Str & Dwawing.

 Acceblign for z+=g+=g+= g+=door is not shown.


 Show design wooden platform
 Show detail design of isolatted, Mat combined noothing and show mimioniment lotail.
 Show design of Base & Rate, Botton place
 Provide specification for conveyor.
 Snow Detail section of built up I-Beam.
 stirmp detial for follmn is not snow.
Estimate part.
 Earthwork in Nearation is taken for omeg tea 0.6m which is insulticient.
 In RCE for footing taperk part is not considenred.
 Reiniorcoment work is taken eniy 0.8% of RCE volume which is insufficient
 Add rate analysis of each and every item used in abstract of cost.
 Add detial of item used in eletical work and calculated amount of electrical work instead of usding it
in L.S.