ITEM DESCRIPCION UND METRADO C.U.
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 974.21
01.02 CONSTRUCCION DE ALAMACEN Y CAMPAMENTO PROVISIONAL 12M X 6M GLB 1.00 3,533.52
02 TRABAJOS PRELIMINARES
02.01 LIMPIEZA DE TERRENO MANUAL m2 328.00 0.63
02.02 TRAZO Y REPLANTEO PRELIMINAR m2 328.00 0.26
02.03 CONTROL TOPOGRAFICO EN PROCESO CONSTRUCTIVO m2 328.00 1.27
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION MATERIAL CON BOLONERIA BAJO AGUA m3 88.20 69.99
03.02 EXCAVACION MATERIAL CON BOLONERIA m3 88.00 18.98
03.03 EXCAVACION CON MAQUINARIA m3 600.60 10.36
03.04 RELLENO COMPACTADO CON MATERIAL GRANULAR m3 142.20 50.19
03.05 RELLENO COMPACTADO CON MATERIAL PROPIO m3 406.07 15.69
03.06 ACARREO DE MATERIAL EXCEDENTE D=30 MT. m3 211.44 7.59
04 OBRAS DE CONCRETO SIMPLE
04.01 FALZA ZAPATAS, MEZCLA C:H 1:10 + 30%P.G. m3 27.00 200.35
04.02 CONCRETO F'C=175 KG/CM2 + 40% P.G. m3 96.00 239.29
04.03 ENCOFRADO Y DESENCOFRADO. m2 114.40 25.49
05 OBRAS DE CONCRETO ARMADO
05.01 ZAPATA DE ESTRIBO
05.01.01 CONCRETO F'C= 210 KG/CM2 m3 67.50 398.27
05.01.02 ENCOFRADO Y DESENCOFRADO. m2 46.00 25.49
05.01.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 3,945.38 4.55
05.02 PANTALLA Y ALAS
05.02.01 CONCRETO F'C= 210 KG/CM2 m3 68.95 398.27
05.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 246.10 44.72
05.02.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 2,088.05 4.55
05.03 COLUMNAS EN TORRE DE CONCRETO ARMADO
05.03.01 CONCRETO F'C= 210 KG/CM2 m3 6.34 398.27
05.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 63.36 44.72
05.03.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 1,908.48 4.55
05.04 VIGAS EN TORRE DE CONCRETO ARMADO
05.04.01 CONCRETO F'C= 210 KG/CM2 m3 1.58 398.27
05.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 13.20 44.72
05.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 191.33 4.55
06 SUPERESSTRUCTURA DE PUENTE COLGANTE
06.01 MONTAJE MECANICO DE SUPERESTRUCTURA DE PUENTE COLGANTE. GLB 1.00 37,650.98
06.02 COLOCACION DE PENDOLAS. und 66.00 211.87
06.03 VIGA 4" X 6" und 33.00 226.10
06.04 TABLERO DE MADERA. GLB 1.00 65,296.24
06.05 BARANDA DE MADERA. GLB 1.00 69,755.74
06.06 COLOCACION DE CARRILES. und 4.00 1,753.09
06.07 ARMADO Y COLOCACION DE TEMPLADORES EN CAMARA DE ANCLAJE. GLB 1.00 36,520.32
07 OBRAS DE PROTECCION
07.01 ENCAUSAMIENTO DE CURSOS DE AGUA m3 3,000.00 8.10
07.02 PROTECCION DE ESTRIBOS m3 2,820.00 9.13
08 PINTURA
08.01 PINTURA ANTICORROSIVO EPOXI ZINCROMATO m 571.56 6.84
08.02 PINTURA ESMALTE SINTETICO EN SUPERFICIE METALICO (02 MANOS) m 571.56 6.12
