 Prepares reports, designs and drawings
 Performs calculations about loads and stresses on Industrial Projects
 Seismic analysis (Static and Dynamic Analysis)
 Seismic design involves proportioning and detailing of structure to withstand
shaking from an earthquake event with acceptable performance in
accordance with project local code like ASCE 7 and AISC.
 Interprets local code as per project location
 Inspecting properties to check conditions/foundations
 Design of Foundation for Vibrating Equipment
 Static Equipment Foundation Design / Storage Tank Design
 Liaising with relevant professional staff such as architects and engineers,
administering contracts, and managing projects.
 Prepares detailed engineering design schedule and design procedures.
 Acquired knowledge in EPC scheduling using critical path Method (CPM) and
Program Evaluation and Review Technique (PERT) along with forced detail
(Budget) Estimate and Work Breakdown Structure (WBS)
 Construction management and design of Industrial Concrete and Steel
Structures

Acquired skills in the following tools:


 Staad Pro v8i
 CSI Safe Foundation
 Autocad
 Tekla Structures
 MS Office
 MS Project
Received technical training the following:
 Structural design using Staad Pro v8i

Projects and Roles USC 2x600 MW Power Plant, Philippines Jul 2018 - Present
Company: Mitsubishi Hitachi Power Systems (Japan)
Prepares project time schedule and work breakdown structure (WBS). Interprets
local design code and design criteria as per owner’s technical specification.
Involved in the early planning of overall layout plan and general structural
concept of the project. Prepares design criteria, design calculations, drawings
and bill of quantity. Coordinates with subcontractors and verifies design
calculations to ensure that the design criteria/technical specifications are met.
Manages design schedules and monitor deadlines. Distributes work load, assists
and supports engineers in the design procedure. Provides design checklist.
 Design of Power plant major structures like Gas/Steam Turbine, Boiler, Stack
and etc.
 Design of Steel and Concrete structure like office building and steel
supporting stuctures.

Atimonan 2x600 MW Super Critical Power Plant Aug 2017 – Jun 2018
Company: Mitsubishi Hitachi Power Systems (Japan).
Time schedule preparation. Interprets local design code and design criteria as per
owner’s technical specification. Involved in the early planning of overall layout
plan and general structural concept of the project. Prepares design criteria,
design calculations, drawings and bill of quantity. Coordinates with
subcontractors and verifies design calculations to ensure that the design
criteria/technical specifications are met. Manages design schedules and monitor
deadlines. Distributes work load, assists and supports engineers in the design
procedure. Provides design checklist.
 Design of Power plant major structures like Gas/Steam Turbine, Boiler and
etc.
 Design of Steel and Concrete structure like office building and steel
supporting stuctures.
 Design of building and equipment foundation
 Verifies and checking of the technical drawings as per structure design
calculations and standards.

Himeji Natural Gas Power Plant Aug 2016 – Jul 2017


Company: Mitsubishi Hitachi Power Systems (Japan)
Prepares design criteria, design calculations, structural analysis and bill of
quantity. Coordinates with subcontractors and verifies design calculations to
ensure that the design criteria/technical specifications are met. Manages design
schedule and monitor deadlines. Distributes work load, assists and supports
engineers in the design procedure. Provides design checklist
 Design of Power plant major structures like Gas/Steam Turbine, Boiler, Stack
and etc.
 Design of Steel and Concrete structure like office building and steel
supporting stuctures.
 Design of building and equipment foundation
 Verifies and checking of the technical drawings as per structure design
calculations and standards.

6x1080MW Coal Fired Egypt/Hawrawein Aug 2015 – July 2016


Company: Mitsubishi Hitachi Power Systems (Japan).
Interprets local design code and design criteria as per owner’s technical
specification. Involved in the early planning of overall layout plan and general
structural concept of the project. Prepares design criteria, design calculations,
drawings and bill of quantity. Coordinates with subcontractors and verifies
design calculations to ensure that the design criteria/technical specifications are
met. Manages design schedules and monitor deadlines. Distributes work load,
assists and supports engineers in the design procedure. Provides design checklist
 Design of Power plant major structures like Gas/Steam Turbine, Boiler and
etc.
 Design of Steel and Concrete structure like office building and steel
supporting stuctures.
 Design of building and equipment foundation
 Verifies and checking of the technical drawings as per structure design
calculations and standards.

