Anda di halaman 1dari 4

A B C D E F G H I J K

1 1

2 2

3
P&ID FEEDWATER SYSTEM 3

SHEET DESCRIPTION REV DATE


0 P&ID FEEDWATER SYSTEM 03 17-07-28
1 P&ID FEEDWATER SYSTEM 03 17-07-28
2 P&ID FEEDWATER SYSTEM 03 17-07-28
3 P&ID FEEDWATER SYSTEM 03 17-07-28

4 4

REFERENCE DRAWINGS CODE DRAWING Nº NOTES :


0.- P&ID SYMBOLOGY AND GENERAL NOTES IBRI-00-ZAA-MDD-EAI-00300
1.- NOT USED.
1.- P&ID STEAM & BYPASS SYSTEM LB IBRI-18-LB_-MDD-EAI-10200
2.- NOT USED.
2.- P&ID CONDENSATE SYSTEM LC IBRI-18-LC_-MDD-EAI-10400
3.- P&ID AUXILIARY STEAM SYSTEM QLB IBRI-18-QLB-MDD-EAI-13300 3.- PUMPS SUCTION LINES WILL HAVE A MINIMUM SLOPE OF 15 DOWNWARDS
FROM FEEDWATER TANK.
4.- P&ID CHEMICAL INJECTION SYSTEM QC IBRI-18-QC_-MDD-EAI-14400
4.- FLOW ORIFICE PLATES WILL BE INSTALLED IN STRAIGHT RUN OF PIPE IN DESIGN
5.- P&ID SAMPLING SYSTEM QU IBRI-18-QU_-MDD-EAI-14300 ACCORDANCE WITH THE MINIMUM REQUIREMENTS SET UP IN ISO 5167:2003
BRANCH
TAKING INTO ACCOUNT THE BETA RATIO 0.75. P T
6.- P&ID "HRSG-HP EVA/ECO SYSTEM" HA 0567 B X HA* S 007 barg ºC
5.- SEE SUPPLIER DRAWING: IBRI-18-LAC-MDD-POW-00001
7.- P&ID "HRSG-IP SH/EVA/ECO SYSTEM" HA 0567 B X HAA S 002 a 6/-1 148
6.- FOR DEAERATOR FEEDWATER TANK IN DETAIL SEE SUPPLIER DRAWING:
8.- P&ID "HRSG-FEEDWATER HTR SYSTEM" HA 0567 B X HA* S 009 IBRI-18LAA-JDA-WUH-02203. b 108 150
5 5
7.- THERMAL RELIEF VALVES DISCHARGES WILL BE SENT TO THE CLOSEST DRAIN
9.- P&ID GAS STORAGE DISTRIBUTION QJ IBRI-18-QJ_-MDD-EAI-13600 PIT OR TO SAFETY PLACE. c 272 154
SYSTEM
10.- P&ID FUEL GAS SYSTEM EK IBRI-18-EK_-MDD-EAI-13100
8.- DRAINS SHALL BE ROUTED TO THE NEAREST PIT. IF THIS IS NOT POSSIBLE d 18 149
A THREADED CONNECTION SHALL BE INSTALLED DOWNSTREAM THE DRAIN VALVE.
11.- P&ID OTC COOLING SYSTEM MBL IBRI-18-MBL-MDD-EAI-10500 e 3.5/-1 148
9.- A STRAIGHT LENGTH OF PIPE OF AT LEAST SIX DIAMETERS SHOULD BE
CONNECTED TO THE SUCTION NOZZLE BEFORE PLACING ELBOWS, BENDS, f 14.6 390
STRAINER OR VALVE.
10.- PLACE AS NEAR AND STRAIGHT AS POSSIBLE TO THE CONDENSATE TANK. g 3.5/-1 390

11.- NOT USED. h 18/-1 178

i 3.5/-1 106,5
12.- NOT USED.
j 3.5 148
13.- THE VENT AND SAFETY VALVE DISCHARGE SHOULD BE ROUTED TO A SAFE LOCATION,
FAR AWAY FROM PERSONAL ACCESS.
14.- PLACE AS NEAR AS POSSIBLE TO THE DEAERATOR.

6 15.- CHEMICAL CLEANING CONNECTION. OWNER´S / OWNER´S ENGINEER STAMP EPC CONTRACTOR´S STAMP 6

16.- PLACE AS NEAR AS POSSIBLE TO THE ACC DUCT.

17.- SEE SUPPLIER DRAWING: IBRI-18-LAC-MDA-SIC-16001.


SIGNATURE SIGNATURE
18.- VENT LINE SHALL SLOPE DOWN CONTINUOUSLY TO THE ACC DUCT.

