Anda di halaman 1dari 12

DAFTAR ISI

HALAMAN PERSETUJUAN ..................................................................................i

HALAMAN PENGESAHAN .......................................................................... .......ii

HALAMAN KEASLIAN NASKAH..................................................................... iii

HALAMAN PERSEMBAHAN............................................................................. iv

HALAMAN MOTTO ...........................................................................................viii

KATA PENGANTAR .............................................................................................x

DAFTAR ISI .........................................................................................................xii

DAFTAR TABEL ................................................................................................xvii

DAFTAR GAMBAR ...........................................................................................xix

DAFTAR LAMBANG ..........................................................................................xx

INTISARI........................................................................................................... xxiv

BAB I PENDAHULUAN....................................................................................... .1

1.1. Latar Belakang........................................................................................1

1.2. Tinjauan Pustaka.................................................................................... 2

1.3. Kegunaan Produk ............................................................................ .......4

1.4. Penentuan Kapasitas Pabrik....................................................................4

1.5. Pemilihan Lokasi................................................................................... .8

1.6. Spesifikasi Bahan Baku dan Produk.................................................... .13

1.7. Tinjauan Termodinamika..................................................................... 18

1.8. Tinjauan Kinetika................................................................................ .21

xiv
BAB II URAIAN PROSES....................................................................................24

2.1. Uraian Proses.......................................................................................24

2.2. Diagram Kualitatif...............................................................................27

2.3. Diagram Kuantitatif.............................................................................28

BAB III SPESIFIKASI BAHAN BAKU DAN PRODUK.................................. 29

3.1. Spesifikasi Bahan Baku ..................................................................... .29

3.2. Spesifikasi Bahan Pembantu ............................................................. .31

3.3. Spesifikasi Produk.............................................................................. .32

BAB IV NERACA MASSA.................................................................................. 34

4.1. Neraca Massa Tiap Alat...................................................................... 34

4.2. Neraca Massa Total ........................................................................... .37

BAB V NERACA PANAS.................................................................................... 38

5.1. Neraca Panas di Heat Exchanger (HE-01)......................................... .38

5.2. Neraca Panas di Heat Exchanger (HE-02)......................................... .38

5.3. Neraca Panas di Reaktor (R-01)......................................................... .39

5.4. Neraca Panas di Cooler (CL-01)........................................................ .39

5.5. Neraca Panas Menara Distilasi (MD-01)........................................... .40

5.6. Neraca Panas di Heat Exchanger (HE-03)......................................... .40

5.7. Neraca Panas Menara Distilasi (MD-02)........................................... .41

5.8. Neraca Panas di Cooler (CL-02)........................................................ .41

5.9. Neraca Panas Menara Distilasi (MD-03)........................................... .42

5.10. Neraca Panas di Cooler (CL-03)....................................................... ..42

xv
5.11. Neraca Panas di Cooler (CL-04)........................................................ .43

5.12. Neraca Panas Total Prarancangan Pabrik Metil Laktat...................... .44

BAB VI SPESIFIKASI ALAT.............................................................................. 46

6.1. Tangki Metanol (T-01)....................................................................... .46

6.2. Tangki Asam Laktat (T-02).................................................................46

6.3. Tangki Metil Laktat (T-03)................................................................ .47

6.4. Heat Exchanger 01 (HE-01).............................................................. .48

6.5. Heat Exchanger 02 (HE-02) .............................................................. 48

6.6. Heat Exchanger 03 (HE-03)............................................................... 49

6.7. Reaktor 01 (R-01)................................................................................50

6.8. Cooler 01 (CL-01)...............................................................................51

6.9. Cooler 02 (Cl-02)............................................................................... .52

6.10. Cooler 03 (CL-03)...............................................................................52

6.11. Cooler 04 (CL-04)...............................................................................53

6.12. Menara Destilasi-01 (MD-01)........................................................... .54

6.13. Menara Destilasi-02 (MD-02)........................................................... .55

6.14. Menara Destilasi-03 (MD-03)........................................................... .56

6.15. Reboiler-01 (RB-01).......................................................................... 57

6.16. Reboiler-02 (RB-02).......................................................................... 57

6.17. Reboiler-03 (RB-03).......................................................................... 58

6.18. Condenser 01 (CD-01)...................................................................... .59

6.19. Condenser 02 (CD-02)...................................................................... .59

6.20. Condenser 03 (CD-03)...................................................................... .60

xvi
6.21. Accumulator 01 (ACC-01)................................................................ .61

