Show some points representing significant changes on graphs
 2D FEM V, I values at rated and knee point