Anda di halaman 1dari 15

SR.

REQUESTITION PURCHASE MATERIAL CONTRACTOR CONTRACTOR CERTIFICATE


ITEM
NO.
UP NOW INTIMATION GIVEN UP ON WORK ON WORK ON ON

Foundation (including excavation,


1 antitermite & dewatering) Footing

Plinth beams (including earth filligng


2 copmpaction rubble solling)

Grade slab (including Damp Proof


3 course) with anti - termite

1st floor column beams, slabs & all


RCC items staircase, lifts, etc
including conseal conduit pipes,
4 juction,s fan hooks, sleeves etc.

Civil Wrok for U. G. Tank (suction &


5 static & pump room)

6 Placing order for lift & follow up.

2nd floor column beam slabs & all


RCC items including conseal conduit
pipes, junctions, fan hooks, sleeves
7 etc.

8 Manufacturing blocks

Mabufacturing door frames &


9 window sub frames
SR. REQUESTITION PURCHASE MATERIAL CONTRACTOR CONTRACTOR CERTIFICATE
ITEM
NO.
UP NOW INTIMATION GIVEN UP ON WORK ON WORK ON ON

3rd floor columns beam slab & all


RCC items including conseal ete.
conduit pipes, juntion boxes, fan
10 hooks, sleeves etc.

Ground floor external & internal


block masonry with door frames
11 window & conduit pipe & boxes

12 RCC patlee work in brick work

4th floor column beam slab & all


RCC items with all conseal ele. Pipe
13 work, junctions, fan hooks, sleevs etc.

14 Fixing precast jallis on groun floor

1st floor external & internal block


15 masonry

16 Patlee in brick wall.

17 1st floor door & windo frames fixing

Ground floor junction box & conduit


18 placing
SR. REQUESTITION PURCHASE MATERIAL CONTRACTOR CONTRACTOR CERTIFICATE
ITEM
NO.
UP NOW INTIMATION GIVEN UP ON WORK ON WORK ON ON

Internal cement plaster & backing


19 coat (for toilets of Ground floor)

Replastering conseal pipe


20 chasing work

5th floor column beams slabs & all


RCC items with ele. Pipe work &
21 junctions, fan hooks, sleeves etc.

2nd floor external & internal block/


22 brick masonry

23 RCC patlee work

2nd floor door & window frames


24 fixing

Replastering chasing part of


25 conduit work

1st floor junction box & conduit


26 placing.

Internal cement plaster & toilet


27 backing coat for 1st floor

28 Replaster chess part of wall


SR. REQUESTITION PURCHASE MATERIAL CONTRACTOR CONTRACTOR CERTIFICATE
ITEM
NO.
UP NOW INTIMATION GIVEN UP ON WORK ON WORK ON ON
29 Fixing Pre cast jali 1st floor

6th floor column beams slabs & all


RCC items including ele. Conseal
conduits, junction boxes, fan hooks,
30 sleeves etc.

3rd floor external & internal block


31 masonry

32 RCC patlee work

3rd floor door & window frames


33 fixing

Placing junction box & conduit for


34 2nd floor

35 Replastering chassing part of wall

36 Fixing Pre cast jali 2nd floor.

Internal cement plaster & (toilet


37 backing coat for 2nd floor

Construction of kitchen platform


38 1st flors.

Flooring & Skirting in all rooms &


39 excluding toilets of Gr. floor
SR. REQUESTITION PURCHASE MATERIAL CONTRACTOR CONTRACTOR CERTIFICATE
ITEM
NO.
UP NOW INTIMATION GIVEN UP ON WORK ON WORK ON ON

40 Fixing Pre cast jali 3rd floor

7th floor column beams slabs & all


RCC items including conseal ele.
conduits, junctions, fan hooks, sleeves
41 etc.

