ze")
Propet tone FIT OUT FOR TOWER 10 AT GPD
Package No 48 CcentactNo= GC18105600
Cont i Ne, vors7FTi0 Ferm No: POT-Y0/Rer.00/ Jul 2048
P=
| teenie mae ”
4
Matoral Submit for LSHF Wies 7 pe ce ved
Subba Cones [] -Naiasampe [J -Neckup WARN, __—ORDESWAR EAH Row 8
TH -cosvpesoaue — C]-ctes oa sua Pan 218
Tate ae Raed on She 1an2OTS
OO -o lsc Etec) norton Teh) Proton Pend: 25 D5
Gi -Stucl = - Mechanic =] -Plumbing 3) - Others Toa Daley Tie: 35 Daye
-tandicape Cntr Dasgn ? pecs aon Se 35 Days From Apo
Doha ables Ey
E10
ye ver
Tena nr
235 Specs Pel: anne SECTION GO ace wien 682014, Secon
Sif: OPDHGDEDIOOS fet Ren Wa a
ejnooRe. WA svete: WR
dover = WR "ote Nik =
GSAS PROV REGURED a -WO—T]-VES es Geass he TETRA Fm
Manufacture Supp Deas: THB -ocaty enutacures J Inport County ofOrgin: aster
Local Supple / Agent ‘b) Meruecturr
Corgan Nane cha Cates Company ame Oona Cablos
‘ress Cotte Doha tr 0 Box 2207 ‘Mees Cotas ‘Doha Qatar PO Box 22087
ToLoogs 42553033 “Te:00074 «4653003
Sabai
tre sues ercomment
Does aoa has dened hee cycle and method of eisposal sper 0 40012015
Ws NOL Nat Apolabe
nS
Tl 0-sopovd ening)
D1 t-tpprvetwinot cannes Rein nated
(eee
2S te pa oN Te ay AY pp Set ap AGO,
EG
Tora SP RSH ee
C7 2-Net Approved (incorporate comments and resubit- work
‘Salo poceod)
CD 6-Forintormation
ancliaton Accepted
es Rope Res HR)
EB Guat Forme
Ferm Na: FOP-07 Ron. on 208ba |
Ke
Ja fol b=
Qatar Pe
‘trofeum
CONTRACT No.: GC18105500
CONTRACT TITLE: -
FITOUT FOR TOWER 10 AT QPD
DOCUMENT TITLE
Material Submit
‘al for LSHF Wires
Rt
‘TEL # 4406 8888 / FAX # 4447 7868
C:
yw Lasl asst pus cided!
Arab Engineering Bureau
ARAB ENGINEERING BUREAU
PO BOX 1148, DOHA~ QATAR
www.aeb-qatar.com
MAIN CONTRACTOR:
URBACON TRADING & CONTRACTING
PO BOX 201184, DOHA ~ QATAR
TEL # 4429 2220 / FAX
92244
17.06.2019 3 ISSUED FOR APPROVAL,
01.08.2019 2 ISSUED FOR APPROVAL,
12.05.2019 1 ISSUED FOR APPROVAL,
08.04.2019 0 ISSUED FOR COMMENTS: KB MK AG
pare | REV.NO poet PREPARED | CHECKED | ppp, | APO...
Document No. QPDH-9-MAR-E-0099 Page: 1 of 2Fit Out for Tower 10 at Qatar Petroleum District (QPD)
618105500
Qatar Petroleum District ~ Material Submittal for LSHF Wires by Doha
Title: Arab Engineering Bureau (QRC)
Cables
Pec QPDH-9-MAR- E-0099 z Urbacon Contracting & Trading
evewre| 22/06/2019 E Be 22/05/2019
“Status 10,
| 6,1and1.
Revision
NOTED, material approval checklist will be
a No material approval checklist is provided. Please include as :
1 i be rai lisoor provided along with ITP for Closed.
approval
MAR deliverables are not completed as per QP checklist. List
of material is missing. Please provide.
faae COMPLY ,REFER TO MAR.
List of material still missing, Please provide.
2 Rev.01
2. : : Closed.
10 fot compliant to project” Specifications, | Comply, List of Material attached section 10
Ml of Quantity showed 1.5mm* esa 25 | ea go
minimum and Is not acceptable. is
Provide confirmation to employ as minimum conductor esa | COMP, Updated lst Attached Section no.10
for final sub-circuit is 2,5mm*to close this comment.
a 2 Aached PVLis not as per signed contact atachment: | coygpy, aay
Document Reference: QPDH-S-MAR-<-0089 3 age rota Form No. PO7-F68, Rev, Date: 44.2018