BLCP Expansion Project, Thailand Nov 2015 – July 2016


Company: Mitsubishi Hitachi Power Systems (Japan).
Interprets design local code and design criteria as per owner’s technical
specification. Prepares design criteria, design calculations, drawings and bill of
quantity. Coordinates with subcontractors and verifies design calculations in
accordance with the design criteria/technical specification. Manages design
schedules and monitor deadlines. Distributes work load, assists and supports
engineers in the design procedure. Provides design checklist
 Design of Power plant major structures like Gas/Steam Turbine, Boiler and
etc.
 Design of Steel and Concrete structure like office building and steel
supporting stuctures.
 Design of building and equipment foundation
 Verifies and checking of the technical drawings as per structure design
calculations and standards.

2x600 MW Matarbari USC Coal Fired Power Project Jan 2015 - Oct 2015
Company: Mitsubishi Hitachi Power Systems (Japan).
Interprets design local code and design criteria as per owner’s technical
specification. Prepares design criteria, design calculations, drawings and bill of
quantity. Coordinates with subcontractors and verifies design calculations in
accordance with the design criteria/technical specification. Manages design
schedules and monitor deadlines. Distributes work load, assists and supports
engineers in the design procedure. Provides design checklist
 Design of Power plant major structures like Gas/Steam Turbine, Boiler and
etc.
 Design of Steel and Concrete structure like office building and steel
supporting stuctures.
 Design of building and equipment foundation
 Verifies and checking of the technical drawings as per structure design
calculations and standards.

Central Java IPP 2X1000MW Coal Fired Power Plant Indonesia May 2014 - Dec 2014
Company: Mitsubishi Heavy Industries Ltd. (Japan)
Interprets design local code and design criteria as per owner’s technical
specification. Prepares design criteria, design calculations, drawings and bill of
quantity. Coordinates with subcontractors and verifies design calculations in
accordance with the design criteria/technical specification. Manages design
schedules and monitor deadlines. Distributes work load, assists and supports
engineers in the design procedure. Provides design checklist
 Design of Power plant major structures like Gas/Steam Turbine, Boiler and
etc.
 Design of Steel and Concrete structure like office building and steel
supporting stuctures.
 Design of building and equipment foundation
 Verifies and checking of the technical drawings as per structure design
calculations and standards.

Turkey Sinop Power Plant Project July 2013 – Apr 2014


Company: Mitsubishi Heavy Industries Ltd. (Japan)
Interprets design local code and checks/verifies design criteria as per owner’s
technical specification. Prepares design criteria, design calculations, drawings
and bill of quantity. Coordinates with subcontractors and verifies design
calculations to ensure that the design criteria/technical specification are met.
Manages design schedule and monitor deadlines using MS Project. Assists and
supports engineers in the design procedure.
 Design of boiler steel supporting structure and gas turbine building
 Design of Steel Pipe Racks
 Design of Boiler Foundation and Turbine Building Foundation
 Design of Plant miscellaneous equipment foundation
 Verifies and checking of the technical drawings as per structure design
calculations and standards.

Pagbilao Project Unit 3 Philippines Nov 2012 –Jun 2013


Company: Mitsubishi Heavy Industries Ltd. (Japan).
Prepares design criteria, design calculations, and bill of quantity. Coordinates
with subcontractors and verifies design calculations to ensure that the design
criteria are met. Manages design schedule and monitor deadlines using MS
Project. Assists/supports cadet engineers in technical works and provides
training in structural design using Staad Pro. and provides excel design
templates.
 Design of boiler steel supporting structure and gas turbine building
 Design of Boiler Foundation and Turbine Building Foundation
 Design of Plant miscellaneous equipment foundation
 Verifies and checking of the technical drawings as per structure design
calculations and standards.

