STATEMENT OF WORK ACCOMPLISHED


As of July 21, 2018 to August 17, 2018
PROJECT ID NO. : 18KH0022
NAME OF PROJECT : Constrcution of Bypass/Diversion Roads: Cagayan de Oro
CONTRACTOR : JAMARI Construction

UNIT COST
ITEM DESCRIPTION UNIT CONTRACT IN TOTAL
QUANTITY PESO AMOUNT
(PESO)
CW1 DRAINAGE STRUCTURE
102(1) Unsuitable Excavation cu.m 490.00 360.87 176,826.30
103(1)a Structure Excavation cu.m 588.00 353.32 207,752.16
404(1)a Reinforcing Steel Bar (Grade 40)- Bridge Structures & other Major Structures) kgs 97,268.33 62.02 6,032,581.83
405(1)a2 Structural Concrete, Class "A" cu.m 917.28 5,886.13 5,399,229.33
505(2)a Grouted Riprap, Class "A" cu.m 162.50 3,748.76 609,173.50
CW2 BRIDGE STRUCTURE
103(2)a Bridge Excavation cu.m 360.00 360.68 129,844.80
400(16) Test Pile, (Furnished and Driven) m 35.00 7,409.45 259,330.75
400(4)a Precast Concrete Piles, Furnished m 1,260.00 4,629.04 5,832,590.40
400(14) Precast Concrete Piles, Driven m 1,260.00 1,754.05 2,210,103.00
404(1)a Reinforcing Steel Bar (Grade 40)- Bridge Structures & other Major Structures) kgs 57,106.61 62.02 3,541,751.95
405(1)a1 Structural Concrete, Class "A" (Major Structures)-Bridge Substructure 20.70 MPa cu.m 129.55 7,370.73 954,878.07
405(b1 Structural Concrete, Class "A" (Major Structures)-Bridge Superstructure 28.0 MPa cu.m 168.75 7,327.53 1,236,520.69
407(8) Lean Concrete cu.m 3.24 5,179.52 16,781.64
401(2)a Concrete Railing m 24.00 2,754.98 66,119.52
411(1)a Paint (Concrete Structures) sq.m 28.28 2,611.51 73,853.50
413(1)a Preformed Joint Expansion (Multi-flex Expansion) cu.m 2.73 12,961.60 35,385.17
511(2) Matresses cu.m 64.80 1,709.92 110,802.82
517(1)a Drain Pipe (Galvanized) l.m 12.00 4,581.54 54,978.48
CW3 ROAD
B.5 Project Billboard/Signboard each 2.00 5,041.90 10,083.80
B.7 Occupational Safety and Health Program mos 7.00 24,048.88 168,342.16
B.8 Traffic Management mos 6.00 30,396.80 182,380.80
B.9 Mobilization and Demobilization l.s. 1.00 218,064.00 218,064.00
101(3)a3 Removal of Existing Concrete Pavement (0.23 m thk.) sq.m 1,340.00 659.81 884,145.40
101(6) Removal of Structures and Obstruction cu.m 343.00 644.42 221,036.06
200 Aggregate Subbase Course (t=200 mm) cu.m 613.28 1,532.86 940,072.38
104(2)a Embankment (From borrow) cu.m 934.02 767.76 717,103.20
311(1)e1 PCC Pavement, Unreinforced (0.28 m thk.) sq.m 1,340.00 1,699.69 2,277,584.60
GRAND TOTAL P 32,567,316.31

Submitted by: Checked by: Recommen

JOSE MARCOS S. DACANAY ROEL M. CONDEZA


Project Engineer Acting Chief, Construction Section
Acc. No. 3467
lic of the Philippines
UBLIC WORKS AND HIGHWAYS
HE DISTRICT ENGINEER
ST DISTRICT ENGINEERING OFFICE
quipment Services Compound
Cagayan de Oro City

F WORK ACCOMPLISHED
2018 to August 17, 2018

s/Diversion Roads: Cagayan de Oro Coastal Road, incl. Bridge and Drainage, Cagayan de Oro City

WT. % Accomp. Actual Actual Actual Remarks


Qty Amount Accomp

0.54% 4.53% 22.20 8,011.31 0.02%


0.64% 3.52% 20.72 7,320.79 0.02%
18.52% 63.74% 62,000.00 3,845,240.00 11.81%
16.58% 21.50% 197.18 1,160,650.66 3.56%
1.87% 100.00% 162.50 609,173.50 1.87%

0.40% 100.00% 360.00 129,844.80 0.40%


0.80% 100.00% 35.00 259,330.75 0.80%
17.91% 100.00% 1,260.00 5,832,590.40 17.91%
6.79% 85.00% 1,071.00 1,878,587.55 5.77%
10.88% 75.00% 42,829.96 2,656,313.96 8.16%
2.93% 60.00% 77.73 572,926.84 1.76%
3.80% 60.00% 101.25 741,912.41 2.28%
0.05% 100.00% 3.24 16,781.64 0.05%
0.20% 50.00% 12.00 33,059.76 0.10%
0.23% 0.00% - 0.00%
0.11% 0.00% - 0.00%
0.34% 0.00% - 0.00%
0.17% 0.00% - 0.00%

0.03% 100.00% 2.00 10,083.80 0.03%


0.52% 70.00% 4.90 117,839.51 0.36%
0.56% 70.00% 4.20 127,666.56 0.39%
0.67% 50.00% 0.50 109,032.00 0.33%
2.71% 100.00% 1,340.00 884,145.40 2.71%
0.68% 35.00% 120.05 77,362.62 0.24%
2.89% 100.00% 613.28 940,072.38 2.89%
2.20% 75.00% 700.52 537,827.40 1.65%
6.99% 50.00% 670.00 1,138,792.30 3.50%
100.00% 21,694,566.36 66.61%