08.03 PINTURA ESMALTE SINTETICO EN SUPERFICIE DE CONCRETO (02 MANOS) m2 225.82 12.82
08.04 ACABADO EN CARPINTERIA DE MADERA m2 281.84 13.62
09 CONTROL DE CALIDAD
09.01 ENSAYO DE ROTURA DE PROBETA DE CONCRETO und 26.00 30.00
09.02 SEGURIDAD PERSONAL
09.02.01 INDUCCION EN SEGURIDAD PERSONAL GLB 1.00 1,500.00
09.02.02 EQUIPO DE PROPTECCION PERSONAL GLB 1.00 5,250.00
10 PLACA RECORDEATORIA
10.01 PLACA RECORDATORIA ACRILICA und 1.00 604.27
11 FLETE Y TRANSPORTE TERRESTRE
11.01 FLETE PARA TRASLADO DE ACCESORIOS GLB 1.00 15,000.00
12 CONFORMACION DE COMITE DE GESTION
12.01 CONFORMACION DE COMITE DE GESTION GLB 1.00 1,500.00
12.02 MANUAL DE CAPACITACION und 1.00 375.00
01 PROGRAMAS DE CAPACITACION Y SENSIBILIZACION EN TEMAS DE MANTENIMIENTO
01.01 PROGRAMA DE CAPACITACION Y SENSIBILIZACION EN MANTENIMIENTO und 1.00 1,300.00
01.02 MATERIALES DE CAPACITACION GLB 1.00 236.00
14 PLAN DE MANEJO AMBIENTAL
14.01 SENSIBILIZACIÓN Y CAPACITACIÓN EN TEMAS AMBIENTALES
14.01.01 CONSTRUCCION DE MICRO RELLENO SANITARIO m3 27.00 193.64
14.01.02 RECOLECCION MANUAL DE RESIDUOS DE AREA DE TRABAJO m3 20.00 25.32
14.01.04 RECUPERACION DE AREA DE BOTADERO E INST. DE COBERTURA VEGETAL M2 9.00 0.95
14.01.05 SEÑALES INFORMATIVAS (IMPACTO AMBIENTAL) und 4.00 130.37
14.01.06 LIMPIEZA FINAL DE OBRA m2 328.00 0.76
COSTO DIRECTO
GASTOS GENERALES (12.30% C.D.)
TOTAL PRESUPUESTO
- CUSCO”
TOTALES TOTALES
4,507.73
974.21
3,533.52
708.48
206.64
85.28
416.56
29,178.67
6,173.12
1,670.24
6,222.22
7,137.02
6,371.24
1,604.83
31,297.35
5,409.45
22,971.84
2,916.06
110,106.38
46,007.25
26,883.23
1,172.54
17,951.48
47,966.94
27,460.72
11,005.59
9,500.63
14,042.07
2,525.03
2,833.46
8,683.58
2,090.12
629.27
590.30
870.55
237,680.36
37,650.98
13,983.42
7,461.30
65,296.24
69,755.74
7,012.36
36,520.32
50,046.60
24,300.00
25,746.60
14,141.09
3,909.47
3,497.95
2,895.01
3,838.66
7,530.00
780.00
6,750.00
1,500.00
5,250.00
604.27
604.27
15,000.00
15,000.00
1,875.00
1,500.00
375.00
1,536.00
1,300.00
236.00
6,513.99
6,513.99
5,228.28
506.40
8.55
521.48
249.28
510,725.92
62,819.29
573,545.21
10,500.00
31,544.99
5,735.45
621,325.65
DESCRIPCION VALOR
MANO DE OBRA CALIFICADA 0.91
MANO DE OBRA NO CALIFICADA 0.41
BIENES NO TRANSABLES 0.84
BIENES TRANSABLES 0.86
S SOCIALES
FUENTE
guia de perfil MEF
guia de perfil MEF
guia de perfil MEF
guia de perfil MEF
Precios y cantidades de recursos reque
Fecha 01/03/2010
Lugar 080907 CUSCO - LA CONVENCION - KIMBIRI
TOPOGRAFO hh
OPERARIO hh
OFICIAL hh
OPERADOR MONTAJISTA hh
OPERARIO CARPINTERO hh
OFICIAL DE OPERARIO MONTAJISTA hh