OWNER:

OWNER´S ENGINEER:

EPC CONTRACTOR:

7 7

DESIGNER:

EMPRESARIOS AGRUPADOS

PROJECT:

IBRI IPP

PROPRIETARY INFORMATION 3 17-07-28 FOR CONSTRUCTION HAM David Palacios


2017.07.28 11:34:50 +02'00'
Sergio Makow
2017.07.28 12:24:39
+02'00'

This document contains proprietary information of SIZE SCALE 2 16-12-23 FOR CONSTRUCTION HAM RGO SML
Empresarios Agrupados Internacional,S.A. and is to be used 1 16-05-25 FOR DESIGN HAM ECF SML
8 A0 NONE 8
REV. DATE DESCRIPTION DESIGNED CHECKED APPROVED
solely for the Project and the purpose for which it is furnished.
DRAWING NUMBER: SHEET: DRAWING NAME:
It may not be disclosed to others for a different use without the
written permission of Empresarios Agrupados Internacional,S.A.
000 P&ID
IBRI-18-LA_-MDD-EAI-10300 OF:
CONTAINS INFORMATION FOR THE DESIGN OF STRUCTURES 003
FEEDWATER SYSTEM
SYSTEM OR COMPONENTS ................................ YES x NO
DOCUMENT EAI : Rev. EA :
VERIFICATION: N/A SUP. VERIFIER L1 L2 x 465-18-DT-M-10300 4
A B C D E F G H I J K FORMATO DIN A-0 (1189x841)
A B C D E F G H I J K

1 1
QLB LA FA 18QLB40
f BR003-BA1s-AH f g 18QLB40
18QLB40
REF. 3 BR002-BA1s-AH DN300xDN* BR006-AA1r-AH
DN700
QLB 5342 Sheet 1, K-4
DN300 DN25 18QLB40 DN700xDN* 18QLB40 DN700 18LAB10
FROM AUXILIARY 18QLB40
AA002 AA201 AA003 BR004-AA1r-AH
STEAM SYSTEM
NOTE 14 Sheet 2, C-3 5355
DN150
IP/HP PUMP 1
BR401-BA1s-AH
18LAB20 RECIRCULATION
BR004-AA1r-AH
REF. 11 Sheet 2, C-5 5996
DN200 DN150
MBL 6635 Sheet 2, G-1 IP/HP PUMP 2
FROM OTC RECIRCULATION
18LAB30
DEAERATOR FW BR004-AA1r-AH
TANK OVERFLOW
Sheet 2, C-7 5997
DN150
REF. 10 IP/HP PUMP 3
DN80 RECIRCULATION
EK 5993 Sheet 3, H-2
FROM GT1 GAS
2 PERFORMANCE 2
HEATER

REF. 10
DN80
EK 5992 Sheet 3, H-2
FROM GT2 GAS NOTE 13 NOTE 13
PERFORMANCE 18LAA01
HEATER BS001 18LAA01
BS002 BR408-AA1r-AP
DN25
DN25
LC LA

