RENCANA PENGGUNAAN DANA

#REF! : #REF!
DAERAH IRIGASI : KEUMALA
DESA : #REF!
KABUPATEN/KOTA : #REF!
PROPINSI : ACEH
PENCAIRAN DANA TAHAP : I

HARGA JUMLAH
NO. URAIAN SAT 100% VOLUME KET
SATUAN (RP) HARGA (RP)

1 Pekerjaan Persiapan
Err:509 0.40 Err:509 Err:509
Err:509 0.40 Err:509 Err:509
Err:509 0.40 Err:509 Err:509
Err:509 0.40 Err:509 Err:509
LS
Err:509 0.40 Err:509 Err:509
Err:509 0.40 Err:509 Err:509
Err:509 0.40 Err:509 Err:509
Err:509 0.40 Err:509 Err:509

2 Bahan.
Sement PC Zak Err:509 281.00 #REF! #VALUE!
Batu Belah / Kali m3 Err:509 70.00 #REF! #REF!
Pasir Pasang m3 Err:509 37.00 #REF! #REF!

3 Upah.
Pekerja oh Err:509 243.00 #REF! #VALUE!
Pekerja Galian Tanah oh Err:509 16.00 #REF! #VALUE!
Tukang Batu oh Err:509 95.00 #REF! #VALUE!
Kepala Tukang oh Err:509 4.00 125,000 500,000
Mandor oh Err:509 21.00 110,000 2,310,000

Jumlah Dana #ERROR!


Total (Rp.) dibulatkan #ERROR!

Terbilang : Tujuh Puluh Satu Juta Dua ratus Ribu Rupiah

Cot Ara, 25 Agustus 2017

dibantu dibuat
Tenaga Pendamping Masyarakat Tim Pelaksana

NUR MUHAMMAD, ST MUNZIR

Menyetujui, diusulkan
Kepala Desa Ketua P3a ......

.................. .....................
hari kerja 11

#ERROR!

#REF!
#ERROR!
#ERROR!
#ERROR!

#ERROR!

#REF!
Err:509 131 Err:509
Err:509 30 Err:509 12045000
Err:509 17 Err:509 #REF!
-
-
Err:509 Err:509 22.0909090909 20
Err:509 178,000,000 Err:509 1.4545454545 10
Err:509 3,560,000 Err:509 8.6363636364 8
Err:509 Err:509 0.3636363636 2
Err:509 Err:509 #REF! 1.9090909091 1
71,200,000
Err:509 1,424,000 #REF! #ERROR! #REF!
#ERROR!

#ERROR! 40% #REF! #REF!


#ERROR! #REF! 30% #REF!
30% #REF!
#REF! Err:509 #REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF! 379
#REF!
#REF!
#REF!
#REF!

379 0.40 Err:509


337.00 #REF!
#ERROR! 82.00 #REF!
46.00 #REF!

303.00 #REF!
31.00 #REF!
121.00 #REF!
12.00 125,000
16.00 110,000
#REF! 703
#REF! 171
#REF! 88

#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
45,455 250,000
210,000 110,000
#REF!

71200000

Err:509
#VALUE!
#REF!
#REF!

#VALUE!
#VALUE!
#VALUE!
Rp 1,500,000
Rp 1,760,000
#ERROR!
SOAL UJIAN
BAGI PESERTA CALON TPM KEGIATAN P3-TGAI TAHUN 2019

Nama :
Nomor Peserta :
Nomor Hp :
Alokasi kegiatan Wilayah Barat : Kab. Aceh Jaya, Kab. Aceh Barat, Kab. Aceh Barat Daya
Kab. Aceh Selatan dan Kab. Gayo Lues ( No. Peserta 001 s/d 109 )
Alokasi kegiatan Wilayah Timur : Kota Banda Aceh, Aceh Besar, Pidie, Pidie Jaya, Bireuen, Bener Meriah,
Aceh Tengah, Aceh Utara, Aceh Timur dan Tamiang ( No. Peserta 110 s/d 267 )

Rencana Pilihan
Lokasi Kegiatan : Pilihan ke - 1. Kabupaten ..
Pilihan ke - 2. Kabupaten ..
Pilihan ke - 3. Kabupaten ..
Note. Contoh Gambar Typical Saluran

1. Gambarkan Penampang Saluran Berikut dalam Format Autocad


No.Ujian a b c h1 h2 h3
XX0
XX1
XX2
XX3
XX4
XX5
XX6
XX7
XX8
XX9
Note : Pilih Soal sesuai Satu Angka Terakhir Nomor Peserta Calon TPM

2. Hitung Volume Pekerjaan sesuai gambar penampang diatas dengan panjang Saluran (L) = 100 M.
(Sesuai Satu Angka Terakhir No. Peserta Calon TPM)

3. Hitunglah Rencana Anggaran Biaya (RAB) Pekerjaan dimaksud dalam Bentuk Bill Of Quantity
(File Excel)

4. Hitung Kebutuhan Total masing–masing komponen biaya berupa Upah dan Bahan
a. Upah :
- Pekerja : ............... OH, Rp. ...............
- Tukang : ............... OH, Rp. ...............
- Kepala Tukang : ............... OH, Rp. ...............
- Mandor : ............... OH, Rp. ...............

b. Bahan:
- Semen : ............... Zak
- Batu Kali/Gunung : ............... M3
- Pasir : ............... M3

