Date Job Description

Rescue Plan 103-D Signing


Job Safety Analysis for Replacement of Pan Flex near Old Ammonia storage Tank
DSC MOMs Circulated
1/1/2019
Observed the fixture building of Deaerator cap for flange facing machine
Globe Valve Nitric Acid Overhauling (4th Attempt)
Appeared in UTC

Rectified JSA for Replacement of Pan Flex and got it signed


Made monthly report of December
Rectified monthly highlights of november
Appeared in Weekly Planning meeting
1/2/2019
Observed fixture building of Deaerator cap for flange facing machine
Machining of Globe Valves
Don’t ever Give feedback without follow up on the scenario
Woma Jet Machine pressure testing procedure discussion

Observed Assembling of Flange Facing Machine


UTC MOMs Compilation
Item information / Stock / Procurement History from Oracle
Significance of Wear Rings in 2203 Pump
Acted as Training Facilitator
Training received on Valve overhauling guidelines (UTC)
1/3/2019
Observed Replacement of PanFlex at sight According to JSA
Procurement Handling of Bearings 6322, Delivery Status from Vendor
Meeting attended and noted responsibilities of maintenance department for Major Inspection of GTG-2
Observed the Incorrect Pressure Testing of Woma Jet Machine
Closed Workorders of Mechanical Workshop
Observed working of Flange Facing Machine, Problem Faced: Flowrate of air is too low

Updated UTC, compiled UTC package to be sent to PFL TTC


Managed the shifting of NP-1185 Motor, to be shifted on Monday
Carried forward the PM work orders of Workshop
Made Workorder for Flange Facing of Deareator Job
Produced / Found Diesel Requisition form
Visited site of GTG-02 for the Rigging and Scheduling plan of its Major Inspection, agreed to make Rigging p
1/4/2019
5 ton overhead crane got diagnosed by Electrical, limit switch is displaced from its position, scaffolding requ
0.3 millimeter flange facing completed on Deareator cap as per project recommendation, indentation mark
Meeting planned for Dereator cap on Monday about next steps, more facing will result in weld strength los
Studied the WPS of the Dereactor Repair and Maintenance, Base metal SS 321, Thickness 2-5 mm, Filler wi
Learnt Pick Slip and MIV making procedure on eAM
Observed the pressure testing of Petrol Pump pit Gate Valve, Raw Water 4 kg pressure, rating 150, test pres
or Inspection of GTG-2

agreed to make Rigging plan before hand,


s position, scaffolding required for its maintenance, MR deploying / receiving learnt
ndation, indentation marks still available on the gasket seat, inspection (Asif Sir) recommended more facing.
result in weld strength loss (More machining, weld rebuild or fit in this condition)
hickness 2-5 mm, Filler wire E-347

sure, rating 150, test pressure 8 kg, leaked at 6 kg, overhauling planned on Monday