RAB ADMN Alpukat Farm 2
RAB ADMN Alpukat Farm 2
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
II. PEKERJAAN STANDARD
A. PEKERJAAN STRUKTUR
B. PEKERJAAN ATAP
C. PEKERJAAN ARSITEKTUR
D. PEKERJAAN MEKANIKAL & SANITARY
E. PEKERJAAN PANTRY
F. PEKERJAAN ELEKTRIKAL
TOTAL PEKERJAAN STANDARD
TOTAL PEKERJAAN BANGUNAN PENDUKUNG
JUMLAH TOTAL
PPN (10%)
JUMLAH + PPN
DIBULATKAN
Terbilang :
Subang,
CV. PRA
General Contrac
RINCIAN
RENCANA ANGGARAN BIAYA
PEMBANGUNAN GEDUNG DORMITORY
KABUPATEN SUBANG
TAHUN ANGGARAN 2019
1 2 3 4
I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran kembali lokasi site 448.00 m2
2 Pek. Pengadaan Air & Listrik kerja 1.00 Ls
3 Pek. Pembersihan sisa bekas pekerjaan 1.00 Ls
TOTAL PERSIAPAN
II. PEKERJAAN STANDARD
A. PEKERJAAN STRUKTUR
I. PEKERJAAN GALIAN & URUGAN
1 Pek. Pasang Papan Bouplank 223.60 m1
2 Pek. Galian Tanah Pondasi Batu kali menerus 71.55 m3
3 Pek. Urugan Pasir Bawah Pondasi batu kali t=10cm 8.94 m3
4 Pek. Urugan Tanah Kembali bks Galian 16.77 m3
JUMLAH - I
II. PEKERJAAN PONDASI, POER & SLOOF 63
1 Pek. Aanstamping Batukali 8.94 m3
2 Pek. Pondasi Batu kali camp. 1Pc:4Psr 54.78 m3
3 Pek. Lantai Kerja dibawah Pondasi 8.94 m3
JUMLAH - II
1 2 3 4
SUB TOTAL ATAP
C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN DINDING & PLESTERAN
1 Pasangan dinding 1/2 bata 1 : 5 719.99 m2
2 Pekerjaan plester dan acian dinding 1 : 5 1,439.98 m2
3 Pekerjaan dinding keramik 20X25 h= 2m 232.86 m2
4 Pekerjaan Railling Tangga (Depan & Belakang ) Pipa Stainlesstel 6.80 m2
JUMLAH - I
II. PEK. KUSEN PINTU/JENDELA & PARTISI, LENGKAP ASSESORIES
1 Pasang Kusen+Pintu PD1 15.00 Unit
2 Pasang Kusen+Pintu Type PD2 5.00 Unit
3 Pasang Kusen+jendela 27.00 Unit
JUMLAH - II
III. PEKERJAAN PLAFOND
1 Pek. Plafond Gypsum 9mm+Rangka Hollow 40x40 540.00 m2
2 Pekerjaan profil gipsum 447.20 m'
JUMLAH - III
NO URAIAN PEKERJAAN VOLUME SAT
1 2 3 4
IV. PEKERJAAN LANTAI
1 Urugan pasir bawah lantai t=10 cm 45.00 m3
2 Lantai kerja t = 5 cm 2.25 m2
3 Pekerjaan lantai keramik 40X40 ( Diagonal) 450.00 m2
JUMLAH - IV
V. PEKERJAAN FINISHING & PENGECATAN
1 Pekerjaan pengecatan dinding Exterior Watershiel 719.99 m2
2 Pekerjaan pengecatan dinding bata & partisi (Interior) 719.99 m2
3 Pekerjaan pengecatan plafond 540.00 m2
JUMLAH - V
SUB TOTAL ARSITEKTURE
D. PEKERJAAN MEKANIKAL & SANITARY
1 Kloset 9.00 unit
2 Wastafel + dudukan 6.00 unit
3 Urinoir 3.00 unit
4 Jet Washer 9.00 unit
5 Floor Drain 16.00 unit
6 Exhaust Fan 9.00 unit
7 Water faucet 6.00 unit
8 Instalasi Air Bersih 1.00 ls
9 Instalasi Air Kotor 1.00 ls
10 Septictank 3.00 unit
11 Pompa Air 2.00 unit
JUMLAH
SUB TOTAL PEK.MEKANIKAL STANDARD & SANITARY
E. PEKERJAAN PANTRY
20'' x 18'' x 14'' Kitchen Sink 3.00 unit
JUMLAH
SUB TOTAL PEK.PANTRY
F. PEKERJAAN ELEKTRIKAL
Installasi Titik Lampu 1.00 Ls
Saklar ganda 10.00 titik
Saklar Tunggal 2.00 titik
Installasi Stop Kontak 16.00 titik
Down Light 31.00 bh
SUB JUMLAH
SUB TOTAL PEK. ELEKTRIKAL STANDARD
TOTAL JUMLAH PEKERJAAN GEDUNG
NO URAIAN PEKERJAAN VOLUME SAT
1 2 3 4
C
General
...........
