1. Calculate approximate quantity for footing and column stump for both F1 and F2, the approximate should include:
a. Excavation
b. Formwork
c. Concrete
d. Reinforcement
Reinforcement detail
- Column = 80kg/m3
- Pad footing = 85kg/m3
- Beam = 70kg/m3