CAPACITADOR SOCIAL EN TEMAS DE MANTENIMIENTO DE PUENTES PEATONALES und
PEON hh
MATERIALES
Sub. Total
EQUIPOS
HERRAMIENTAS MANUALES
es de recursos requeridos
OBRA CALIFICADA
ENTAS MANUALES
FUENTE
guia de perfil MEF
guia de perfil MEF
guia de perfil MEF
guia de perfil MEF
PRESUPUESTO ALTERNATIVA II
UBICACIÓN
SECTOR : HELARES
DISTRITO : KIMRIRI
PROVINCIA : LA CONVENCION
DEPARTAME : CUSCO
ITEM DESCRIPCION UND
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und
01.02 CONSTRUCCION DE ALAMACEN Y CAMPAMENTO PROVISIONAL 12M X 6M GLB
02 TRABAJOS PRELIMINARES
02.01 LIMPIEZA DE TERRENO MANUAL m2
02.02 TRAZO Y REPLANTEO PRELIMINAR m2
02.03 CONTROL TOPOGRAFICO EN PROCESO CONSTRUCTIVO m2
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION MATERIAL CON BOLONERIA BAJO AGUA m3
03.02 EXCAVACION MATERIAL CON BOLONERIA m3
03.03 EXCAVACION CON MAQUINARIA m3
03.04 RELLENO COMPACTADO CON MATERIAL GRANULAR m3
03.05 RELLENO COMPACTADO CON MATERIAL PROPIO m3
03.06 ACARREO DE MATERIAL EXCEDENTE D=30 MT. m3
04 OBRAS DE CONCRETO SIMPLE
04.01 FALZA ZAPATAS, MEZCLA C:H 1:10 + 30%P.G. m3
04.02 CONCRETO F'C=175 KG/CM2 + 40% P.G. m3
04.03 ENCOFRADO Y DESENCOFRADO. m2
04.04 PANTALLA Y ALAS
04.04.01 CONCRETO F'C=175 KG/CM2 + 40% P.G. m3
04.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2
05 OBRAS DE CONCRETO ARMADO
05.01 ZAPATA DE ESTRIBO
05.01.01 CONCRETO F'C= 210 KG/CM2 m3
05.01.02 ENCOFRADO Y DESENCOFRADO. m2
05.01.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg
05.02 COLUMNAS EN TORRE DE CONCRETO ARMADO
05.02.01 CONCRETO F'C= 210 KG/CM2 m3
05.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2
05.02.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg
05.03 VIGAS EN TORRE DE CONCRETO ARMADO
05.03.01 CONCRETO F'C= 210 KG/CM2 m3
05.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2
05.03.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg
06 SUPERESSTRUCTURA DE PUENTE COLGANTE
06.01 MONTAJE MECANICO DE SUPERESTRUCTURA DE PUENTE COLGANTE. GLB
06.02 COLOCACION DE PENDOLAS. und
06.03 VIGA 4" X 6" und
06.04 TABLERO DE MADERA. GLB
06.05 BARANDA DE MADERA. GLB
06.06 COLOCACION DE CARRILES. und
06.07 ARMADO Y COLOCACION DE TEMPLADORES EN CAMARA DE ANCLAJE. GLB
07 OBRAS DE PROTECCION
07.01 ENCAUSAMIENTO DE CURSOS DE AGUA m3
07.02 PROTECCION DE ESTRIBOS m3
08 PINTURA
08.01 PINTURA ANTICORROSIVO EPOXI ZINCROMATO m
08.02 PINTURA ESMALTE SINTETICO EN SUPERFICIE METALICO (02 MANOS) m
08.03 PINTURA ESMALTE SINTETICO EN SUPERFICIE DE CONCRETO (02 MANOS) m2
08.04 ACABADO EN CARPINTERIA DE MADERA m2
09 CONTROL DE CALIDAD
