PREPARED BY
Pranjal Wadhwa
(2017BTECHME010)
EXTERNAL SUPERVISOR
Mr. Narendra Singh Rathore
FACULTY GUIDE
Mrs. Deepika Mishra
July 2019
I
TITLE
Study and Analysis of Material Handling System
Practice School-1
Submitted in partial fulfilment of the requirements
for the degree of
Bachelor of Technology in Mechanical Engineering
by
Pranjal Wadhwa (2017BTECHME010)
External Supervisor
Mr. Narendra Singh Rathore
Faculty Supervisor
Mrs. Deepika Mishra
July 2019
II
CERTIFICATE
This is to certify that the Practice School-1 project work entitled “Study and Analysis of
Material Handling System” submitted by Pranjal Wadhwa (2017BTECHME010),
towards the partial fulfilment of the requirements for the degree of Bachelor of Technology
in Mechanical Engineering of JK Lakshmipat University Jaipur is the record of work
carried out by them under my supervision and guidance. In my opinion, the submitted work
has reached a level required for being accepted for Practice School-I examination.
------------------------------- ------------------------------
Mrs Deepika Mishra Dr. Ravi Shankar Prasad
Institute of Engineering & Technology (IET) Institute of Engineering & Technology (IET)
Date of Submission
III
ACKNOWLEDGEMENTS
I would like to express my heartfelt gratitude to Mr. Narender Singh Rathore, Federal
National Engineering Industries Ltd. for his valuable time and guidance that made the project
work a success. I would also like to thank Mr. Rakesh, National Engineering Industries Ltd.
Mrs. Deepika Mishra, Assistant Professor, IET, JK Lakshmipat University for being my
mentor and in-charge throughout my project, helping me at every turn.
I would also like to express our gratitude to the Training and Placement Department, JK
Lakshmipat University and the HR Department, National Engineering Industries Ltd. for
providing me an internship opportunity.
Sincerely yours,
Pranjal Wadhwa
(2017BTECHME010)
IV
ABSTRACT
National Engineering Industries Ltd. Designs and Manufactures Bearings and its equipment.
It manufactures more than 150 Million bearings annually in more than 1000 bearings in its
4 plants in India. In every industry, there are factors which affect the growth of the industry.
These factors include the lack of communication, poor maintenance, lack of space which
causes trouble in Material handling, etc. In this project, we have studied and analyzed the
material handling system and proposed changes to some of their issues. We have curated a
Checklist for workers which will help them. While some of the conveyer belt were damaged,
so we suggested the respective department for repairing by padding. There was lack of
communication due to improper methodology, so Material Handling operator must be
trained.
V
List of Figures
VI
List of Tables
VII
Contents
ACKNOWLEDGEMENTS IV
ABSTRACT V
LIST OF FIGURES VI
CHAPTER 1 : INTRODUCTION 1
3.1 INTRODUCTION 9
3.2 PRODUCT SUBTYPES 10
3.3 BEARING DESIGNATION 11
3.4 MANUFATURING PROCESS 11
3.4.1 Steps involved in assembly 15
3.5 MATERIAL HANDLING SYSTEM 18
CHAPTER 4 : CONCLUSION 24
4.1 SUMMARY 24
REFERENCES 25