Anda di halaman 1dari 2

TAMIMI Pre-Engineered Buildings DOC.

# TPEB-QHSE-F-01

ISSUE# 01
IN-PROCESS ASSEMBLY INSPECTION CHECK LIST
ISSUE DATE 05-06-2017

TAMIMI PEB INSPECTION CHECKLIST IC NUMBER DATE APPROVED RFI NUMBER

ASSEMBLY OF CEILING INSPECTION CHECK LIST TPEB-AKH-037

PROJECT TITLE JO NUMBER CONTRACTOR / SUBCONTRACTOR

AL KIFAH HOLDING - MARJAN TPEB-TAMIMI

BUILDING DESCRIPTION Scheduled Inspection DATE Inspection Level


BUILDING Number

ITE
M ACCEPTANCE CRITERIA Reference PASS FAIL N/A REMARKS
NO.

A: Assembly of ceiling
Interior ceiling shall be constructed with minimum 89/63 x 41 x 1 mm studs and TPEB- SPR-
A1 runners, spaced 610mm on center. 10

The surfaces of gypsum board shall be true and free from imperfections that would TPEB- SPR-
A2 render it unfit for use with or without decoration. 10

Installed products shall be protected from weather, condensation, direct sunlight, TPEB- SPR-
A3 construction, and other causes during the remainder of construction period. 10

Panels that are wet, damage by mold and moisture shall be removed. TPEB- SPR-
A4
10
A5 The gypsum board of the ceiling should be minimum 16mm thick fire resistant. TPEB-SPR-10

REMARKS:

Production Engineer / QC INSPECTOR QC MANAGER/ QC Supervisor Third Party Representative


Supervisor
NAME: NAME: NAME: NAME:
TAMIMI Pre-Engineered Buildings DOC. # TPEB-QHSE-F-01

ISSUE# 01
IN-PROCESS ASSEMBLY INSPECTION CHECK LIST
ISSUE DATE 05-06-2017

SIGNATURE SIGNATURE SIGNATURE SIGNATURE

DATE: DATE: DATE: