CIMAHI 7-Nov-17 PEMBATASAN KUOTA BBM DI SPBU REKANAN SOLAR DIGANTI DENGAN DEXLITE (Rp 7,200/ liter)

CIMAHI 7-Nov-17 TYPE SUHU MOBIL NIAGA SHARE CARA MENSTANDARKAN SUHU 9 MOBIL TYPE CHILLER

MAKASSAR 7-Nov-17 TYPE SUHU MOBIL NIAGA MOBIL R170 DIAJUKAN MENJADI TYPE FROZEN (SEBELUMNYA DRY)

MAKASSAR 7-Nov-17 TYPE SUHU MOBIL NIAGA MOBIL R312 PENGGUNAAN UNTUK PENGIRIMAN DRY, SEHARUSNYA TYPE FROZEN

MAKASSAR 7-Nov-17 MOBIL RUSAK MOBIL R257 SUDAH RUSAK LAGI

MAKASSAR 7-Nov-17 BBM VOUCHER KAPAN BISA DIMULAI DAN APAKAH SUDAH DAPAT REKANAN SPBU?

MANADO 7-Nov-17 REPORT OPERATIONAL KE BDD BANYAK REPORT YANG TIDAK DIKIRIM

BANJARMASIN 7-Nov-17 BBM VOUCHER KAPAN BISA DIMULAI DAN APAKAH SUDAH DAPAT REKANAN SPBU?

Note:

Skala 1 1 bulan

Skala 2 3 bulan

Skala 3 6 bulan

Skala 4 12 bulan
FOTO TEMUAN GMP CABANG LOMBOK
PERIODE
TEMUAN PIC GAMBAR TEMUAN AWAL
AWAL TEMUAN

1. Instalasi jalur buangan air dari


unit sistem pendingin, berada di (17 - 19 November
atas lantai dengan ketinggian 2016)
hampir 50 cm.

1. Pipa condensor (refrigerant


system), kondisinya sudah mulai (17 - 192016)
November
karatan

Logo Diamond terlepas, akibat 2-Feb-17


hujan angin waktu lalu

Pintu toilet wanita rusak 11-Mar-17

Keran toilet rusak 15-Apr-17 Engineering

Tembok Luar yg menghadap ke 5-May-17 CS


gudang di Lt.2 Kotor
AUG-17 SEP-17
FOTO TERAKHIR JIKA CASE
STATUS STATUS STATUS STATUS STATUS STATUS CLOSED
26-Aug-17 2-Sep-17 9-Sep-17 16-Sep-17 23-Sep-17 30-Sep-17

ON ON ON
ON PROGRESS PROGRESS PROGRESS PROGRESS ON PROGRESS

ON ON ON
ON PROGRESS PROGRESS PROGRESS PROGRESS ON PROGRESS

ON ON ON
ON PROGRESS PROGRESS PROGRESS PROGRESS ON PROGRESS

ON ON ON
ON PROGRESS PROGRESS PROGRESS PROGRESS ON PROGRESS

ON ON ON
ON PROGRESS PROGRESS PROGRESS PROGRESS ON PROGRESS

ON ON ON
ON PROGRESS PROGRESS PROGRESS PROGRESS ON PROGRESS
ERAKHIR JIKA CASE KETERANGAN
CLOSED

AKAN SEGERA DI FU

AKAN SEGERA DI FU

Masih mencarikan penawaran harga


untuk pembuatan LOGO DIAMOND
ANALISA BY SUGGEST 25 Februari
2017

TEMUAN BY GMP ACTUAL KUNJUNGAN ENGINEERING


MANAGER

TEMUAN BY GMP ACTUAL KUNJUNGAN ENGINEERING


MANAGER

SUGGEST BY QA/QC BELUM TERCLOSED OLEH CABANG LOMBOK


CABANG LOMBOK
SUGGEST QA/QC Periode 26 SEP 2017

mohon dapat di infokan progresnya, karena case closed salah satu point dalam p

mohon dapat di infokan progresnya, karena case closed salah satu point dalam p

mohon dapat di infokan progresnya, karena case closed salah satu point dalam p

mohon dapat di infokan progresnya, karena case closed salah satu point dalam p

mohon dapat di infokan progresnya, karena case closed salah satu point dalam p

mohon dapat di infokan progresnya, karena case closed salah satu point dalam p
ANALISA BY SUGGEST 25 MARET MINOR MAJO INFRASTRUKTU
2017 R R

TEMUAN BY GMP ACTUAL KUNJUNGAN ENGINEERING Ѵ


MANAGER

TEMUAN BY GMP ACTUAL KUNJUNGAN ENGINEERING Ѵ


MANAGER

SUGGEST BY QA/QC BELUM TERCLOSED OLEH CABANG Ѵ


LOMBOK CABANG LOMBOK

SUGGEST BY QA/QC BELUM TERCLOSED OLEH CABANG Ѵ


LOMBOK CABANG LOMBOK