KAPITULASI
ANGGARAN BIAYA
AN GEDUNG DORMITORY
UPATEN SUBANG
N ANGGARAN 2019
(RP.) (RP.)
7,626,000.00
361,521,927.20
136,724,000.00
512,973,854.00
105,632,000.00
6,000,000.00
19,527,000.00
1,142,378,781.20
1,150,004,781.20
1,150,000,000.00
115,000,000.00
1,265,000,000.00
1,265,000,000.00
……………………..
Estimator
RINCIAN
ANGGARAN BIAYA
AN GEDUNG DORMITORY
UPATEN SUBANG
N ANGGARAN 2019
TOTAL JUMLAH
HARGA SATUAN HARGA
(RP.) (RP.)
5 6=5X3
7,000.00 3,136,000.00
2,490,000.00 2,490,000.00
2,000,000.00 2,000,000.00
7,626,000.00
20,000.00 4,472,000.00
23,000.00 1,645,696.00
122,300.00 1,093,851.20
12,000.00 201,240.00
7,412,787.20
390,000.00 3,488,160.00
600,000.00 32,869,200.00
120,000.00 1,073,280.00
37,430,640.00
4,000,000.00 19,200,000.00
4,000,000.00 7,680,000.00
220,000.00 35,200,000.00
4,000,000.00 73,216,000.00
4,000,000.00 26,512,500.00
2,600,000.00 113,620,000.00
4,000,000.00 6,930,000.00
4,000,000.00 34,320,000.00
316,678,500.00
361,521,927.20
120,000.00 64,800,000.00
110,000.00 59,400,000.00
75,000.00 6,060,000.00
80,000.00 6,464,000.00
TOTAL JUMLAH
HARGA SATUAN HARGA
(RP.) (RP.)
5 6=5X3
136,724,000.00
160,000.00 61,691,424.00
40,000.00 57,599,360.00
87,000.00 20,258,820.00
750,000.00 5,100,000.00
144,649,604.00
3,600,000.00 54,000,000.00
2,102,200.00 10,511,000.00
1,435,800.00 38,766,600.00
103,277,600.00
150,000.00 81,000,000.00
50,000.00 22,360,000.00
103,360,000.00
TOTAL JUMLAH
HARGA SATUAN HARGA
(RP.) (RP.)
5 6=5X3
122,300.00 5,503,500.00
95,000.00 213,750.00
187,000.00 84,150,000.00
89,867,250.00
42,000.00 30,239,664.00
33,000.00 23,759,736.00
33,000.00 17,820,000.00
71,819,400.00
512,973,854.00
2,500,000.00 22,500,000.00
1,800,000.00 10,800,000.00
2,350,000.00 7,050,000.00
1,500,000.00 13,500,000.00
25,000.00 400,000.00
1,200,000.00 10,800,000.00
197,000.00 1,182,000.00
5,000,000.00 5,000,000.00
4,000,000.00 4,000,000.00
8,000,000.00 24,000,000.00
3,200,000.00 6,400,000.00
105,632,000.00
105,632,000.00
2,000,000.00 6,000,000.00
6,000,000.00
6,000,000.00
7,000,000.00 7,000,000.00
240,000.00 2,400,000.00
170,000.00 340,000.00
137,000.00 2,192,000.00
245,000.00 7,595,000.00
19,527,000.00
19,527,000.00
1,142,378,781.20
TOTAL JUMLAH
HARGA SATUAN HARGA
(RP.) (RP.)
5 6=5X3
..........................................................