09.01 ENSAYO DE ROTURA DE PROBETA DE CONCRETO und
09.02 SEGURIDAD PERSONAL
09.02.01 INDUCCION EN SEGURIDAD PERSONAL GLB
09.02.02 EQUIPO DE PROPTECCION PERSONAL GLB
10 PLACA RECORDEATORIA
10.01 PLACA RECORDATORIA ACRILICA und
11 FLETE Y TRANSPORTE TERRESTRE
11.01 FLETE PARA TRASLADO DE ACCESORIOS GLB
12 CONFORMACION DE COMITE DE GESTION
12.01 CONFORMACION DE COMITE DE GESTION GLB
12.02 MANUAL DE CAPACITACION und
01 PROGRAMAS DE CAPACITACION Y SENSIBILIZACION EN TEMAS DE MANTENIMIENTO
01.01 PROGRAMA DE CAPACITACION Y SENSIBILIZACION EN MANTENIMIENTO und
01.02 MATERIALES DE CAPACITACION GLB
14 PLAN DE MANEJO AMBIENTAL
14.01 SENSIBILIZACIÓN Y CAPACITACIÓN EN TEMAS AMBIENTALES
14.01.01 CONSTRUCCION DE MICRO RELLENO SANITARIO m3
14.01.02 RECOLECCION MANUAL DE RESIDUOS DE AREA DE TRABAJO m3
14.01.04 RECUPERACION DE AREA DE BOTADERO E INST. DE COBERTURA VEGETAL M2
14.01.05 SEÑALES INFORMATIVAS (IMPACTO AMBIENTAL) und
14.01.06 LIMPIEZA FINAL DE OBRA m2
COSTO DIRECTO
GASTOS GENERALES (12.30% C.D.)
TOTAL PRESUPUESTO
LTERNATIVA II
4,507.73
1.00 974.21 974.21
1.00 3,533.52 3,533.52
708.48
328.00 0.63 206.64
328.00 0.26 85.28
328.00 1.27 416.56
29,178.67
88.20 69.99 6,173.12
88.00 18.98 1,670.24
600.60 10.36 6,222.22
142.20 50.19 7,137.02
406.07 15.69 6,371.24
211.44 7.59 1,604.83
149,352.45
31.59 200.35 6,329.06
114.24 239.29 27,336.49
114.40 25.49 2,916.06
112,770.84
425.28 239.29 101,765.25
246.10 44.72 11,005.59
62,139.44
46,007.25
67.50 398.27 26,883.23
46.00 25.49 1,172.54
3,945.38 4.55 17,951.48
14,042.07
6.34 398.27 2,525.03
63.36 44.72 2,833.46
1,908.48 4.55 8,683.58
2,090.12
1.58 398.27 629.27
13.20 44.72 590.30
191.33 4.55 870.55
237,680.36
1.00 37,650.98 37,650.98
66.00 211.87 13,983.42
33.00 226.10 7,461.30
1.00 65,296.24 65,296.24
1.00 69,755.74 69,755.74
4.00 1,753.09 7,012.36
1.00 36,520.32 36,520.32
50,046.60
3,000.00 8.10 24,300.00
2,820.00 9.13 25,746.60
14,141.09
571.56 6.84 3,909.47
571.56 6.12 3,497.95
225.82 12.82 2,895.01
281.84 13.62 3,838.66
14,130.00
26.00 30.00 780.00
13,350.00
1.00 1,500.00 1,500.00
1.00 11,850.00 11,850.00
604.27
1.00 604.27 604.27
15,000.00
1.00 15,000.00 15,000.00
1,875.00
1.00 1,500.00 1,500.00
1.00 375.00 375.00
1,581.00
1.00 1,300.00 1,300.00
1.00 281.00 281.00
6,513.99
6,513.99
27.00 193.64 5,228.28
20.00 25.32 506.40
9.00 0.95 8.55
4.00 130.37 521.48
328.00 0.76 249.28
587,459.08
72,257.47
659,716.55
11,479.07
36,284.41
6,597.17
714,077.20
Precios y cantidades de recur
Fecha 01/04/2010
Lugar 080907 CUSCO - LA CONVENCION - KIMBIRI
TOPOGRAFO hh
OPERARIO hh
OFICIAL hh
OPERADOR MONTAJISTA hh
