PEKERJAAN : PERENCANAAN REHABILITASI BERAT KANTOR

LOKASI : JL. BANDARA HALUOLEO KENDARI

HITUNGAN

A PEKERJAAN PERSIAPAN
1 Galian Poer Plat A = V = PXLXT
P = 16
L = 1.4
T = 1.35
V = 30.24 M3

Jadi Jumlah Volume Galian Voer Plat Adalah 30.24 M3

2 Galian Tanah Pondasi garis = V = PXLXT A


A P = 60
L = 0.9
T = 0.62
V = 33.48 M3

Galian Tanah Pondasi Panggung = V = PXLXT


B P = 11
L = 0.45
T = 0.25
V = 1.24 M3
V = A+B
V = 33.48 M3

= 33.48 + 1.24 B
V = 34.72

Jadi Jumlah Volume Galian Pondasi Garis Adalah 34.72 M3


3 Urugan Kembali Alur Ponasi Per Plat
V = PXLXT - Poer Plat
P = 16
L = 1.4
T = 1.35
V = 30.24 M3
Volume Poer Plat
Volume a V = 0.21
Volume b V = 0.18
Volume c V = 0.09
Volume d V = 0.0525
Jumlah V = 0.53 X 16
V = 8.52
V = 30.24 - 8.52
V = 21.72 M3
Jadi Jumlah Volume Urugan Kembali Adalah 21.72 M3

4 Urugan Kembali Alur Pondasi P = 60.00


L = 0.44 M3
T = 0.52
V = 13.73 M3

Jadi Jumlah Volume Urugan Kembali Adalah 13.73 M3

5 Urugan Tanah Alas Lantai A P = 18.33


L = 11.8
T = 0.25
V = 54.07 M3
Urugan Tanah Alas Lantai B P = 3.8
L = 1.7
T = 0.25
V = 1.62 X 2
= 3.23 M3
Urugan Tanah Alas Lantai C P = 1.83
L = 1.33
T = 0.25
V = 0.61
Urugan Tanah Alas Lantai D P = 1.35
L = 1.48
T = 0.25
V = 0.50 M3

Urugan Tanah Alas Lantai E P = 2.35


L = 1.33
T = 0.25
V = 0.78 M3
=
Urugan Tanah Alas Lantai F P = 3.83
L = 1.48
T = 0.25
V = 1.42 M3

Urugan Tanah Alas Lantai G P = 1.85


L = 1.33
T = 0.25
V = 0.62 M3
Urugan Tanah Alas Lantai H P = 6
L = 2.5
T = 0.48
V = 7.20 M3

TOTAL JUMLAH V = 68.43 M3


Jadi Jumlah Volume Urugan Tanah Adalah 68.43 0
6 Urugan Pasir Alas Pondasi P = 60
L = 0.9
T = 0.1
V = 5.40 M3

Urugan Pasir Alas Ponasi Panggung

P = 11
L = 0.45
T = 0.1
V = 0.50
= 5.40 + 0.50
V = 5.90 M3

Jadi Jumlah Volume Adalah 5.90 M3

#REF!
7 A P = 18.33
L = 11.8
T = 0.1
V = 21.63 M3
B P = 3.8
L = 1.7
T = 0.1
V = 0.65 X 2
= 1.29 M3
C P = 1.83
L = 1.33
T = 0.1
V = 0.24

D P = 1.35
L = 1.48
T = 0.1
V = 0.20 M3

E P = 2.35
L = 1.33
T = 0.1
V = 0.31 M3
=
F P = 3.83
L = 1.48
T = 0.1
V = 0.57 M3

G P = 1.85
L = 1.33
T = 0.1
V = 0.25 M3
H P = 6
L = 2.5
T = 0.1
V = 1.50 M3

TOTAL JUMLAH V = 25.99 M3


Jadi Jumlah Volume dalah 25.99 M3
B PEKERJAAN PONDASI DAN BETON

1 Pas. Batu Kosong ( Poer Plat)

P = 16 -
L = 1.4
T = 0.15
V = 3.36 m3

Jadi Jumlah Volume Adalah = 3.36 m3

1 Pasangan Batu Kosong ( Garis)


P = 60 -
L = 0.9
T = 0.15
V = 8.10 m3
=

Jadi Jumlah Volume Adalah 8.10 m3


2 Pek. Pas Batu Gunung 1 : 5
A P = 60

L = 0.45
T = 0.7
V = 18.9 M3

Pondasi Panggung
B P = 11
L = 0.375
T = 0.48
V = 1.98
Tangga Panggung V = PXL/2
C P = 0.9
L = 11.1
V = 4.995
= 0
A+B+C V = 20.88 M3
JUMLAH V = 20.88 M3

Jadi Jumlah Volume Adalah 20.88 M3


3 Pek. Voort Plat = 16
A P = 1.2
L = 1.2
T = 0.15
V = 3.46 M3
B P = 16
L = 0.7
T = 0.15
V = 1.68
JUMLAH V = 5.14 M3

Jadi Jumlah Volume Adalah 5.14 M3


4 #REF!
P = 64 M1
L = 0.2
T = 0.35
V = 4.48 M3

Jadi Jumlah Volume Adalah 4.48 M3

5 #REF!
P = 12.28
M1

Jadi Jumlah Volume Adalah 12.28 M1

6 #REF!

P = 12.90
L = 0.20
T = 0.25
V = 0.65 M3

Jadi Jumlah Volume Adalah 0.65 M3


#REF!
P = 2.54 X 4
L = 0.40
T = 0.40
V = 0.41 X 4
= 1.63 M3

Jadi Jumlah Volume Adalah 1.63 M3

5 #REF!
Jumlah Titik = 16
P = 0.2
L = 0.35
T = 7.25
V = 8.12 M3

Jadi Jumlah Volume Adalah 8.12 M3

6 #REF!
P = 20.65 m1

Jadi Jumlah Volume Adalah 20.65 m1


7 #REF!
Jumlah Titik = 2
P = 0.2
L = 0.2
T = 4.7
V = 0.38 m3

Jadi Jumlah Volume Adalah 0.38 m3

8 #REF!
TERAS P = 2.75
L = 5.3
T = 0.12
V = 1.75 M3
JUMLAH V = 1.75 M3

Jadi Jumlah Volume Adalah 1.75 M3

9 #REF!

P = 59.45 M1
L = 0.15
T = 0.3
V = 2.67525

Jadi Jumlah Volume Adalah 2.68 M3


10 #REF!
P = 12.90
L = 0.15
T = 0.35
V = 0.68 M3

Jadi Jumlah Volume Adalah 0.68 M3


10 #REF!
P = 64
P = 12.28
V = 76.28 M3

Jadi Jumlah Volume Adalah 76.28 M3


13 Pek. Plat Canopy
P = 1.9
L = 1
T = 0.1
V = 0.19 X 5
V = 0.95 M3
Kanopy Ventilasi
A P = 5.6
L = 0.4
T = 0.1
V = 0.22 X 7
= 1.57 M3

B P = 3.4
L = 0.4
T = 0.1
V = 0.14 X 3
V = 0.41 M3

C P = 2.3
L = 0.4
V = 0.1 M3
V = 0.092 X 2
V = 0.184 M3

D P = 1.7
L = 0.28
T = 0.1
V = 0.05 X 2
V = 0.10 M3

JUMLAH V = 3.21 M3
Jadi Jumlah Volume Adalah 3.21 M3

Pek. Kolom Pada Kusen Jendela 10x25 TITIK


P = 3.35 X 20
V = 67 M1

Jadi Jumlah Volume Adalah 67.00 M1


Pekerjaan List Pfofil Pada Teras P = 20.82 M2
L = 0.1
V = 2.082 m2

Jadi Jumlah Volume Adalah 2.08 M2


GAMBAR SKETSA
D
13 90
5
C
B
A
120
140
Plat kanopi
PEKERJAAN : PERENCANAAN REHABILITASI BERAT KANTOR
LOKASI : JL. BANDARA HALUOLEO KENDARI

HITUNGAN
PEKERJAAN DINDING
1 asangan Bata Merah 1 : 3 (Trasram) V = PXT - Lubang Kusen
Pinggir Bangunan P = 55.79
T = 0.3
V = 16.737

Lubang Kusen V = PXT


P1 = 1.02

V = 1.02
V = 16.737 - 1.02
V = 15.717 M2

Tras Tram Km/Wc Tinggi 1.6 m V = PXT - Lubang Kusen


P = 12.64
T = 1.6
V = 20.224 M2

Lubang Kusen V = PXT


P = 1.28 X 2
V = 2.56
V = 20.224 - 2.56
V = 17.664
V = 15.717 + 17.664
Jumlah Total V = 33.38 M2

Jadi Humlah Total Volume Adalah 33.38 m2


2 Pasangan Bata Merah 1 : 5, 1/2 bata V = PXT - Lubang Kusen
Dinding Luar A P = 59.45
T = 5.8
v = 344.81

Dindind Dalam B V = PXT


P = 11.2
T = 2.95
V = 33.04
= A+B
V = 377.85

Lubang Kusen V = PXT Jumlah Buah


2 P1 P = 3.655 X2 7.31
1 Lubang Pintu P2 P = 1.72 X1 1.72
2 Lubang Pintu P3 P = 1.47 X2 2.94
5 Lubang Jendela J1 P = 3.78 X5 18.9
7 Lubang Ventilasi v1 P = 1.3 X7 9.1
3 Lubang Ventilasi v2 P = 0.78 X3 2.34
3 Lubang Ventilasi v3 P = 0.52 X2 1.56
Lubang Ventilasi v4 P = 0.3 X3 0.9
Volume Lubang Kusen V = 43.87 M2 Lunag Kusen
V = 377.85 - 43.87
Volume Dinding Dikurang Luasan Lb V = 333.98 M2

Pas Dinding A + B + C V = A+B - Dinding TrasRam 1 :3


V = 333.98 - 33.38
= 300.60 M2
Jadi Jumlah Total Volume Adalah 300.60 m2
3 Pek. Plesteran Tembok 1 : 3 V = (P X T ) / 2 SISI

Pas. Batu merah Dinding 1:3 x 2 sisih V = 33.38 X 2


V = 66.762 M2

Jadi Jumlah Total Volume Adalah 66.762 M2

4 Pek. Plesteran Tembok 1 : 5


V = (P X T ) / 2 SISI

Pas. Batu Dinding 1:5 X 2 Sisih V = 300.60 X 2


V = 601.20 M2

Jadi Jumlah Total Volume Adalah 601.20 M2


5 #REF! V = PXT
A P = 4.4
T = 5.8
V = 25.52 M2
=
B V = PXT - Lubang Kusen
P = 4
T = 5.8
= 23.2 M2
V1 = 0.26 X 5 1.3
V4 = 0.39
Jumlah Lubang Kusen V = 1.69
V = 23.2 - 1.69
= 21.51
V = 23.20 M2

V = PXT
C P = 4.4
T = 5.8
V = 25.52

D V = PXT
P = 4.25
T = 3.13
V = 13.30 M2

E V = PXT
P = 4.25
T = 3.13
V = 13.30 M2
Lunang Kusen V1 = 0.26 X 5 1.3
V = 13.30 - 1.3
= 17.29 M2
Total Volume Dinding Alcopan V = 104.84 m2
Alcopan Pada Teras V = PXT
A P = 2.00
T = 2.85
V = 5.7 x 4
V = 22.8 M2
B P = 2.76
T = 2
V = 5.52 X 2
V = 11.04 M2

C P = 10.12
T = 0.48
V = 4.8576 X 2
V = 9.7152 M2
Total Volume Alcopan Pada Teras V = A+B+C
= 43.56 M2
Jumlah = 148.39 m2

Jadi Jumlah Total Volume Adalah 148.39 m2


#REF!
V = PXL
BELAKANG P = 5.75
L = 0.93
V = 5.35 X 6
V = 32.09
SAMPING KIRI
A P = 5.75
L = 1.84
V = 10.58 M2
B P = 5.75
L = 2.3
V = 13.23 M2
SAMPING KANAN P = 5.75
L = 3.8
V = 21.85 M2
JUMLAH V = 51.00

Lubang Kusen V = PXL


VI = 2.34
V2 = 0.52
Jumlah V = V1 + V2 M2
= 2.34 + 0.52
= 2.86
V = 51.00 - 2.86
V = 48.14 M2

Jadi Jumlah Total Volume Adalah 48.14 M2


PEKERJAAN KUSEN PINTU DAN JENDELA
1 . Kusen Pintu, Jendela dan Ventilasi
V = PXTL = M3
KUSEN PINTU P2 P = 3.05 M1
KUSEN PINTU P3 P = 5.1 X 2
= 10.2 M1
VENTILASI KUSEN J1 P = 6.24 X 15
= 93.6 M1
VENTILASI KUSEN V1 P = 2.3 X 58
= 133.4 M1
VENTILASI KUSEN V4 P = 1.15 X 2
= 2.3
TOTAL JUMLAH PANJANG KUSEN V = V1 + v2 + v3
= 247.65 M1
V = PXTL = M3
P = 247.65
L = 0.06
T = 0.12
V = 1.78 M3
Jadi Jumlah Total Volume Adalah 1.78 M3
#REF!
P2 V = PXL
P = 5.3
L = 0.1
= 0.53
P3 V = PXL
P = 5.84
L = 0.08
= 0.47 X 2
= 0.93 M2
= 1.46 M2
Jadi Jumlah Total Volume Adalah 1.46 M2
2 #REF!
V = PXT X Jumlah Unit
JENDELA J1 P = 2.43 X
L = 0.41
V = 0.9963 X 15
V = 14.9445 M2
VENTILAS V1 P = 0.56 X
L = 0.31
V = 0.1736 X 58
V = 10.0688 M2
VENTILASI V2 P = 0.41
L = 0.56
V = 0.2296 X 3
JUMLAH V = 0.6888 M2

V = 25.7021 M2
Jadi Jumlah Total Volume Adalah 25.70 M2
#REF!
PINTU P2 P = 0.925
PINTU P3 P = 1.85
P = 2.09
V = P1 + P2
= 4.865 M2

Jadi Jumlah Total Volume Adalah 4.87 M2

#REF!
1 #REF!
K1 P = 64
KS1 P = 16
KS2 P = 32
JURAI KUDA-KUDA P = 39.8
Kuda- Kuda Nok P = 7.95
V = 159.75 M1

Jadi Jumlah Total Volume Adalah 159.75 M1

2 #REF!
P = 91 + 195.49
P = 286.49
= 286.49 X 2
= 572.98 M1

Jadi Jumlah Total Volume Adalah 572.98 M1


#REF!

