REV. 1
E14005 CB3-EC-50-MT-001-A4
TABLE OF CONTENT
1. GENERAL ................................................................................................................................... 4
1.1 Scope ..................................................................................................................................4
1.2 References ..........................................................................................................................4
2. DEFINITIONS .............................................................................................................................. 5
1. GENERAL
1.1 Scope
This document present material take off for civil work Pipanisasi CB-III (Lomanis –
Tasikmalaya).
References
1.1.1 Related specifications
The following project specifications and document prescribe items of related work:
CB3-EC-50-SP-001-A4 Civil and Structure General Specification,
CB3-EC-50-SP-004-A4 Concrete Work Specification,
CB3-EC-50-SP-005-A4 Foundation Specification,
CB3-EC-50-CA-001-A4 Calculation Sheet for Pig Launcher & Pig Receiver
Foundation,
CB3-EC-50-CA-006-A4 Calculation Sheet for Pump Metering Shelter
Structure and Foundation,
CB3-EC-50-CA-007-A4 Calculation Sheet for Densito Meter Shelter
Structure and Foundation,
CB3-EC-50-CA-008-A4 Calculation Sheet for Box Valve Shelter Structure
and Foundation,
2. DEFINITIONS
Definitions used in this document will not violate other definitions used in other documents which is :
COMPANY : PT. PERTAMINA (Persero), the owner of the FEED Pipanisasi CB-III
(Lomanis – Tasikmalaya).
Third Party Inspector : a third party inspector to be appointed by Pertamina to inspect the
works of Contractor.
Site : the right-of-way and places provided by the Employer where the
construction works are to be executed and any other places as may
be specifically designated in the Contract as forming part of the Site.
Issuer : the person / party who develop and release the document and
correspondence.
Project Documents : All documents which are prepared, revised, and issued for
accelerating the project execution, such as correspondence,
drawings, specifications, requisitions, purchase orders, and Vendor
Prints, etc.