OPERARIO CARPINTERO hh
OFICIAL DE OPERARIO MONTAJISTA hh
CAPACITADOR SOCIAL EN TEMAS DE MANTENIMIENTO DE PUENTES PEATONALES und
PEON hh
HERRAMIENTAS MANUAL
HERRAMIENTAS MANUALES %MO
COSTO DIRECTO
os y cantidades de recursos requeridos
MATERIALES
345,405.24 345,442.27
EQUIPOS
HERRAMIENTAS MANUALES
2,671.71 2,671.71
2,671.71 2,671.71
DESCRIPCION VALOR
MANO DE OBRA CALIFICADA 0.91
MANO DE OBRA NO CALIFICADA 0.41
BIENES NO TRANSABLES 0.84
BIENES TRANSABLES 0.86
PRESUPUESTO ALTERNATIVA II
A PRECIOS DE MERCADO
1,381.24
0.91 1,183.00 CUADRO DE RESUMEN DE OBRA
0.41 - PRECIOS PRIVADOS
0.84 198.24 1.1. Mano de Obra Calificada 28,758.63
0.84 - 1.2. Mano de Obra No Calificada 27,336.87
0.84 - 1.3. Materiales 288,885.70
1.4 .Equipos 163,476.70
3,533.99 1.5 .Herramientas Manuales 2,268.02
0.91 1,104.81 1.6.Costo Directo 510,725.92
0.41 1,928.66 1.7.Gastos Generales 62,819.29
0.84 336.00 1.8.Valor referencial 573,545.21
0.84 164.51 1.9.Elaboracion de Expediente Tecnioco 10,500.00
0.84 - 1.10.Gastos de Supervision 31,544.99
1.11.Gastos Administrativos 5,735.45
419,268.02
51,569.97 TOTAL INVERSIONES 621,325.65
470,837.99
8,619.72
25,896.09
4,708.38
510,062.18
COSTO A PRECIO
FC CUADRO DE RESUMEN DE OBRA
SOCIALES
PRECIOS PRIVADOS
473,989.04 1.1. Mano de Obra Calificada 30,158.57
0.91 25,156.49 1.2. Mano de Obra No Calificada 35,022.63
0.41 12,430.61 1.3. Materiales 345,442.27
0.84 288,024.47 1.4 .Equipos 174,359.84
0.84 146,297.75 1.5 .Herramientas Manuales 2,475.86
0.84 2,079.72 1.6.Costo Directo 587,459.17
- 1.7.Gastos Generales 72,257.48
1,575.00 1.8.Valor referencial 470,837.99
0.91 - 1.9.Elaboracion de Expediente Tecnioco 11,479.07
0.41 - 1.10.Gastos de Supervision 36,284.42
0.84 1,575.00 1.11.Gastos Administrativos 6,597.17
0.84 -
0.84 - TOTAL INVERSIONES 714,077.30
1,419.04
0.91 1,183.00 CUADRO DE RESUMEN DE OBRA
0.41 - PRECIOS SOCIALES
0.84 236.04 1.1. Mano de Obra Calificada 27,444.30
0.84 - 1.2. Mano de Obra No Calificada 14,359.28
0.84 - 1.3. Materiales 290,171.51
1.4 .Equipos 146,462.27
3,533.99 1.5 .Herramientas Manuales 2,079.72
0.91 1,104.81 1.6.Costo Directo 480,517.07
0.41 1,928.66 1.7.Gastos Generales 59,103.60
0.84 336.00 1.8.Valor referencial 539,620.67
0.84 164.51 1.9.Elaboracion de Expediente Tecnioco 9,389.40
0.84 - 1.10.Gastos de Supervision 29,679.14
1.11.Gastos Administrativos 5,396.21
480,517.07
12.300% 59,103.60 0.123 TOTAL INVERSIONES 584,085.41
539,620.67
Costos de Mantenimiento
troncos de madera (palotes) und 20.00 30.00
Mano Obra HH 60.00 25.00
Herramientas global 1.00 60.00
Costo Total Anual
Costo Mensual