A V = A+B XC
A = 22.15
B = 8
C = 8.15
= A + B
= 22.15 + 8
= 30.15 X C
= 30.15 X 8.15
= 245.72
B V = AXB
A = 14.15
B = 8.15
= A X B
= 14.15 X 8.15
= 115.3225 X

V = A + B
V = 245.72 + 115.32
V = 361.05 M2
Jadi Jumlah Total Volume Adalah 361.05 M2

1 #REF!
P V = M1
Rangka A P = 48 M1

Jadi Jumlah Total Volume Adalah 48.00 M1

#REF!

P = 22 X 2
V = 44
P = 14 X 2
V = 28
= 28 + 44
= 72 X
= 72 M2

Jadi Jumlah Total Volume Adalah 72.00 M2


#REF!
#REF!
A P = 18.33
L = 11.8
T = 0.05
V = 10.81 M3
B P = 3.8
L = 1.7
T = 0.05
V = 0.32 X 2
= 0.65 M3
C P = 1.83
L = 1.33
T = 0.05
V = 0.12

D P = 1.35
L = 1.48
T = 0.05
V = 0.10 M3

E P = 2.35
L = 1.33
T = 0.05
V = 0.16 M3
=
F P = 3.83
L = 1.48
T = 0.05
V = 0.28 M3

G P = 1.85
L = 1.33
T = 0.05
V = 0.12 M3
H P = 6
L = 2.5
T = 0.08
V = 1.20 M3

TOTAL JUMLAH V = 13.45 M3


#REF!
A P = 18.33
L = 11.8
= 216.294

B P = 3.8
L = 1.7
V = 6.46 X 2

C P = 1.35
L = 1.48
V = 2.00 M2

D P = 2.35
L = 1.33
V = 3.1255 M2

=
E P = 3.83
L = 1.48
V = 5.6684 M2
=
F P = 6
L = 2.5
V = 15 M2

Tegel Anak Tangga P = 1.93


L = 0.5
= 0.965 X 2
V = 1.93 M2
Total = 250.48

TOTAL JUMLAH V = 250.48 M2

#REF!
C P = 1.83
L = 1.33
V = 2.43 m2

G P = 1.85
L = 1.33
V = 2.4605 M2
V = 2.46 + 2.46
= 4.92 M2

TOTAL JUMLAH V = 4.92 M2


#REF!
V = M1
LUBAG PINTU
P = 73.50 - 5.9
= 67.60 m1

TOTAL JUMLAH V = 67.60 m1 67.60 M

#REF!
KUSEN PINTU P = 5.9
TANGGA PANGGUNG P = 15.44
= 15.44 + 5.9
= 21.34 M1

TOTAL JUMLAH V = 21.34 M1

#REF!
Tras Tram Km/Wc Tinggi 1.6 m V = PXT - Lubang Kusen
P = 12.64
T = 1.6
V = 20.224 M2

Lubang Kusen V = PXT


P = 1.28 X 2
V = 2.56
V = 20.224 - 2.56
V = 17.664

Pas Dinding Panggung


V = PXT
P = 6.4
T = 0.5
V = 3.2
V =
Jumlah Total V = 20.86 M2

TOTAL JUMLAH V = 20.86 M2


#REF!
3 #REF!
A P = 7.54
L = 1.05
V = 7.92

B P = 12
L = 3
L = 36.00

C P = 17
L = 1.5
V = 25.5 X 2
V = 51.00

D P = 8.8
L = 1.5
V = 13.20

E P = 48.16
L = 0.9
V = 43.344

F P = 11.41
L = 4.47
T = 51.0027 X 2
102.01

G P = 4.925
L = 4.47
V = 22.01 X 2
V = 44.03 M2

H P = 8.8
L = 1.75
V = 15.4 M2

I P = 1.85
L = 1.33
V = 2.4605 X 2
= 4.92 M2

J P = 2.35
L = 1.33
V = 3.1255 M2
K P = 1.85
L = 1.33
V = 2.4605 X 2
= 4.92 M2
Plafond Luar
P = 73.42
L = 0.8
V = 58.736 M2
Plafond Teras
P = 3.85
L = 1.7
V = 6.545 M2
Total Jumlah V = 391.14 - 0.90 X 9
391.14 - 8.1
= 383.04 M2

Jadi Jumlah Volume dalah 383.04 M2

#REF!
A P = 7.54
L = 1.05
V = 7.92

B P = 12
L = 3
L = 36.00
C P = 17
L = 1.5
V = 25.5 X 2
V = 51.00

D P = 9
L = 1.5
V = 13.50
E P = 48.16
L = 0.9
V = 43.344
F P = 11.41
L = 4.47
T = 51.0027 X 2
102.01

G P = 5.025
L = 4.47
V = 22.46 X 2
V = 44.92 M2
H P = 9
L = 1.75
V = 15.75 M2

I P = 1.85
L = 1.33
V = 2.4605 X 2
= 4.92 M2
J P = 2.35
L = 1.33
V = 3.1255 M2

K P = 1.85
L = 1.33
V = 2.4605 X 2
= 4.92 M2
Plafond Luar
P = 73.42
L = 0.8
V = 58.736 M2
Plafond Teras
P = 3.85
L = 1.7
V = 6.545 M2

Total Jumlah V = 392.69 - 8.1


= 384.59 M2

Jadi Jumlah Volume dalah 384.59 M2

#REF!
Plafond Dalam P = 100.18

Plafond Luar P = 64.95

v = 165.13 M1

Jadi Jumlah Volume dalah 165.13 M1


#REF!
V = PXLXT
#REF! P = 79.80
L = 0.3
T = 0.35
V = 8.38 M3

Jadi Jumlah Volume adalah 8.38 M3

Urugan Pasir Keliling Bangunan V = PXLXT


P = 73.43
L = 0.9
T = 0.05
V = 3.30 M3

Jadi Jumlah Volume adalah 3.30 M3

Urugan Tanah Keliling Bangunan V = PXLXT


P = 73.43
L = 0.9
T = 0.15
V = 9.91 M3

Jadi Jumlah Volume adalah 9.91 M3


Pasangan Batu Gunung 1 : 3 + diaci dengan air semen
P = 79.80 M1

Jadi Jumlah Volume adalah 79.80 M1

Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5


V = PXLXT
P = 73.43
L = 0.9
T = 0.05
V = 3.30 M3

Jadi Jumlah Volume adalah 3.30 M3

PEKERJAAN PENGECETAN / FINISHING


1 #REF!
A V = (P X T ) / 2 SISI

Pas. Batu merah Dinding 1:3 x 2 sisih


V = 33.381 X 2
V = 66.762 M2

B V = (P X T ) / 2 SISI

Pas. Dinding 1:5 X 2 Sisih V = 300.60 X 2


V = 601.20 M2
V = A+B
V = 66.762 + 601.20
V = 667.96 M2

VOLUME DIMDING PLESTERAN PROFIL


VOLUME DINDING ALCOPAN
JUMLAH V = 48.14 M2
V = 148.39 M2
V = 196.53 M2

V = 667.96 - 196.53
V 471.43 M2

Jadi Jumlah Volume adalah 471.43 M2

#REF!

BELAKANG P = 5.75
L = 0.93
V = 5.35 X 6
V = 32.09
SAMPING KIRI
A P = 5.75
L = 1.84
V = 10.58 M2
B P = 5.75
L = 2.3
V = 13.23 M2
SAMPING KANAN P = 5.75
L = 3.8
V = 21.85 M2
JUMLAH V = 51.00

Lubang Kusen V = PXL


VI = 2.34
V2 = 0.52
Jumlah V = V1 + V2 M2
= 2.34 + 0.52
= 2.86
V = 51.00 - 2.86
V = 48.14 M2

Jadi Jumlah Total Volume Adalah 48.14 M2


2 #REF!
Rangka Dalam P = 274.11 m2

Rangka Luar P = 46.41


V = 320.52 M2

Jadi Jumlah Volume adalah 320.52 M2

#REF!
3 V = PXT X Jumlah Unit
KUSEN P2 P = 0.89 X 1
V = 0.89 M2

V = PXT X Jumlah Unit


KUSEN P3 P = 0.87 X 2
V = 1.74 M2

V = PXT X Jumlah Unit


KUSEN J1 P = 1.037 X 15
V = 15.555 M2

V = PXT X Jumlah Unit


VENTILASI 1 P = 0.44 X 58
V = 25.52 M2

V = PXT X Jumlah Unit


VENTILASI 3 P = 0.48 X 2
V = 0.96 M2
TOTAL V = 44.67
Jadi Jumlah Total Volume Adalah 44.67 M2
#REF!
V = PXT X Jumlah Unit
KUSEN P2 P = 0.89 X 1
V = 0.89 M2

V = PXT X Jumlah Unit


KUSEN P3 P = 0.87 X 2
V = 1.74 M2

V = PXT X Jumlah Unit


KUSEN J1 P = 1.037 X 15
V = 15.555 M2

V = PXT X Jumlah Unit


VENTILASI 1 P = 0.44 X 58
V = 25.52 M2

V = PXT X Jumlah Unit


VENTILASI 3 P = 0.48 X 2
V = 0.96 M2
TOTAL V = 44.669
Jadi Jumlah Total Volume Adalah 44.67 M2

Pek. Pemb. Jalan masuk Kantor


V = PXLXT
P = 2.00
L = 1.40
T = 0.12
V = 0.34 x 2
V = 0.67 m3

Jadi Jumlah Total Volume Adalah 0.34 m3


KANTOR

GAMBAR SKETSA
A B

C
D

E
A B

BELAKANG

S.KIR A
I

S.KANAN
V1

J1

V2
P2
P3 X 2
640
ALCOPA
N

BELAKANG

S.KIR A
I
B

S.KANAN

J1 V1
RENCANA ANGGARAN BIAYA
#REF! : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KE
#REF! : PERENCANAAN REHABILITASI BERAT WISMA MAKMUR LUAS BANGUN
#REF! #REF!
#REF! #REF!

NO. URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4
1
2
3
4
5
6

Jumlah Harga Pekerjaan Persiapan (Dipindahkan ke Rekapitulasi Biaya)


I PEKERJAAN TANAH DAN PASIR
1 Galian tanah untuk pondasi 12.42 M3
2 Urugan Kembali Alur Pondasi 3.11 M3
3 Urugan Pasir Bawah Pondasi 0.69 M3
4 Pas.Batu Kosong 1.38 M3
5 Pek. Pas. Pondasi Batu Gunung 5.61 M3
Jumlah Harga Pekerjaan Tanah dan Pasir (Dipindahkan ke Rekapitulasi Biaya)
II PEKERJAAN PONDASI DAN DINDING
1 Pek.Plesteran dinding bata 1:3 20.48 M2
2 Pek.Pas.dinding bata 1:3 40.96 M2
Jumlah Harga Pekerjaan Pondasi dan Dinding (Dipindahkan ke Rekapitulasi Biaya)
III PEKERJAAN BETON
1 Pek. Sloof 15/20 2.30 M3
2 Pek. Kolom 15/25 0.51 M3
Jumlah Harga Pekerjaan Beton (Dipindahkan ke Rekapitulasi Biaya)
IV PEKERJAAN PENGECETAN / FINISHING
1 Pek. Cat Tembok 40.96 M2
3 Pek. List Profil Pada Tembok 11.80 M1
4 Pembersihan Akhir / Finishing 1.00 Ls
Jumlah Harga Pekerjaan Pengecatan / Finishing ( Dipindahkan ke Rekapitulasi Biaya )
IAYA
WISMA PSTW MINAULA KENDARI
A MAKMUR LUAS BANGUNAN 127 M2

HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
5 6

-
-

-
-
kapitulasi Biaya) -

-
-
-

-
-
-

-
-
-
pitulasi Biaya ) -
RENCANA ANGGARAN BIAYA
### : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
### : PERENCANAAN REHABILITASI BERAT WISMA MAKMUR LUAS BANGUNAN 127 M2
### #REF!
### #REF!