BR405-AA1r-AP
NOTE 16

BR804-AA1r-AP
e

BR802-AA1r-AP
PS PS
REF. 2
LC Sheet 1, D-1 6180

DN450
NOTE 18

18LAA01

DN450
TO ACC DUCT TP-ACC-12 18LAA01

18LAA01
18LAA01

BR002-AA1r-AH
BP001 AA101 NOTE 13

BR407-AA1r-AP
BR404-AA1r-AP
DN100
3 3

BR001-AA1r-AH

18LAA01
DN100
18LAA01
LC LA
NOTE 13

BR801-AA1r-AP
i 18LCA30 18LAA01

BR803-AA1r-AP
REF. 2 BR014-AA1s-AP DN300xDN250 AA102
DN25 DN25
LC 5867 Sheet 3, A-6

BR004-AA1r-AP

BR403-AA1r-AP
DN300

18LAA01

DN250
FROM

DN250

BR406-AA1r-AP
18LAA01
CONDENSATE

BR016-AA1s-AP
BR015-AA1s-AP

18LCA30
18LCA30

DN25

BR003-AA1r-AH
18LAA01
DN250 3,50 barg

DN250
18LAA01 PS PS 3,50 barg
AA004
j
18LAA01 j

18LAA01
PS
AA003

DN150
18LAA01 18LAA01

e
BP002 AA001

PS

PS
PS DN25 REF. 9
PS DN25 DN25
Sheet 2, C-4 6058
i

a
e

e
NITROGEN
4 N1 B N1 A N2F N26 A N26 B N11 N5 N8 B BLANKETING 4
DN50 N2E N23 N4 N9 A N9 B N9 C N8 A N28

BR502-BA1v-AH
DN50 N22 E PG
FEEDWATER TANK DEAERATOR
PS

12LAB60 CP501
PS

N22 C
18LAA01 18LAA01 DN50
AA 310 18LAA01BB001 12LAB60
AA305 N22 A 12LAB60
PS

AA503
PS

PS

18LAA01 AA302
AA302 PS DN15 12LAB60 LA HA
PS PS

12LAB60
12LAB60 h
PS

VOLUME: 297 M3 AA502


BR002-BA1v-AH REF. 8
PS

18LAA01 N21 A PG PTC PTC AA 301


AA309 DN40 DN20
18LAA01 Sheet 1, C-4 6671 HA
PS

18LAA01 18LAA01 CP501 18LAA01 CP001 18LAA01 CP002


AA306 DN200

BR403-BA1v-AH
TP-HA-27

BR402-BA1v-AH
AA301 FROM FW
PS

BR502-BA1v-AH
PS

PS
PG 12LAB60

PS
LTCN 18LAA01 18LAA01 AA 402 PREHEATER HRSG2

DN100
TTI TG 11LAB60 CP501 DN20
LTCN LTCN LG AA320 AA 322

PS PS
18LAA01 CL003 18LAA01 CT001 18LAA01 CT501

PS PS
NOTE 6 12LAB60 11LAB60 NOTE 15
18LAA01 CL002 18LAA01 CL001 18LAA01 CL501
DN15 11LAB60 AA 403 AA503
AA 302
PS

DN15 DN25
PS

HA
PS

18LAA01 18LAA01 LA
11LAB60 11LAB60 h
PS

AA319 AA321
PS

18LAA01 18LAA01 18LAA01 DN15

PS

PS
PS
11LAB60 BR002-BA1v-AH AA502
AA311 AA307 AA303 REF. 8
PS PS

AA301
PS

DN40 DN15
PS

N21 B NOTE 14
5 Sheet 1, C-4 6672 HA 5
N19 N18 N17 N7 A N7 B DN200

BR403-BA1v-AH
FROM FW
PS

11LAB60 TP-HA-27
PS

BR402-BA1v-AH
PS
18LAA01 18LAA01 11LAB60 AA402 PREHEATER HRSG1

DN100
18LAA01 AA304 12LAB60
AA308 AA101
PS

AA 312 N22 B AA101


N24
PS

DN50 11LAB60
PS

N22 D AA403
DN50 DN600 NOTE 15
N22 F h DN25
BR004-BA1v-AH
N15 N25 C N25 B N25 A N16 N6 C N6 B N6 A N10 N27
DN50 18LAB60
LA QC
a

a
e

e
18LAA01
DN100 BR601-AC1r-AP REF. 4
Sheet 1, J-4 5831 QC
VALID FOR UNIT 2

BR402-AA1r-AH
18LAA01 18LAA01 DN15 18LAA01 OXYGEN
AA403 AA602 AA601
PS PS PS SCAVENGER
PS KKS IDENTIFICATION FOR UNIT 2:
LA QC REPLACE 11, 12 & 18 BY 21, 22 & 28
18LAA01
18LAA01 e
BR603-AC1r-AP REF. 4
AA404
Sheet 1, G-7 5891 QC
18LAA01 DN15
6 18LAA01 AMMONIA OWNER´S / OWNER´S ENGINEER STAMP EPC CONTRACTOR´S STAMP 6
PS AA604 PS PS AA603 PS HYDROXIDE DOSING
LC LA
a 18LAA03 SIGNATURE SIGNATURE
REF. 2 BR003-AA1w-AH 18LAB30
BR001-AA1r-AH
LC Sheet 1, D-6 5320
TP-ACC-37B DN400 5999 Sheet 2, A-6 OWNER:
FW TANK DN300 NOTE 3
OVERFLOW TO TO IP/HP FW
CONDENSATE 18LAA03 PUMP 3
LO BR001-AA1w-AH
TANK 18LAB20
BR001-AA1r-AH
OWNER´S ENGINEER:
18LAA03 DN25 18LAA03 DN400 5998 Sheet 2, A-4
AA101 AA001 DN300 NOTE 3
TO IP/HP FW
NOTE 10 18LAA03
AA 401 PUMP 2
LC LA
a 18LAA03 18LAB10
REF. 2 BR002-AA1w-AH 18LAA03 BR001-AA1r-AH EPC CONTRACTOR:
AA402
LC Sheet 1, D-6 6921 5345 Sheet 2, A-2
7 TP-ACC-37A DN400 18LAB63 DN300 NOTE 3
FW TANK BR401-AA1w-AH TO IP/HP FW 7
OVERFLOW TO BR001-AA1r-AH
PUMP 1
CONDENSATE 6002 Sheet 3, A-6
DN300 NOTE 3 DESIGNER:
TANK TO PREHEATER
RECIRC. PUMP 3
18LAB62 EMPRESARIOS AGRUPADOS
BR001-AA1r-AH
PROJECT:
6001 Sheet 3, A-4
DN300 NOTE 3
TO PREHEATER
RECIRC. PUMP 2
IBRI IPP
18LAB61
BR001-AA1r-AH
6000 Sheet 3, A-2
DN300 NOTE 3 PROPRIETARY INFORMATION 3 17-07-28 FOR CONSTRUCTION HAM DPU SML
TO PREHEATER SIZE SCALE 2 16-12-23 FOR CONSTRUCTION HAM RGO SML
This document contains proprietary information of
RECIRC. PUMP 1 1 16-05-25 FOR DESIGN HAM ECF SML
8
Empresarios Agrupados Internacional,S.A. and is to be used A0 NONE 8
REV. DATE DESCRIPTION DESIGNED CHECKED APPROVED
solely for the Project and the purpose for which it is furnished.
DRAWING NUMBER: SHEET: DRAWING NAME:
It may not be disclosed to others for a different use without the
written permission of Empresarios Agrupados Internacional,S.A.
001 P&ID
IBRI-18-LA_-MDD-EAI-10300 OF:
CONTAINS INFORMATION FOR THE DESIGN OF STRUCTURES 003
FEEDWATER SYSTEM
SYSTEM OR COMPONENTS ................................ YES x NO
DOCUMENT EAI : Rev. EA :
VERIFICATION: N/A SUP. VERIFIER L1 L2 x 465-18-DT-M-10300 4
A B C D E F G H I J K FORMATO DIN A-0 (1189x841)
A B C D E F G H I J K

