16 July 2019

FOR : MARCELO NICOMEDES J. CASTILLO


Regional Director

THRU : NORA D. DELA PAZ


OIC-Assistant Regional Director/RPMT Head

MELECIO C. UBILAS JR.


Chief Administrative Officer

FROM : ENGINEER II
BGMS Field Office - 1

SUBJECT : Feedback Report re: Site inspection conducted at Brgy.


Refaro, San Juan, Ilocos Sur

Respectfully submitting the feedback report re: Abovementioned subject:

SIGNIFICANT
AREAS VISITED FINDINGS RECOMMENDATIONS/
AGREEMENTS

1. Demolition of 1. As agreed with the


damaged concrete Municipal Engineer and
floor slab due to poor Contractor they will add
soil conditions. grade beam at the middle
Another reason is the part of the building to
presence of Mining support the load of the
Refaro Day Care
areas near the new concrete floor slab.
Center, Brgy. Refaro,
construction site. We also recommend them
San Juan, Ilocos Sur
to decrease the spacing of
2. The building is bars from 0.40cm to 30cm
constructed on a both ways to increase the
newly developed land structural integrity of the
by soil filling. The floor slab. Presence of any
foundation on such mining areas needs to be
soils tend to settle inspected and
more with time as professional help shall be
long time is needed taken for the construction
for such soil to settle of new buildings in such
and become compact areas.
to resist the loads
from the building 2. It shall be ensured that
foundation. such soils are adequately
compacted before
construction begins.
However, we recommend
3. Visible cracks on wall them using soil compactor
openings such as on before concrete pouring in
doors and windows. order to prevent soil
subsidence in the future.

4. Poor workmanship for 3. Other repair may push


the installation of through prior to the repair
ceiling. of the slab on fill.

4. We recommend them to
5. Upper part of the CR use drywall for the
walls was removed by replacement of the
the Contractor due to removed CHB of the CR
the damage caused walls to decrease the
by the shrinkage of loadings of the affected
soil. area.

5. The LGU should provide a


6. No clear path walk safe and permanent
going to the Day Care walkway along Day Care
Center. Center.

6. Replace the corrugated


7. They installed roof with Pre painted long
corrugated roof span roof as per contract
instead of Pre painted or Variation order may
long span roof as apply. They must install
indicated in the POW. the roof gutter as indicated
No gutter installed yet. in the POW.

7. Provision of handrails in
8. No provision of the ramp is
handrails on the ramp. recommended.

FRANC ANTHONY C. GALAO


Ongoing
demolition of
concrete slab

Removed
CHB to be
replace
with drywall
Poor
workmanship
for the
installation of
ceiling
No clear
pathway

Removed
CHB to be
replace
with drywall
Corrugated
roof
No gutter
installed