FROM : ENGINEER II
BGMS Field Office - 1
SIGNIFICANT
AREAS VISITED FINDINGS RECOMMENDATIONS/
AGREEMENTS
4. We recommend them to
5. Upper part of the CR use drywall for the
walls was removed by replacement of the
the Contractor due to removed CHB of the CR
the damage caused walls to decrease the
by the shrinkage of loadings of the affected
soil. area.
7. Provision of handrails in
8. No provision of the ramp is
handrails on the ramp. recommended.
Removed
CHB to be
replace
with drywall
Poor
workmanship
for the
installation of
ceiling
No clear
pathway
Removed
CHB to be
replace
with drywall
Corrugated
roof
No gutter
installed