PTA
18LAB11 CP001

18LAB11
AA302

18LAB11
AA301 18LAB11
1 1
DN20 BR001-EA1t-AH
DN100
PDTN
18LAB11 18LAB11
18LAB10 CP002 6,00 barg FEEDWATER PUMP 1 AA 001 AA101 REF.11
18LAB10
18LAC10AP001 DN25 DN25
BR802-AA1r-AP 18LAB11 6700 Sheet 1, K-4 MBL
PDTN 18LAB11 BR002-EA1t-AH
DN50 AA401 TO OTC PEGGING
18LAB10 CP001
DESUPERHEATING
BR501-AA1r-AH DN25 18LAB11
18LAB10 NOTE 7 18LAB11
18LAB10 18LAB10 PS PS AA002
AA801 AA402 LA QLB
AA302 AA308

b
18LAB10 DN25 18LAB10 PS PS PS PS 18LAB51 18LAF40 LO b

BR801-AA1r-AH
PTA c PS PS BR401-EA1t-AH
AA304 AA306 BR003-EA1t-AH
PG PG BR003-GA2r-AH REF. 3
18LAB10 18LAB10 18LAB10 18LAB10 CP003

BR001-EA1t-AH
18LAB03
AA301 AA 502 AA307 6285 Sheet 1, A-3 QLB
DN20 DN25

DN25
18LAB10 18LAB10 18LAB10 18LAF40 18LAF40 TO AUXILIARY

18LAB10
AA303 AA310 18LAB51 18LAB51 18LAB51

DN150
AA 305 AA 004 BP001 AA003 18LAB51 AA004 AA001
STEAM
18LAB10 18LAB10 BR001-GA2r-AH
DN15 DN15 AA501 DN15 DN15 ATEMPERATOR

PS
BR001-AA1r-AH 18LAB10 a
AA309 c 18LAB51
LO NOTE 9 AA001

PS

PS
DN200

PS
PS
DN300 DN15
5345 Sheet 1, I-7
18LAB10 j LA LB
FROM FW TANK 18LAB51
AA 001 PS PS DN25 18LAB51 AA101 11LAE30 b
DEAERATOR NOTE 5 AA301 BR001-EA1t-AH LO
REF. 1

PS
2 18LAB10 18LAB10 TTA 18LAB51 18LAB51 2

c
c
BR002-AA1r-AH AT001 BR002-GA2r-AH 5677 Sheet 1, C-5 LB

a
18LAB10 18LAB10 CT001 AA401 PTI

PS
PS PS

PS PS
AA403 18LAB51 18LAB03 CP001 NOTE 4 11LAE30 11LAE30 TO HP BYPASS

BR003-GA2r-AH
18LAB10
18LAC10 18LAC10 AA302 AA001 AA002
DN25 18LAB10 18LAC10 AA403 18LAB51 18LAB51 DN25 FE DN65 11MAN30AA200
AA401
AA 002 AA405 AA002