Costo Mensual Por Familia
Fuente : Elaboracion propia
Factores de Corrección
Bienes Transables 0.86
Bienes No Transables 0.84
Mano de Obra No calificada Rural (Sierra) 0.41
Mano de Obra Calificada 0.91
SIN PROYECTO
ALTERNATIVAS I Y II
Factor de
A Precios de Mercado A Precios Sociales
Conversion
2,160.00 1,169.40
600.00 0.84 504.00
1,500.00 0.41 615.00
60.00 0.84 50.40
2,160.00 1,169.40
180.00 97.45
1.82 0.98
COSTOS DE OPERACIÓN Y MANTENIMIENTO EN LA SITUACION CO
A PRECIOS DE MERCADO Y A PRECIOS SOCIALES ALTERNATIV
COSTO DE OPERACIÓN
TAREAS DE GESTION Y ADMINISTRACION
GLB 1.00
COSTO DE MANTENIMIENTO
SUPERESTRUCTURA DE PUENTE COLGANTE
MANO DE OBRA
OPERARIO hh 26.6800
OFICIAL hh 125.2800
PEON hh 37.2000
OPERARIO CARPINTERO hh 120.0000
MATERIALES
EQUIPOS
s Soles)
COSTO PRECIOS F.C. PRECIOS
UNITARIO PRIVADOS SOCIALES
14,970.00 12,076.00
1,160.00 475.60
13,810.00 11,600.40
97.00 97.00
5.00 133.40 132.00
270.00 5,022.00 5,020.00
20.00 266.80 266.00
5,519.20 5,515.00
13,810.00
Descripción
Situación sin
Proyecto
Alternativa 1
Alternativa 2
Costos Incrementales
Alternativa 1
Alternativa 2
1200
12120.0
Costo de Inversión VP.CO&M VP.Costo Total
0 6,884.51 6,884.51
510,061.74 71,118.37 581,180.10
714,077.30 14,970.00 729,047.30
os Incrementales
510,061.74 64,233.86 574,295.60
714,077.30 8,085.49 722,162.79
COSTOS INCRE
F.A(11%) 1.00
VACT 696,520.35 621,325.65
FUENTE:Equipo formulador
Nota: Según el parámetro del Anexo SNIP 09, se está utilizando el 11% de TSD por lo que los precios estan elab
COSTOS INCRE
F.A(11%) 1.00
VACT 574,083.92 510,062.18
FUENTE:Equipo formulador
Nota: Según el parámetro del Anexo SNIP 09, se está utilizando el 11% de TSD por lo que los precios estan elab
419,268.02
COSTOS INCRE
DESCRIPCION VACT
0
A.-COSTO DE PRE INVERSION 11,479.07
1. Intangibles 11,479.07
1.9.Elaboracion de Expediente Tecnico 11,479.07
B.-COSTO DE INVERSION 702,598.23
1.1. Mano de Obra Calificada 30,158.57
1.2. Mano de Obra No Calificada 35,022.63
1.3. Materiales 345,442.27
1.4 .Equipos 174,359.84
1.5 .Herramientas Manuales 2,475.86
1.6.Costo Directo 587,459.17
1.7.Gastos Generales 72,257.48
1.10.Gastos de Supervision 36,284.42
1.11.Gastos Administrativos 6,597.17
F.A(11%) 1.00
VACT (ExF) 789,272.00 714,077.30
FUENTE:Equipo formulador
Nota: Según el parámetro del Anexo SNIP 09, se está utilizando el 11% de TSD por lo que los precios estan elab
COSTOS INCRE
F.A(11%) 1.00
VACT (ExF) 662,490.34 584,085.41
FUENTE:Equipo formulador
Nota: Según el parámetro del Anexo SNIP 09, se está utilizando el 11% de TSD por lo que los precios estan elab
