Plant Design Schedule 2019-2020

JULY
11 Submission of topic
16 Topics submitted initially checked by ChE faculty
18 Topic submitted reviewed by ChE faculty
23 Topic submitted has approved process to be used in the design
30 Title defense

AUGUST
Finalize process
1
Initial submission OMB
Market Feasibility Study
Process Selection Analysis
6
Management Study
Revised OMB
Energy Balance
Criteria for plant location
13
Timeline of the project
Sensitivity Analysis of process selection
Revised Energy Balance
15
Revised Management Study
22 Defense 1
27 Revised paper
29 Equipment Design

SEPTEMBER
Plant size
Production schedule
3
Pumps and Piping Design
Instrumentation and Process Control
6 Revised ED and Financial Study
Plant location and layout
Utilities and Waste Disposal
Raw materials
10 Packaging specs
Finalize cost estimates
Finalize financial projection
Trade-off
17 Executive summary with constraints
Table of standards
Contribution to Philippine Economy
All drawings
Copies of MSDS

OCTOBER
1 Defense 2
3 Revised paper
8 Final Defense