DN150
AA402

PS
18LAB10 DN20 18LAB03 18LAB03 CF001 ATTEMPERATION
AA404 DN20 AA 302 TG
BR405-AA1r DN25 BR401-GA2r-AH

PS
DN25 18LAC10 PTA 18LAB03 CT501
18LAC10 TTC
BR403-AA1r-AH DN25 AA404
AA402

BR503-GA2r-AH
18LAB51 CP001

PS
18LAB03 18LAB03 CT001
DN20 18LAB03 11LAB03 HA
AA301
DN25 BR002-EA1t-AH BR001-EA1t-AH b
BR403-AA1r-AH DN40
DN20 REF. 7
18LAB10
18LAB10
DN40 DN150 DN100
BR401-GA2r-AH AA504 6249 Sheet 3, 3-16 HA
NOTE 14 AA405 DN20
DN20 DN150xDN100 TO IP/LP
18LAB10 18LAB10 TP-HA-19
ac
PS PS
AA503 18LAB10 DN20 18LAB03 18LAB03 DN20
BR004-AA1r-AH LO ECONOMIZER

DN100
AA406 AA303 AA305
DN20 HRSG1

BR001-GA2r-AH
18LAB02
Sheet 1, H-1 5355 BR405-GA2r-AH
DN150 18LAB03 18LAB03 BR401-EA1t-AH
TO FW TANK 18LAB10 18LAB03 18LAB03 AA309
AA307

DN300
18LAB10 PS AA 004 AA304 AA306
PS
DEAERATOR AA003
PTA FTCN NOTE 15
18LAB03 18LAB03
3 18LAB12 CP001 AA308 18LAB03 CF001 A AA310 3
LA LB
18LAB12 FTCN 12LAE30 b
AA302 BR001-EA1t-AH LO
18LAB03 CF001 B REF. 1
18LAB12 5671 Sheet 1, C-1 LB
PDTN AA301 18LAB12 DN65
BR001-EA1t-AH 12LAE30 12LAE30 TO HP BYPASS
18LAB20 CP002 6,00 barg 18LAB20 DN20 DN100 AA001 AA002
12MAN30AA200
BR802-AA1r-AP ATTEMPERATION
18LAB12 18LAB12 DN20
PDTN 18LAB12
DN50 FEEDWATER PUMP 2 AA 001 AA101
18LAB20 CP001 AA401 12LAB03
18LAC20AP001 18LAB12 AA 502
DN25
BR501-AA1r-AH NOTE 7 BR002-EA1t-AH
18LAB20 18LAB20 18LAB20 PS
18LAB12 BR501-EA1t-AH LA HA
AA801 PS AA402 12LAB03
AA302 AA308 AA501 b

b
c PS PS PS PS PS PS 18LAB52 18LAB12 DN25
18LAB20 DN25 18LAB20 REF. 7
BR801-AA1r-AH

PTA BR401-EA1t-AH
AA304 AA306 BR003-GA2r-AH AA002 DN100
18LAB20 18LAB20 CP003 PG PG 6251 Sheet 3, E-16 HA
18LAB20 18LAB20
AA 502
DN25

AA301 AA307 DN20 BR001-EA1t-AH TP-HA-19 TO IP/LP

DN100
18LAB20 18LAB20 18LAB20 18LAB52 18LAB52 18LAB52
12LAB03 ECONOMIZER
18LAB20

AA303 AA305 AA310 AA004 BP001 AA003


DN15 18LAB52 HRSG2

BR401-EA1t-AH
18LAB20 18LAB20 BR001-GA2r-AH DN20
DN15 AA501 DN15 DN15 18LAB20 PTI
PS

BR001-AA1r-AH AA309 c
a 18LAB52
PS
PS

NOTE 9 18LAB02 CP002


PS

PS

DN300 LO DN15 AA001 18LAB02 18LAB02


4 5998 Sheet 1, I-7 AA 301 AA 302 4
NOTE 15
FROM FW TANK 18LAB20 j 18LAB52
AA 001 PS PS DN25 18LAB52
AA301 AA101 DN40
DEAERATOR NOTE 5 TG
PS

18LAB20 18LAB20 TTA 18LAB52 18LAB52


AT001 18LAB02 CT501

c
AA 401

c
a

BR002-AA1r-AH 18LAB20 CT001 PS BR002-GA2r-AH


PS
18LAB20 PS 18LAB52 DN25

PS PS PS PS
AA 403 18LAC20 18LAC20 AA302 LC LA
18LAC20
18LAB20 DN25

BR003-GA2r-AH
18LAB52 LA QU

18LAB20
AA 401 18LAB52 DN25 b

BR002-GA2r-AH
AA405 AA403 18LAB03

18LAB02
DN20 AA402 18LAB03 b
PS

AA 002 AA002

DN150
18LAB20 REF. 2 BR003-EA1t-AH
AA404 BR405-AA1r DN25 DN50 BR601-EA1t-AH REF. 5
PTA BR401-GA2r-AH

DN300
18LAC20 LC 6428 Sheet 3, C-7
DN25 18LAC20 AA402 18LAB52 CP001 6103 Sheet 3, D-1 QU
BR403-AA1r-AH AA404 BOILER FILLING 18LAB03 18LAB03 18LAB03
DN15 18LAB03 18LAB03 TO SAMPLING
DN20
AA001 AA002 AA003 AA601
AA600
DN20