6.22. Accumulator 02 (ACC-02)................................................................ .61

6.23. Accumulator 03 (ACC-03)................................................................ .62

6.24. Pompa 01 (P-01).................................................................................62

6.25. Pompa 02 (P-02).................................................................................63

6.26. Pompa 03 (P-03).................................................................................64

6.27. Pompa 04 (P-04).................................................................................64

6.28. Pompa 05 (P-05).................................................................................65

6.29. Pompa 06 (P-06).................................................................................65

6.30. Pompa 07 (P-07).................................................................................66

6.31. Pompa 08 (P-08).................................................................................67

6.32. Pompa 09 (P-09).................................................................................67

6.33. Pompa 10 (P-10).................................................................................68

6.34. Pompa 11 (P-11).................................................................................68

BAB VII UTILITAS............................................................................................. .70

7.1. Unit Penyediaan dan Pengolahan Air.................................................70

7.2. Unit Pembangkit Steam......................................................................77

7.3. Unit Pembangkit Listrik................................................................... 108

7.4. Unit Penyedia Bahan Bakar............................................................. 108

7.5. Pengolahan Limbah......................................................................... 108

BAB VIII LAY OUT PABRIK DAN PERALATAN PROSES........................ .119

8.1. Lokasi Pabrik................................................................................... 119

xvii
8.2. Tata Letak Pabrik............................................................................. 122

8.3. Tata Letak Proses............................................................................. 128

BAB IX STRUKTUR ORGANISASI PERUSAHAAN....................................130

9.1. Organisasi Perusahaan..................................................................... 130

9.2. Struktur Organisasi..........................................................................131

9.3. Tugas dan Wewenang..................................................................... .131

9.4. Pembagian Jam Kerja...................................................................... 141

9.5. Perincian Tugas dan Keahlian......................................................... 142

9.6. Sistem Kepegawaian dan Sistem Gaji............................................. 144

9.7. Kesejahteraan Sosial Karyawan...................................................... .147

9.8. Manajemen Perusahaan.................................................................. .148

BAB X EVALUASI EKONOMI........................................................................ 150

10.1. Penafsiran Harga Alat.................................................................... .150

10.2. Dasar Perhitungan........................................................................... 154

10.3. Perhitungan Biaya........................................................................... 155

10.4. Analisa Kelayakan.......................................................................... 156

BAB XI KESIMPULAN.................................................................................... 166

DAFTAR PUSTAKA......................................................................................... 168

LAMPIRAN........................................................................................................ 171

xviii
DAFTAR TABEL

Tabel 1.1. Kelebihan dan Kekurangan Proses Pembuatan Metil Laktat................. .3

Tabel 1.2. Data Impor Metil Laktat di Indonesia................................................... ..5

Tabel 1.3. Perhitungan Kapasitas............................................................................ .6

Tabel 1.4. Pabrik Metil Laktat di Luar Negeri........................................................ .8

Tabel 1.5. Harga Bahan Baku dan Produk Per Kg................................................ .10

Tabel 1.6. Harga ∆Hfo masing-masing komponen (Yaws, 1999) ..........................18

Tabel 1.7. Harga ∆Gfo masing-masing komponen (Yaws, 1999)...........................19

Tabel 4.1. Neraca Massa Reaktor (R-01).............................................................. .34

Tabel 4.2. Neraca Massa Menara Distilasi (MD-01)............................................. 35

Tabel 4.3. Neraca Massa Menara Distilasi (MD-02)............................................. 35

Tabel 4.4. Neraca Massa Menara Distilasi (MD-03)............................................. 36

Tabel 4.5. Neraca Massa Total Prarancangan Pabrik Metil Laktat........................ 36

Tabel 5.1. Neraca Panas di Heat Exchanger (HE-01)........................................... 37

Tabel 5.2. Neraca Panas di Heat Exchanger (HE-02)........................................... 37

Tabel 5.3. Neraca Panas di Reaktor (R-01)............................................................38

Tabel 5.4. Neraca Panas di Cooler (CL-01).......................................................... .38

Tabel 5.5. Neraca Panas di Menara Distilasi (MD-01)......................................... .39

Tabel 5.6. Neraca Panas di Heat Exchanger (HE-03)........................................... 39

Tabel 5.7. Neraca Panas di Menara Distilasi (MD-02).......................................... 40

Tabel 5.8. Neraca Panas di Cooler (CL-02).......................................................... .40

xix
Tabel 5.9. Neraca Panas di Menara Distilasi (MD-03)......................................... .41

Tabel 5.10. Neraca Panas di Cooler (CL-03)........................................................ .41

Tabel 5.11. Neraca Panas di Cooler (CL-04)........................................................ .42

Tabel 5.12. Neraca Panas Total Prarancangan Pabrik Metil Laktat...................... 43

Tabel 8.1. Harga Bahan Baku dan Produk Per Kg.............................................. .120

Tabel 8.2. Distribusi Pabrik dan Luasnya............................................................ 125