Costos Incrementales
Alternativa 1 621,325.65
Alternativa 2 714,077.30
COSTOS INCREMENTALES (PRECIOS PRIVADOS)
ALTERNATIVA I
1 2 3 4 5 6
1 2 3 4 5 6
2,160.00 6,884.51
14,970.00 636,295.65
14,970.00 729,047.30
12,810.00 634,135.65
12,810.00 726,887.30
1
7 8 9 10 0.90
0.81
0.73
0.66
0.59
0.53
0.48
0.43
0.39
0.35
7 8 9 10
12,076.00 12,076.00 12,076.00 12,076.00
7 8 9 10
7 8 9 10
Cronograma
Alternativa I
Descripción AÑO 0
MES 1- 4 PRIMER MES
Etapa Preinversión
Elaboración de Expediente técnico
Etapa Inversión
2.-EJECUCION DE OBRA
3.-COSTOS DE PLAN DE MANEJO AMBIENTAL
4.-COSTOS DE SEGURIDAD Y ASISTENCIA MEDICA
5.-GASTOS DE SUPERVISION
6.-GASTOS ADMINISTRATIVOS
CRONOGRAMA DE EJECUCION
NOMBRE DEL PROYECTO “CONSTRUCCION DE PUENTE PEATONAL HELARES DIST
Cronograma
Alternativa I
Descripción AÑO 0
MES 1- 4 PRIMER MES
Etapa Preinversión
Elaboración de Expediente técnico 50% 50%
Etapa Inversión
2.-EJECUCION DE OBRA 25%
3.-COSTOS DE PLAN DE MANEJO AMBIENTAL 50%
4.-COSTOS DE SEGURIDAD Y ASISTENCIA MEDICA 25%
5.-GASTOS DE SUPERVISION 25%
6.-GASTOS ADMINISTRATIVOS 25%
Fase de Post Inversion
OPERACIÓN Y MANTENIMIENTO
RAMA DE EJECUCION FISICA
ograma
MA DE EJECUCION FINANCIERA
EATONAL HELARES DISTRITO DE KIMBIRI- LA CONVENCION - CUSCO”
Cronograma
PROYECTO : Err:509
UBICACIÓN:
SECTOR: SECTOR: HELARES
DISTRITO: DISTRITO: KIMRIRI
PROVINCIA: PROVINCIA: LA CONVENCION
DEPARTAMENTO: DEPARTAMENTO: CUSCO
VAN (Soles)
Resultados de la evaluación
Indicadores Resultados
VAN a precios
sociales (S/.) 581,180.54 S/. 581,180.54
Pob. Promedio (hab 409
ICE (S/./hab.) 1421.33 OK! ICE (S/. Hab)
Analisis de sensibilidad
1.30 1.2 1.1 0.9 0.8 0.7
663,080.83 612,074.61 561,068.40 459,055.96 408,049.74 357,043.52
15,698.80 14,491.20 13,283.60 10,868.40 9,660.80 8,453.20
15,698.80 14,491.20 13,283.60 10,868.40 9,660.80 8,453.20
15,698.80 14,491.20 13,283.60 10,868.40 9,660.80 8,453.20
15,698.80 14,491.20 13,283.60 10,868.40 9,660.80 8,453.20
15,698.80 14,491.20 13,283.60 10,868.40 9,660.80 8,453.20
15,698.80 14,491.20 13,283.60 10,868.40 9,660.80 8,453.20
15,698.80 14,491.20 13,283.60 10,868.40 9,660.80 8,453.20
15,698.80 14,491.20 13,283.60 10,868.40 9,660.80 8,453.20
15,698.80 14,491.20 13,283.60 10,868.40 9,660.80 8,453.20
15,698.80 14,491.20 13,283.60 10,868.40 9,660.80 8,453.20
MAL!
PROYECCION DE LA DEMANDA
Año Poblacion Cobertura Demanda (Hab.) N° de Miem/Fam
(1) (2) (3) (4)=(2)x(3) (5)
0 380 1 380 3.85
1 385 1 385 3.85
2 390 1 390 3.85
N° Familias
(6)=(4)/(5)
99
100
101
Descripción Costo de Inversión VP.CO&M VP.Costo Total
Costos Incrementales