BR503-GA2r-AH
DN20 BR405-GA2r-AH
BR403-AA1r-AH
BR401-GA2r-AH DN25
18LAB20 18LAB20
AA504 AA405

18LAB20 ac 18LAB20 18LAB20


BR004-AA1r-AH LO NOTE 14 AA503 AA406
5 Sheet 1, H-1 5996 LA LC 5
DN150 18LAB20
TO FW TANK 18LAB02 c
PS 18LAB20 PS PS AA004 PS BR003-GA2r-AH REF. 2
DEAERATOR AA 003
DN80
PTA Sheet 3, C-7 5868 LC
18LAB13 CP001 18LAB02 18LAB02 18LAB02 BOILER FILLING
AA003 AA002 AA 001

18LAB13
AA302

PDTN
18LAB13
AA301 18LAB13 VALID FOR UNIT 2
6,00 barg BR001-EA1t-AH
18LAB30 CP002 18LAB30 DN20 DN100
KKS IDENTIFICATION FOR UNIT 2:
BR802-AA1r-AP
18LAB13
PDTN
DN50 FEEDWATER PUMP 3
18LAB13
AA001
18LAB13 AA101 REPLACE 11, 12 & 18 BY 21, 22 & 28
18LAB30 CP001 AA401
18LAC30AP001 18LAB13
DN25
BR501-AA1r-AH 18LAB30
NOTE 7 18LAB13 BR002-EA1t-AH
18LAB30 18LAB30 SEP PS
AA801 AA 402
AA302 AA308
b

18LAB30 c
PS PS PS PS PS PS 18LAB53 18LAB13 DN25
DN25 18LAB30
BR801-AA1r-AH

6 PTA BR401-EA1t-AH 6
AA304 AA 306 BR003-GA2r-AH AA002 OWNER´S / OWNER´S ENGINEER STAMP EPC CONTRACTOR´S STAMP
18LAB30 CP003 PG PG
18LAB30 18LAB30 18LAB30
AA301 AA 502 AA307 TTC
DN20 FE
DN25

18LAB30 18LAB30 18LAB30 18LAB53 18LAB53 18LAB53 18LAB02 CT001 LA HA


18LAB30

AA303 AA305 AA310 AA004 BP 001 AA003 18LAB53 18LAB02 CF001


11LAB02 c SIGNATURE SIGNATURE
18LAB30 18LAB30 BR001-GA2r-AH
DN15 DN15 DN40 BR001-GA2r-AH REF. 6
AA501 DN15 DN15 18LAB30
PS

BR001-AA1r-AH AA309 c
a 18LAB53 6256 Sheet 2, K-5 HA
PS

PS

PS

PS

LO DN15 NOTE 9 AA001 DN20 DN200 OWNER:


DN300 DN200 DN20 TP-HA-11 TO HP

DN100
5999 Sheet 1, I-6 DN20 18LAB02
NOTE 4 DN300xDN200
18LAB02 DN20 ECONOMIZER
FROM FW TANK 18LAB30 DN25 j 18LAB53 AA303 AA305 BR401-GA2r-AH
AA 001 PS PS 18LAB53 DN25 AA 101 HRSG1
PS

DEAERATOR TTA
NOTE 5 AA301
18LAB30 18LAB30 18LAB53 18LAB53 18LAB02
AT001 18LAB02 18LAB02 18LAB02 NOTE 15
c

AA401 AA307
c
a

BR002-AA1r-AH 18LAB30 CT001 BR002-GA2r-AH AA306


PS

18LAB53 AA304 AA309


18LAB30 PS DN20 OWNER´S ENGINEER:
PS PS PS PS

SEP 18LAC30 AA302


AA403 18LAC30 18LAC30
AA405 AA401 FTCN
AA403 18LAB53 DN25
18LAB53 18LAB02
18LAB30 DN25 DN20 18LAB02 12LAB02
BR003-GA2r-AH

AA308
PS

18LAB30

AA 002 BR405-AA1r DN25 AA402 AA002 18LAB02 CF001 A AA310 AA502 BR501-GA2r-AH
DN150

18LAB30
AA404 18LAC30 PTA LA HA
18LAC30
AA402
BR401-GA2r-AH FTCN
12LAB02
AA404 18LAB53 CP001 c
DN25 BR403-AA1r-AH 18LAB02 CF001 B AA501 EPC CONTRACTOR:
DN20 DN20 REF. 6
BR403-AA1r-AH BR405-GA2r-AH 6257 Sheet 2, K-5 HA
7 DN200 7
BR503-GA2r-AH