HARGA
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN
(Rp.)
1 2 3 4 5
I PEKERJAAN PERSIAPAN
1 Pembuatan Direksi Keet Dan Bangsal Kerja (Disewa) 1.00 Ls 3,000,000.00
2 Pembongkaran Bangunan Lama/ Pembersihan Lokasi 1.00 Ls 5,000,000.00
3 Pemasangan Bouplank / Pengukuran Kembali 1.00 Ls 1,500,000.00
4 Air Kerja / P3K 1.00 Ls 1,500,000.00
5 Papan Nama Proyek 1.00 Ls 250,000.00
6 Aadministrasi / Foto Dokumentasi 1.00 Ls 3,000,000.00
Jumlah Harga Pekerjaan Persiapan (Dipindahkan ke Rekapitulasi Biaya)
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Poor Plat 20.00 M3 #REF!
2 Pek. Galian Tanah Alur Pondasi 42.60 M3 #REF!
3 Urugan Kembali Alur Pondasi Poor Plat 5.00 M3 #REF!
4 Urugan Kembali Alur Pondasi 10.65 M3 #REF!
5 Urugan Tanah Alas Lantai 38.93 M3 #REF!
6 Urugan Pasir Alas Pondasi 3.360 M3 #REF!
7 Urugan Pasir Alas Lantai 59.93 M3 #REF!
Jumlah Harga Pekerjaan Tanah dan Pasir (Dipindahkan ke Rekapitulasi Biaya)
III PEKERJAAN PONDASI DAN BETON
1 Pasangan Batu Kosong 6.24 M3 #REF!
2 Pek. Pas Batu Gunung 1 : 5 13.89 M3 #REF!
3 Pek. Voort Plat 2.14 M3 #REF!
4 Pek. Sloof 15/20: 1pc :2ps :3kr 123.00 M1 #REF!
5 Pek. Kolom 20x20 Cm 3.52 M3 #REF!
6 Pek. Plat Beton 2.33 M3 #REF!
7 Pek.Kolom Praktis 15/15 1pc 2ps:3kr 88.00 M1 #REF!
8 Pek. Balok Latei 15/15 1pc : 2ps : 3kr 21.00 M1 #REF!
9 Pek.Ring Balok 15/15 1pc 2ps:3kr 116.50 M1 #REF!
10 Pek. Balok Latey 15 / 35 1.34 M 3
#REF!
Jumlah Harga Pekerjaan Pondasi dan Dinding (Dipindahkan ke Rekapitulasi Biaya)
IV PEKERJAAN DINDING
1 Pasangan Bata Merah 1 : 3 (Trasram) 27.08 M2 #REF!
2 Pasangan Bata Merah 1 : 5, 1/2 bata 295.26 M2 #REF!
3 Pek. Plesteran Tembok 1 : 3 54.16 M2 #REF!
4 Pek. Plesteran Tembok 1 : 5 590.51 M2 #REF!
Jumlah Harga Pekerjaan Beton (Dipindahkan ke Rekapitulasi Biaya)
V PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pek. Kusen Pintu, Jendela dan Ventilasi 1.17 M3 #REF!
2 Pek. Bingkai Kaca Jendela, Pintu dan Ventilasi 4.70 M2 #REF!
3 Pek. Kaca 5 mm riben Pada Daun Jendela 8.35 M2 #REF!
4 Pek. Pintu Panil Jati 30.00 M2 #REF!
5 Pek. Angker Kusen Pintu dan Jendela. Besi 6 Mm 94.00 Bh 2,000.00
6 Pek. Newt-Newt Kusen Pintu 24.00 Tiang 5,000.00
7 Pek. Pasangan Kunci Pintu Utama 2.00 Bh #REF!
8 Pek. Pasangan Pintu Kunci Biasa 2 x Putar 10.00 Bh #REF!
9 Pek. Pasangan Engsel Jendela 14.00 Psg #REF!
10 Pek. Pasangan Engsel Pintu 12.00 Psg #REF!
11 Pek. Pasangan Grendel Jendela 14.00 Bh #REF!
12 Pek. Pasangan Grendel Pintu 12.00 Bh #REF!
13 Pek. Pasangan Hak Angin Jendela 14.00 Bh #REF!
Jumlah Harga Pekerjaan Kusen Pintu dan Jendela (Dipindahkan ke Rekapitulasi Biaya)
VI PEKERJAAN KAP DAN KUDA-KUDA
1 Pek. Kuda-kuda + Baja Ringan 266.40 M2 200,000.00
2 Pek. Pasangan Atap Almunium 0.55 278.16 M2 #REF!
3 Pek. Pasangan Nok Almunium 0.55 60.08 M' #REF!
4 Pek. Listplank 57.43 M' #REF!
5 Pek. Pasangan Talang 16.60 M' #REF!
Jumlah Harga Pekerjaan Kap dan Kuda-Kuda (Dipindahkan ke Rekapitulasi Biaya)
VII PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Pek. Rabat Beton 1pc : 3ps : 5kr, Alas Lantai 6.80 M3 #REF!
2 Pek. Lantai Keramik 40 x 40 Cm 125.00 M2
#REF!
3 Pek. Lantai Keramik 20 x 20 Cm Anti Slip (KM/WC) 11.25 M2 #REF!
4 Pek. Tegel Plin 20 Cm 138.00 M1
#REF!
5 Pek. Tegel Kuku 13.40 M1 #REF!
6 Pek. Dinding keramik pd km/wc 37.43 M2
#REF!
Jumlah Harga Pekerjaan Lantai dan Dinding Keramik (Dipindahkan ke Rekapitulasi Biaya)
VIII PEKERJAAN LANGIT-LANGIT (PLAFOND)
1 Pek. Rangka Plafon Holo Aluminium 197.00 M2 #REF!
2 Pek. Plafon Gipsum 197.00 M2 #REF!
3 Pek. List Plafond Gipsum 286.50 M'1 #REF!
Jumlah Harga Pekerjaan Langit-Langit / Plafond (Dipindahkan ke Rekapitulasi Biaya)
IX PEKERJAAN INSTALASI LISTRIK
1 Pek. Pasangan Instalasi Titik Lampu 25.00 Ttk #REF!
2 Pek. Pasangan lampu Phillips 10 watt 5.00 Bh #REF!
3 Pek. Pasangan lampu Phillips 20 watt 15.00 Bh #REF!
4 Pek. Pasangan lampu Phillips 40 watt 3.00 Bh #REF!
5 Pek. Pasangan Saklar Tunggal "Broco" 12.00 Bh #REF!
6 Pek. Pasangan Saklar Ganda " Broco" 2.00 Bh #REF!
7 Pek. Pasangan Stop Kontak"Broco" 8.00 Bh #REF!
8 Pek. Pas MCB 1.00 Ls #REF!
Jumlah Harga Pekerjaan Instalasi Listrik (Dipindahkan ke Rekapitulasi Biaya)
X PEKERJAAN SANITAIR
1 Pek. Pasangan Instalasi Air Bersih Pipa 3/4" 15.00 M' #REF!
2 Pek. Pasangan Instalasi Air Kotor Pipa 3" 10.13 M' #REF!
3 Pek. Pas. Kloset Duduk lengkap 5.00 Bh #REF!
4 Pek. Pasangan Kran 6.00 Bh #REF!
5 Pek. Pasangan Bak Fibreglass 5.00 Bh 300,000.00
6 Pek. Pembuatan Septik Tank + Resapan 2.00 Unit 3,000,000.00
7 Pek. Floor Drain 5.00 Bh #REF!
8 Pek. Pas. Tempat Cuci Piring Stenlis 1 Lubang 1.00 Unit 700,000.00
9 Pek. Pemasangan Wastafel + Kaca 2.00 Bh #REF!
Jumlah Harga Pekerjaan Sanitair (Dipindahkan ke Rekapitulasi Biaya)
XI PEKERJAAN RABAT DAN SALURAN
1 Galian Tanah Selokan 6.15 M3 #REF!
2 Urugan Kembali Alur Galian 1.54 M3 #REF!
3 Urugan Pasir Selokan 0.82 M3 #REF!
4 Urugan Pasir Rabat Keliling Bangunan 1.44 M3 #REF!
5 Pasangan Batu Gunung 1 : 3 + diaci dengan air semen 41.00 M1 #REF!
6 Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5 1.72 M3 #REF!
Jumlah Harga Pekerjaan Rabat dan Saluran (Dipindahkan ke Rekapitulasi Biaya)
XII PEKERJAAN PENGECETAN / FINISHING
1 Pek. Cat Tembok 644.67 M2 #REF!
2 Pek. Cat Plafond 197.00 M2
#REF!
3 Pek. Menggosok dan Mendempul Bidang Kayu 25.00 M2
#REF!
4 Pek. Cat Kilap Kusen, Pintu, Jendela dan lestplank 42.10 M2 #REF!
5 Pek. Relling dari stenlis steel Untuk Penyandang Cacat 3.00 M2
300,000.00
6 Pek. Relling dari stenlis steel Untuk Kamar Mandi 5.00 Bh 150,000.00
7 Pek. List Profil Pada Teras 5.00 M2
#REF!
8 Pek. Pemasangan Papan Nama Wisma 1.00 Ls 500,000.00
9 Pek. Tralis Jendela 14.00 Bh 250,000.00
10 Pek. Exabilitas pada dinding ruangan tamu dari Stenlis Stiil 19.00 M' 150,000.00
11 Pek. Pembuatan Jalan Masuk Wisma 0.18 Ls #REF!
12 Pembersihan Akhir / Finishing 1.00 Ls 2,000,000.00
Jumlah Harga Pekerjaan Pengecatan / Finishing (Dipindahkan ke Rekapitulasi Biaya)
XII PEKERJAAN SELASAR
1 Pek. Galian Tanah 15.40 M2 #REF!
2 Pek. Urugan Kembali Alur Pondasi 3.85 M2 #REF!
3 Pek. Urugan Pasir Alas Pondasi 3.08 M2 #REF!
4 Pek. Urugan Tanah Alas Lantai 18.90 M2 #REF!
5 Pek. Urugan Pasir Alas Lantai 6.30 M2 #REF!
6 Pek. Pasangan Batu Kosong 4.62 M3 #REF!
7 Pek. Pondasi Batu Gunung 1 : 5 7.70 M3 #REF!
8 Pek. Slof 15 x 20 Cm 63.50 M1 #REF!
9 Pek. Kolom 15 x 20 Cm 67.60 M' #REF!
10 Pek. Ring Balk 15 x 25 Cm 63.50 M' #REF!
11 Pek. Rangka Atap kuda- Kuda Baja Ringan 105.60 M2 200,000.00
12 Pek. Atap Spandek 110.00 M2 #REF!
13 Pek. Nok Atap Spandek 22.00 M1 #REF!
14 Pek. Lisplank 54.00 M1 #REF!
15 Pek. Rabat Lantai 1 : 3 : 5 2.20 M3 #REF!
16 Pek. Lantai Keramik Anti Slip 40 x 40 Cm 44.00 M2 #REF!
17 Pek Plesteran Kolom Dan Ring Balk 88.60 M2 #REF!
18 Pek. Pengecetan Kolom Dan Ring Balk 88.60 M2 #REF!
19 Pek Pengecetan List Plank 16.20 M2 #REF!
20 Pek. Drainase pada selasar 44.00 M' #REF!
21 Pek. Rabat 1 : 3 : 5 keliling selasar 1.54 M3 #REF!
22 Pembersihan Akhir / Finishing 1.00 Ls 1,500,000.00
Jumlah Harga Pekerjaan Selasar (Dipindahkan ke Rekapitulasi Biaya)
ANA ANGGARAN BIAYA

LITASI BERAT WISMA MAKMUR LUAS BANGUNAN 127 M2

JUMLAH
HARGA
(Rp.)
6

3,000,000.00
5,000,000.00
1,500,000.00
1,500,000.00
250,000.00
3,000,000.00
14,250,000.00

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
188,000.00
120,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

53,280,000.00
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
1,500,000.00
6,000,000.00
#REF!
700,000.00
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
900,000.00
750,000.00
#REF!
500,000.00
3,500,000.00
2,850,000.00
#REF!
2,000,000.00
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
21,120,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1,500,000.00
#REF!
REKAPITULASI
#REF! : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
#REF! : PERENCANAAN REHABILITASI BERAT WISMA MAKMUR LUAS BANGUNAN 127 M2
#REF! #REF!
#REF! #REF!

No. URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN Rp.

II. PEKERJAAN TANAH DAN PASIR Rp.

III. PEKERJAAN PONDASI DAN BETON Rp.

IV. PEKERJAAN DINDING Rp.

V. PEKERJAAN KAP DAN KUDA-KUDA Rp.

VI. PEKERJAAN KUSEN PINTU DAN JENDELA Rp.

VII. PEKERJAAN LANTAI DAN DINDING KERAMIK Rp.

VIII. PEKERJAAN LANGIT-LANGIT (PLAFOND) Rp.

IX. PEKERJAAN INSTALASI LISTRIK Rp.

X. PEKERJAAN SANITAIR Rp.

XI. PEKERJAAN RABAT DAN SALURAN Rp.

XII. PEKERJAAN PENGECETAN / FINISHING Rp.


XIII PEKERJAAN SELASAR Rp.
Real Cost Rp.
PPN 10% Rp.

Perencanaan Teknis Rp.


Pengawasan Teknis Rp.
Pengelola Proyek Rp.
JUMLAH Rp.
Dibulatkan Rp.

Terbilang:"Tujuh Ratus Sembilan Puluh Dua Juta Delapan Ratus Sembilan puluh Ribu Rupiah"
Kendari, Februari 2015
Mengetahui
CV. AZZA SURYA KONSULTAN Pembuat:

SUHADIONO Ir. SYARIFUDDIN TOMPO


Direktur Staf Teknik
GUNAN WISMA PSTW MINAULA KENDARI
T WISMA MAKMUR LUAS BANGUNAN 127 M2

JUMLAH HARGA

14,250,000.00

#REF!

#REF!

#REF!

#REF!

#REF!
###

#REF!
###

#REF!

#REF!

