DETAILS FORMAT FOR TECHNICAL AUDIT

(TO BE DULY FILLED IN & RETURNED)

1. GENERAL DETAILS

SR. PARTICULARS DETAILS


NO.
1 Name & Address of Company
Web Site (If any)

2A Name of Contact Officer


Designation
Contact No.: Landline No /Mobile
No./Fax No./Email .
Name of Alternative Officer
Designation
2B Contact No.: Landline No /Mobile
No./Email
3 No. of Shifts/ Hours/Shift
4 No. of Employees (Approx.)
5 Any other details:

6 Type of Fuel Used Gas Oil Coal Others


(MMSCM) (KL) (Tons)
Annual Fuel Consumption
7 Electricity Consumption Units Imported Power Generation (In-house)
Specific Energy Consumption Fuel Electricity
8 Energy Lit./Ton SCM/ KWh , kVAh / Ton of
of Prod. Ton of Production
Prod.
9 Water Consumption (Unit/Ton of
Production)
Steam Consumption (kg / Ton of
Production)

Page 1 of 7
II. THERMAL DETAILS

1. HSD/ LDO /RFO/LSHS - FIRED UNIT DETAILS

A. BOILER
Equipment Make Model Capacity Flue Gas Steam Uses Area
TPH Temp.
(oC)
Boiler No. 1
Boiler No. 2
Boiler No. 3
Boiler No. 4

B. HVAC

Equipment Make/ Operating Capacity Rated Serving Area


Type Model Temp. (oC) “TR”. COP
In Out
CHiller-1
Chiller -2
Chiller-3
Total nos of
AHU’s

Page 2 of 7
Sl. Equipment Type of Product Design Actual Flue Consumpt
No use Furnace/ Capaci Productio Gas ion of Fuel
. (Rolling / Oven ty of n/ hr. Tem Oil
Forging / (Oil Fired / Furnac p (Lit./Ton)
Heat Electrical / e/ hr.
Treatment Induction /
etc.) Arc)
1
2
3
4

C. DIESEL GENERATING SET

S.No Make Model Rating Stand by or Actual Avg. kWh Units


KVA Continuous Average /Lit. of Oil
operation Loading
1
2
3

2. DETAILS OF STEAM

A. STEAM CONSUMPTION DETAILS

S.No Name of Equipment MT/hr Pressure Temp. oC


. kg/cm2 /
psi
1
2
3

Page 3 of 7
B. CONDENSATE RECOVERY
i) Whether condensate recovery is being done : Yes / No
ii) %age of condensate recovery :

C. STEAM TRAPS
i) Approximate No. of steam traps being used :
ii) Type of steam Traps :

3. ANY OTHER ITEM:

III. ELECTRICAL DETAILS

1. TRANSFORMERS

No. 1 No. 2 No. 3 No. 4


Voltage Ratio
KVA
% Impendence

2. ELECTRICITY CONSUMPTION

Particulars Demand
A Contract demand KVA
B Maximum demand
C Total Energy units consumed / day
D Avg. Power Factor (P.F.)
E Avg. Energy bills (Rs/month)
F Load Morning Noon Night
KVA Load
Peak KVA
Duration

Page 4 of 7
3. DETAILED LIST OF ELECTRIC MOTORS OPERATING IN THE PLANT

NAME OF THE PLANT RATING OF NO. OF MOTORS


S.NO. MOTOR (KW)
1
2

4. DETAILS OF CAPACITORS INSTALLED

S.NO. NAME OF THE PLANT KVAR


1
2

5. CONNECTED LOAD

EQUIPMENT TOTAL LOAD IN KW (TOTAL)


NUMBERS
A Motors : Greater than 10 kW
: Less than 10 kW
B Air / Gas Compressors Details Rated CFM
Compressor – 1 (kW)
Compressor – 2 (kW)
Compressor – 3 (kW)
C AC & Ventilation with TR capacity Total Nos. Capacity
a) Air Conditioner Plant Capacity in TR
b) No. of Chiller Units
c) No. of Condenser Units
d) No. of AHUs
e) Others (Package ACs/ Split ACs /
Windows ACs) in TR
D Total Process Load (in kW)
E Total Lighting Load (in kW)
Total Load (in kW)

Page 5 of 7
6. OTHER MAJOR EQUIPMENT:

A Gas Turbines / Steam Turbines Capacity & Rating


1
2
B HRSG / WHRBs Capacity & Rating
1
2
C Cooling Towers- Capacity Nos.
1
2
D Any Other Equipment- Capacity Nos.
1

Water Audit

Major water Uses Area

A Water Supply Mode Capacity Timing


MCD supply Tank/Bore well

B Pumps in WTP/Make
C Rain Water Harvesting No of Inlet Size of Sump
Provisions

D STP Size of treatment tank Operation Time


No of Pump Capacity
G Certification Obtained Name of Certifying body Year

Renewable Energy Source Available

A Type of Renewable Capacity Uses


Energy

Page 6 of 7