BERITA ACARA PEMERIKSAAN DAN UJI FUNGSI GENSET

RSUD TGK.CHIK DITIRO SIGLI


Inspection Report of Power Generator Unit

IJIN/PENGESAHAN ULANG (RE-SERTIFIKASI)


No.

Pemilik
(Owner)
Lokasi Tanggal Verifikasi
(Location) (Verification Date)

I. DATA TEKNIS

Uraian Penggerak Mula Pembangkit Tenaga Listrik


Description Prime Mover Generator
No item
Item Number
Pabrik Pembuat
Manufacture
Tipe / Model
Type / Model
No. Seri
Serial Number
Tahun Pembuatan
Year of Built
Kapasitas
Capacity
Putaran
Revolution
Kelas Isolasi
Isolation Class
Selungkup
Enclosure
Temperatur Ruang
Ambient Temperature
Tegangan
Voltage
Arus Nominal
Nominal Current
Frekuensi
Frequency
Faktor Daya (Cos )
Power Factor (Cos )
Tegangan Eksiter
Exciter Voltage
Arus Eksiter
Exciter Current

II. HASIL VERIFIKASI

Verifikasi Hasil Verifikasi


No Item Verifikasi
Tidak
Ya Tidak Memenuhi Keterangan
Memenuhi
A. PENELAAHAN DOKUMEN
1 Sertifikat SKPP lama
Previous Certificate
2 Gambar diagram satu garis
One line diagram drawing
3 Gambar diagram pengawatan
Wiring diagram drawing
4 Kartu riwayat
History card
5 Buku Manual
Manual Book
6 Buku pemeliharaan & operasi
Maintenance & operational book
7 Tanda peringatan
Warning sign
8 Sertifikat pabrik pembuat
Manufacture certificate
9. Data Penunjang Lainnya
Verifikasi Hasil Verifikasi
No Item Verifikasi
Tidak
Ya Tidak Memenuhi Keterangan
Memenuhi
Verifikasi Hasil Verifikasi
No Item Verifikasi Tidak
Ya Tidak Memenuhi Keterangan
Memenuhi
B. PEMERIKSAAN VISUAL
1 Konstruksi unit pembangkit
tenaga
Power generator unit construction
2 Dudukan pembangkit tenaga
Generator mounting
3 Verifikasi plat nama
Nameplate verification
4 Peralatan pengaman
Safety equipment
5 Instrument / meter pengukur
Instrument / metering
6 Lampu indicator
Indicator lamp
7 Peralatan alarm
Alarm equipment
8 Fasilitas keselamatan & tanda
bahaya
Safety & warning sign facilities
9 Terminal kabel utama &
penetralan
Main cable and neutral
10 Kondisi air battery (dgn start
battery)
Battery condition (with start
battery)
11 Minyak lumas penggerak mula
Prime mover lubrication
12 Terminal battery (diberi grease)
Battery terminal (with grease)
13 Penempatan battery (dikotak
khusus)
Battery arrangement (special box)
14 Pemanas anti kondensasi
Heater anti condensation
15 Peralatan start
Starting equipment
16 Peralatan stop
Verifikasi Hasil Verifikasi
No Item Verifikasi
Tidak
Ya Tidak Memenuhi Keterangan
Memenuhi
Stopper equipment
17 Air pendingin penggerak mula
Prime mover cooling water
C. VERIFIKASI HASIL PENGUJIAN
1 Pengujian tahanan isolasi
Isolation resistance testing
2 Uji fungsi peralatan pengaman
Safety equipment function test
3 Tegangan & arus tanpa beban dan
berbeban
Voltage & current with load and
no load
4 Tingkat kebisingan
Noise Level

5 Analisa Getaran
Vibratipon analysis
6 Uji jalan / unjuk kerja
Running test / performance test

7 Uji parralel (bila ada)


Parallel test (if any)

III. LAPORAN PENGUJIAN

A. PENGUJIAN TAHANAN ISOLASI


Insulation resistances Test

- Nama Alat ukur :


Name of Eqpt.
- Pabrik Pembuat :
- Rating Tegangan :
Voltage Rating

1 3 Phasa – Ground
M
3 Phase - Ground
2 Phasa – Phasa (R – S)
M
Phase – Phase (R – S)
3 Phasa – Phasa (R – T)
M
Phase – Phase (R – T)
4 Phasa – Phasa (S – T)
M
Phase – Phase (S – T)
5 Kondisi Pengukuran Basah Kering Dingin Panas
Measuring Condition Wet Dry Cold Hot
B. ANALISA GETARAN
Vibration Analysis
1 Kecepatan Putar 1800 RPM
Speed
Description Vertical Horizontal Axial
2 Amplitudo / p
Amplitudo / p
3 Velocity / Vrms, cm/s

4 Displacement / dp – p, mm

C. PENGUKURAN TINGKAT KEBISINGAN


Noise Level Measurement
1 Kecepatan Putar RPM
Speed
2 Tingkat Kebisingan dBA
Noise Level
Catatan :
Note
Pemilik / Owner Inspektur / Inspector

Tanggal : Tanggal :

Dievaluasi oleh Diperiksa /Diuji oleh


Pegawai Pengawas Spesialis K3 Listrik Ahli K3 Spesialis Listrik

NIP : SK No :