#REF!
###

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Sembilan puluh Ribu Rupiah"


Kendari, Februari 2015 ###

Pembuat:

Ir. SYARIFUDDIN TOMPO


Staf Teknik
RENCANA ANGGARAN BIAYA

KEGIATAN #REF!
PEKERJAAN : PEMBUATAN SALURAN DRAINASE GEDUNG GUEST HOUSE
LOKASI : JL. ARIFIN SUGIANTO
TAHUN ANGGARAN : 2012

HARGA
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN
(Rp.)
1 2 3 4 5
I PEKERJAAN PERSIAPAN
1 Pemasangan Bouplank / Pengukuran Kembali 1.00 Ls 300,000.00
2 Air Kerja / P3K 1.00 Ls 300,000.00
3 Administrasi / Foto Dokumentasi 1.00 Ls 200,000.00
Jumlah Harga Pekerjaan Persiapan (Dipindahkan ke Rekapitulasi Biaya)
II PEKERJAAN TANAH DAN BATU ;
1 Pek. Galian Tanah saluran air hujan 34.80 M3 26,000.00
2 Pek Urugan Kembalui Alur Pondasi 8.70 M3
12,466.00
3 Pas. Batu Gunung 1 : 5 Pada Saluran Type A 93.06 M3 749,890.00
4 Pek Plesteran 1 : 3 dilicin Saluran Type A 510.48 M2 39,397.20
5 Pek. Saluran Air Hujan Type B 3.00 M' #REF!
7 Pembersihan Akhir/Finishing 1.00 Ls 350,000.00
8 Pek. Penutup Saluran dari besi (GREEL) TYPE A 28.00 M' 200,000.00
9 Pek. Penutup Saluran dari besi (GREEL) TYPE B 4.50 M' 150,000.00
Jumlah Harga Pekerjaan (Dipindahkan ke Rekapitulasi Biaya)
RENCANA ANGGARAN BIAYA

JUMLAH
HARGA
(Rp.)
6

300,000.00
300,000.00
200,000.00
800,000.00

904,800.00
108,454.20
69,781,951.31
20,111,482.66
#REF!
350,000.00
5,600,000.00
675,000.00
#REF!
RENCANA ANGGARAN BIAYA
KEGIATAN : REHABILITASI SEDANG / BERAT GEDUNG KANTOR
PEKERJAAN : PENATAAN HALAMAN RUMAH JABATAN WAKIL WALIKOTA KENDARI
LOKASI : JL. ARIFIN SUGIANTO
TAHUN ANGGARAN : 2012

HARGA
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN
(Rp.)
1 2 3 4 5

I PEKERJAAN PERSIAPAN
1 Pembuatan Direksi Keet 1.00 Ls 1,500,000.00
2 Pembersihan Lokasi 1.00 Ls 860,000.00
3 Pemasangan Bouplank / Pengukuran Kembali 1.00 Ls 300,000.00
4 Air Kerja / P3K 1.00 Ls 200,000.00
5 Papan Nama Proyek 1.00 Ls 200,000.00
6 Administrasi / Foto Dokumentasi 1.00 Ls 300,000.00
Jumlah Harga Pekerjaan Persiapan (Dipindahkan ke Rekapitulasi Biaya)
II PEKERJAAN TANAH DAN PASIR
1 Galian Tanah untuk kesting, 36.87 M3 26,000.00
2 Urugan Kembali Alur Pondasi 23.24 M3 12,466.00
Jumlah Harga Pekerjaan Tanah dan Pasir (Dipindahkan ke Rekapitulasi Biaya)
III PEKERJAAN MENANAM BUNGA
1 pekerjaan pemasangan kenstin 55.50 M3 833,055.00
2 urungan tanah untuk taman 140.51 M3 52,250.00
3 Pek. Urugan Tanah pada area jalan penghubung 96.95 M3 52,250.00
4 Pek. Urugan pasir pada area jalan penghubung 19.39 M3 192,466.00
5 Pek. Rabat pada jalan penghubung 20.50 M3 841,195.00
7 Menanam bunga Merambat 194.26 m2 45,850.00
8 Menanam bunga Palem ekor tupai minimal tinggi bunga 1 M' 56.00 Phn 160,000.00
Jumlah Harga Pekerjaan Kuda-Kuda (Dipindahkan ke Rekapitulasi Biaya)
IV PEKERJAAN JALAN
1 Pekerjaan Pemasangan Paving blok 2,542.40 M2 181,120.00
2 Pek,. Pembersihan/ Finishing 1.00 LS 725,000.00
JUMLAH
HARGA
(Rp.)
6

1,500,000.00
860,000.00
300,000.00
200,000.00
200,000.00
300,000.00
3,360,000.00

958,620.00
289,709.84
1,248,329.84

46,234,552.50
7,341,647.50
5,065,637.50
3,731,915.74
17,244,497.50
8,906,821.00
8,960,000.00
97,485,071.74

460,479,488.00
725,000.00
461,204,488.00
BACK UP DATA
0 : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
0 : PERENCANAAN REHABILITASI BERAT WISMA MAKMUR LUAS BANGUNAN 127 M2
0 : JL. BANDARA HALUOLEO KENDARI
0 : 2014

No VOLUME TERLAKSANA
A Pekerjaan Tanah Dan Pasir
1 Galian Tanah Pondasi (poer Plat)
P = 1
L = 16
T = 1.25
V = P X L X T
= 1 16 1.25
V 20.00
Jadi Volume Galian Tanah Voor Plat = 20.00 M3
1 Pek. Galian Tanah Alur Pondasi
P = 32
L = 0.8
T = 0.75
V = P X L X T
= 32 0.8 0.75
V 19.20
Jadi Volume Galian Tanah Alur Pondasi = 19.20 M3
3 Urugan Kembali Alur Pondasi Poor Plat
P = 16
L = 0.5
T = 0.75
V = P X L X T
= 16 0.5 0.75
V 6.00
Jadi Volume Urugan Alur Pondasi = 6.00 M3
3 Urugan Kembali Alur Pondasi
P = 32
L = 0.34
T = 0.75
V = P X L X T
= 32 0.34 0.75
V 8.16
Jadi Volume Urugan Alur Pondasi = 8.16 M3
4 Urugan Tanah Alas Lantai
P = 10
L = 12.977
T = 0.3
V = P X L X T
= 10 12.98 0.3
V 38.93
Jadi Volume Pekerjaan Urugan Tanah Alas Lantai = 38.93 M3
5 Urugan Pasir Alas Pondasi
P = 32
L = 0.7
T = 0.15
V = P X L X T
= 32 0.7 0.15
V 3.36
Jadi Volume Pekerjaan Urugan Pasir Alas Pondasi = 3.36 M3
6 Urugan Pasir Alas Lantai
P = 10
L = 19.977
T = 0.3
V = P X L X T
= 10 19.98 0.3
V 59.93
Jadi Volume Pekerjaan Urugan Pasir Alas Lantai = 59.93 M3
B Pekerjaan Pondasi Dan Beton
1 Pasangan Batu Kosong
P = 32
L = 0.8
A T = 0.15
V = P X L X T
= 32 0.8 0.15
V 3.84
= 3.84 M3

P = 1
L = 16
B T = 0.15
V = P X L X T
= 1 16 0.15
V 2.40
2.40 + 3.84
Jadi Volume Pekerjaan Pasangan Batu Kosong = 6.24 M3
2 Pek. Pas Batu Gunung 1 : 5
P = 32
L = 0.45
T = 0.6
V = P X L X T
= 32 0.45 0.6
V 8.64
Jadi Volume Pek. Pasangan Batu Gunung = 8.64 M3
3 PEK. VOOER PLAT
P = 0.5
L = 0.5
A T = 0.15
V = P X L X T
= 0.5 0.5 0.15
V 0.038 X 16
= 0.600

P = 0.8
L = 0.8
B T = 0.15
V = P X L X T
= 0.8 0.8 0.15
V 0.096 X 16
1.536
Volume A +B 0.60 + 1.54 = 2.14
Jadi Volume Pekerjaan Vooer Plat = 2.14 M3
4 Pek. Sloof 15/20: 1pc :2ps :3kr
P = 98

Jadi Volume Pekerjaan Sloef = 98 M'


5 Pek. Kolom 20x20 Cm
P = 80
L = 0.2
T = 0.2
V = P X L X T
= 80 0.2 0.2
V 3.20
Jadi Volume Pekerjaan Kolom = 3.20 M3
6 Pek. Plat Beton
P = 14
L = 0.7
T = 0.1
V = P X L X T
= 14 0.7 0.1
V 0.98
Jadi Volume Pekerjaan Plat Beton = 0.98 M3
7 Pek.Kolom Praktis 15/15 1pc 2ps:3kr
P = 64

Jadi Volume Pekerjaan Kolom Praktis = 64 M'


8 Pek. Balok Latei 15/15 1pc : 2ps : 3kr
P = 27

Jadi Volume Pekerjaan Kabel = 27 M'


9 Pek.Ring Balok 15/15 1pc 2ps:3kr
P = 98

Jadi Volume Pekerjaan Kabel = 98 M'


10 Pek. Balok Latey 15 / 25
P = 6.5
L = 0.15
T = 0.35
V = P X L X T
= 6.5 0.15 0.35
V 0.34
Jadi Volume Pekerjaan Kabel = 0.34 M3
C Pekerjaan Dinding
1 Pasangan Bata Merah 1 : 3 (Trasram)
P = 80.4
L = 0.3

V = P X L
= 80.4 0.3
V 24.12
Jadi Volume Pekerjaan Pasangan Bata Merah Trasram = 24.12 M2
2 Pasangan Bata Merah 1 : 5, 1/2 bata
P = 83.44
L = 3.4

V = P X L
= 83.44 3.4
V 283.70
Jadi Volume Pekerjaan Bata Merah 1:5 1/2 Bata = 283.70 M2
3 Pek. Plesteran Tembok 1 : 3
P = 160.8
L = 0.3

V = P X L
= 160.8 0.3
V 48.24
Jadi Volume Pekerjaan Plesteran Tembok 1:3 = 48.24 M2
4 Pek. Plesteran Tembok 1 : 5
P = 166.88
L = 3.4

V = P X L
= 166.9 3.4
V 567.39
Jadi Volume Pekerjaan Plesteran Tembok ! : 5 = 567.39 M2
D Pekerjaan Kusen Pintu Dan Jendela
1 Pek. Kusen Pintu, Jendela dan Ventilasi
P = 153.5
L = 0.06
T = 0.12
V = P X L X T
= 153.5 0.06 0.12
V 1.11
Jadi Volume Pekerjaan Kusen Pintu Dan Jendela = 1.11 M3
2 Pek. Bingkai Kaca Jendela, Pintu dan Ventilasi
P = 56.8
L = 0.08
V = P X L
= 56.8 0.08
V 4.54
Jadi Volume Pekerjaan Bingkai Kaca Jendela = 4.54 M2
3 Pek. Kaca 5 mm riben Pada Daun Jendela
P = 23.86
L = 0.35

V = P X L
= 23.86 0.35
V 8.35
Jadi Volume Pekerjaan Kaca 5 mm = 8.35 M2
4 Pek. Pintu Panil Jati
P = 33.33
L = 0.9

V = P X L
= 33.33 0.9
V 30.00
Jadi Volume Pekerjaan Pintu Panil Jati = 30.00 M2
E Pekerjaan Kap Dan Kuda-Kuda
1 Pek. Kuda-kuda + Baja Ringan
P = 12
L = 18.79

V = P X L
= 12 18.79
V 225.48
Jadi Volume Pekerjaan Kuda-Kuda Baja Ringan = 225.48 M2
2 Pek. Pasangan Atap Multi Roof
P = 12
L = 19.308

V = P X L
= 12 19.31
V 231.70
Jadi Volume Pekerjaan Atap Multi Roof = 231.70 M2
3 Pek. Pasangan Nok
P = 58.48

Jadi Volume Pekerjaan Skun Kabel cu 16 mm = 58.48 M'


4 Pek. Listplank
P = 61.16

Jadi Volume Pekerjaan Pentanahan Gardu = 61 M'


5 Pek. Pasangan Talang
P = 11

Jadi Volume Pekerjaan Pentanahan Gardu = 11.00 M'


F Pekerjaan Lantai Dan Dinding Keramik
1 Pek. Rabat Beton 1pc : 3ps : 5kr, Alas Lantai
P = 12
L = 10.81
T = 0.05
V = P X L X T
= 12 10.81 0.05
V 6.49
Jadi Volume Pekerjaan Rabat Lantai = 6.49 M3
2 Pek. Lantai Keramik 40 x 40 Cm
P = 12
L = 9.87

V = P X L
= 12 9.87
V 118.44
Jadi Volume Pekerjaan Keramik 40 x 40 = 118.44 M2
3 Pek. Lantai Keramik 20 x 20 Cm Anti Slip (KM/WC)
P = 2.25
L = 5
V = P X L
= 2.25 5
V 11.25
Jadi Volume Pekerjaan Dinding Keramik 20x20 = 11.25 M2
4 Pek. Tegel Plin 20 Cm
P = 120.8

V 120.80
Jadi Volume Pekerjaan Tegel Plin = 120.80 M1
5 Pek. Tegel Kuku
P = 13.4

V 13.40
Jadi Volume Pekerjaan Tegel Kuku = 13.40 M1
6 Pek. Dinding keramik pd km/wc
P = 24.95
L = 1.5

V = P X L
= 24.95 1.5
V 37.43
Jadi Volume Pekerjaan Tegel Kuku = 37.43 M2
G Pekerjaan Langit - Langit (Plafon)
1 Pek. Rangka Plafon Holo Aluminium
P = 10
L = 19.5

V = P X L
= 10 19.5
V 195.00
Jadi Volume Pekerjaan Rangka Plafon = 195.00 M2
2 Pek. Plafon Kalsi board
P = 10
L = 19.5