Hydrogen Energy California LLC HECA Project Jan 2012 –Oct 2012
Company: Mitsubishi Heavy Industries Ltd. (Japan).
Interprets design local code and design criteria as per owner’s technical
specification. Prepares design criteria, design calculations, drawings and bill of
quantity. Assists/supports cadet engineers in technical works and provides
training in structural design using Staad Pro. and provides excel design
templates.
 Design of boiler steel supporting structure and gas turbine building
 Design of Steel Pipe Racks
 Design of Boiler Foundation and Turbine Building Foundation
 Design of Plant miscellaneous equipment foundation
 Verifies and checking of the technical drawings as per structure design
calculations and standards.

ABC Hotel/Fields Plaza Condominium Building Feb 2010 –Dec 2011


Company: Angeles Beach Club Hotel Construction Management (Angeles)
Prepares technical specification, materials and construction procedure. Design
and Construction management, site inspection and site supervision. Manages
construction schedule and monitor subcontractor deadlines using MS Project
: Project Lead
 Planning, design and built of hotel and condominium building
 Coordination with owner, suppliers and site engineers.
 Supervise project’s time, cost and design quality as per owner’s
specifications
 Preparation of As-built plans for permit

Senoko Power Station Stage II, Singapore Aug 2009 –Dec 2009
Company: Commonwealth Engineers Co. Ltd (Japan)
Prepares design calculations as per technical specification provided by the main
contractor, drafting works and bill of quantity
 Design of Gas Turbine building and electrical room
 Design of office building

Shintech Plaquemine VCM Plant, Luisiana, USA. Mar 2009 –Jul 2009
Company: Commonwealth Engineers Co. Ltd (Japan)
Prepares design calculations as per technical specification provided by the main
contractor, drafting works and bill of quantity
 Design of Pipe racks and shallow foundation

Sohar Fertilizer Plant, Oman UAE Oct 2008 –Feb 2009


Company: Commonwealth Engineers Co. Ltd (Japan)
Load recalculation as per updated loading data, retrofitting and redesign of a
fertilizer plant structures located in Oman, UAE.
 Main structure consists of structural steel frames and precast reinforced
concrete frames resting on shallow foundations
 Design of equipment foundation, power grid facility racks, cable trenches
and various pipe racks

Dubai International Airport, U.A.E Jan 2008 –Sept 2008


Company: R&D TecDesign Inc (Manila )
Prepares design calculations, drafting works and bill of quantity
 Design of civil works including concrete manhole, pit, cable duct for runway
lighting fixtures and drainage system
 Design of Steel Pole Foundation

King Khalid International Airport, Riyadh, Saudi Arabia May 2006 –Dec 2007
Company: R&D TecDesign Inc (Manila )
Prepares design calculations, drafting works and bill of quantity
 Design of civil works including concrete manhole, pit, cable duct for runway
lighting fixtures and drainage system. Prepared drafting work including plan,
elevation and detailing.
 Design of Steel Pole Foundation and prepared drafting work including plan,
elevation and detailing.

Other Skills CAD Detailing


Drafting, Structural planning, Structural detailing, Architectural and Site plot plan
Project Coordinator/Management
Managing project schedule and MTO works

Work History January 2012 – Present


Senior Structural Engineer
Mitsubishi Hitachi Power Systems
(Outsourced by Commonwealth Engineers Co. Ltd)
Yokohama City, Japan
Feb 2010 – December 2011
Project Engineer/ Assistant Project Manager
Angeles Beach Club Hotel Construction Management
Angeles City, Philippines
October 2008 – December 2009
Structural Engineer
Commonwealth Engineers Co. Ltd
Tokyo, Japan
May 2006 - September 2008
Civil /Structural Engineer
R&D TecDesign Inc
Pasig, Philippines

May 2004
Apprenticeship Trainee
RMD Kwikform Co HK LTD
Hongkong, China

Education Bachelor of Science, Major in Civil Engineering


Holy Angel University
Angeles City, Philippines
March 2005

References [References are available upon request.]

Anda mungkin juga menyukai