BR401-GA2r-AH DN25 TP-HA-11 TO HP

DN100
DN20 BR001-GA2r-AH
18LAB30 ECONOMIZER
AA405 12LAB02 HRSG2 DESIGNER:
18LAB30 BR401-GA2r-AH
AA504 18LAB30
NOTE 14 AA406

DN15
18LAB30 18LAB30 NOTE 15 EMPRESARIOS AGRUPADOS
ac AA503
BR004-AA1r-AH LO LA QU
18LAB02 PROJECT:
Sheet 1, H-2 5997 c
BR601-GA2r-AH REF. 5
DN150
TO FW TANK
DEAERATOR
18LAB30
PS AA003 PS
18LAB30
PS AA004 PS 5982 Sheet 3, C-1 QU IBRI IPP
18LAB02 18LAB02 TO SAMPLING
AA600 AA601

PROPRIETARY INFORMATION 3 17-07-28 FOR CONSTRUCTION HAM DPU SML


This document contains proprietary information of SIZE SCALE 2 16-12-23 FOR CONSTRUCTION HAM RGO SML
Empresarios Agrupados Internacional,S.A. and is to be used 1 16-05-25 FOR DESIGN HAM ECF SML
A0 NONE
8
FEEDWATER PUMPS solely for the Project and the purpose for which it is furnished.
It may not be disclosed to others for a different use without the
DRAWING NUMBER:
REV. DATE
SHEET: DRAWING NAME:
DESCRIPTION DESIGNED CHECKED APPROVED 8

002 P&ID
(3x50%)
written permission of Empresarios Agrupados Internacional,S.A. IBRI-18-LA_-MDD-EAI-10300 OF:
CONTAINS INFORMATION FOR THE DESIGN OF STRUCTURES 003
FEEDWATER SYSTEM
SYSTEM OR COMPONENTS ................................ YES x NO
DOCUMENT EAI : Rev. EA :
VERIFICATION: N/A SUP. VERIFIER L1 L2 x 465-18-DT-M-10300 4
A B C D E F G H I J K FORMATO DIN A-0 (1189x841)
A B C D E F G H I J K

1 1

PDTN
18LAB61 CP002

DN15 DN15
DN15 PDTN DN15
18LAB61 CP001
6,00 barg
BR501-AA1r-AH
18LAB61 18LAB61 PS PS
AA306 18LAB61
AA 308
DN25 18LAB61 BR802-AA1r-AP REF. 9

BR801-AA1r-AH
PTA DN40
18LAB61 AA304 6440 Sheet 1, A-4 MBL
18LAB61 CP003 PG PG
AA302 18LAB61 DN50
18LAB61 18LAB61 TO OTC
AA502 18LAB61
AA305 18LAB61 AA307 18LAB61 FEEDWATER TANK
AA801

18LAB61
AA303 NOTE 7 AA310 TTA DEAERATOR
18LAB61

DN25
AA 301 18LAB61 18LAB61 CT001
AA501 18LAB61

PS
18LAB61 AA309 18LAB61
LO a d LO

PS

PS
2 BR001-AA1r-AH BR002-AA1u-AH

PS
DN25 2

PS
DN15
DN200
6000 Sheet 1, F-8
DN300 18LAB61 18LAB61 18LAB61
FROM FW TANK 18LAB61
AA001 PS PS NOTE 17 AA002 AA405 AA003
DEAERATOR

PS
DN25
18LAB61
AT001
PS FEEDWATER PREHEATER PUMP 1 PS LA HA
18LAB61
AA403 18LAC61AP001 18LAB60 11LAB60 d
BR405-AA1u-AH
BR002-AA1u-AH BR001-AA1u-AH REF. 8
18LAB61 6111 Sheet 1, H-10 HA
AA404 DN250 DN200 TP-HA-28

BR401-AA1u-AH
TO FW PREHEATER
DN25
BR403-AA1r-AH

BR001-AA1u-AH
HRSG1

18LAB60

BR501-AA1u-AH
DN100

DN250
NOTE 15

12LAB60 LA HA
AA 501
12LAB60 d
DN15
PTCN BR001-AA1u-AH DN20 REF. 8
18LAB60 CP001 6112 Sheet 1, H-10 HA
3 18LAB60 DN200 3
AA301

