Buku BANK Desa Aikmual
Buku BANK Desa Aikmual
1 2
1 15/02/2018 ALOKASI DANA DESA (ADD)
2 19/02/2018 Pengambilan uang dari Bank bulan Februari
3 14/03/2018 ALOKASI DANA DESA (ADD)
4 20/03/2018 SARANA DAN PRASARANA KANTOR DESA
5 29/03/2018 DANA DESA (DD) DD
6 29/03/2018 Pembangunan Sarana Prasarana Olah Raga DD
7 29/03/2018 Pembangunan Jaringan Air Bersih (Sumur Bor) DD
8 02/04/2018 TALUD JALAN DUSUN BATU TAMBUN DD
9 03/04/2018 Pelatihan Penigkatan Kapasitas Masyarakat (Bid. DD
Perbengkelan)
10 04/04/2018 ALOKASI DANA DESA (ADD)
11 04/04/2018 Pelatihan Penigkatan Kader Posyandu Desa DD
12 06/04/2018 Penghasilan Tetap Dan Tunjangan Aparatur
Pemerintah Desa
13 06/04/2018 Opersional Kantor Desa (Sarana Prasarana)
14 18/04/2018 ALOKASI DANA DESA (ADD)
15 23/04/2018 BANTUAN KABUPATEN (POL.PP)
16 23/04/2018 Penyelenggaraan Lomba Desa
17 24/04/2018 Bantuan Keuangan (PBK)
18 24/04/2018 Tunjangan Aparatur Pemerintah Desa
19 24/04/2018 Opersional Kantor dan Honorarium Tim PPKDes
20 24/04/2018 Penyusunan RKPDes/RAPBDes
21 24/04/2018 Pembebasan Lahan Kantor Desa
22 16/05/2018 ALOKASI DANA DESA (ADD)
23 18/05/2018 Penghasilan Tetap dan Tunjangan Aparatur
Pemerintah Desa
24 18/05/2018 Operasional Kantor Desa
25 25/05/2018 ALOKASI DANA DESA (ADD)
26 25/05/2018 BANTUAN KABUPATEN (POL.PP)
27 28/05/2018 Honor Pol.PP dan Operasional Kantor Desa
28 05/06/2018 ALOKASI DANA DESA (ADD)
29 06/06/2018 DANA DESA (DD) DD
30 06/06/2018 Penghasilan Tetap dan Tunjangan Aparatur
Pemerintah Desa beserta Opersional Perkantoran
Saldo
B. Admin (Rp) ( Rupiah )
9 10
0.00 77,098,950.00
0.00 0.00
0.00 38,250,000.00
0.00 0.00
0.00 188,301,800.00
0.00 136,781,800.00
0.00 106,781,800.00
0.00 60,022,800.00
0.00 30,022,800.00
0.00 142,541,300.00
0.00 112,541,300.00
0.00 44,284,172.00
0.00 20,932,800.00
0.00 59,721,526.00
0.00 65,721,526.00
0.00 44,811,526.00
0.00 38,811,526.00
0.00 31,611,526.00
0.00 28,036,526.00
0.00 25,036,526.00
0.00 36,526.00
0.00 38,825,252.00
0.00 1,081,295.00
0.00 22,800.00
0.00 13,288,427.00
0.00 14,788,427.00
0.00 138,427.00
0.00 38,927,153.00
0.00 415,530,753.00
0.00 376,666,856.00
0.00 378,166,856.00
0.00 376,666,856.00
0.00 278,601,856.00
0.00 317,390,582.00
0.00 279,622,582.00
0.00 253,772,582.00
0.00 214,140,582.00
0.00 181,783,582.00
0.00 152,533,582.00
0.00 113,889,632.00
0.00 115,389,632.00
0.00 117,920,886.00
0.00 116,420,886.00
0.00 66,116,886.00
0.00 48,216,886.00
0.00 3,216,886.00
0.00 42,005,612.00
0.00 43,505,612.00
0.00 3,084,655.00
0.00 30,050,282.00
0.00 45,283,783.00
0.00 54,150,195.00
0.00 45,025,195.00
0.00 17,500,695.00
0.00 56,289,421.00
0.00 57,789,421.00
0.00 8,682,464.00
0.00 47,471,190.00
0.00 48,971,190.00
0.00 8,777,233.00
0.00 12,507,487.00
0.00 389,111,087.00
0.00 385,616,087.00
0.00 387,037,291.00
0.00 425,826,017.00
0.00 387,037,310.00
0.00 267,380,310.00
0.00 265,880,310.00
0.00 267,380,310.00
0.00 258,898,310.00
0.00 297,687,036.00
0.00 299,187,036.00
0.00 237,217,036.00
0.00 214,477,036.00
0.00 212,977,036.00
0.00 174,556,829.00
0.00 132,180,829.00
0.00 119,150,829.00
0.00 138,771,028.00
0.00 148,998,463.00
0.00 283,936,717.00
0.00 234,447,717.00
0.00 129,447,717.00
0.00 89,277,717.00
0.00 69,458,390.00
0.00 44,516,399.00
0.00 22,546,181.00
29/03/2018 DANA DESA (DD) DD
29/03/2018 Pembangunan Sarana Prasarana Olah Raga DD
29/03/2018 Pembangunan Jaringan Air Bersih (Sumur Bor) DD
02/04/2018 TALUD JALAN DUSUN BATU TAMBUN DD
03/04/2018 Pelatihan Penigkatan Kapasitas Masyarakat (Bid. DD
Perbengkelan)
04/04/2018 Pelatihan Penigkatan Kader Posyandu Desa DD
06/06/2018 DANA DESA (DD) DD
07/06/2018 Bid. Pembangunan Desa (Material Bangunan) DD
03/07/2018 Bid. Pembangunan Desa (Upah Tukang/Pekerja DD
Harian)
03/07/2018 Bid. Pemberdayaan Masyarakat (Bahan Dan Alat - DD
alat Pelatihan Tatarias)
03/07/2018 Bid. Pembangunan (Material Bangunan Talud DD
Penaban Metro dan Rabat Aikmual Timur)
09/07/2018 Bid. Pembangunan (Material Bangunan Rabat DD
Aikmual Barat dan SPAL Aikmual Timur, Upah
Tukang/Pekerja Talud
09/07/2018 Bid. Pemberdayaan Masyarakat (Konsumsi, DD
Transport Pelatihan Tatarias dan Bahan Bahan dan
Alat Praktek Pelatihan Jahit)
26/07/2018 Bid. Pembangunan (Material Bangunan dan Upah DD
Tukang/Pekerja Harian)
26/07/2018 BId. Pemberdayaan Masyarakat (Konsumsi, DD
Transport Peserta dan Honorarium Narasumber
Pelatihan Menjahit)
26/07/2018 Pembiayaan Penyertaan Modal BUMDes DD
22/10/2018 DANA DESA (DD) thp 03 DD
22/11/2018 Bid. Pembangunan Desa DD
27/11/2018 Bid. Pemberdayaan Masyarakat (PLT. Tata boga) DD
941,509,000.00 922,319,000.00
selisih 19,190,000.00