Anda di halaman 1dari 5

BOQ Restaurant

Urban Oak
Design & Décor
Sarjapur Road Phone: (+91) 9535048048

Bangalore E-mail: urbanoak7@gmail.com


560102
Statement

Statement #: C7016 Bill To: Name Suman Reddy


Date: October 7, 2014 Company Restaurant
Name
Customer ID: Suman Reddy # Nagwara junction

A CIVIL WORKS

Sr.No. Description Nos. Unit Quantity Amount


Walls Demolition & As per
Disposal of site
debris. Removal condit
of plastering ion

Walls
Wall Cladding SFT 1244 1,18,180.00
brick
reception Reception table included in brick
table and back cladding
elevation
cladding

counter Buffet Counter included in brick


brick base cladding

Ceiling Demolition & As per site condition


Disposal of
debris. Removal
of Pop

Bathrooms Dado Tiling 5ft As per site condition


flooring Demolition & As per site condition
Disposal of
debris. Removal
of Tiles

B ELECTRICAL
WORKS
Sr.No. Description Nos. Unit Quantity Amount
Electrical Wiring, 84,000
chipping for
rerouting of
wires as per
design
requirement.

Switches and included above


MCB
AC Provision as per space
requirement
Speaker wiring as per client system

Camera as per client request


provision
C PAINTING
WORKS
Sr.No. Description Nos. Unit Quantity Amount
Industrial spray 6,000.00
painting for
metal art
Tandoor outer 48,000.00
and inside mud
texture and
paint

Bathroom not included


Painting
external walls not included
Wall treatment included in tandoor
for weather design
proofing and
termite
resistance
mud/tandoor
area
D LIGHTING
WORKS
Sr.No. Description Nos. Unit Quantity Amount
high cct and
low cri
recommened
lights

Ceiling lights all included in light


works
Ambience all included in light
lighting works
tandoor mud all included in light
wall lights works
Focus lights all included in light 1,20,000
works
E GLASS WORK

Sr.No. Description Nos. Unit Quantity Amount

Plain glass sft 377 1,38,025


12mm
toughened+ 2
glass doors

F FLOORING
Sr.No. Description Nos. Unit Quantity Amount
Black stone with sft 1050 58,080.00
random
designing
Demolition & not included
Disposal of
debris. Removal
of granite

Steps at included
entrance
Demolition & not included
Disposal of
debris for steps.
G METAL ART
WORK
Sr.No. Description Nos. Unit Quantity Amount
Metal art sft 348 1,44,000.00
sculture 2d
Metal panel included
support above
structure

H SEATING AND
TABLES
Sr.No. Description Nos. Unit Quantity Amount
Tables 15 1,23,792.00
Seating 54 2,68,800.00
Reception 1 24,000.00
Buffet Table included in tables
Stone
I CEILING
Sr.No. Description Nos. Unit Quantity Amount
3D box rendered sft 1050 69,600.00
finish

J WOOD
Sr.No. Description Nos. Unit Quantity Amount
Textured sft 335 1,39,860.00
Wooden wall
paneling
Tandoor Door included in glass

Wood treatment included above


for termite
resistance

Kitchen entrance included in glass


door
bathroom doors 2 30,000.00

K SANITARY
Sr.No. Description Nos. Unit Quantity Amount
Wash Basin 2 6,000.00
Comode 2 30,000.00
Urinal Male 1 3,000.00
Sanitary fittings 11,000.00
necessary
Mirror included in glass

L ANCILLARY
Sr.No. Description Nos. Unit Quantity Amount
Designer lights included in light
section
Artifacts as per 15 60,000.00
design
requirements
Cameras for not included
Hall dvr 4
channel 1tb HD

Decorative 10,000.00
plants as per
design
Pebble bay not included
outside
Pathway décor not included
Outside

GRAND 14,92,336.81
TOTAL