Job Procedure No.: NRP/Gail/TEC/BANAS/OO3. ((, nrp r.gR!EQ1. I

THACTEBEL I
I
eNGle I
I
I
PERMANENT MITIGATION MEASURE OF PIPE EXPOSED IN BANAS RIVER I
PROJECT I
CROSSING AND ADJACENT AREA OF JAM NAGAR LONI LPG PIPE LINE. I

OWNER I GAIL INDIA LIMITED I

CONSULTANT TRACTEBEL ENGINEERING ---- - - - - I

Job Procedure

For

INCOMING· MATERIAL INSPECTION REPORT

Job Procedure No.:

NRP/GAIL/TE/BANAS/003

' ~--'- ­
=-­
B.APMCMD-..::T1OM= .......

~. N _ _ ~I
C. NO'~ _( I
GAil : GAil INDIA LIMITED. O. ,,0It . . . . . . .1IDII . r I
1'1418 AII'MOIa&. DOlt..". a.ow.". ~
TE
NRP
: TRACTEBEl ENGINEERING
: NRP PROJECTS PVT.LTD.
~ ...u_,...,...
OF Hl1 ~0&IQA1tICIIII.

I~ . . . . . . . . . . . . . . . . . . . . . . . .

IMIR : INCOMING MATERIAL INSPECTION!;R!PORT ~~iB


JP : JOB PROCEDURE NO 01

I Review and RAVI TEJA


00 I SUNANDA
approval
SEN ROY D.
Prepared Checked Reviewed Approved
Rev I Date I Description ByTE
by NRP By NRP ByTE
@
GAIL (India) Limited

=;ril
NRP PROJECTS PVT. LTD.
Job Procedure No.: NRP/Gail/TEC/BANAS/003.
r{(, nrp F.!(!!E.QI,
TRACTEBEL
eNGle

I PERMANENT MITIGATION MEASURE OF PIPE EXPOSED IN BANAS RIVER


PROJECT
CROSSING AND ADJACENT AREA OF JAMNAGAR LONI LPG PIPE LINE.
OWNER GAIL INDIA LIMITED
CONSULTANT I TRACTEBEL ENGINEERING

TABLE OF CONTENT
SL.NO DESCRIPTION PAGE
1 PROJECT 3
2 PURPOSE 3
3 REFERENCE 3
4 INSPECTION 3
5 METHODOLOGY 3-4
6 APPENDICES/FORMATS 4

-
.~~~l\GIN~ . .
(:5 ""'c :)
\, ~
~
~

SUBJEm INCOMING MATERIAL INSPECTION


REVISION- 00
C~~Y
~ \
_
G..- kE4.... Pag e 12
~
GAIL (IndIa) Limited
NRP PROJECTS PVT. LTD.
Job Procedure No.: NRP/Gail/TEC/BANAS/OO3.
rr, nrp P.!\!!~
TRACreBeL
­
e NGle
I
PERMANENT MITIGATION MEASURE OF PIPE EXPOSED IN BANAS RIVER I
PROJECT
CROSSING AND ADJACENT AREA OF JAM NAGAR LONI LPG PIPE LINE. I
OWNER \ GAIL INDIA LIMITED I
CONSULTANT TRACTEBEL ENGINEERING ------ ~

1.0 Projects:

M/s Gail (India) Limited has awarded to M/s. NRP projects Limited (Infrastructure Division), a
contract for laying 16/1 dia. HDD for BANAS river crossing total 2.2 Km long in length.

2.0 Purpose:

This procedure is intended to lay guidelines and requirements and to establish a method
or a system to control the Incoming Material Inspection to be used in the PERMANENT
MITIGATION MEASURE OF PIPE EXPOSED IN BANAS RIVER CROSSING AND ADJACENT
AREA OF JAM NAGAR LONI LPG PIPELINE PROJECT.

3.0 Reference:

a. Tractebel Technical Specification- P.012220 R11050 001.


b. Reference Codes

4.0 Inspection:

The Jointly Inspection report shall be made with NRP and TE/GAIL and send it at site as the

accepted material for use.

Inspection shall be done with the all necessary tools, measuring instrument etc.

5.0 Methodology:­

The following actions shall be under taken with regards to the receipt and inspection of
incoming material.

a. Review of list of material supplied with respect to the packing list and packing.

b. Check the availability of release note.

c. Check the identification mark for co-relation.

SUBJECT: INCOMING MATERIAL INSPECTION ~~


REVISION-OO ~ ~~
@
GAIL (IndIa) LimIted
NRP PROJECTS PVT. LTD.
Job Procedure No.: NRP/Gail/TEC/BANAS/003.
((, nrp P.!l!l!f.Q?
TRA(TEBEL
-
eNGle

PERMANENT MITIGATION MEASURE OF PIPE EXPOSED IN BANAS RIVER I


PROJECT
CROSSING AND ADJACENT AREA OF JAMNAGAR LONI LPG PIPE LINE.
OWNER GAIL INOlA LIMITED
CONSULTANT TRACTEBEL ENGINEERING - - - - -

d. Inspect material visually.