V = P X L
= 10 19.5
V 195.00
Jadi Volume Pekerjaan Plafon Kalsi Board = 195.00 M2
3 Pek. List Plafond
P = 257

V 257.00
Jadi Volume Pekerjaan Tegel Kuku = 257.00 M1
H Pekerjaan Sanitair
1 Pek. Pasangan Instalasi Air Bersih Pipa 3/4"
P = 32.00

V 32.00
Jadi Volume Pekerjaan Instalasi Air Bersih = 32.00 M1
2 Pek. Pasangan Instalasi Air Kotor Pipa 3"
P = 24.00

V 24.00
Jadi Volume Pekerjaan Instalasi Air Kotor Pipa 3 " = 24.00 M2
I Pekerjaan Rabat Dan Saluran
1 Galian Tanah Selokan
P = 58.74
L = 0.5
T = 0.3
V = P X L X T
= 58.74 0.5 0.3
V 8.81
Jadi Volume Pekerjaan Tanah Selokan = 8.81 M3
2 Urugan Kembali Alur Galian
P = 58.74
L = 0.06
T 0.3
V = P X L X T
= 58.74 0.06 0.3
V 1.06
Jadi Volume Pekerjaan Urugan Kembali = 1.06 M3
3 Urugan Pasir Selokan
P = 58.74
L = 0.5
T 0.04
V = P X L X T
= 58.74 0.5 0.04
V 1.17
Jadi Volume Pekerjaan Urugan Pasir Selokan = 1.17 M3
4 Urugan Pasir Rabat Keliling Bangunan
P = 58.74
L = 0.7
T 0.05
V = P X L X T
= 58.74 0.7 0.05
V 2.06
Jadi Volume Pekerjaan Pasir Rabat Keliling Bangunan = 2.06 M3
5 Pasangan Batu Gunung 1 : 3 + diaci dengan air semen
P = 58.74

V 58.74
Jadi Volume Pekerjaan Urugan Kembali = 58.74 M1
5 Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5
P = 58.74
L = 0.7
T = 0.06
V = P X L X T
= 58.74 0.7 0.06
V 2.47
Jadi Volume Pekerjaan Urugan Kembali = 2.47 M3
J Pekerjaan Pengecetan / Finishing
1 Pek. Cat Tembok
P = 153.908
L = 4

V = P X L
= 153.9 4
V 615.63
Jadi Volume Pekerjaan Cat Tembok = 615.63 M2
2 Pek. Cat Plafond
P = 10
L = 19.5

V = P X L
= 10 19.5
V 195.00
Jadi Volume Pekerjaan Cat Plafon = 195.00 M2
3 Pek. Menggosok dan Mendempul Bidang Kayu
P = 5
L = 5

V = P X L
= 5 5
V 25.00
Jadi Volume Pekerjaan Menggosok Dan Mendempul Bidang ka = 25.00 M2
4 Pek. Cat Kilap Kusen, Pintu, Jendela dan lestplank
P = 81
L = 1

V = P X L
= 81 1
V 81.00
Jadi Volume Pekerjaan Men Cat Bidang kayu = 81.00 M2
5 Pek. List Profil Pada Teras
P = 6
L = 1
15.00
V = P X L
= 6 1
V 6.00
Jadi Volume Pekerjaan List Profil Pada Teras = 6.00 M2
K Pekerjaan Pembangunan Selasar
1 Pek. Galian Tanah
P = 41
L = 0.6
T = 0.4
V = P X L X
= 41 0.6 0.4
V 9.84
Jadi Volume Pekerjaan Galian Tanah = 9.84 M3
2 Pek. Urugan Kembali Alur Pondasi
P = 41
L = 0.6
T = 0.05
V = P X L X
= 41 0.6 0.05
V 1.23
Jadi Volume Pekerjaan Urugan Kembali Alur Pondasi = 1.23 M3
3 Pek. Urugan Pasir Alas Pondasi
P = 41
L = 0.1
T = 0.4
V = P X L X
= 41 0.1 0.4
V 1.64
Jadi Volume Pekerjaan Urugan Kembali Alur Pondasi = 1.64 M3
4 Pek. Urugan Tanah Alas Lantai
P = 20.5
L = 1.5
T = 0.2
V = P X L X
= 20.5 1.5 0.2
V 6.15
Jadi Volume Pekerjaan Urugan Tanah Alas Lantai = 6.15 M3
5 Pek. Urugan Pasir Alas Lantai
P = 20.5
L = 1.5
T = 0.05
V = P X L X
= 20.5 1.5 0.05
V 1.54
Jadi Volume Pekerjaan Urugan Pasir Alas Lantai = 1.54 M3
6 Pek. Pasangan Batu Kosong
P = 41
L = 0.6
T = 0.1
V = P X L X
= 41 0.6 0.1
V 2.46
Jadi Volume Pekerjaan Pasangan Batu Kosong = 2.46 M3
7 Pek. Pondasi Batu Gunung 1 : 5
P = 41
L = 0.3
T = 0.4
V = P X L X
= 41 0.3 0.4
V 4.92
Jadi Volume Pekerjaan Pondasi Batu Gunung 1 : 5 = 4.92 M3
8 Pek. Slof 15 x 20 Cm
P = 41

V 41.00
Jadi Volume Pekerjaan Sloef 15 X 20 = 41.00 M3
9 Pek. Kolom 15 x 20 Cm
P = 29.7

V 29.70
Jadi Volume Pekerjaan Kolom = 29.70 M3
10 Pek. Ring Balk 15 x 25 Cm
P = 37.5
L = 0.15
T = 0.25
V = P X L X
= 37.5 0.15 0.25
V 1.41
Jadi Volume Pekerjaan Ring Balk = 1.41 M'
11 Pek. Rangka Atap kuda- Kuda Baja Ringan
P = 17
L = 3.8

V = P X L X
= 17 3.8
V 64.60
Jadi Volume Pekerjaan Rangka Atap = 64.60 M2
12 Pek. Atap Spandek
P = 17
L = 4.1

V = P X L X
= 17 4.1
V 69.70
Jadi Volume Pekerjaan Atap Sakura Roof = 69.70 M2
13 Pek. Nok Atap Spandek
P = 17

= 17
V 17.00
Jadi Volume Pekerjaan Atap Sakura Roof = 17.00 M'
14 Pek. Lisplank
P = 54.00

= 54
V 54.00
Jadi Volume Pekerjaan Lisplank = 54.00 M'
15 Pek. Rabat Lantai 1 : 3 : 5
P = 17
L = 1.5
T = 0.07
V = P X L X T
= 17 1.5 0.07
V 1.79
Jadi Volume Pekerjaan Rabat Lantai = 1.79 M3
16 Pek. Lantai Keramik Anti Slip 40 x 40 Cm
P = 17
L = 1.5

V = P X L
= 17 1.5
V 25.50
Jadi Volume Pekerjaan Keramiik 40x40 = 25.50 M2
17 Pek Plesteran Kolom Dan Ring Balk
P = 42
L = 0.7

V = P X L
= 42 0.7
V 29.40
Jadi Volume Pekerjaan Plesteran = 29.40 M3
18 Pek. Pengecetan Kolom Dan Ring Balk
P = 42
L = 0.7

V = P X L
= 42 0.7
V 29.40
Jadi Volume Pekerjaan Pengecetan = 29.40 M3
19 Pek Pengecetan List Plank
P = 30
L = 0.3

V = P X L
= 30 0.3
V 9.00
Jadi Volume Pekerjaan Pengecetan Lisplang = 9.00 M3
A
AULA KENDARI
BANGUNAN 127 M2

GAMBAR PEKERJAAN
RENCANA ANGGARAN BIAYA
### : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
### : PERENCANAAN REHABILITASI BERAT WISMA DAMAI LUAS BANGUNAN 116 M2
### #REF!
### #REF!

HARGA
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN
(Rp.)
1 2 3 4 5
I PEKERJAAN PERSIAPAN
1 Pembuatan Direksi Keet Dan Bangsal Kerja (Disewa) 1.00 Ls 2,500,000.00
2 Pembongkaran Bangunan Lama/ Pembersihan Lokasi 1.00 Ls 3,150,000.00
3 Pemasangan Bouplank / Pengukuran Kembali 1.00 Ls 1,000,000.00
4 Air Kerja / P3K 1.00 Ls 1,500,000.00
5 Papan Nama Proyek 1.00 Ls 300,000.00
6 Aadministrasi / Foto Dokumentasi 1.00 Ls 3,000,000.00
Jumlah Harga Pekerjaan Persiapan (Dipindahkan ke Rekapitulasi Biaya)
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Poor Plat 19.20 M3 #REF!
2 Pek. Galian Tanah Alur Pondasi 13.65 M3 #REF!
3 Urugan Kembali Alur Pondasi Poor Plat 4.80 M3 #REF!
4 Urugan Kembali Alur Pondasi 3.41 M3 #REF!
5 Urugan Tanah Alas Lantai 27.20 M3 #REF!
6 Urugan Pasir Alas Pondasi 2.490 M3 #REF!
7 Urugan Pasir Alas Lantai 10.82 M3 #REF!
Jumlah Harga Pekerjaan Tanah dan Pasir (Dipindahkan ke Rekapitulasi Biaya)
III PEKERJAAN PONDASI DAN BETON
1 Pasangan Batu Kosong 2.08 M3 #REF!
2 Pek. Pas Batu Gunung 1 : 5 10.99 M3 #REF!
3 Pek. Voort Plat 2.58 M3 #REF!
4 Pek. Sloof 15/20: 1pc :2ps :3kr 94.30 M1 #REF!
5 Pek. Kolom 20x20 Cm 4.89 M3 #REF!
6 Pek. Plat Beton 2.30 M3 #REF!
7 Pek.Kolom Praktis 15/15 1pc 2ps:3kr 22.30 M1 #REF!
8 Pek. Balok Latei 15/15 1pc : 2ps : 3kr 14.00 M1 #REF!
9 Pek.Ring Balok 15/15 1pc 2ps:3kr 94.30 M1 #REF!
10 Pek. Balok Latey 15 / 35 0.39 M 3
#REF!
Jumlah Harga Pekerjaan Pondasi dan Dinding (Dipindahkan ke Rekapitulasi Biaya)
IV PEKERJAAN DINDING
1 Pasangan Bata Merah 1 : 3 (Trasram) 84.51 M2 #REF!
2 Pasangan Bata Merah 1 : 5, 1/2 bata 295.26 M2 #REF!
3 Pek. Plesteran Tembok 1 : 3 169.02 M2 #REF!
4 Pek. Plesteran Tembok 1 : 5 590.52 M2 #REF!
Jumlah Harga Pekerjaan Beton (Dipindahkan ke Rekapitulasi Biaya)
V PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pek. Kusen Pintu, Jendela dan Ventilasi 1.17 M3 #REF!
2 Pek. Bingkai Kaca Jendela, Pintu dan Ventilasi 4.70 M2 #REF!
3 Pek. Kaca 5 mm riben Pada Daun Jendela 8.35 M2 #REF!
4 Pek. Pintu Panil Jati 20.45 M2 #REF!
5 Pek. Angker Kusen Pintu dan Jendela. Besi 6 Mm 96.00 Bh 2,000.00
6 Pek. Newt-Newt Kusen Pintu 24.00 Tiang 5,000.00
7 Pek. Pasangan Kunci Pintu Utama 2.00 Bh #REF!
8 Pek. Pasangan Pintu Kunci Biasa 2 x Putar 10.00 Bh #REF!
9 Pek. Pasangan Engsel Jendela 12.00 Psg #REF!
10 Pek. Pasangan Engsel Pintu 12.00 Psg #REF!
11 Pek. Pasangan Grendel Jendela 12.00 Bh #REF!
12 Pek. Pasangan Grendel Pintu 12.00 Bh #REF!
13 Pek. Pasangan Hak Angin Jendela 12.00 Bh #REF!
Jumlah Harga Pekerjaan Kusen Pintu dan Jendela (Dipindahkan ke Rekapitulasi Biaya)
VI PEKERJAAN KAP DAN KUDA-KUDA
1 Pek. Kuda-kuda + Baja Ringan 266.40 M2 200,000.00
2 Pek. Pasangan Atap Almanium 0.55 278.16 M2 #REF!
3 Pek. Pasangan Nok Almanium 0.55 60.08 M' #REF!
4 Pek. Listplank 57.43 M' #REF!
5 Pek. Pasangan Talang 16.60 M' #REF!
Jumlah Harga Pekerjaan Kap dan Kuda-Kuda (Dipindahkan ke Rekapitulasi Biaya)
VII PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Pek. Rabat Beton 1pc : 3ps : 5kr, Alas Lantai 6.80 M3 #REF!
2 Pek. Lantai Keramik 40 x 40 Cm 119.31 M2 #REF!
3 Pek. Lantai Keramik 20 x 20 Cm Anti Slip (KM/WC) 18.69 M2 #REF!
4 Pek. Tegel Plin 20 Cm 107.86 M1 #REF!
5 Pek. Tegel Kuku 5.50 M1 #REF!
6 Pek. Dinding keramik pd km/wc 35.60 M2 #REF!
Jumlah Harga Pekerjaan Lantai dan Dinding Keramik (Dipindahkan ke Rekapitulasi Biaya)
VIII PEKERJAAN LANGIT-LANGIT (PLAFOND)
1 Pek. Rangka Plafon Holo Aluminium 194.88 M2 #REF!
2 Pek. Plafon Gipsum 194.88 M2 #REF!
3 Pek. List Plafond Gipsum 286.50 M'1 #REF!
Jumlah Harga Pekerjaan Langit-Langit / Plafond (Dipindahkan ke Rekapitulasi Biaya)
IX PEKERJAAN INSTALASI LISTRIK
1 Pek. Pasangan Instalasi Titik Lampu 30.00 Ttk #REF!
2 Pek. Pasangan lampu Phillips 10 watt 5.00 Bh #REF!
3 Pek. Pasangan lampu Phillips 20 watt 5.00 Bh #REF!
4 Pek. Pasangan lampu Phillips 40 watt 9.00 Bh #REF!
5 Pek. Pasangan Saklar Tunggal "Broco" 12.00 Bh #REF!
6 Pek. Pasangan Saklar Ganda " Broco" 2.00 Bh #REF!
7 Pek. Pasangan Stop Kontak"Broco" 8.00 Bh #REF!
8 Pek. Pas MCB 1.00 Ls #REF!
Jumlah Harga Pekerjaan Instalasi Listrik (Dipindahkan ke Rekapitulasi Biaya)
X PEKERJAAN SANITAIR
1 Pek. Pasangan Instalasi Air Bersih Pipa 3/4" 10.00 M' #REF!
2 Pek. Pasangan Instalasi Air Kotor Pipa 3" 10.00 M' #REF!
3 Pek. Pas. Kloset Duduk lengkap 5.00 Bh #REF!
4 Pek. Pasangan Kran 5.00 Bh #REF!
5 Pek. Pasangan Bak Fibreglass 5.00 Bh 400,000.00
6 Pek. Pembuatan Septik Tank + Resapan 2.00 Ls 2,500,000.00
7 Pek. Floor Drain 5.00 Bh #REF!
8 Pek.Pas. Tempat Cuci Piring Stenlis 2 Lubang 1.00 Unit 2,000,000.00
9 Pek. Pemasangan Wastafel + Kaca 2.00 Bh #REF!
Jumlah Harga Pekerjaan Sanitair (Dipindahkan ke Rekapitulasi Biaya)
XI PEKERJAAN RABAT DAN SALURAN
1 Galian Tanah Selokan 6.15 M3 #REF!
2 Urugan Kembali Alur Galian 1.54 M3 #REF!
3 Urugan Pasir Selokan 0.82 M3 #REF!
4 Urugan Pasir Rabat Keliling Bangunan 1.44 M3 #REF!
5 Pasangan Batu Gunung 1 : 3 + diaci dengan air semen 41.00 M1 #REF!
6 Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5 1.72 M3 #REF!
Jumlah Harga Pekerjaan Rabat dan Saluran (Dipindahkan ke Rekapitulasi Biaya)
XII PEKERJAAN PENGECETAN / FINISHING
1 Pek. Cat Tembok 759.54 M2 #REF!
2 Pek. Cat Plafond 194.88 M2 #REF!
3 Pek. Menggosok dan Mendempul Bidang Kayu 25.00 M2 #REF!
4 Pek. Cat Kilap Kusen, Pintu, Jendela dan lestplank 42.10 M2 #REF!
5 Pek. Relling dari stenlis steel Untuk Penyandang Cacat 3.00 M2 300,000.00
6 Pek. Relling dari stenlis steel Untuk Kamar Mandi 5.00 Bh 150,000.00
7 Pek. List Profil Pada Teras 6.00 M2 #REF!
8 Pek. Pemasangan Papan Nama Wisma 1.00 Ls 500,000.00
9 Pek. Tralis Jendela 12.00 Bh 250,000.00
10 Pek. Pas. Exbilitas dari Stanlist Steel 12.00 M' 200,000.00
11 Pek. Pemb. Jalan masuk Wisma 0.18 Ls #REF!
12 Pembersihan Akhir / Finishing 1.00 Ls 1,000,000.00
Jumlah Harga Pekerjaan Pengecatan / Finishing (Dipindahkan ke Rekapitulasi Biaya)
XIII PEKERJAAN SELASAR
1 Pek. Galian Tanah 24.50 M2 #REF!
2 Pek. Urugan Kembali Alur Pondasi 6.13 M2 #REF!
3 Pek. Urugan Pasir Alas Pondasi 3.50 M2 #REF!
4 Pek. Urugan Tanah Alas Lantai 7.11 M2 #REF!
5 Pek. Urugan Pasir Alas Lantai 4.28 M2 #REF!
6 Pek. Pasangan Batu Kosong 5.25 M3 #REF!
7 Pek. Pondasi Batu Gunung 1 : 5 8.75 M3 #REF!
8 Pek. Slof 15 x 20 Cm 63.50 M' #REF!
9 Pek. Kolom 15 x 20 Cm 40.80 M' #REF!
10 Pek. Ring Balk 15 x 25 Cm 2.37 M3 #REF!
11 Pek. Rangka Atap kuda- Kuda Baja Ringan 115.84 M2 200,000.00
12 Pek. Atap Spandek 124.00 M2 #REF!
13 Pek. Nok Atap Spandek 27.00 M1 #REF!
14 Pek. Lisplank 63.56 M1 #REF!
15 Pek. Rabat Lantai 1.80 M3 #REF!
16 Pek. Lantai Keramik Anti Slip 40 x 40 Cm 43.05 M2 #REF!
17 Pek Plesteran Kolom Dan Ring Balk 69.51 M2 #REF!
18 Pek. Pengecetan Kolom Dan Ring Balk 69.51 M2 #REF!
19 Pek Pengecetan List Plank 19.07 M2 #REF!
20 Pek. Drainase pada keliling Selasar 50.00 M' #REF!
21 Pek. Rabat pada Keliling selasar 27.95 Ls #REF!
22 Pembersihan Akhir / Finishing 1.00 Ls 500,000.00
Jumlah Harga Pekerjaan Selasar (Dipindahkan ke Rekapitulasi Biaya)
NA ANGGARAN BIAYA

