Anda di halaman 1dari 3

 Perhitungan Berat Jenis Kerikil

Kerikil Kondisi SSD ( A ) = 500 gram


Kerikil + Tempat Dalam Air ( B ) = 480 gram
Tempat Dalam Air ( C ) = 299 gram

𝐴 500
Berat Jenis = {𝐴−(𝐵−𝐶)} = 480−299

= 2,7624

 Perhitungan Berat Jenis Kering SSD

Kerikil + Tempat Dalam Air ( B ) = 480 gram


Tempat Dalam Air ( C ) = 299 gram

𝐵 480
Berat Jenis SSD = 𝐵−𝐶 = 480−299

= 2,6519

 Perhitungan Presentase Penyerapan

Kerikil Kondisi SSD ( A ) = 500 gram


Kerikil + Tempat Dalam Air ( B ) = 480 gram

𝐵−𝐴 480−500
% Penyerapan = 𝐴
𝑥 100% = 500
𝑥 100%

= 0%

 Pengujian Berat Satuan Kerikil

Berat Bejana Kosong (B1) = 5,88 Kg


Berat Bejana + Kerikil (B2) = 20,50 Kg
Berat Kerikil = B2 – B1
= 20,50 Kg – 5,88 Kg
= 14,62 Kg
Tinggi Bejana = 12,80 Cm
Diameter Dalam Bejana = 8 Cm
1
Volume Bejana = 4 𝑥 𝜋 𝑥 𝑑2 𝑥 𝑡
1
= 4 𝑥 𝜋 𝑥 82 𝑥 12,80

= 643,40 Cm2
𝐵𝑒𝑟𝑎𝑡 𝐾𝑒𝑟𝑖𝑘𝑖𝑙
Berat Satuan K =
𝑉𝑜𝑙𝑢𝑚𝑒 𝐵𝑒𝑗𝑎𝑛𝑎
14,62
= Cm3
643,40

= 22738,64 Kg/m3
Volume Mold = 1286, 80 Cm3

 Modulus Halus Agregat Kasar

Lubang Ayakan Berat Teringgal Persen Kumulatif


mm Gram Persen Tertinggal Persen Kumulatif Lewat Ayakan
37,50 0 0 1,05 100
25 42 1,05 39,15 98,95
16,10 1524 38,10 79,55 60,85
12,50 1616 40,40 89,20 20,45
9,52 386 9,65 97,20 10,80
4,80 320 8 99,73 2,80
2,36 101 2,53 100 0,28
1,18 11 0,28 - -
PAN - - - -
Jumlah 4000 - 505,88 -

𝐽𝑢𝑚𝑙𝑎ℎ 𝑃𝑒𝑟𝑠𝑒𝑛 𝐾𝑢𝑚𝑢𝑙𝑎𝑡𝑖𝑓


FM =
100

505,88
= = 5,06
100

Ukuran normal agregat kasar = 37,50mm – 4,76mm


 Modulus Halus Butir Pasir

Lubang Berat Tertinggal Persen Kumulatif


Ayakan mm Gram Persen Tertinggal Persen Kumulatif Lewat Ayakan
9,60 0 0 0 100
4,80 16 0,60 0,60 99,40
2,40 19 1,90 2,50 97,50
1,20 80 8 10,50 89,50
0,60 166 16,60 27,10 72,90
0,30 340 34 61,10 38,90
0,15 386 38,60 99,70 0,30
PAN 3 0,30 - -
Jumlah 1000 100 201,50 -

𝐽𝑢𝑚𝑙𝑎ℎ 𝑃𝑒𝑟𝑠𝑒𝑛 𝐾𝑢𝑚𝑢𝑙𝑎𝑡𝑖𝑓


FM =
100

201,50
= = 2,02 → Termasuk kedalam zona 3