In case, the material do not pass the acceptance criteria (if found damaged, not conforming to
the specification or having no identification mark etc) then, the material shall be considered
non-conforming. The deficiency shall be intimated in writing to the vendor/ supplier under
intimation to TE/GAIL

e. Generation of material inspection report and record keeping shall be the responsibility of
Store In-Charge/QA/QC Engineer.

f. No material shall be allowed to be used in the job unless the material inspection report is
received and material incoming inspection report is generated with the acceptance.

g. Non- acceptable/ rejected material shall be stacked separately with proper identification and
disposed off as early as possible.

h. NRP shall take action for re-procurement/repair/replacement of the rejected material under
intimation of TE/GAIL.

Material such as Welding electrodes, Cement etc. shall be additionally tested for their
properties as per code/ specification requirements before of its use in the works.

Where incoming material has to be released on urgent basis, it shall be positively identified
and recorded in order to permit immediate recall and replacement in the event of non­
conformance to specified requirements.

Note: ­ NRP shall be submitting certificate and MTC wherever required.

6.0 Appendices/Formats:

Annexure - 1.lnspection Test Plan

Annexure - 2.lnspection Report NRP/GaiI/TEC/BANAS/FR/003

SUBJECT: INCOMING MATERIAL INSPECTION


REVISION- 00 v- Pag e 14
Client: MIs Gall India Limited
®~
GAIL (India) LIm ited Client: MIs Tractebel

Contractor: MIs NRP Projects Limited


f. ,
nrp PROJECTS
PRIVATe LIMITED

TRAC.TEBE ~ ___
Project: Permanent Mitigation Measure or Pipe Exposed In Banas
river Crossing And Adjacent Area or Jamnagar Loni LPG Pipeline

Inspection & Test Plan for Incoming Materials


Document No: NRP/GaiI/TECjBANAS/ITP-003

Verification By
S.No Activity Description Inspection by NRP Records to be Submitted by NRP
GAII/TEC

1 Submission and Obtaining approval of procedure. we RW NRP/GAIL/TEC/BANAS/PR-003

2 Reviewing Packing List. we s

3 Availability of Inspection/ Release note. we s

4 Availability of identification mark for co-relation. we w


5 Visual Inspection. we w
6 Intimation of Deficiency. we w
7 Material Inspection Report. we w
LEGENDS:
"P" : PERFORM
"WC" : 100% EXAMINATION BY CONTRACTOR .'

"5" : SURVEILLANCE INSPECTION BY TE/ GAIL


"HP" : HOLD POINT
"RW" : REVIEW OF CONTRACTORS DOCUMENTATION
"W" : WI1NESS POrNT


~60(-; -
~
Q. Cher ' .
~~ ~G'N~
,~~~ _n
~l 1< ~~ _\-..&~ ~I~'- . \CC .. / \1 I)
For Review and Approval Sunanda Sen Roy .... Ravi Teja D.
~~~ ~J. ~\l;~
Date Description Prepared by NRP Checked by NRP
.~
Checkea "Y -- ·~roved ~y
Rev TE/GAIL TE/GAIL
- -
CLIENT: GAIL (INDIA) LIMITED
C~~
GAIL (India) Limited
r//~ nrp PROJECTS
(( PRtIo'A1!U'4IT[O
CONSULTANT: TRACTEBEL ENGINEERING

CONTRACTOR: NRP PROJECTS LIMITED


TAAC.TEBE ~
..._ ....ca
PROJECT: PERMANENT MITIGATION MEASURE OF PIPE EXPOSED IN BANAS RIVER CROSSING AND Doc. No: NRP/GaiVTEC/BANAS/FRl003 .
ADJACENT AREA OF JAMNAGAR LONI PIPELINE Rev. 00

INCOMING MATERIAL INSPECTION REPORT

Report No.: Date:

Manufacturel Ref InvoicelChalan


S.No. Date Of Receipt Material Description QTY. MTC No. Heat NolBatch No. Remarks
Vender No.

Defects Recorded at the time of taking over (Free Issue Material) : YESINo ~ .

INSPECTION ACTIVITY AT SITE:


1)Quality Verified & Found in order. 2)Material Condition Appears to be good.3)HeatiBatch No. mentioned on Material. 4)Correlation
~=;;~
Remarks (If Any) ~\~, \V..."" 7..11
NRP If~f Chennal \~" ! ~ . ~~~
Sign. &1Vt . \V~1 600014 } S )J! Slgn.: ~ ----­
Name: ~.{Nf)~cia £g/Vl ~~ / IName: J(jJtM-~ A't;Lg ~
Date ...., ' " IDate : • " I 0 ;J I~
( ---r

C2J~C.5~~~ _,

Anda mungkin juga menyukai