Rab PJR
Rab PJR
KANTOR PJR
BOGOR
8 Pek. Sloof S2 15 x 20
Beton K225 M3 1.14 900,000 1,026,000
9 Pek. Sloof S3 15 x 15
Beton K225 M3 0.78 900,000 702,000
10 Pek. Kolom K1 15 x 40
Beton K225 M3 0.68 900,000 612,000
11 Pek. Kolom K2 15 X 30
Beton K225 M3 3.42 900,000 3,078,000
12 Pek. Kolom KP 15 x 15
Beton K225 M3 1.44 1,200,000 1,728,000
13 Balok B1 15 x 40
Beton K225 M3 1.83 900,000 1,647,000
14 Balok B1 15 x 30
Beton K225 M3 1.08 1,200,000 1,296,000
15 Balok B2 15 x 20
Beton K225 M3 1.61 900,000 1,449,000
D PEKERJAAN ATAP
5 Waterproofing dak talang M2 12.00 20,000 240,000
6 Waterproofing Topian beton M2 75.50 20,000 1,510,000
E PEKERJAAN PENGECATAN
1 Pengecatan dinding exsterior M2 212.50 12,000 2,550,000
2 Pengecatan dinding interior M2 335.88 12,000 4,030,560
3 Pengecatan Plafond M2 120.00 12,000 1,440,000