JUMLAH
HARGA
(Rp.)
6

2,500,000.00
3,150,000.00
1,000,000.00
1,500,000.00
300,000.00
3,000,000.00
11,450,000.00

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
192,000.00
120,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

53,280,000.00
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
2,000,000.00
5,000,000.00
#REF!
2,000,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
900,000.00
750,000.00
#REF!
500,000.00
3,000,000.00
2,400,000.00
#REF!
1,000,000.00
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
23,168,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
500,000.00
#REF!
REKAPITULASI
#REF! : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
#REF! : PERENCANAAN REHABILITASI BERAT WISMA DAMAI LUAS BANGUNAN 116 M2
#REF! #REF!
#REF! #REF!

No. URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN Rp. 11,450,000.00

II. PEKERJAAN TANAH DAN PASIR Rp. #REF!

III. PEKERJAAN PONDASI DAN BETON Rp. #REF!

IV. PEKERJAAN DINDING Rp. #REF!

V. PEKERJAAN KUSEN PINTU DAN JENDELA Rp. #REF!

VI. PEKERJAAN KAP DAN KUDA-KUDA Rp. #REF!


###

VII. PEKERJAAN LANTAI DAN DINDING KERAMIK Rp. #REF!


###

VIII. PEKERJAAN LANGIT-LANGIT (PLAFOND) Rp. #REF!

IX. PEKERJAAN INSTALASI LISTRIK Rp. #REF!

X. PEKERJAAN SANITAIR Rp. #REF!


###

XI. PEKERJAAN RABAT DAN SALURAN Rp. #REF!

XII. PEKERJAAN PENGECETAN / FINISHING Rp. #REF!


XIII PEKERJAAN SELASAR Rp. #REF!
Real Cost Rp. #REF!
PPN 10% Rp. #REF!
Perencanaan Teknis Rp. #REF!
Pengawasan Teknis Rp. #REF!
Pengelola Proyek Rp. #REF!
JUMLAH Rp. #REF!
Dibulatkan Rp. #REF!

Terbilang: "Delapan Ratus Dua Puluh Tiga Juta Lima Ratus Ribu Rupiah."
Kendari, Februari 2015 ###
Mengetahui
CV. AZZA SURYA KONSULTAN Pembuat:

SUHADIONO Ir. SYARIFUDDIN TOMPO


Direktur Staf Teknik
RENCANA ANGGARAN BIAYA
### : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
### : PERENCANAAN REHABILITASI BERAT WISMA BAHAGIA LUAS BANGUNAN 121 M2
### #REF!
### #REF!

HARGA
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN
(Rp.)
1 2 3 4 5
I PEKERJAAN PERSIAPAN
1 Pembuatan Direksi Keet Dan Bangsal Kerja (Disewa) 1.00 Ls 3,000,000.00
2 Pembongkaran Bangunan Lama/ Pembersihan Lokasi 1.00 Ls 5,000,000.00
3 Pemasangan Bouplank / Pengukuran Kembali 1.00 Ls 1,000,000.00
4 Air Kerja / P3K 1.00 Ls 1,500,000.00
5 Papan Nama Proyek 1.00 Ls 250,000.00
6 Aadministrasi / Foto Dokumentasi 1.00 Ls 4,000,000.00
Jumlah Harga Pekerjaan Persiapan (Dipindahkan ke Rekapitulasi Biaya)
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Poor Plat 19.20 M3 #REF!
2 Pek. Galian Tanah Alur Pondasi 13.65 M3 #REF!
3 Urugan Kembali Alur Pondasi Poor Plat 4.80 M3 #REF!
4 Urugan Kembali Alur Pondasi 3.41 M3 #REF!
5 Urugan Tanah Alas Lantai 27.20 M3 #REF!
6 Urugan Pasir Alas Pondasi 2.490 M3 #REF!
7 Urugan Pasir Alas Lantai 10.82 M3 #REF!
Jumlah Harga Pekerjaan Tanah dan Pasir (Dipindahkan ke Rekapitulasi Biaya)
III PEKERJAAN PONDASI DAN BETON
1 Pasangan Batu Kosong 2.08 M3 #REF!
2 Pek. Pas Batu Gunung 1 : 5 10.99 M3 #REF!
3 Pek. Voort Plat 2.58 M3 #REF!
4 Pek. Sloof 15/20: 1pc :2ps :3kr 94.30 M1 #REF!
5 Pek. Kolom 20x20 Cm 4.89 M3 #REF!
6 Pek. Plat Beton 2.30 M3 #REF!
7 Pek.Kolom Praktis 15/15 1pc 2ps:3kr 22.30 M1 #REF!
8 Pek. Balok Latei 15/15 1pc : 2ps : 3kr 14.00 M1 #REF!
9 Pek.Ring Balok 15/15 1pc 2ps:3kr 94.30 M1 #REF!
10 Pek. Balok Latey 15 / 35 0.39 M3 #REF!
Jumlah Harga Pekerjaan Pondasi dan Dinding (Dipindahkan ke Rekapitulasi Biaya)
IV PEKERJAAN DINDING
1 Pasangan Bata Merah 1 : 3 (Trasram) 84.51 M2 #REF!
2 Pasangan Bata Merah 1 : 5, 1/2 bata 295.26 M2 #REF!
3 Pek. Plesteran Tembok 1 : 3 169.02 M2 #REF!
4 Pek. Plesteran Tembok 1 : 5 590.52 M2 #REF!
Jumlah Harga Pekerjaan Beton (Dipindahkan ke Rekapitulasi Biaya)
V PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pek. Kusen Pintu, Jendela dan Ventilasi 1.17 M3 #REF!
2 Pek. Bingkai Kaca Jendela, Pintu dan Ventilasi 4.70 M2 #REF!
3 Pek. Kaca 5 mm riben Pada Daun Jendela 8.35 M2 #REF!
4 Pek. Pintu Panil Jati 20.45 M2 #REF!
5 Pek. Angker Kusen Pintu dan Jendela. Besi 6 Mm 136.00 Bh 2,000.00
6 Pek. Newt-Newt Kusen Pintu 24.00 Tiang 5,000.00
7 Pek. Pasangan Kunci Pintu Utama 2.00 Bh #REF!
8 Pek. Pasangan Pintu Kunci Biasa 2 x Putar 10.00 Bh #REF!
9 Pek. Pasangan Engsel Jendela 14.00 Psg #REF!
10 Pek. Pasangan Engsel Pintu 12.00 Psg #REF!
11 Pek. Pasangan Grendel Jendela 14.00 Bh #REF!
12 Pek. Pasangan Grendel Pintu 12.00 Bh #REF!
13 Pek. Pasangan Hak Angin Jendela 14.00 Bh #REF!
Jumlah Harga Pekerjaan Kusen Pintu dan Jendela (Dipindahkan ke Rekapitulasi Biaya)
VI PEKERJAAN KAP DAN KUDA-KUDA
1 Pek. Kuda-kuda + Baja Ringan 266.40 M2 200,000.00
2 Pek. Pasangan Atap Almanium 0.55 278.16 M2 #REF!
3 Pek. Pasangan Nok Almanium 0.55 60.08 M' #REF!
4 Pek. Listplank 57.43 M' #REF!
5 Pek. Pasangan Talang 16.60 M' #REF!
Jumlah Harga Pekerjaan Kap dan Kuda-Kuda (Dipindahkan ke Rekapitulasi Biaya)
VII PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Pek. Rabat Beton 1pc : 3ps : 5kr, Alas Lantai 6.80 M3 #REF!
2 Pek. Lantai Keramik 40 x 40 Cm 119.31 M2 #REF!
3 Pek. Lantai Keramik 20 x 20 Cm Anti Slip (KM/WC) 18.69 M2 #REF!
4 Pek. Tegel Plin 20 Cm 120.80 M1 #REF!
5 Pek. Tegel Kuku 107.86 M1 #REF!
6 Pek. Dinding keramik pd km/wc 35.60 M2 #REF!
Jumlah Harga Pekerjaan Lantai dan Dinding Keramik (Dipindahkan ke Rekapitulasi Biaya)
VIII PEKERJAAN LANGIT-LANGIT (PLAFOND)
1 Pek. Rangka Plafon Holo Aluminium 195.00 M2 #REF!
2 Pek. Plafon Gipsum 195.00 M2 #REF!
3 Pek. List Plafond Gipsum 257.00 M'1 #REF!
Jumlah Harga Pekerjaan Langit-Langit / Plafond (Dipindahkan ke Rekapitulasi Biaya)
IX PEKERJAAN INSTALASI LISTRIK
1 Pek. Pasangan Instalasi Titik Lampu 30.00 Ttk #REF!
2 Pek. Pasangan lampu Phillips 10 watt 5.00 Bh #REF!
3 Pek. Pasangan lampu Phillips 20 watt 5.00 Bh #REF!
4 Pek. Pasangan lampu Phillips 40 watt 3.00 Bh #REF!
5 Pek. Pasangan Saklar Tunggal "Broco" 12.00 Bh #REF!
6 Pek. Pasangan Saklar Ganda " Broco" 2.00 Bh #REF!
7 Pek. Pasangan Stop Kontak"Broco" 8.00 Bh #REF!
8 Pek. Pas MCB 2.00 Ls #REF!
Jumlah Harga Pekerjaan Instalasi Listrik (Dipindahkan ke Rekapitulasi Biaya)
X PEKERJAAN SANITAIR
1 Pek. Pasangan Instalasi Air Bersih Pipa 3/4" 10.00 M' #REF!
2 Pek. Pasangan Instalasi Air Kotor Pipa 3" 10.00 M' #REF!
3 Pek. Pas. Kloset Duduk lengkap 5.00 Bh #REF!
4 Pek. Pasangan Kran 7.00 Bh #REF!
5 Pek. Pasangan Bak Fibreglass 5.00 Bh 300,000.00
6 Pek. Pembuatan Septik Tank + Resapan 2.00 Ls 2,240,000.00
7 Pek. Floor Drain 5.00 Bh #REF!
8 Pek. Pas.Tempat Cuci Piring Stanlis 2 Lubang 1.00 Unit 2,000,000.00
9 Pek. Pemasangan Wastafel + Kaca 2.00 Bh #REF!
Jumlah Harga Pekerjaan Sanitair (Dipindahkan ke Rekapitulasi Biaya)
XI PEKERJAAN RABAT DAN SALURAN
1 Galian Tanah Selokan 6.15 M3 #REF!
2 Urugan Kembali Alur Galian 1.54 M3 #REF!
3 Urugan Pasir Selokan 0.82 M3 #REF!
4 Urugan Pasir Rabat Keliling Bangunan 1.44 M3 #REF!
5 Pasangan Batu Gunung 1 : 3 + diaci dengan air semen 41.00 M1 #REF!
6 Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5 1.72 M3 #REF!
Jumlah Harga Pekerjaan Rabat dan Saluran (Dipindahkan ke Rekapitulasi Biaya)
XII PEKERJAAN PENGECETAN / FINISHING
1 Pek. Cat Tembok 759.54 M2 #REF!
2 Pek. Cat Plafond 195.00 M 2
#REF!
3 Pek. Menggosok dan Mendempul Bidang Kayu 25.00 M 2
#REF!
4 Pek. Cat Kilap Kusen, Pintu, Jendela dan lestplank 42.10 M2 #REF!
5 Pek. Relling dari stenlis steel Untuk Penyandang Cacat 3.00 M 2
300,000.00
6 Pek. Relling dari stenlis steel Untuk Kamar Mandi 5.00 Bh 150,000.00
7 Pek. Tralis Jendela 12.00 Bh 250,000.00
8 Pek. List Profil Pada Teras 6.00 M2 #REF!
9 Pek. Pemasangan Papan Nama Wisma 1.00 Ls 500,000.00
10 Pek. Exabilitas dari Stalit Steel 12.00 M' 150,000.00
11 Pek. Pembuatan jalan masuk Wisma 0.22 Ls #REF!
12 Pembersihan Akhir / Finishing 1.00 Ls 3,000,000.00
Jumlah Harga Pekerjaan Pengecatan / Finishing (Dipindahkan ke Rekapitulasi Biaya)
NA ANGGARAN BIAYA