BR401-AA1u-AH
TP-HA-28 TO FW PREHEATER
DN15 HRSG2
PTCN
18LAB60 CP002 DN100
PDTN 18LAB60
AA302 NOTE 15
18LAB62 CP002

DN15 DN15 DN25 TG


DN15 PDTN DN15
18LAB60 CT501
18LAB62 CP001
18LAB62 18LAB62 6,00 barg
AA 306 BR501-AA1r-AH AA308
18LAB62 PS PS
18LAB62 BR802-AA1r-AP
18LAB62 DN25 AA304

BR801-AA1r-AH
PTA
AA 302
18LAB62 18LAB62 18LAB62 18LAB62 CP003 PG PG
AA502 DN50
AA 305 AA307
18LAB62 18LAB62 18LAB62
AA303
18LAB62 AA801 AA 310 TTA

DN25
18LAB62 NOTE 7
18LAB62 18LAB62 CT001
AA301 AA 501 18LAB62
PS

18LAB62 AA309 18LAB62


LO DN25 a d LO
PS

PS

BR001-AA1r-AH BR002-AA1u-AH
PS

PS

DN15
4 6001 Sheet 1, F-7 4
DN300 18LAB62
DN200
FROM FW TANK 18LAB62 18LAB62 18LAB62
AA001 PS PS NOTE 17 AA002 AA003
DEAERATOR AA405
PS

18LAB62 DN25
AT001 FEEDWATER PREHEATER PUMP 2
18LAB62 PS PS
AA 403 18LAC62AP001
BR405-AA1u-AH
18LAB62
AA404

DN25 BR403-AA1r-AH

d 18LAB60
5 FO BR006-AA1u-AH 5
REF. 2
6868 Sheet 3, *-*
18LAB60 18LAB60 DN50
FILLING LINE 18LAB60
AA002 AA250 AA003
PDTN
18LAB63 CP002

DN15 DN15 PDTN DN15 DN15


18LAB63 CP001
18LAB63
AA306
BR501-AA1r-AH 18LAB63
AA308
6,00 barg VALID FOR UNIT 2
18LAB63 PS PS
18LAB63
AA304
BR802-AA1r-AP KKS IDENTIFICATION FOR UNIT 2:
BR801-AA1r-AH

18LAB63 PTA
AA302 18LAB63 DN50 18LAB63 CP003 PG PG REPLACE 11, 12 & 18 BY 21, 22 & 28
18LAB63 AA 502
18LAB63 18LAB63
AA305 18LAB63 AA307 18LAB63
AA801
18LAB63

AA303 AA 310 TTA


18LAB63 NOTE 7
DN25

AA301 18LAB63 18LAB63 CT001


AA501 18LAB63
PS

18LAB63 AA309 18LAB63


6 LO DN25 a d LO OWNER´S / OWNER´S ENGINEER STAMP EPC CONTRACTOR´S STAMP 6
BR001-AA1r-AH
PS

BR002-AA1u-AH
PS

PS

PS

DN15
6002 Sheet 1, F-7
DN300 18LAB63 DN200
FROM FW TANK 18LAB63 18LAB63 18LAB63
AA001 PS PS NOTE 17 AA002 AA 003
DEAERATOR DN25 AA405 SIGNATURE SIGNATURE
PS

18LAB63
AT001
18LAB63 PS FEEDWATER PREHEATER PUMP 3 SEP
AA403
18LAC63AP001 BR405-AA1u-AH OWNER:

18LAB63
AA404

DN25 BR403-AA1r-AH
OWNER´S ENGINEER:

EPC CONTRACTOR:

7 7

DESIGNER:

EMPRESARIOS AGRUPADOS

FEEDWATER PREHEATER PUMPS PROJECT:

IBRI IPP
(3x50%)
PROPRIETARY INFORMATION 3 17-07-28 FOR CONSTRUCTION HAM DPU SML
This document contains proprietary information of SIZE SCALE 2 16-12-23 FOR CONSTRUCTION HAM RGO SML
Empresarios Agrupados Internacional,S.A. and is to be used 1 16-05-25 FOR DESIGN HAM ECF SML
8 A0 NONE 8
REV. DATE DESCRIPTION DESIGNED CHECKED APPROVED
solely for the Project and the purpose for which it is furnished.
DRAWING NUMBER: SHEET: DRAWING NAME:
It may not be disclosed to others for a different use without the
written permission of Empresarios Agrupados Internacional,S.A.
003 P&ID
IBRI-18-LA_-MDD-EAI-10300 OF:
CONTAINS INFORMATION FOR THE DESIGN OF STRUCTURES 003
FEEDWATER SYSTEM
SYSTEM OR COMPONENTS ................................ YES x NO
DOCUMENT EAI : Rev. EA :
VERIFICATION: N/A SUP. VERIFIER L1 L2 x 465-18-DT-M-10300 4
A B C D E F G H I J K FORMATO DIN A-0 (1189x841)