42 4th floor door & frames fixing

4th floor external & internal block


43 masonry

44 RCC patlee work

Construction of kitchen platform on


45 2nd floor

Placing junction box & conduit for


46 3rd floor

47 Chassed part replastering

48 Fixign Pre cast jali 4th floor

Internal plaster & toilet backing


49 coat for 3rd floor

50 Kitchen platform on 3rd floor


SR. REQUESTITION PURCHASE MATERIAL CONTRACTOR CONTRACTOR CERTIFICATE
ITEM
NO.
UP NOW INTIMATION GIVEN UP ON WORK ON WORK ON ON
Flooring & skirting in all room &
51 kitchen excluding, toilets on 1st floor

52 Fixing Pre cast jali 5th floor

8th floor column beams slabs & all


RCC items including conseal ele.
conduits, junction boxes, fan hooks
53 & sleeves etc.

54 5th floor door frames fixing

55 Kitchen platform on 4th floor

5th floor external & internal block


56 masonry

57 RCC patlee work

Placing junction box & conduit for


58 4th floor

59 Chassed part replastering

60 Fixing Pre cast jali 6th floor

Internal plaster & toilet backing coat


61 for 4th floor.
SR. REQUESTITION PURCHASE MATERIAL CONTRACTOR CONTRACTOR CERTIFICATE
ITEM
NO.
UP NOW INTIMATION GIVEN UP ON WORK ON WORK ON ON
Flooring & skirting in all rooms &
62 kitchen excluding toiles of 2nd floor

63 Fixing Pre cast jali 7th floor.

9th floor column beams slabs & all


RCC items (7th flr plaster to be
finished) including conseal conduit
pipes, junction boxes, fan hooks
64 sleeves etc.

6th floor door frames & window


65 frames fixing

66 Kitchen platform on 5th floor.

6th floor external & internal block


67 masonry

68 RCC patlee work

Placing junction box & conduit


69 for 5th floor.

70 Chassed part replastering

71 Fixing Pre cast jali 8th floor.

Internal plaster & toilet backing coat


72 for 1st5 flor.
SR. REQUESTITION PURCHASE MATERIAL CONTRACTOR CONTRACTOR CERTIFICATE
ITEM
NO.
UP NOW INTIMATION GIVEN UP ON WORK ON WORK ON ON

Internal marble granite cladding &


flooring for lobbies including
73 polishing on Ground floor

Floor & skirting in all rooms &


74 kitchen excluding toiloets of 3rd fl.

Waterproofing of toilets/sumps 1st


75 floor 1st base coat

10th floor coloumns beams slabs *|&


all RCC items including ele. Conduit
pipes, junction boxes, fan hooks
76 sleeves etc.

7th floor door frames fixing


77 fixing

78 Kitchen platform on 6th floor

7th floor external & internal block


79 masonry

80 RCC patlee work

Placing junction box & conduit


81 for 6th floor.
SR. REQUESTITION PURCHASE MATERIAL CONTRACTOR CONTRACTOR CERTIFICATE
ITEM
NO.
UP NOW INTIMATION GIVEN UP ON WORK ON WORK ON ON
82 Chassed part replastering

83 Fixing Pre cast jali 9th floor.

Internal plaster & toilet backing coat


84 for 6th floor.

Interior cladding & flooring & polishing


85 in lobbies on 1st floor.

Flooring & skirting in all rooms &


86 Kitchen excluding toilets of 4th floor

87 External plaster ground to 8th floor

88 Fixing Pre cast jali 10th floor.

11th floor column beams slabs &


all RCC items including conseal ele
conduit pipes, junction boxes, fan
89 hooks & sleeve etc.

Waterproofing of toilets/sumps on
90 2nd floor, Base coat

91 8th floor door frames fixing

92 Kitchen plat form on 7th floor


SR. REQUESTITION PURCHASE MATERIAL CONTRACTOR CONTRACTOR CERTIFICATE
ITEM
NO.
UP NOW INTIMATION GIVEN UP ON WORK ON WORK ON ON
8th floor external & internal block
93 masonry

94 RCC patlle work

95 Fixing Pere cast jali 11th floor

Internal plaster & toilet backing coat


96 for 7th floor

Interior cladding & flooring & polishing


97 in lobbies on 2nd floor.

flooring & skirting in all room &


98 kitchen excluding toilets of 5th floor

99 External plaster on 1st floor

Laying concealed traps etc including


making holes in masonry for pipes
100 oform 1st flr.