JUMLAH
HARGA
(Rp.)
6

2,500,000.00
3,500,000.00
1,000,000.00
1,170,000.00
250,000.00
4,000,000.00
12,420,000.00

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
272,000.00
120,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

53,280,000.00
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
1,500,000.00
4,480,000.00
#REF!
2,000,000.00
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
900,000.00
750,000.00
3,000,000.00
#REF!
500,000.00
1,800,000.00
#REF!
3,000,000.00
#REF!
REKAPITULASI
### : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
### : PERENCANAAN REHABILITASI BERAT WISMA BAHAGIA
### #REF!
### #REF!

No. URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN Rp.

II. PEKERJAAN TANAH DAN PASIR Rp.

III. PEKERJAAN PONDASI DAN BETON Rp.

IV. PEKERJAAN DINDING Rp.

V. PEKERJAAN KAP DAN KUDA-KUDA Rp.

VI. PEKERJAAN KUSEN PINTU DAN JENDELA Rp.

VII. PEKERJAAN LANTAI DAN DINDING KERAMIK Rp.

VIII. PEKERJAAN LANGIT-LANGIT (PLAFOND) Rp.

IX. PEKERJAAN INSTALASI LISTRIK Rp.

X. PEKERJAAN SANITAIR Rp.

XI. PEKERJAAN RABAT DAN SALURAN Rp.

XII PEKERJAAN PENGECATAN/FINIDHING Rp.

XIII. PEKERJAAN SELASAR Rp.


Real Cost Rp.
PPN 10% Rp.
Perencanaan Teknis Rp.
Pengawasan Teknis Rp.
Pengelola Proyek Rp.
JUMLAH Rp.
Dibulatkan Rp.

Terbilang : "Tujuh Ratus Dua Puluh Tujuh Juta Dua Ratus Empat Puluh Ribu Rupiah."
Kendari, Februari 2015
Mengetahui
CV. AZZA SURYA KONSULTAN Pembuat:

SUHADIONO Ir. SYARIFUDDIN TOMPO


Direktur Staf Teknik
SI
GUNAN WISMA PSTW MINAULA KENDARI
T WISMA BAHAGIA

JUMLAH HARGA

12,420,000.00

#REF!

#REF!

#REF!

#REF!

#REF!
###

#REF!
###

#REF!

#REF!

#REF!
###

#REF!

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

pat Puluh Ribu Rupiah."


Kendari, Februari 2015 ###

Pembuat:

Ir. SYARIFUDDIN TOMPO


Staf Teknik
REKAPITULASI
#REF! : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
#REF! : PERENCANAAN REHABILITASI BERAT WISMA PSTW MINAULA KENDARI
#REF! #REF!
#REF! #REF!

No. URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN WISMA MAKMUR Rp.


II. PEKERJAAN WISMA FLAMBOYAN Rp.
III. PEKERJAAN WISMA AMAN Rp.
IV PEKERJAAN WISMA ABADI Rp.
V PEKERJAAN WISMA SENTOSA Rp.
VI PEKERJAAN WISMA BAHAGIA Rp.
VII PEKERJAAN WISMA DAMAI Rp.
VIII PEKERJAAN WISMA BOUGENVILLE Rp.
IX PEKERJAAN BANGUNAN PERAWATAN KHUSUS Rp.
X PEKERJAAN POS SEKURITY 2 (DUA ) UNIT Rp.
XI GAPURA PINTU MASUK DAN KELUAR Rp.
XII PEMBANGUNAN POLIKLINIK Rp.
XIII PEMBANGUNAN GEDUNG KETERAMPILAN Rp.
XIV REHAB. RUMAH PETUGAS TYPE 36, 2 (DUA)UNIT Rp.
XV REHAB.RUMAH PETUGAS TYPE 54 Rp.
XVI REHAB.RUMAH PETUGAS TYPE57 Rp.
XVII PEMBANGUNAN GAPURA 2 (DUA ) UNIT Rp.
XVIII PEMBUATAN PAPAN NAMA PSTW MINAULA KENDARI Rp.
XIX PEMBANGUNAN GEDUNG SERBA GUNA Rp.
XX PEMBANGUNAN GUDANG Rp.
XXI PEMBANGUNAN TOWER Rp.
XXII REHABILITASI BERAT KANTOR Rp.
XXIII REHABILITASI BERAT AULA Rp.
XXIV PEMBANGUNAN MESJID Rp.
XXV PEKERJAAN PEMBANGUNAN DAPUR UMUM PSTW Rp.

Real Cost Rp.

Dibulatkan Rp.

Terbilang:
Tiga Belas Milyar Sembilan Ratus Tujuh Puluh Enam Juta Enam Ratus Ribu Rupiah"
Kendari, Ferbruari 2015
Mengetahui
CV. AZZA SURYA KONSULTAN Pembuat:

SUHADIONO Ir. SYARIFUDDIN TOMPO


Direktur Staf Teknik

DISETUJUI;
PANTI SOSIAL TRESNA WERDHA DINAS PU. PROV. SULTRA.
MINAULA KENDARI. BAGIAN CIPTA KARYA
KEPALA UNSUR TEHNIK.

H.ARIFUDDIN M.SH. LA LIUSU ST.


Nip.: 1958 0308 1980 03 1010 Nip.: 19790908 200803 1001
NAN WISMA PSTW MINAULA KENDARI
WISMA PSTW MINAULA KENDARI

JUMLAH HARGA

792,890,000.00
793,290,000.00
793,290,000.00
792,890,000.00
798,530,000.00
727,240,000.00
823,500,000.00
698,420,000.00
516,920,000.00
103,480,000.00
79,072,000.00
250,000,000.00
531,170,000.00
552,220,000.00
270,400,000.00
291,600,000.00
79,072,000.00
30,927,000.00
550,010,000.00
531,170,000.00
272,105,000.00
1,421,590,000.00
1,250,000,000.00
250,000,000.00
776,860,000.00
13,976,646,000.00

13,976,600,000.00

uta Enam Ratus Ribu Rupiah"


Kendari, Ferbruari 2015 ###

Pembuat:

Ir. SYARIFUDDIN TOMPO


Staf Teknik

DINAS PU. PROV. SULTRA.


BAGIAN CIPTA KARYA
UNSUR TEHNIK.

LA LIUSU ST.
Nip.: 19790908 200803 1001
RENCANA ANGGARAN BIAYA

Satuan Kerja : Dinas Sumber Daya Air Dan Bina Marga Prov Sulawesi Tenggara
Pekerjaan : Penataan Ruang Tamu Dan Sekretariat
Lokasi : Kota Kendari, Prov. Sulawesi Tenggara
Tahun Anggaran : 2019

NO. URAIAN PEKERJAAN

a b
I PEKERJAAN PENDAHULUAN / PERSIAPAN
1 Pengukuran
2 Administrasi Dan Dokumentasi laporan

II PEKERJAAN PENATAAN INTERIOR RUANG TAMU DAN SEKRETARIAT


a PEKERJAAN INTERIOR RESEPSIONIS DAN KORIDOR LANTAI SATU
1 Pek. Meja Resepsionis
2 Pek. Pemasanagan Backdrob Respsionis
3 Pek. Tulisan Timbul Acrilyc
4 Pek. Logo Acrilyc
5 Pek. Dinding Partisi Dua Sisi Multipleks Lapis HPL
b PEKERJAAN INTERIOR KORIDOR LANTAI DUA
1 Pek. Dinding Partisi Dua Sisi Multipleks Lapis HPL
3 Pek. Pemasangan Kaca

III PEKERJAAN AKHIR


1 Pek. Pembersihan Lokasi
A ANGGARAN BIAYA

v Sulawesi Tenggara

HARGA JUMLAH
VOL SAT SATUAN HARGA
(Rp.) (Rp.)
c d e f

1.00 Ls Rp 1,000,000.00 Rp 1,000,000.00


1.00 Ls Rp 2,000,000.00 Rp 2,000,000.00
Jumlah Harga Pekeraan I Rp 3,000,000.00
ETARIAT
TU
1.00 Unit Rp 8,701,354.71 Rp 8,701,354.71
11.12 M2 Rp 1,078,399.77 Rp 11,993,962.23
53.00 Bh Rp 80,000.00 Rp 4,240,000.00
2.00 Bh Rp 700,000.00 Rp 1,400,000.00
26.70 M2 Rp 1,365,421.20 Rp 36,449,919.03

16.47 M2 Rp 1,365,421.20 Rp 22,488,487.23


3.60 M2 Rp 452,325.50 Rp 1,628,371.80
Jumlah Harga Pekerjaan II Rp 86,902,094.99

1.00 Ls Rp 1,000,000.00 Rp 1,000,000.00


Jumlah Harga Pekerjaan III Rp 1,000,000.00
Dibuat Oleh,
Konsultan Perencana
CV. Mega Konsultan

SYAMSUL ALAM, ST
Direktur
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)

Satuan Kerja : Dinas Sumber Daya Air Dan Bina Marga


Pekerjaan : Penataan Ruang Tamu Dan Sekretariat
Lokasi : Kota Kendari
Tahun Anggaran : 2019

NO URAIAN KEGIATAN
a b

I PEKERJAAN PENDAHULUAN / PERSIAPAN


II PEKERJAAN PENATAAN INTERIOR RUANG TAMU DAN SEKRETARIAT
III PEKERJAAN AKHIR
Real Cost
Ppn 10%
Jumlah Total
Dibulatkan