5. Gambarkan Sket Lokasi Pekerjaan Dalam Format Google Earth ke Excel

Note : contoh Sket Lokasi desa Mata ie Kecamatan Montasik


Kabupaten aceh Besar.
GAMBAR/SKET NO PERHITUNGAN

STA : A. Galian Tanah

B. Pasangan Batu 1 : 4

GAMBAR TYPICAL SALURAN


(AUTOCAD)

C. Plesteran 1 : 3
Hal :

NGAN SAT VOLUME


DAFTAR HARGA SATUAN UPAH, BAHAN DAN PERALATAN

I. UPAH KERJA

HARGA
NO URAIAN SATUAN KET
(RP)
1 Pekerja OH L.01 80,000.00
2 Pekerja Galian Tanah OH L.02 80,000.00
3 Kepala Tukang batu OH L.03 125,000.00
4 Tukang batu OH L.04 95,000.00
5 Kepala Tukang kayu OH L.05 125,000.00
6 Tukang kayu OH L.06 95,000.00
7 Mandor OH L.15 110,000.00

II. BAHAN
HARGA
NO URAIAN SATUAN KET
(RP)

A KELOMPOK AIR, TANAH, BATUAN DAN CEMENT

1 Pasir pasang kali M3 M.08 185,000.00


2 Batu kali / Gunung M3 M.12 180,000.00
3 Portland Cement (PC 40 kg / zak) zak M.17 58,000.00
4 Portland Cement (PC 40 kg / zak) kg M.18 1,450.00
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : GALIAN TANAH BIASA (MP)


PROPINSI : Aceh
TAHUN : 2019
SATUAN : M3

Kuantitas/ Harga Satuan


No. Uraian Kode Satuan
Koefisien Dasar (Rp.)
(1) (2) (3) (4) (5)
I Upah/Tenaga Kerja
1 Pekerja Galian Tanah L.01 OH 0.5630
2 Mandor L.04 OH 0.0563
3
4
5
Sub Jumlah I
II Bahan/Material
1
2
3
4
5
Sub Jumlah II
III
1
2
3
4
5
Sub Jumlah III
Sub Jumlah ( I + II + III )
Harga satuan pekerjaan....... (dibulatkan)
Ket :* AHSP-SDA, Permen. PU-PR 28/PRT/M/2016
#REF!

- Kuantitas/Koefesien tenaga kerja dan peralatan, ditentukan masing-masing calon penyedia jasa.

ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : PASANGAN BATU KALI/GUNUNG 1 : 4


PROPINSI : Aceh
TAHUN : 2019
SATUAN : M3

Kuantitas/ Harga Satuan


No. Uraian Kode Satuan
Koefisien Dasar (Rp.)
(1) (2) (3) (4) (5)
I Upah/Tenaga Kerja
1 Pekerja L.01 OH 2.700
2 Tukang batu L.02 OH 0.900
3 Mandor L.04 OH 0.270
4
Sub Jumlah I
II Bahan/Material
1 Batu kali/Gunung M.05 m3 1.200
2 Pasir pasang M. 14.b m3 0.520
3 Semen PC (40 kg) M.15 Kg 163.000
4
5
Sub Jumlah II
III
1
2
3
4
5
Sub Jumlah III
Sub Jumlah ( I + II + III )
Harga satuan pekerjaan....... (dibulatkan)
Ket :* AHSP-SDA, Permen. PU-PR 28/PRT/M/2016

- Kuantitas/Koefesien tenaga kerja dan peralatan, ditentukan

ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : PLESTERAN 1 : 3, TEBAL 1,5 CM


PROPINSI : Aceh
TAHUN : 2019
SATUAN : M2

Kuantitas/ Harga Satuan


No. Uraian Kode Satuan
Koefisien Dasar (Rp.)
(1) (2) (3) (4) (5)
I Upah/Tenaga Kerja
1 Pekerja L.01 OH 0.384
2 Tukang batu L.02 OH 0.192
3 Kepala Tukang L.03 OH 0.019
4 Mandor L.04 OH 0.019
5
Sub Jumlah I
II Bahan/Material
1 Pasir pasang M.14.b m3 0.030
2 Semen PC (40 kg) M.15 kg 7.776
3
4
5
Sub Jumlah II
III
1
2
3
4
5
Sub Jumlah III
Sub Jumlah ( I + II + III )
Harga satuan pekerjaan....... (dibulatkan)
Ket :* AHSP-SDA, Permen. PU-PR 28/PRT/M/2016
N

Harga
(Rp.)
(6) = (4) x (5)

###
#REF!

masing calon penyedia jasa.

Harga
(Rp.)
(6) = (4) x (5)

###
N

Harga
(Rp.)
(6) = (4) x (5)

###
RENCANA ANGGARAN BIAYA

HARGA
No. URAIAN PEKERJAAN SAT. VOLUME SATUAN
(Rp.)
1 2 3 4 5

A. PEKERJAAN SALURAN

1 GALIAN TANAH BIASA (MP) M3

2 PASANGAN BATU KALI/GUNUNG 1 : 4 M3

3 PLESTERAN 1 : 3, TEBAL 1,5 CM M2

JUMLAH
JUMLAH
HARGA KET
(Rp.)
6 7
KEBUTUHAN UPAH DAN BAHAN

HARGA JUMLAH
NO. URAIAN SAT 100% KET
SATUAN (RP) HARGA (RP)

1. Bahan.

Sement PC Zak

Batu Kali/Gunung m3

Pasir Pasang m3

2. Upah.

Pekerja oh

Pekerja Galian Tanah oh

Tukang Batu oh

Kepala Tukang oh

Mandor oh
Jumlah