4000/Wks/ /E4
GE (Project) Mamun
1 Ref your office letter No.4001/A/22/E4 dt 17 Feb 2018 & 4001/A/38/E4 dt 01 Mar 2018.
2 The detail justification according to KLP proposed project electric load requirement dem
(P) Mamun are briefed as under :-
(b) Provn of OTM Accn for 'A' Inf 415 KVA Near JCO/ORs Md
Bn of 72 Inf Div at North of Lal Accn Lal Tikku (D-IV
Tikku Khad at Mamun Mil Stn Feeder)
(c) Provn of OTM Accn for 'B" Inf 415 KVA Near JCO Md accn Lal
Bn of 72 Inf Div at North of Lal Tikku Khad
Tikku Khad at Mamun Mil Stn
(d) Provn of OTM Accn for C Inf 415 KVA Near JCO Md Accn
Bn of 72 Inf div at North of Lal (D-IV Feeder
Tikku Khad at Mamun Mil Stn
Page 5
(e) Provn of OTM Accn for B Fd 315 KVA Near STP Lal Tikku
Regt of 72 Arty Bde at North Khad Feeder
of Lal Tikku Khad at Mamun
Mil Stn
(f) Provn of OTM Accn for HQ 100 KVA Near JCOs Md Accn
Inf Bde Sig Coy, workshop, Lal Tikku Khad (D-IV
FPO & GS Sec 72 Inf Div at Feeder)
North of Lal Tikku Khad
Mamun
(g) Provn of OTM Accn for 629 315 KVA Near Stn HQ Mamun
EME Bn at Mamun Mil Stn
(j) Provn of OTM Accn for Mech 250 KVA Near Haryal Market
Inf Bn of 16 (I) Armd Bde at
Mamun
(k) Provn of OTM Accn for 2 (I) 200 KVA Near 11 GUARD (Lal
Armd Bde at Mamun Tikku Khad)
Page 6
(l) Provn of OTM Accn for HQ B3 36 KVA Near Karoli Village
Inf Bde Sig Coy, Wksp, FPO
& Gl Sec of 72 Inf Div at North
of Lal Tikku Khad Mamun (Sig
Coy)
(m) Provn of habitat for HQ 72 250 KVA Near 132 KV Sub Stn
Arty Bde with Wksp & Sig Coy
(n) Provn of habitat for EME Bn 250 KVA Near Accn Bana
(Less for Wksp) at Ajeya Enclave Lal Tikku
Mamun Khad
(b) Load required for new vacant Qtr in Lal Tikku Khad is
=1530 KVA
=80.30 Amp
Say 80.00 Amp
(c) (i) Maximum Reqd load current of Mamun Cantt is 132 KV Grid Transformer No.1 = 385
(iii) Grand Total load = GE (P) Mamun demand load + Vacant Qtr load + 132 KV Sub Stn
=21496.00 KVA
= 1128.00 Amp
(v) As per safety factor transformer run under 80% load, so permisserable load is 902.40
(P) Mamun demand load is 1010.00 Amp
4 In view of above, it is suggested that tapping point available on PSPCL/any Sub Stn o
or GE(S) Mamun area installation of complete HT Panel or any Addition alteration req
be carried out by GE (P) Mamun with agreement of PSPCL for augumentation
enhanced before handing over the completed project to concern GE Division and a
office will not be in position to provide any other tapping point please.
Copy to :-
HQ CWE Mamun
for info please.
AGE E/M-I
Page 8
Mar-18
Remarks
KLP project load demanded by the GE (P) Mamun except Srl No (h) (7800
Mamun demand load + Vacant Qtr load + 132 KV Sub Stn Load i.e.
Page 11
ormer run under 80% load, so permisserable load is 902.40 Amp but GE
010.00 Amp
ted that tapping point available on PSPCL/any Sub Stn of GE (N) Mamun
ation of complete HT Panel or any Addition alteration required will have to
Mamun with agreement of PSPCL for augumentation for Electric load
er the completed project to concern GE Division and also in future this
o provide any other tapping point please.
(RL Karnik)
EE
Garrison Engineer