Terbilang:
" Sembilan Puluh Sembilan Juta Sembilan Ratus Ribu Rupiah''

Mengetahui / Menyetujui,
Pengguna Anggaran
H. ABDUL RAHIM, SE.,M.SI
NIP : 19650308 199502 1002
REKAPITULASI
ANGGARAN BIAYA (RAB)

a Marga
etariat

JUMLAH HARGA
c

Rp 3,000,000.00
Rp 86,902,094.99
Rp 1,000,000.00
Rp 90,902,094.99
Rp 9,090,209.50
Rp 99,992,304.49
Rp 99,900,000.00

mbilan Juta Sembilan Ratus Ribu Rupiah''

Kendari , 20 Maret 2019

Dibuat Oleh,
Konsultan Perencana
CV. Mega Konsultan
SYAMSUL ALAM, ST
Direktur
BACK UP DATA

NO SKETSA GAMBAR PANJANG


A INTERIOR RUANG TAMU DAN SEKERTARIAT
1 Pek. Meja Resepsionis 3.50
348.5

45 98 106 99.5

27 5
41.7

105.7
5 27

2 Pek. Pemasangan Backdrob Respsionis 3.52


352

104 144 104

HPL TH 156 AA
60
49.2

HPL TH 925 JG HPL TH 156 AA HPL TH 925 JG


49.2

HPL TH 925 JG HPL TH 925 JG


316
49.2

HPL TH 156 AA
HPL TH 925 JG HPL TH 925 JG
49.2

HPL TH 925 JG HPL TH 925 JG

HPL TH 156 AA
49.2

HPL TH 925 JG HPL TH 925 JG

3 Pek. Dinding Partisi Dua Sisi Multipleks Lapis HPL Koridor Lantai 1 2.2
560
2.2
2.5
220 120 220

250
35

2.5
70

HPL TACO 156 AA HPL TACO 156 AA

HPL TACO 156 AA


78

0.4
43

0.4
300

300

HPL TACO 100 AA HPL TACO 100 AA


265

HPL TACO 100 AA


43

230

0.4
43

HPL TACO 156 AA HPL TACO 156 AA HPL TACO 156 AA


60

60

560

235 90 235

250
35

70

HPL TACO 156 AA HPL TACO 156 AA


35

HPL TACO 156 AA


43
43
300

300
170

HPL TACO 100 AA HPL TACO 100 AA


265

HPL TACO 100 AA


43
43

HPL TACO 156 AA HPL TACO 156 AA HPL TACO 156 AA


60

60
560

235 90 235

250

35

70
HPL TACO 156 AA HPL TACO 156 AA

35
HPL TACO 156 AA

43
43
300

300
170
HPL TACO 100 AA HPL TACO 100 AA

265
HPL TACO 100 AA

43
43
HPL TACO 156 AA HPL TACO 156 AA HPL TACO 156 AA

60

60
4 Pek. Dinding Partisi Dua Sisi Multipleks Lapis HPL Koridor Lantai 2 5.85
585

23 40 30 40 30 40 31 120 31 40 30 40 30 40 23

HPL TACO 156 AA

60
HPL TACO 156 AA
HPL TACO 156 AA HPL TACO 156 AA
40

HPL TACO 156 AA

KACA 5 MM KACA 5 MM KACA 5 MM KACA 5 MM KACA 5 MM KACA 5 MM

300
180
150

230

HPL TACO 156 AA

60
HPL TACO 156 AA

600
29 40 30 40 32 40 31 120 31 40 32 40 30 40 29

60
HPL TACO 156 AA

HPL TACO 156 AA


HPL TACO 156 AA HPL TACO 156 AA
300
180
150

230

HPL TACO 156 AA


60

HPL TACO 156 AA


600
29 40 30 40 32 40 31 120 31 40 32 40 30 40 29

60
HPL TACO 156 AA

HPL TACO 156 AA


HPL TACO 156 AA HPL TACO 156 AA

300
180
150

230
HPL TACO 156 AA

60
HPL TACO 156 AA

5 Pek. Pemasangan Kaca 0.4


0.4
0.4
150

0.4

150
0.4
0.4
BACK UP DATA

LEBAR TINGGI VOLUME

3.50

3.50
3.16 11.1232

11.1232
3 6.6
3 6.6
2.65 6.625
1.5 3.75
2.65 1.06
2.65 1.06
2.5 1
26.695
3 17.55
17.55
1.5 0.6
1.5 0.6
1.5 0.6
1.5 0.6
1.5 0.6
1.5 0.6
3.6
ANALISIS HARGA SATUAN
INTERIOR RUANG TAMU DAN SEKRETARIAT

1 RUANG RESEPSIOANIS KORIDOR LANTAI SATU

1 M1 Pembuatan Meja Resepsionis


HARGA SATUAN
NO URAIAN SATUAN KOEFISIEN
(RP)
1 2 4 5
A TENAGA
1 Pekerja OH 1.600 Rp 95,000.00
2 Tukang Kayu OH 1.600 Rp 180,000.00
4 Tukang Hpl OH 2.400 Rp 180,000.00
5 Kepala Tukang OH 0.160 Rp 200,000.00
6 Mandor OH 0.080 Rp 110,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Multipleks 12mm M2 24.830 Rp 62,289.56
2 Multipleks 15mm M 2
6.555 Rp 85,069.44
3 HPL M 2
62.770 Rp 60,606.06
4 Paku Peluru Ramset 2"-5" Dos 1.500 Rp 60,000.00
5 List Stainlees Bh 17.100 Rp 50,000.00
6 Lem Fox Kg 3.000 Rp 48,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Peralatan


D Jumlah (A+B+C)
E Overhead &profit 10%XD
F Harga Satuan Pekerjaan (D+F)

1M2 Pemasangan Backdoob Multipleks Lapis HPL


HARGA SATUAN
NO URAIAN SATUAN KOEFISIEN
(RP)
1 2 4 5
A TENAGA
1 Pekerja OH 0.800 Rp 95,000.00
2 Tukang Kayu OH 1.00 Rp 180,000.00
3 Tukang HPL OH 1.80 Rp 180,000.00
4 Kepala Tukang OH 0.090 Rp 200,000.00
5 Mandor OH 0.045 Rp 110,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Multipleks T 8mm M2 2.200 Rp 47,138.05
2 Multipleks T 15mm M2 1.100 Rp 85,069.44
3 Paku Peluru Ramset Dos 0.500 Rp 60,000.00
4 HPL M2 2.200 Rp 60,606.06
5 Lem Fox Kg 0.350 Rp 48,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Peralatan


D Jumlah (A+B+C)
E Overhead &profit 10%XD
F Harga Satuan Pekerjaan (D+F)
1M2 Pemasangan Partisi Dua Sisi Multipleks Lapis HPL
HARGA SATUAN
NO URAIAN SATUAN KOEFISIEN
(RP)
1 2 4 5
A TENAGA
1 Pekerja OH 0.80 Rp 95,000.00
2 Tukang Kayu OH 1.00 Rp 180,000.00
3 Tukang HPL OH 2.20 Rp 180,000.00
4 Kepala Tukang OH 0.090 Rp 200,000.00
5 Mandor OH 0.045 Rp 110,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Multipleks T 8mm M2 4.004 Rp 47,138.05
2 Multipleks T 15 mm M 2
2.200 Rp 85,069.44
3 Paku Peluru Ramset Dos 0.200 Rp 60,000.00
4 HPL M2 2.39 Rp 60,606.06
5 Lem Fox Kg 0.700 Rp 48,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Peralatan


D Jumlah (A+B+C)
E Overhead &profit 10%XD
F Harga Satuan Pekerjaan (D+F)

2 KORIDOR LANTAI DUA

1M2 Pemasangan Partisi Dua Sisi Multipleks Lapis HPL


HARGA SATUAN
NO URAIAN SATUAN KOEFISIEN
(RP)
1 2 4 5
A TENAGA
1 Pekerja OH 0.80 Rp 95,000.00
2 Tukang Kayu OH 1.00 Rp 180,000.00
3 Tukang HPL OH 2.20 Rp 180,000.00
4 Kepala Tukang OH 0.0900 Rp 200,000.00
5 Mandor OH 0.0450 Rp 110,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Multipleks T 8mm M2 4.004 Rp 47,138.05
2 Multipleks T 15 mm M 2
2.200 Rp 85,069.44
3 Paku Peluru Ramset Dos 0.200 Rp 60,000.00
4 HPL M2 2.39 Rp 60,606.06
5 Lem Fox Kg 0.700 Rp 48,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Peralatan


D Jumlah (A+B+C)
E Overhead &profit 10%XD
F Harga Satuan Pekerjaan (D+F)

1M2 Pemasangan Kaca


HARGA SATUAN
NO URAIAN SATUAN KOEFISIEN
(RP)
1 2 4 5
A TENAGA
1 Pekerja OH 0.017 Rp 85,000.00
2 Tukang OH 0.170 Rp 130,000.00
3 Kepala Tukang OH 0.017 Rp 150,000.00
6 Mandor OH 0.001 Rp 110,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Kaca 5mm M2 1.100 Rp 350,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Peralatan


D Jumlah (A+B+C)
E Overhead &profit 10%XD
F Harga Satuan Pekerjaan (D+F)
ALISIS HARGA SATUAN
RETARIAT

ANTAI SATU

JUMLAH
6

Rp 152,000.00
Rp 288,000.00
Rp 432,000.00
Rp 32,000.00
Rp 8,800.000
Rp 912,800.00

Rp 1,546,649.83
Rp 557,630.21
Rp 3,804,242.42
Rp 90,000.00
Rp 855,000.000
Rp 144,000.00
Rp 6,997,522.46

Rp 7,910,322.464
Rp 791,032.25
Rp 8,701,354.711

JUMLAH
6

Rp 76,000.000
Rp 180,000.000
Rp 324,000.000
Rp 18,000.000
Rp 4,950.000
Rp 602,950.000

Rp 103,703.70
Rp 93,576.389
Rp 30,000.000
Rp 133,333.333
Rp 16,800.000
Rp 377,413.43

-
Rp 980,363.426
Rp 98,036.34
Rp 1,078,399.769
HPL
JUMLAH
6

Rp 76,000.00
Rp 180,000.00
Rp 396,000.00
Rp 18,000.00
Rp 4,950.00
Rp 674,950.00

Rp 188,740.74
Rp 187,152.778
Rp 12,000.00
Rp 144,848.485
Rp 33,600.000
Rp 566,342.00

Rp 1,241,292.00
Rp 124,129.20
Rp 1,365,421.20

HPL
JUMLAH
6

Rp 76,000.00
Rp 180,000.00
Rp 396,000.00
Rp 18,000.00
Rp 4,950.00
Rp 674,950.00

Rp 188,740.74
Rp 187,152.778
Rp 12,000.00
Rp 144,848.485
Rp 33,600.000
Rp 566,342.00
Rp 1,241,292.00
Rp 124,129.20
Rp 1,365,421.20

JUMLAH
6

Rp 1,445.00
Rp 22,100.00
Rp 2,550.00
Rp 110.00
Rp 26,205.00

Rp 385,000.00
Rp 385,000.00

Rp 411,205.00
Rp 41,120.50
Rp 452,325.50
DAFTAR UPAH KERJA DAN HARGA BAHAN

Upah Kerja
No. JENIS JABATAN
Harga Satuan
A. UPAH KERJA
1 Pekerja Rp 95,000.00 Oh
2 Tukang HPL Rp 180,000.00 Oh
3 Tukang Kayu Rp 180,000.00 Oh
4 Tukang Rp 180,000.00 Oh
5 Kepala Tukang Rp 200,000.00 Oh
6 Mandor Rp 110,000.00 Oh

B. BAHAN
1 Amplas 80 Rp 10,000.00 M1
2 Cat dasar Rp 25,000.00 Kg
3 Engsel pintu Rp 54,000.00 Bh
4 Engsel Sendok Hidrolic Rp 100,000.00 Psg
5 Tarikan pintu huben Ex. Huben Rp 35,000.00 Bh
6 High pressure laminate (HPL) Ex. Taco Rp 60,606.1 M2
7 Kaca 5 mm' Rp 350,000.00 M2
8 Kunci dan handle set pintu stanlees Rp 180,000.- Set
9 Kunci dan handle tanam Rp 150,000.- Set
10 Kunci selot Rp 30,000.- Bh
11 Lem fox 168 Rp 48,000.- Kg
12 Lem wallpaper Rp 60,000.- Bks
13 List gypsum profile Rp 23,000.- M1
14 List stanlees 15 mm Rp 50,000.- M1
15 Standing Stainlees Rp 40,000.- Bh
16 Lampu sorot Rp 300,000.- Bh
17 Multipleks 15mm Rp 85,069.4 M2
18 Multipleks 12mm Rp 62,289.6 M2
19 Multipleks 8 mm Rp 47,138.- M2
20 Paku Peluru Ramset Rp 60,000.- Dos
21 Sunblast Rp 150,000.- M1
22 Wallpaper Rp 43,333.3 M1
R UPAH KERJA DAN HARGA BAHAN

Upah Kerja
Harga Satuan

Rp 13,571.43 Jam
Rp 25,714.29 Jam
Rp 25,714.29 Jam
Rp 25,714.29 Jam
Rp 28,571.43 Jam
Rp 15,714.29 Jam

Rp 180,000.- Lbr

Rp 480,000.- Klg/10 Kg

Rp 150,000.- Btg/3 Mtr

Rp 245,000.- Lbr
Rp 185,000.- Lbr
Rp 140,000.- Lbr

Rp 650,000.- Roll/15 Mtr