Anda di halaman 1dari 6
ze") Propet tone FIT OUT FOR TOWER 10 AT GPD Package No 48 CcentactNo= GC18105600 Cont i Ne, vors7FTi0 Ferm No: POT-Y0/Rer.00/ Jul 2048 P= | teenie mae ” 4 Matoral Submit for LSHF Wies 7 pe ce ved Subba Cones [] -Naiasampe [J -Neckup WARN, __—ORDESWAR EAH Row 8 TH -cosvpesoaue — C]-ctes oa sua Pan 218 Tate ae Raed on She 1an2OTS OO -o lsc Etec) norton Teh) Proton Pend: 25 D5 Gi -Stucl = - Mechanic =] -Plumbing 3) - Others Toa Daley Tie: 35 Daye -tandicape Cntr Dasgn ? pecs aon Se 35 Days From Apo Doha ables Ey E10 ye ver Tena nr 235 Specs Pel: anne SECTION GO ace wien 682014, Secon Sif: OPDHGDEDIOOS fet Ren Wa a ejnooRe. WA svete: WR dover = WR "ote Nik = GSAS PROV REGURED a -WO—T]-VES es Geass he TETRA Fm Manufacture Supp Deas: THB -ocaty enutacures J Inport County ofOrgin: aster Local Supple / Agent ‘b) Meruecturr Corgan Nane cha Cates Company ame Oona Cablos ‘ress Cotte Doha tr 0 Box 2207 ‘Mees Cotas ‘Doha Qatar PO Box 22087 ToLoogs 42553033 “Te:00074 «4653003 Sabai tre sues ercomment Does aoa has dened hee cycle and method of eisposal sper 0 40012015 Ws NOL Nat Apolabe nS Tl 0-sopovd ening) D1 t-tpprvetwinot cannes Rein nated (eee 2S te pa oN Te ay AY pp Set ap AGO, EG Tora SP RSH ee C7 2-Net Approved (incorporate comments and resubit- work ‘Salo poceod) CD 6-Forintormation ancliaton Accepted es Rope Res HR) EB Guat Forme Ferm Na: FOP-07 Ron. on 208 ba | Ke Ja fol b= Qatar Pe ‘trofeum CONTRACT No.: GC18105500 CONTRACT TITLE: - FITOUT FOR TOWER 10 AT QPD DOCUMENT TITLE Material Submit ‘al for LSHF Wires Rt ‘TEL # 4406 8888 / FAX # 4447 7868 C: yw Lasl asst pus cided! Arab Engineering Bureau ARAB ENGINEERING BUREAU PO BOX 1148, DOHA~ QATAR www.aeb-qatar.com MAIN CONTRACTOR: URBACON TRADING & CONTRACTING PO BOX 201184, DOHA ~ QATAR TEL # 4429 2220 / FAX 92244 17.06.2019 3 ISSUED FOR APPROVAL, 01.08.2019 2 ISSUED FOR APPROVAL, 12.05.2019 1 ISSUED FOR APPROVAL, 08.04.2019 0 ISSUED FOR COMMENTS: KB MK AG pare | REV.NO poet PREPARED | CHECKED | ppp, | APO... Document No. QPDH-9-MAR-E-0099 Page: 1 of 2 Fit Out for Tower 10 at Qatar Petroleum District (QPD) 618105500 Qatar Petroleum District ~ Material Submittal for LSHF Wires by Doha Title: Arab Engineering Bureau (QRC) Cables Pec QPDH-9-MAR- E-0099 z Urbacon Contracting & Trading evewre| 22/06/2019 E Be 22/05/2019 “Status 10, | 6,1and1. Revision NOTED, material approval checklist will be a No material approval checklist is provided. Please include as : 1 i be rai lisoor provided along with ITP for Closed. approval MAR deliverables are not completed as per QP checklist. List of material is missing. Please provide. faae COMPLY ,REFER TO MAR. List of material still missing, Please provide. 2 Rev.01 2. : : Closed. 10 fot compliant to project” Specifications, | Comply, List of Material attached section 10 Ml of Quantity showed 1.5mm* esa 25 | ea go minimum and Is not acceptable. is Provide confirmation to employ as minimum conductor esa | COMP, Updated lst Attached Section no.10 for final sub-circuit is 2,5mm*to close this comment. a 2 Aached PVLis not as per signed contact atachment: | coygpy, aay Document Reference: QPDH-S-MAR-<-0089 3 age rota Form No. PO7-F68, Rev, Date: 44.2018

Anda mungkin juga menyukai