1. Water & Electricity shall be supplied by Client.
2. For smooth working environment client shall cooperate positively. 3. For BOQ preparation, floor to floor height considered 10’-0”, Maximum Foundation depth 8’-0”. 4. Final bill shall be as per site measurement. 5. Client shall appoint a consultant to ensure quantity & Quality. 6. This BOQ is excluding the charges for testing. 7. Total time needed to complete the works 04 month. 8. Mode of Payment: i. 30% as advance on signing. ii. 20% on completion of foundation excavation. iii. 20% on foundation & Ground floor jacketing completion. iv. 20% on all structural strengthening completion v. 10% all completion.