Dimensions A,B & C are the original pile's spacing. 3-PILE-GROUP 4/C
Dimensions a1, a2, b1,b2, c1 & c2 are the ecc. pile's spacing 300 X 300 RC PILES

Y PILE WORKING LOAD = 900 KN PER PILE


( a1 ) ( -a1 )
COLUMN SERVICE AXIAL LOAD ( W ) = 2580 KN
1

C.G of Column
( a2 ) A= 520
X X mm
( b1 )
( b2 ) B= 260 mm
2 3

Y C= 450 mm
C C
( c1 ) ( c2 ) PILE 1 ECCENTRICITY
+ - -33 mm
3-PILE-GROUP 4/C
+ - 0 mm
a1 = -33 mm
a2 = 520 mm PILE 2 ECCENTRICITY
b1 = 379 mm + - -2 mm
b2 = 330 mm
c1 = 448 mm - + 119 mm
c2 = 461 mm
PILE 3 ECCENTRICITY
- + 11 mm

- + 70 mm

Y
N.A. ABOUT Y - Y AXIS
+ -
ey = ( a1 ) + ( c1 ) - ( c2 ) = -15.33 mm about y - y axis
3 Y

My-y = W.ey = -39.56 KN.M


Sum dy2
Sum dy2 = ( a1 - ey )^2 + ( c1 - ey )^2 + ( c2 + ey )^2 = 413,609 mm2

N.A. ABOUt X - X AXIS


+
ex = ( a2 ) - ( b1 ) - ( b2 ) = -63.00 mm about x - x axis X X
3 -

Mx-x = W.ex = -162.54 KN.M


Sum dx2
Sum dx2 = ( a2 - ex )^2 + ( b1 + ex )^2 + ( b2 + ex )^2 = 598,149 mm2

FILE : 3PILECC
Sheet2

3-PILE-GROUP 4/C
COMPUTATION OF PILE LOAD 300 X 300 RC PILES

Pile W My-y. dy Mx-x. dx Total


Number No. of pile + Sum dy2 + sum dx2 = Load
in KN

1 860.00 + -1.69 + 158.42 = 1016.73 more than working load

2 860.00 + 44.32 + -85.87 = 818.45 pile - ok

3 860.00 + -42.63 + -72.55 = 744.82 pile - ok

Sum = 2580.00