1. INTRODUCTION
1.1 Purpose
The purpose of this hydraulic calculation “AMMONIA STORAGE SHELTER” is to check that
the adequate flow and pressure are available to meet the required flow demand and
pressure demand at each indoor hydrant.
The following data and assumptions were used in the Hydraulic Calculations.
3.1 Software
Spray / Sprinkler Program “WinSprink” Ver. 2.21
Building / Fire
Water demand Discharge Water
NO. Fighting Equipment Remarks
(Lpm) pressure (barg)
5. CALCULATION METHOD
Qm1.85
pm = 6.05 x 105
1.85
C dm4.87
q = 651.9 L/min
= 10.87 l/sec
l = 20m
= 0.012 x 10.87² x 20
= 28.36m
= 2.8 Bars Approx
7. EQUIVALENT TABLE
TYPE OF
DN INSIDE T B W S K V V V
PIPE
TEE GATE WET DRY
VALUE DIAMETER 45DEG. 90DEG. CHECK VALVE/ SPRAY VALVE
PIECE VALVE VALVE VALVE
ELBOW ELBOW STRAINER
20 20.96 1.2 0.3 0.6 0 0 0 0 0 ASTM
25 26.64 1.5 0.3 0.6 0 0 0 0 0 ASTM
32 35.08 1.8 0.3 0.9 0 0 0 0 0 ASTM
40 40.94 2.4 0.6 1.2 0 0 0 0 0 ASTM
50 52.48 3.1 0.6 1.5 0.3 3.4 0 0 3.1 ASTM
65 62.68 3.7 0.9 1.8 0.3 4.3 0 0 0 ASTM
80 77.92 4.6 0.9 2.1 0.3 4.9 4.6 5 7.1 ASTM
100 102.26 6.1 1.2 3.1 0.6 6.7 5.4 7.4 21.4 ASTM
125 128.2 7.6 1.5 3.7 0.6 8.2 0 0 0 ASTM
150 154.08 9.2 2.1 4.3 0.9 9.8 9.6 9.9 26.9 ASTM
200 202.74 10.7 2.7 5.5 1.2 13.7 11.2 0 24.4 ASTM
250 254.56 15.3 3.4 6.7 1.5 16.8 0 0 0 ASTM
300 303.28 18.3 4 8.2 1.8 19.8 0 0 0 ASTM
350 339.76 21.7 5 10 2.1 22.8 0 0 0 ASTM
151 130.80 13.89 3.17 6.49 1.36 14.8 0 0 0 HDPE
201 163.60 16.16 4.08 8.31 1.81 20.69 0 0 0 HDPE
251 204.60 23.1 5.13 10.12 2.27 25.37 0 0 0 HDPE
301 257.80 27.63 6.04 12.38 2.72 29.9 0 0 0 HDPE
Demand press required / Supply press available / cushion in bar 12.000 according Hazen-Williams
Name Beg.- End.- pbeg K Qsprinkler Qstrang dia- C-Value length Fittings hydraulic p difference p pend v remarks
node node meter of pipe B/W/T/TAV/NAV/S/V/R/D total length friction in height total
[bar] [l/min] [l/min] DN [m] kind and no [m] [bar/m] [m] [bar] [bar] [m/s]
Z 2- 1 28 29 11.823 1971.6 300 120 4.47 2W+ 1S+ 1K 42.47 0.0001 1.77 0.1774 12.000 0.45 Pump = 9464 l/min
Z 1- 1 28 27 11.823 -1971.6 300 120 6.17 1W 14.37 -0.0001 2.65 0.2587 12.081 0.45
H 3- 1 27 26 12.081 -1971.6 301 150 441.03 9W+ 5S 629.94 -0.0001 1.70 0.0859 12.167 0.63
H 2- 1 26 25 12.167 -1971.6 201 150 82.48 1W 95.04 -0.0012 -0.1117 12.056 1.56
H 1- 1 25 24 12.056 -1971.6 151 150 1.90 1W 11.71 -0.0035 -1.90 -0.2273 11.828 2.45
V 18- 1 24 23 11.828 -1971.6 150 120 0.35 0.35 -0.0024 -0.35 -0.0352 11.793 1.76
V 17- 1 23 22 11.793 -1971.6 100 120 1.67 1W+ 1S+ 1K 12.07 -0.0175 -0.2114 11.582 4.00
V 16- 1 22 21 11.582 -1971.6 100 120 3.10 1W 4.87 -0.0175 -1.77 -0.2589 11.323 4.00
V 15- 1 21 20 11.323 -1971.6 100 120 5.00 1W 5.40 -0.0175 -0.0946 11.228 4.00
V 14- 1 20 19 11.228 -1971.6 100 120 3.00 1W 7.00 -0.0175 -3.90 -0.5052 10.723 4.00
V 13- 1 19 18 10.723 -1971.6 100 120 3.82 1W 4.00 -0.0175 -0.0701 10.653 4.00
V 12- 2 17 18 10.624 660.6 100 120 9.17 1W 12.27 0.0023 0.0284 10.653 1.34
V 12- 1 18 8 10.653 -1311.0 100 120 1.03 1T 7.13 -0.0082 -0.0587 10.594 2.66
V 11- 1 17 16 10.624 -660.6 100 120 20.41 1W 23.51 -0.0023 -0.0545 10.570 1.34
V 10- 1 16 15 10.570 -660.6 100 120 6.73 3W 16.03 -0.0023 5.00 0.4534 11.023 1.34
V 9- 1 15 14 11.023 -660.6 100 120 0.50 1W 3.60 -0.0023 -0.50 -0.0574 10.966 1.34
V 8- 1 14 12 10.966 -660.6 50 120 0.35 1T 3.45 -0.0597 -0.2059 10.760 5.09
V 8- X2 13 12 10.758 201.40 660.6 660.6 50 120 10.760 IH = 312 l/min
V 7- 1 6 11 10.225 -659.2 100 120 7.25 7.25 -0.0023 7.25 0.6945 10.920 1.34
V 6- 1 11 9 10.920 -659.2 50 120 0.35 1T 3.45 -0.0594 -0.2051 10.715 5.08
© By IDAT-GmbH 2000 - 2012 V 2.21 1226
8 of 10
Appendix - B : Isometric Drawing
540001
9 of 10
Appendix - B : Isometric Drawing
5000 14
3000
3821
3098
540001
10 of 10