Tabel 9.1. Jadwal Hari dan Jam Kerja Karyawan Shift....................................... 142

Tabel 9.2. Komposisi dan Sistem Gaji Karyawan............................................... 146

Tabel 10.1. Index dari Chemical Engineering Plant Cost Inside......................... 151

Tabel 10.2. Daftar Harga Alat Proses.................................................................. 153

Tabel 10.3. Fixed Capital Investment.................................................................. 159

Tabel 10.4. Harga Bahan Baku............................................................................ 159

Tabel 10.5. Manufacturing Cost...........................................................................160

Tabel 10.6. Working Capital................................................................................ 160

Tabel 10.7. General Expense............................................................................... 161

Tabel 10.8. Hasil trial nilai interest (i) menggunakan Ms. Excel........................ 164

xx
DAFTAR GAMBAR

Gambar 1.1. Grafik Kebutuhan Metil Laktat di Indonesia..................................... .7

Gambar 1.2. Peta Lokasi Pendirian Pabrik Metil Laktat......................................... 9

Gambar 2.1. Digaram alir kualitatif prarancangan pabrik Metil Laktat................ 27

Gambar 2.2. Digaram alir kuantitatif prarancangan pabrik Metil Laktat.............. 28

Gambar 7.1. Digram alir unit proses utilitas........................................................ 107

Gambar 7.2. Diagram Alir Sistem Pengolahan Limbah...................................... 113

Gambar 8.1. Tata Letak Bangunan Pabrik........................................................... 126

Gambar 8.2. Tata Letak Alat Proses.................................................................... 129

Gambar 9.1. Struktur Organisasi Perusahaan...................................................... 140

Gambar 10.1. Grafik Ekstrapolasi Indeks Harga................................................. 152

Gambar 10.2. Grafik Hubungan Kapasitas Produksi dan Biaya.......................... 165

xxi
DAFTAR LAMBANG

A = Luas perpindahan panas, ft2, in2, m2

ACC = Akumulator

AR = Luas permukaan dinding reaktor, m2

a = Jari-jari dalam reaktor, m

BEP = Break Event Point

BHP = Brake Horse Power, Hp

BM = Berat Molekul, Kg/kmol

b = Sumbu tegak head, m

C = Faktor korosi, in

CA = Konsentrasi zat A, Kmol/L

CAo = Konsentrasi zat A mula-mula, Kmol/L

CB = Konsentrasi zat B, Kmol/L

CBo = Konsentrasi zat B mula-mula, Kmol/L

CD = Condensor

CL = Cooler

Cp = Kapasitas panas, Btu/lb oF, Kkal/Kg oC

DMC = Direct Manufactoring Cost

DPC = Direct Plant Cost

E = Effisiensi pengelasan

Ea = Harga alat dengan kapasitas diketahui

Eb = Harga alat dengan kapasitas dicari

Ex = Harga alat untuk tahun x

xxii
Ey = Harga alat untuk tahun y

FV = Kecepatan volumetrik,m3/j, L/j

FCI = Fixed Capital Investment

Fa = Fixed Expence

f = Allowable strees

f = Faktor friksi

GE = General Expence

gc = Gravitasi, m2/s

gpm = Gallon per menit

HE = Heat Excehanger

hi = Koefisien perpindahan panas pada diameter dalam, Btu/j.ft.oF

hio = Koeisien perpindahan panas, Btu/j.ft.oF

ID = Diameter dalam, in, m, ft

IMC = Indirect Manufacturing Cost

J = Lebar baffle, m, in, ft

L = Tinggi, m, in, ft

LC = Level control

Le = Panjang elbow, ft

MD = Menara Destilasi

m = massa, Kg/j

NRe = Reynold Number

Nt = Jumlah tube

Nx = Nilai index tahun x

xxiii
Ny = Nilai index tahun y

OD = Diameter luar, m,in,ft

P = Tekanan, atm

P = Power motor, Hp

PEC = Purchased Equipment Cost

POT = Pay Out Time

Q = Panas, Btu/j, Kkal/j, KJ/j

r = Jari-jari, m

R = Reaktor

RB = Reboiler

ROI = Returrn Of Investment

Ra = Regulated Expence

SDP = Shut Down Point

Sa = Sales Expence

Sch = Shcedule

T = Suhu

T – n = Tangki

t = Waktu, detik, menit, jam

th = Tebal dinding head, in

ts = Tebal dinding shell, in

WC = Working Capital

X = Konversi

Zl = Tinggi cairan, in, m, ft

xxiv
μ = Viscositas, Cp

η = Effisiensi pompa

π = Jari-jari, in, m, ft

∑ = Jumlah

ρ = Densitas, Kg/m3

ΔP = Pressure drop, psi

ΔT = Beda suhu

xxv

Anda mungkin juga menyukai