1. Project overview
1.1 Project needs
Through the analysis of existing information, the main requirements of
the project are as follows:
Control medium density of heavy medium;
Control thickener flocculant addition and thickener underflow
concentration;
3
Add: No.136 Binjiang M Road, Yanjiang Development Zone, Dandong, China
Post code:118002 Phone &Fax:+86-415 3862205
Web:http://en.dfmc.cc/ Email:sch@dfmc.cc
4
Add: No.136 Binjiang M Road, Yanjiang Development Zone, Dandong, China
Post code:118002 Phone &Fax:+86-415 3862205
Web:http://en.dfmc.cc/ Email:sch@dfmc.cc
5
Add: No.136 Binjiang M Road, Yanjiang Development Zone, Dandong, China
Post code:118002 Phone &Fax:+86-415 3862205
Web:http://en.dfmc.cc/ Email:sch@dfmc.cc
6
Add: No.136 Binjiang M Road, Yanjiang Development Zone, Dandong, China
Post code:118002 Phone &Fax:+86-415 3862205
Web:http://en.dfmc.cc/ Email:sch@dfmc.cc
the density and the flow rate of the incoming material, and calculate the
basic amount of the flocculant to add according to the corresponding
relationship between the amount of dry slime and the flocculant.
The overflow turbidity analysis: through the analysis of the turbidity of the
overflow, the base addition of the flocculant is corrected, so that the
turbidity of the overflow water is qualified.
Thickener internal interface detection: The settlement rate of the settling
layer, the transition layer, the bed level and the bed pressure of the
thickener is analyzed according to the on-line interface instrument with the
thickener. The small transitional layer shows that the solid-liquid interface
is distinct and the flocculation effect is good. The large transitional layer
shows the unclear interface because of worse solid precipitation. Therefore,
the base amount of the flocculant is corrected by the data of the on-line
interface instrument and the data of the bed pressure.
Thicker working condition monitoring: Through the communication
method to read thickener control system data, including torque, rake height
and other parameters, and then determine the thickener settling effect
through these parameters, by adjusting the flocculant added and the
frequency of underflow pump, prompting thickener access to the amount
of coal balance, so as to achieve the best flocculant added effect.
7
Add: No.136 Binjiang M Road, Yanjiang Development Zone, Dandong, China
Post code:118002 Phone &Fax:+86-415 3862205
Web:http://en.dfmc.cc/ Email:sch@dfmc.cc
Flow
Flocculant Base value
Dry Coal
Density Calculation
Flocculant Corrected Flocculant
value I Flocculant
Calculation
Adding System
Module
Bed Level
Underflow
Flocculant Corrected Density Analysis
value II Module
Torque
Concentrator
Rake Height State Analysis Density Corrected
Value II Underflow Frequency
Density Control
Module
Manual Setting
8
Add: No.136 Binjiang M Road, Yanjiang Development Zone, Dandong, China
Post code:118002 Phone &Fax:+86-415 3862205
Web:http://en.dfmc.cc/ Email:sch@dfmc.cc
Dilute Medium
Cyclone
Dense Medium
Cyclone
Splitter
Box Splitter
Box
Dilute Media Dilute Media
Refuse
1-50mm Heavy Media
Magnetic
Separator
Density
Gauge Non-Magnetic
Fines
9 Liquidometer
Frequency Control
Control Module
Frequency
Control
FlowMeter Density Gauge
Torque
Bed Level
FlowMeter Rake Height
Bed Pressure
Flocculant Flow Rate
Density
Settling Rater
Water
Overflow Turbidity
Thickener Control
System
Density Gauge
10