Flooring & dado of toilets including


101 polishing from 1st floor.

Fixing of T.W. doors & window


102 shutter 1st floor
SR. REQUESTITION PURCHASE MATERIAL CONTRACTOR CONTRACTOR CERTIFICATE
ITEM
NO.
UP NOW INTIMATION GIVEN UP ON WORK ON WORK ON ON
103 Fixing Pre cast jali 12th floor.

12th floor column beams slabs &


all RCC items including conseal ele
conduit pipes, fan hooks, junction
104 boxes, sleeves etc.

105 External plaster 3rd floor

Waterproofing of toilets/sumps on 3rd


106 floor Base coat

9th floor door frames fixing


107 masonry

108 Kitchen platform on 8th floor

9th floor external & internal block


109 masonary

110 RCC patlee work

111 External plaster 4th floor

Placing junction box & conduit for


112 8th floor

113 Chassed part replastering


SR. REQUESTITION PURCHASE MATERIAL CONTRACTOR CONTRACTOR CERTIFICATE
ITEM
NO.
UP NOW INTIMATION GIVEN UP ON WORK ON WORK ON ON
114 Fixing Pre cast jalis 13th floor

Internal plaster & toilet backing


115 coat for 8th floor

Interior cladding & flooring & polishing


116 in lobbies on 3rd floor.

Flooring & skirting in all rooms &


117 kitchen excluding toilets of 6th floor.

External plumbing G.I down takes


AC/CI RWP & soil pipes (after
external plaster in ducts) for Gr to
118 8th floor.

Finishing of water proofing in toilets


119 1st floor

120 Finishing of toilet plaster on 1st floor

Finishing of water proofing in toilets


121 2nd floor

122 Finishing of toilet plaster on 2nd floor

Finishing of water proofing in toilets


123 3rd floor
SR. REQUESTITION PURCHASE MATERIAL CONTRACTOR CONTRACTOR CERTIFICATE
ITEM
NO.
UP NOW INTIMATION GIVEN UP ON WORK ON WORK ON ON
124 Finishing of toilet plaster on 3rd floor

125 finishing of water proofing in toilets 4th floor

126 Finishing of toilet plaster on 4th floor

Finishing of water proofing in toilets


127 5th floor

128 Finishing of toilet plaster on 5th floor

129 Finishing of water proofing in toilets


6th floor

130 Finishing of toilet plaster on 6th floor

Finishing of water proofing in toilets


131 7th floor

132 Finishing of toilet plaster on 7th floor

133 External plaster 5th floor.

134 fixing Pre cast jallies 14th floor

13th floor column beams slabs & all


RCC items including ele. Conduit
pipes, junction boxes, fan hooks
135 sleeves etc.
SR. REQUESTITION PURCHASE MATERIAL CONTRACTOR CONTRACTOR CERTIFICATE
ITEM
NO.
UP NOW INTIMATION GIVEN UP ON WORK ON WORK ON ON
136 External plaster 6th floor

137 Laying concealed traps etc 2nd floor

Flooring & dado of toilets including


138 polishing 2nd floor

Fixing T.W. doors & windows shutter


139 2nd floor

140 KItchen platform on 9th floor

10th fkloor external internal block


141 masonry

Waterproffing of toilet/sumps on 4th


142 floor

143 10th floor door frams fixing

144 External plaste 7th floor

145 Placing junction box & conduit fo9th floor

Laying concealed traps etc 3rd floor


146

Internal plaster & toilet backin coat


147 for 9th floor
SR. REQUESTITION PURCHASE MATERIAL CONTRACTOR CONTRACTOR CERTIFICATE
ITEM
NO.
UP NOW INTIMATION GIVEN UP ON WORK ON WORK ON ON

Interior cladding & flooring & polishing


148 in loccbies on 4th floor

Flooring & skirting in all rooms &


149 kitchen excluding toilets of 7th floor

flooring & dado of toilets including


150 polishing 3rd floor

Fixing T.W. doors & windows shutters


151 3rd floor

External drainage and construction


152 of manholes.

Anda mungkin juga menyukai