BEMS POINT SCHEDULE & MCC LOAD DIAGRAM

Utilities Compound - Generator

Starting Gear Rating A

Load Item Power kW


Control Cable Cores

Starting Gear Type


Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

Generator Control Panel


Generator Digital Point Interface G-CP 18 D 19
Generator Analouge Point Interface G-CP 9 A 10

X-G-MCC-03
Oil Fill / Alarm System
Alarm FS-CP 1 D 2

Oil Tank
Contents detector Tank 1 A 2

[Fire Alarm]
Fire Alarm Interface Unit, zone 1 MCC 1 D 2

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type :1 = Xlpe/Swa/LSF, Type 2: Xlpe/Swa/Pvc, Type: 3 HEPR cables, Type 4 : PVC/PVC, Type 5: PVC singles
4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for what is required

RE6309/D1361 Rev 0/2003 15910/1 BEMS Point Schedule