Project: Community of Learners Foundation Building

No. Scope of Works / Building materials Unit Quantity


I. GENERAL REQUIREMENTS:
1 Mobilization/Demobilization. Lot
2 Site enclosure and maintenance. Lot
3 Housekeeping. Lot
Temporary Facilities, Site Office, Site Warehouse, Manpower
4 Lot
Barracks,Equipment and handling.
Sub-Tota
II. EARTHWORKS:
1 Excavation. Cbm
2 Back filling. Cbm
3 Hauling / Disposal. Cbm
4 Leveling & Compaction. Cbm
5 Gravel bedding. Cbm
6 Polyethylene Sheet. Sqm
Sub-Tota

III. CONCRETING WORKS:


1 Footing - Lower Base. Cbm
2 Footing - Upper Base Cbm
3 Column Pedestal Cbm
4 Slab - Slab on fill @ 3000 psi Cbm
5 Slab - Second Floor Cbm
6 Slab - Third Floor Cbm
7 Slab - Fourth Floor Cbm
8 Slab - Fifth Floor Cbm
9 Slab - Sixth Floor Cbm
10 Slab - Seventh Floor Cbm
11 Slab - Eight Floor Cbm
12 Stairs - G to 2nd Cbm
13 Stairs - 2nd to 3rd Cbm
14 Stairs - 3rd to 4th Cbm
15 Stairs - 4th to 5th Cbm
16 Stairs - 5th to 6th Cbm
17 Stairs - 6th to 7th Cbm
18 Stairs - 7th to 8th Cbm
19 Stairs - 8th to roof Cbm
20 Stair Wall- G to 2nd Cbm
21 Stair Wall- 2nd to 3rd Cbm
22 Stair Wall- 3rd to 4th Cbm
23 Stair Wall- 4th to 5th Cbm
24 Stair Wall- 5th to 6th Cbm
25 Stair Wall- 6th to 7th Cbm
26 Stair Wall- 7th to 8th Cbm
27 Stair Wall- 8th to roof Cbm
28 Shear Wall- G to 2nd Cbm
29 Shear Wall- 2nd to 3rd Cbm
30 Shear Wall- 3rd to 4th Cbm
31 Shear Wall- 4th to 5th Cbm
32 Shear Wall- 5th to 6th Cbm
33 Shear Wall- 6th to Roof beam Cbm
34 Shear Wall- 7th to 8th Cbm
35 Shear Wall- 8th to Roof Cbm
36 Retaining Wall- Cbm
Sub-Tota
IV. Reinforcements:
1 Footing - Lower Base. Kgs
2 Footing - Upper Base Kgs
3 Column Pedestal Kgs
4 Slab - 2nd Floor Kgs
5 Slab - 3rd Floor Kgs
6 Slab - 4thFloor Kgs
7 Slab - 5th Floor Kgs
8 Slab - 6th Floor Kgs
9 Slab - 7th Floor Kgs
10 Slab - 8th Floor Kgs
11 Slab on fill Kgs
12 Stairs - G to 2nd Kgs
13 Stairs - 2nd to 3rd Kgs
14 Stairs - 3rd to 4th Kgs
15 Stairs - 4th to 5th Kgs
16 Stairs - 5th to 6th Kgs
17 Stairs - 6th to 7th Kgs
18 Stairs - 7th to 8th Kgs
19 Stairs - 8th to roof Kgs
20 Stair Wall - G to 2nd Kgs
21 Stair Wall - 2nd to 3rd Kgs
22 Stair Wall - 3rd to 4th Kgs
23 Stair Wall - 4th to 5th Kgs
24 Stair Wall - 5th to 6th Kgs
25 Stair Wall - 6th to 7th Kgs
26 Stair Wall - 7th to 8th Kgs
27 Stair Wall - 8th to roof Kgs
28 Shear Wall - G to 2nd Kgs
29 Shear Wall - 2nd to 3rd Kgs
30 Shear Wall - 3rd to 4th Kgs
31 Shear Wall - 4th to 5th Kgs
32 Shear Wall - 5th to 6th Kgs
33 Shear Wall - 6th to 7th Kgs
34 Shear Wall - 7th to 8th Kgs
35 Shear Wall - 8th to Roof Kgs
36 Retaining Wall- Kgs
Sub-Tota
V. Formworks & Scaffolding:
1 Footing - Lower Base. Sqm
2 Footing - Upper Base Sqm
3 Column Pedestal Sqm
4 Stairs - G to 2nd Sqm
5 Stairs - 2nd to 3rd Sqm
6 Stairs - 3rd to 4th Sqm
7 Stairs - 4th to 5th Sqm
8 Stairs - 5th to 6th Sqm
9 Stairs - 6th to 7th Sqm
10 Stairs - 7th to 8th Sqm
11 Stairs - 8th to 9th Sqm
12 Stair Wall - G to 2nd Sqm
13 Stair Wall - 2nd to 3rd Sqm
14 Stair Wall - 3rd to 4th Sqm
15 Stair Wall - 4th to 5th Sqm
16 Stair Wall - 5th to 6th Sqm
17 Stair Wall - 6th to Roof beam Sqm
18 Shear Wall - G to 2nd Sqm
19 Shear Wall - 2nd to 3rd Sqm
20 Shear Wall - 3rd to 4th Sqm
21 Shear Wall - 4th to 5th Sqm
22 Shear Wall - 5th to 6th Sqm
23 Shear Wall - 6th to Roof beam Sqm
24 Retaining Wall- Sqm
Sub-Tota
VI. Masonry works:
1 CHB laying. Sqm
2 Plastering works Sqm
Sub-Tota
VII. Site Works:
1 Driveways/ Internal Roads/Side Walk/Gutter
Concreting works @ 3000psi Cbm
Reinforcements Kgs
Gravel bedding. Cbm
Polyethylene Sheet. Sqm
2 Culverts, Canals, Trenchdrains.
Concreting works @ 3000psi Cbm
Reinforcements Kgs
FireTank & Cistern (Concreting, embedded piping,
3
waterproofing).
Concreting works @ 3000psi Cbm
Reinforcements Kgs
Gravel bedding. Cbm
Waterproofing sqm
Septic Tank (Concreting, embedded piping, waterproofing).
Concreting works @ 3000psi Cbm
Reinforcements Kgs
Gravel bedding. Cbm
Waterproofing sqm
Sub-Tota
Total Direct Cost (Labor & Materials)
VAT (12%
Grand Tota
ding

Unit Price Total Amount

₱ -
₱ -
₱ -
₱ -
Sub-Total ₱ -

₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
Sub-Total ₱ -

₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
Sub-Total ₱ -

₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
Sub-Total ₱ -

₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
Sub-Total ₱ -

₱ -
₱ -
Sub-Total ₱ -

₱ -
₱ -
₱ -
₱ -
₱ -

₱ -
₱ -

₱ -
₱ -
₱ -
₱ -

₱ -
₱ -
₱ -
₱ -
Sub-Total ₱ -
ct Cost (Labor & Materials):
VAT (12%)
Grand Total